ADDENDUM 1, GARVEY PARK RESTROOM RENOVATION (31017), 8-14-19CITY OF ROSEMEAD
CALIFORNIA
ADDENDUM #1
CONTRACT DOCUMENTS
SPECIFICATIONS AND STANDARD DRAWINGS
FOR
GARVEY PARK RESTROOM RENOVATION PROJECT
PROJECT No. 31017
FUNDED BY CDBG
FISCAL YEAR 2019-2020
IN THE CITY OF ROSEMEAD
PUBLIC WORKS DEPARTMENT, ENGINEERING DIVISION
8838 E. VALLEY BOULEVARD
ROSEMEAD, CA 91770
TELEPHONE: (626) 569-2150 FAX: (626) 307-9218
DATE ISSUED: WEDNESDAY, AUGUST 14, 2019
City of Rosemead, California Addendum 1, Garvey Park Restroom Renovation Project, Project No. 31017 Document Control Page 1 of 5
Addendum 1, Page 1
Addendum for: GARVEY PARK RESTROOM RENOVATION PROJECT
PROJECT NO. 31017
FUNDED BY CDBG
Addendum No.: 1
Addendum Date: AUGUST 14, 2019
Issued by: City of Rosemead
Okan Demirci, PE, CIP Project Manager
Reminder 1: Please sign Addenda Acknowledgement on page CBF-5 of Bid Package Section
Titled “CONTRACT BID FORMS”. Entire Section “CONTRACT BID
FORMS” including Federal Forms from Appendix A shall be submitted as
Bidder’s Proposal.
Reminder 2: Bid due date is not changed. Bid due date is 10:30 am, on August 27, 2019.
This Addendum 1 replaces Bid Package, Appendix B, Plans, Sheets S-1 and S-2. See Attachment 1 –
Revised Sheets S-1 and S-2.
All other parts of CONTRACT DOCUMENTS, SPECIFICATIONS AND STANDARD
DRAWINGS, not impacted by Addendum 1 remain unchanged.
Attachments:
Attachment 1 – Revised Sheets S-1 and S-2
City of Rosemead, California Addendum 1, Garvey Park Restroom Renovation Project, Project No. 31017 Document Control Page 2 of 5
Attachment 1 – Revised Sheets S-1 and S-2
City of Rosemead, California Addendum 1, Garvey Park Restroom Renovation Project, Project No. 31017 Document Control Page 3 of 5
6
S-2
S2
7
OFFICE
OFFICE
S2
2
TYP.
6
S-2
5
S-2 TYP.
WALL LEGEND
TYP.
5
S-2
OFFICE
OFFICE
S2
9
PLANS PREPARED BY:ECEngineers, Inc.JCONSULTING CIVIL ENGINEERS15859 EDNA PL., SUITE 101IRWINDALE, CA. 91706(626) 960-0152 / (626) 960-9002 FAXCivil EngineersLand SurveyorsLand PlannersS1
ANCHOR BOLTS NOTEFOUNDATION LEGEND FOUNDATION NOTES ANCHOR BOLTS NOTEFOUNDATION NOTES
FOUNDATION PLAN
ROOF AND FRAMING PLAN
FRAMING NOTES AND LEGEND
City of Rosemead, California Addendum 1, Garvey Park Restroom Renovation Project, Project No. 31017 Document Control Page 4 of 5
5
3SCREED
2
PLASTER EXPAN, JOINT
1
TOP VIEW
4
INTERIOR WALL @ SLAB
TYPICAL NON-BEARING 6
7WINDOW OPENING CLOSURE
8
SUSPENDED GYP. BD. CEILING
T-BAR CEILING NOTES (CONT):
CEILING STRUT DETAIL
T-BAR CEILING NOTES:
WIRE ANCHORS
ATTACHED JOINT UNATTACHED JOINT
SUSPENDED (T - BAR ) CEILING
FIRE SPRINKLER TYPICAL INSTALLATION
PENDANT FIXTURE TYPICAL INSTALLATION
OPTION 1
COMPRESSION STRUT CONNECTION
TO TIMBER STRUCTURE
OPTION 2
NOT USED POST BEAM CONNECTION
WALL REINFORCEMENT
FOUNDATION PLAN VIEW
SECTION VIEW
NOTE:
9CONCRETE BEAM REINFORCEMENT
-
9
S-2PLANS PREPARED BY:ECEngineers, Inc.JCONSULTING CIVIL ENGINEERS15859 EDNA PL., SUITE 101IRWINDALE, CA. 91706(626) 960-0152 / (626) 960-9002 FAXCivil EngineersLand SurveyorsLand PlannersCity of Rosemead, California Addendum 1, Garvey Park Restroom Renovation Project, Project No. 31017 Document Control Page 5 of 5