Loading...
PC - Item 3A - Exhibit E - Appendix F - Garvey Walnut Grove Mixed Use Traffic ReportTra!c Engineering # Transporta%on Planning # Parking # Noise & Vibra%on Air Quality # Global Climate Change # Health Risk Assessment GARVEY WALNUT MIXED USE PROJECT TRAFFIC IMPACT ANALYSIS City of Rosemead May 3, 2021 prepared by Bryan Crawford Giancarlo Ganddini, PE, PTP GANDDINI GROUP, INC. 550 Parkcenter Drive, Suite 202 Santa Ana, California 92705 714.795.3100 | ganddini.com Project No. 19302 GARVEY WALNUT MIXED USE PROJECT TRAFFIC IMPACT ANALYSIS City of Rosemead May 3, 2021 Garvey Walnut Mixed Use Project Traffic Impact Analysis i 19302 TABLE OF CONTENTS EXECUTIVE SUMMARY 1. INTRODUCTION .................................................................................................................................................... 3 Project Description .......................................................................................................................................................... 3 Study Area ......................................................................................................................................................................... 3 Analysis Scenarios ........................................................................................................................................................... 3 2. METHODOLOGY ................................................................................................................................................... 6 Intersection Capacity Utilization .................................................................................................................................. 6 Intersection Delay Methodology ................................................................................................................................. 6 Performance Standards .................................................................................................................................................. 7 Need for Improvements ................................................................................................................................................. 7 3. EXISTING CONDITIONS ...................................................................................................................................... 8 Existing Roadway System .............................................................................................................................................. 8 Pedestrian Facilities ......................................................................................................................................................... 8 Bicycle Routes .................................................................................................................................................................. 8 Transit Facilities ................................................................................................................................................................ 8 General Plan Context ..................................................................................................................................................... 8 Existing Traffic Volumes ................................................................................................................................................ 9 Existing Intersection Level of Service......................................................................................................................... 9 4. PROJECT FORECASTS ....................................................................................................................................... 21 Project Description ....................................................................................................................................................... 21 Project Design Features .............................................................................................................................................. 21 Project Trip Generation .............................................................................................................................................. 21 Other Factors Affecting Trip Generation ............................................................................................................... 21 Project Trip Distribution and Assignment .............................................................................................................. 22 Transit Trip Generation ............................................................................................................................................... 22 5. FUTURE VOLUME FORECASTS ...................................................................................................................... 33 Other Development ..................................................................................................................................................... 33 Ambient Growth ........................................................................................................................................................... 33 Analysis Scenario Volume Forecasts ....................................................................................................................... 33 Existing Plus Project ......................................................................................................................................... 33 Opening Year (2022) Without Project ........................................................................................................ 33 Opening Year (2022) With Project............................................................................................................... 33 6. FUTURE OPERATIONAL ANALYSIS ............................................................................................................... 48 Existing Plus Project ..................................................................................................................................................... 48 Intersection Levels of Service ........................................................................................................................ 48 Operational Impact Evaluation ...................................................................................................................... 48 Opening Year (2022) Without Project .................................................................................................................... 48 Intersection Levels of Service ........................................................................................................................ 48 Opening Year (2022) With Project .......................................................................................................................... 48 Intersection Levels of Service ........................................................................................................................ 48 Operational Impact Evaluation ...................................................................................................................... 