Loading...
ADDENDUM 1, GARVEY PARK RESTROOM RENOVATION (31017), 8-14-19CITY OF ROSEMEAD CALIFORNIA ADDENDUM #1 CONTRACT DOCUMENTS SPECIFICATIONS AND STANDARD DRAWINGS FOR GARVEY PARK RESTROOM RENOVATION PROJECT PROJECT No. 31017 FUNDED BY CDBG FISCAL YEAR 2019-2020 IN THE CITY OF ROSEMEAD PUBLIC WORKS DEPARTMENT, ENGINEERING DIVISION 8838 E. VALLEY BOULEVARD ROSEMEAD, CA 91770 TELEPHONE: (626) 569-2150 FAX: (626) 307-9218 DATE ISSUED: WEDNESDAY, AUGUST 14, 2019 City of Rosemead, California Addendum 1, Garvey Park Restroom Renovation Project, Project No. 31017 Document Control Page 1 of 5 Addendum 1, Page 1 Addendum for: GARVEY PARK RESTROOM RENOVATION PROJECT PROJECT NO. 31017 FUNDED BY CDBG Addendum No.: 1 Addendum Date: AUGUST 14, 2019 Issued by: City of Rosemead Okan Demirci, PE, CIP Project Manager Reminder 1: Please sign Addenda Acknowledgement on page CBF-5 of Bid Package Section Titled “CONTRACT BID FORMS”. Entire Section “CONTRACT BID FORMS” including Federal Forms from Appendix A shall be submitted as Bidder’s Proposal. Reminder 2: Bid due date is not changed. Bid due date is 10:30 am, on August 27, 2019. This Addendum 1 replaces Bid Package, Appendix B, Plans, Sheets S-1 and S-2. See Attachment 1 – Revised Sheets S-1 and S-2. All other parts of CONTRACT DOCUMENTS, SPECIFICATIONS AND STANDARD DRAWINGS, not impacted by Addendum 1 remain unchanged. Attachments: Attachment 1 – Revised Sheets S-1 and S-2 City of Rosemead, California Addendum 1, Garvey Park Restroom Renovation Project, Project No. 31017 Document Control Page 2 of 5 Attachment 1 – Revised Sheets S-1 and S-2 City of Rosemead, California Addendum 1, Garvey Park Restroom Renovation Project, Project No. 31017 Document Control Page 3 of 5 6 S-2 S2 7 OFFICE OFFICE S2 2 TYP. 6 S-2 5 S-2 TYP. WALL LEGEND TYP. 5 S-2 OFFICE OFFICE S2 9 PLANS PREPARED BY:ECEngineers, Inc.JCONSULTING CIVIL ENGINEERS15859 EDNA PL., SUITE 101IRWINDALE, CA. 91706(626) 960-0152 / (626) 960-9002 FAXCivil EngineersLand SurveyorsLand PlannersS1 ANCHOR BOLTS NOTEFOUNDATION LEGEND FOUNDATION NOTES ANCHOR BOLTS NOTEFOUNDATION NOTES FOUNDATION PLAN ROOF AND FRAMING PLAN FRAMING NOTES AND LEGEND City of Rosemead, California Addendum 1, Garvey Park Restroom Renovation Project, Project No. 31017 Document Control Page 4 of 5 5 3SCREED 2 PLASTER EXPAN, JOINT 1 TOP VIEW 4 INTERIOR WALL @ SLAB TYPICAL NON-BEARING 6 7WINDOW OPENING CLOSURE 8 SUSPENDED GYP. BD. CEILING T-BAR CEILING NOTES (CONT): CEILING STRUT DETAIL T-BAR CEILING NOTES: WIRE ANCHORS ATTACHED JOINT UNATTACHED JOINT SUSPENDED (T - BAR ) CEILING FIRE SPRINKLER TYPICAL INSTALLATION PENDANT FIXTURE TYPICAL INSTALLATION OPTION 1 COMPRESSION STRUT CONNECTION TO TIMBER STRUCTURE OPTION 2 NOT USED POST BEAM CONNECTION WALL REINFORCEMENT FOUNDATION PLAN VIEW SECTION VIEW NOTE: 9CONCRETE BEAM REINFORCEMENT - 9 S-2PLANS PREPARED BY:ECEngineers, Inc.JCONSULTING CIVIL ENGINEERS15859 EDNA PL., SUITE 101IRWINDALE, CA. 91706(626) 960-0152 / (626) 960-9002 FAXCivil EngineersLand SurveyorsLand PlannersCity of Rosemead, California Addendum 1, Garvey Park Restroom Renovation Project, Project No. 31017 Document Control Page 5 of 5