NIB No. 2020-03 - Garvey Park Gym Cooling Additions - Project No. 31019
CITY OF ROSEMEAD
NOTICE INVITING BIDS
NIB No. 2020-03
NOTICE IS HEREBY GIVEN that the CITY OF ROSEMEAD, California, will receive sealed
bids up to 10:30 o’clock a.m. on Wednesday, the 18th day of March, and they will be publicly
opened at 11:00 a.m. for
GARVEY PARK GYM COOLING ADDITION
PROJECT No. 31019
The project consists of the installation of cooling addition of the existing Garvey Park Gym building
located at 7933 Emerson Place, Rosemead, CA 91770 and consists of new cooling system, electrical,
fixtures, framing, and landscaping as indicated in the appendix and other related work as described in
the Plans, Specifications, and Contract Documents, by this reference, made a part hereof.
The engineer’s estimate for this project is $240,000. The successful bidder shall have SIXTY (60)
working days to complete the work. Liquidated damages shall be $500.00 per working day.
Plans, Specifications, and Contract Documents may be obtained at the office of the City Clerk of the
CITY OF ROSEMEAD, 8838 E. Valley Boulevard, Rosemead, California 91770, (626) 569-2177, for
a non-refundable charge of $25.00 and $40.00 if mailing is requested. All prospective bidders must
register with the office of the City Clerk’s in order for your bid to be considered responsive.
SB 854 Requirements:
This project is subject to the requirements of SB 854. No prime contractor or subcontractor may be
listed on a bid proposal for a public works project unless registered and qualified with the Department
of Industrial Relations pursuant to Labor Code section 1725.5. No prime contractor or subcontractor
may be awarded a contract for public work on a public works project unless registered and qualified
with the Department of Industrial Relations pursuant to Labor Code section 1725.5. This project is
subject to compliance monitoring and enforcement by the Department of Industrial Relations. The bid
proposal must include a print out from the DIR registration website showing that the prime contractor
and each subcontractor is currently registered and qualified. No bid proposals will be accepted nor any
contract entered into with a prime contractor without proof of registration as required above. [Unless
within the limited exceptions from this requirement for bid proposals only under Labor Code Section
1771.1(a)]
MAYOR:
MARGARET CLARK
MAYOR PRO TEM:
SANDRA ARMENTA
COUNCIL MEMBERS:
SEAN DANG
POLLY LOW
STEVEN LY
City of Rosemead
8838 E. VALLEY BOULEVARD P.O BOX 399
ROSEMEAD, CALIFORNIA 91770
TELEPHONE (626) 569-2100
FAX (626) 307-9218
Each bid must be accompanied by a bidder’s security in an amount not less than 10% of the amount of
the bid, as a guarantee that the bidder will, if awarded the Contract, enter into a satisfactory agreement
and provide a Performance Bond and a Payment Bond, each not less than 100% of the total amount of
the bid price.
No bidder may withdraw his bid for a period of sixty-one (61) days after the above bid opening date.
FEDERAL CONTRACT PROVISIONS FOR COMMUNITY DEVELOPMENT BLOCK GRANT
Prevailing Wages Statement:
“This project is funded in whole or in part with Community Development Block Grant (CDBG) funds
provided by the U.S. Department of Housing and Urban Development (HUD). Federal Labor Standards
Provisions, including prevailing wage requirements of the Davis-Bacon and Related Acts will be
enforced.” The current Federal Wage Decision” is the one in effect 10-days prior to the bid opening
date and can be found on-line at http://www/dol.gov. In the event of a conflict between Federal and
State wage rates, the higher of the two will prevail.”
Payrolls and basic records. Payrolls and basic records relating thereto shall be maintained by the
contractor during the course of the work preserved for a period of five (5) years thereafter for all laborers
and mechanics working at the site of the work. The contractor or subcontractor shall make the records
required under subparagraph A.3.(i) of HUD 4010 available for inspection, copying, or transcription by
authorized representatives of HUD or its designee or the Department of Labor, and shall permit such
representatives to interview employees during working hours on the job. If the contractor or
subcontractor fails to submit the required records or to make them available, HUD or its designee may,
after written notice to the contractor, sponsor, applicant or owner, take such action as may be
necessary to cause the suspension of any further payment, advance, or guarantee of funds. Furthermore,
failure to submit the required records upon request or to make such records available may be grounds
for debarment action pursuant to 29 CFR 5.12.
Conflict of Interest Statement:
No employee, officer or agent of the sub-recipient shall participate in selection, or in the award
administration of a contract supported by Federal funds if a conflict of interest, real or apparent, would
be involved. Refer to: 24 CFR 85.36 [Non-Profit Organizations – 24 CFR 84.4], OMB Circular A-110,
and 24 CFR 570.611, respectively, shall apply.
Section 3 Statement:
This is a HUD Section 3 covered construction contract. A bid preference may be given to a bidder who
provides a reasonable bid (within the Zone of Consideration) and is a qualified Section 3 Business
Concern.
Federal and State Contractor Eligibility Check:
Prior to awarding a contract, contractor verification will be performed through the California
Department of Industrial Relations at http://www.cslb.ca.gov, http://efiling.dir.ca.gov, and eligibility
at http://www.dir.ca.gov/dsle/debar.html and excluded parties list at the federal System for Award
Management (SAM) website http://www.sam.gov.
The CITY OF ROSEMEAD will affirmatively ensure the disadvantaged business enterprises will be
afforded full opportunity to submit bids in response to this invitation and will not be discriminated
against on the grounds of race, color, disability, sex or national origin in the consideration for an award.
Any contract entered into pursuant to this notice will incorporate the provisions of the State Labor
Code. Compliance with the prevailing rates of wage and apprenticeship employment standards
established by the State Director of Industrial Relations will be required.
Bidders shall be licensed in accordance with the provision of Chapter 9, Division 111 of the Business
and Professions Code of the State of California. Bidder shall have a Class “B” license in good standing
at the time Bids are received.
Retention of Records Relevant to Audits and Reviews:
The Contractor and subcontractors working in the City of Rosemead must retain records pertaining to
said project for a minimum of five (5) years. Record to be retained include but not limited to documents
regarding payroll, change orders, field directives, as-built plans, etc.
The Council reserves the right to reject any and all bids and to waive any informality, technical defect,
or minor irregularity in any bid submitted.
An award of service shall not be final until the bids have been reviewed and a Contract Agreement
with the City has been signed by the lowest responsible bidder and by the City.
Award of Contract Agreement is proposed for April 28, 2020.
Dated this 27th day of February,2020.
________________________________
Ericka Hernandez
City Clerk
Publish: February 27th & March 5th, 2020.