48 7. SITE ACCESS AND CIRCULATION .................................................................................................................. 54 Project Design Features .............................................................................................................................................. 54 Community Hall Operations ...................................................................................................................................... 54 Garvey Walnut Mixed Use Project Traffic Impact Analysis ii 19302 Queueing Analysis ........................................................................................................................................................ 55 On-Site Parking ............................................................................................................................................................. 56 Trash Truck Circulation ............................................................................................................................................... 56 Truck Access Points and Turning Templates ......................................................................................................... 57 Truck Delivery Schedule ............................................................................................................................................. 57 On-Site Vehicular Stacking......................................................................................................................................... 57 8. CONGESTION MANAGEMENT PROGRAM ................................................................................................. 65 Criteria for Requiring a Traffic Impact Analysis for CMP ................................................................................... 65 CMP Transit Impact Review ...................................................................................................................................... 65 9. VEHICLE MILES TRAVELED (VMT) ................................................................................................................. 67 Background .................................................................................................................................................................... 67 Screening Criteria ......................................................................................................................................................... 67 10. CONCLUSIONS .................................................................................................................................................... 68 Forecast Levels of Service .......................................................................................................................................... 68 Congestion Management Program .......................................................................................................................... 68 Site Access and Circulation ........................................................................................................................................ 68 VMT Evaluation ............................................................................................................................................................. 68 APPENDICES Appendix A Glossary Appendix B Scoping Agreement Appendix C Volume Count Worksheets Appendix D Level of Service Worksheets LIST OF TABLES Table 1. Existing Intersection Level of Service .......................................................................................................... 11 Table 2. Project Trip Generation ................................................................................................................................... 23 Table 3. Other Development Trip Generation .......................................................................................................... 34 Table 4. Existing Plus Project Intersection Level of Service .................................................................................. 49 Table 5. Existing Plus Project Operational Impact Evaluation ............................................................................... 50 Table 6. Opening Year (2022) Without Project Intersection Level of Service ................................................. 51 Table 7. Opening Year (2022) With Project Intersection Level of Service ........................................................ 52 Table 8. Opening Year (2022) With Project Operational Impact Evaluation .................................................... 53 Table 9. Queuing Analysis Summary ............................................................................................................................ 58 Table 10. Opening Year (2022) With Project Intersection Level of Service – With Driveway Restrictions ......................................................................................................................................................... 59 Garvey Walnut Mixed Use Project Traffic Impact Analysis iii 19302 LIST OF FIGURES Figure 1. Project Location Map .......................................................................................................................................... 4 Figure 2. Site Plan .................................................................................................................................................................. 5 Figure 3. Existing Lane Geometry and Intersection Traffic Controls .................................................................... 12 Figure 4. Existing Pedestrian Facilities .......................................................................................................................... 13 Figure 5. City of Rosemead Existing Bicycle Routes and Potential Future Routes ........................................... 14 Figure 6. Foothill Transit System Map .......................................................................................................................... 15 Figure 7. Los Angeles County Metropolitan Transportation Authority System Map ....................................... 16 Figure 8. City of Rosemead Circulation Plan ............................................................................................................... 17 Figure 9. Existing Average Daily Traffic Volumes ...................................................................................................... 18 Figure 10. Existing AM Peak Hour Intersection Turning Movement Volumes ..................................................... 19 Figure 11. Existing PM Peak Hour Intersection Turning Movement Volumes ..................................................... 20 Figure 12. Project Outbound Trip Distribution - Residential .................................................................................... 24 Figure 13. Project Inbound Trip Distribution – Residential ....................................................................................... 25 Figure 14. Project Outbound Trip Distribution - Office ............................................................................................. 26 Figure 15. Project Inbound Trip Distribution - Office ................................................................................................. 27 Figure 16. Project Outbound Trip Distribution – Retail/Restaurant ....................................................................... 28 Figure 17. Project Inbound Trip Distribution – Retail/Restaurant ........................................................................... 29 Figure 18. Project Average Daily Traffic Volumes ....................................................................................................... 30 Figure 19. Project AM Peak Hour Intersection Turning Movement Volumes ...................................................... 31 Figure 20. Project PM Peak Hour Intersection Turning Movement Volumes ...................................................... 32 Figure 21. Other Development Location Map .............................................................................................................. 35 Figure 22. Other Development Average Daily Traffic Volumes ............................................................................... 36 Figure 23. Other Development AM Peak Hour Intersection Turning Movement Volumes ............................. 37 Figure 24. Other Development PM Peak Hour Intersection Turning Movement Volumes .............................. 38 Figure 25. Existing Plus Project Average Daily Traffic Volumes ............................................................................... 39 Figure 26. Existing Plus Project AM Peak Hour Intersection Turning Movement Volumes ............................. 40 Figure 27. Existing Plus Project PM Peak Hour Intersection Turning Movement Volumes.............................. 41 Figure 28. Opening Year (2022) Without Project Average Daily Traffic Volumes .............................................. 42 Figure 29. Opening Year (2022) Without Project AM Peak Hour Intersection Turning Movement Volumes ............................................................................................................................................................... 43 Figure 30. Opening Year (2022) Without Project PM Peak Hour Intersection Turning Movement Volumes ............................................................................................................................................................... 44 Figure 31. Opening Year (2022) With Project Average Daily Traffic Volumes .................................................... 45 Figure 32. Opening Year (2022) With Project AM Peak Hour Intersection Turning Movement Volumes ............................................................................................................................................................... 46 Figure 33. Opening Year (2022) With Project PM Peak Hour Intersection Turning Movement Volumes ............................................................................................................................................................... 47 Figure 34. Trash Truck Circulation - Inbound ................................................................................................................ 60 Figure 35. Trash Truck Circulation - Outbound ............................................................................................................ 61 Figure 36. Truck Turning Templates – Inbound ............................................................................................................ 62 Figure 37. Truck Turning Templates - Outbound ......................................................................................................... 63 Figure 38. On-Site Stacking for Outbound Vehicles ................................................................................................... 64 Garvey Walnut Mixed Use Project Traffic Impact Analysis 1 19302 EXECUTIVE SUMMARY The purpose of this Traffic Impact Analysis is to provide an assessment of traffic operations resulting from development of the proposed Garvey Walnut Mixed Use Project and to identify measures necessary to mitigate potentially significant traffic impacts. This report analyzes traffic impacts for the anticipated project opening year in Year 2022. Although this is a technical report, effort has been made to write the report clearly and concisely. A glossary is provided in Appendix A to assist the reader with terms related to transportation engineering. Project Description The project site is located at the northwest corner of Walnut Grove Avenue and Garvey Avenue in the City of Rosemead. The project site is currently occupied with office land uses. The project is proposing to develop the site with 42 condominium dwelling units, 5,470 square feet of office, 5,500 square feet of community hall (plus 1,272 square feet storage area), 1,130 square feet of café/food service, 5,274 square feet of retail/service and ancillary uses including a recreation room, gym, library, and manager’s office. As a project design feature, the project is proposing full access to Walnut Grove Avenue. The proposed project is anticipated to be constructed and fully operational by year 2022. Existing Conditions The study intersections currently operate at Levels of Service C or better during the peak hours for Existing conditions (see Table 1). Project Trips The proposed project is forecast to generate a total of approximately 1,009 daily trips, including 143 trips during the AM peak hour and 65 trips during the PM peak hour (see Table 2). Forecast Levels of Service The proposed project is forecast to result in no Level of Service operational impacts at the off-site study intersections during the weekday AM and PM peak hours for the scenarios evaluated. Congestion Management Program The proposed project would result in no operational CMP impact as it does not meet the thresholds requiring a traffic impact analysis for CMP purposes and no further CMP analysis is warranted. A transit impact review was conducted for compliance with the CMP requirements and found that the proposed project is forecast to have a nominal impact on transit service. Site Access and Circulation The proposed project shall construct the following improvements as project design features to provide project site access: ▪ Construct the Walnut Grove Avenue (NS) at Project Driveway (EW) to provide one inbound lane and one outbound lane with eastbound stop-control and the following lane configurations: 1 Garvey Walnut Mixed Use Project Traffic Impact Analysis 2 19302 □ Northbound: two through lanes □ Southbound: one through lane and shared through/right turn lane □ Eastbound: one shared left/ right turn lane □ Westbound: not applicable Operational Improvements No off-site operational improvements were identified since the proposed project is forecast to result in no operational traffic impact at the off-site study intersections for the scenarios analyzed. VMT Assessment The proposed project satisfies the screening criteria for low-VMT area and may be presumed to result in a less than significant VMT impact in accordance with City of Rosemead VMT guidelines. 2 Garvey Walnut Mixed Use Project Traffic Impact Analysis 3 19302 1. INTRODUCTION This section describes the purpose of this traffic impact analysis, project location, proposed development, and study area. Figure 1 shows the project location map. Figure 2 illustrates the project site plan. PROJECT DESCRIPTION The project site is located at the northwest corner of Walnut Grove Avenue and Garvey Avenue in the City of Rosemead. The project site is currently occupied with office land uses. The project is proposing to develop the site with 42 condominium dwelling units, 5,470 square feet of office, 5,500 square feet of community hall (plus 1,272 square feet storage area), 1,130 square feet of café/food service, 5,274 square feet of retail/service and ancillary uses including a recreation room, gym, library, and manager’s office. Vehicular access is proposed at Walnut Grove Avenue. The proposed project is anticipated to be constructed and fully operational by year 2022. STUDY AREA Based on the study intersections identified in the approved scoping agreement (Appendix B), the study area consists of the following study intersections within the City of Rosemead: Study Intersections Jurisdiction 1. I-10 Eastbound Ramps (NS) at Hellman Avenue (EW) Caltrans 2. Walnut Grove Avenue (NS) at Hellman Avenue (EW) Rosemead 3. Walnut Grove Avenue (NS) at Project Driveway (EW) Rosemead 4. Walnut Grove Avenue (NS) at Garvey Avenue (EW) Rosemead ANALYSIS SCENARIOS According to the preliminary review of the scoping agreement by the City of Rosemead (see Appendix B, the following traffic conditions shall be included in a traffic impact analysis: a) Existing Conditions; b) Existing Plus Project Conditions; c) Opening Year (Existing + Growth Factor + Cumulative Projects) Conditions; and d) Opening Year Plus Project Conditions Accordingly, the following scenarios are analyzed during typical weekday AM and PM peak hour conditions (with mitigation as necessary): ▪ Existing Conditions ▪ Existing Plus Project Conditions ▪ Opening Year (2022) Without Project Conditions ▪ Opening Year (2022) With Project Conditions 3 Figure 1 Project Location Map Garvey Walnut Mixed Use ProjectTraffic Impact Analysis 19302 N 10 WILLARD AVEWALNUT GROVE AVEBURTON AVELA PRESA AVE GARVEY AVE HELLMAN AVE 1 2 4 Site Study Intersection Legend # 3 4 Figure 2 Site Plan N Garvey Walnut Mixed Use ProjectTraffic Impact Analysis 193025 Garvey Walnut Mixed Use Project Traffic Impact Analysis 6 19302 2. METHODOLOGY This section discusses the analysis methodologies used to assess transportation facility performance as adopted by the respective jurisdictional agencies. INTERSECTION CAPACITY UTILIZATION In accordance with City of Rosemead guidelines, analysis of signalized intersections is based on the Intersection Capacity Utilization (ICU) methodology. The ICU methodology compares the volume of traffic using the intersection to the capacity of the intersection. The resulting volume-to-capacity (V/C) ratio represents that portion of the hour required to provide sufficient capacity to accommodate all intersection traffic if all approaches operate at capacity. The volume-to-capacity ratio is then correlated to a performance measure known as Level of Service based on the following thresholds: Level of Service Volume/Capacity Ratio A ≤ 0.600 B 0.601 to 0.700 C 0.701 to 0.800 D 0.801 to 0.900 E 0.901 to 1.000 F > 1.000 Source: Transportation Research Board, Interim Materials on Highway Capacity, Transportation Research Circular No. 212, January 1980. Level of Service is used to qualitatively describe the performance of a roadway facility, ranging from Level of Service A (free-flow conditions) to Level of Service F (extreme congestion and system failure). ICU analysis was performed using the Vistro software. Consistent with City of Rosemead guidelines, this analysis uses the following input parameters for the ICU analysis: 1,800 vehicles per hour per lane for through and turn lanes, 3,240 vehicles per hour for dual left- turn lanes, and a total clearance time of 10 percent. If the paved lane width of a shared through/right turn lane is wide enough to permit a separate right turn, it is common practice for a right turn lane to be considered “de facto.” To function as a de facto right turn lane there must be sufficient width for right turning vehicles to travel outside the through lane. This analysis uses a minimum lane width of 19 feet from curb to lane stripe. Additionally, a de facto right turn lane was only considered where on-street parking is prohibited near the intersection approach. INTERSECTION DELAY METHODOLOGY The technique used to assess the performance of unsignalized intersections in the City of Rosemead and California Department of Transportation (Caltrans) freeway ramp intersections is known as the intersection delay methodology based on the procedures contained in the Highway Capacity Manual. The methodology compares the traffic volume using the intersection to the capacity of the intersection to calculate the delay associated with the traffic control at the intersection. The intersection delay is then correlated to a performance measure known as Level of Service based on the following thresholds: 6 Garvey Walnut Mixed Use Project Traffic Impact Analysis 7 19302 Level of Service Intersection Control Delay (Seconds / Vehicle) Signalized Intersection Unsignalized Intersection A ≤ 10.0 ≤ 10.0 B > 10.0 to ≤ 20.0 > 10.0 to ≤ 15.0 C > 20.0 to ≤ 35.0 > 15.0 to ≤ 25.0 D > 35.0 to ≤ 55.0 > 25.0 to ≤ 35.0 E > 55.0 to ≤ 80.0 > 35.0 to ≤ 50.0 F > 80.0 > 50.0 Source: Transportation Research Board, Highway Capacity Manual (6th Edition). Level of Service is used to qualitatively describe the performance of a roadway facility, ranging from Level of Service A (free-flow conditions) to Level of Service F (extreme congestion and system failure). Intersection delay analysis was performed using the Vistro software. If the paved lane width of a shared through/right turn lane is wide enough to permit a separate right turn, it is common practice for a right turn lane to be considered “de facto.” To function as a de facto right turn lane there must be sufficient width for right turning vehicles to travel outside the through lane. This analysis uses a minimum lane width of 20 feet from curb to lane stripe. PERFORMANCE STANDARDS The City of Rosemead has established minimum acceptable Level of Service standards during peak hour conditions of LOS D or better for intersections. In accordance with CEQA provision, any Level of Service impacts identified are solely for General Plan consistency and would not constitute a significant impact under CEQA. NEED FOR IMPROVEMENTS In accordance with the City of Rosemead guidelines, a project operational traffic impact occurs if the project related increase in the volume-to-capacity ratio equals or exceeds the thresholds shown below: Significant Impact Threshold for Intersections Level of Service Volume/Capacity Incremental Increase F 1.01 or more 0.02 or more Based on the California Department of Transportation established performance standards, a potentially operational traffic impact is defined to occur if the addition of project generated trips is forecast to cause the performance of a State Highway study intersection to change from acceptable Level of Service (D or better) to unacceptable Level of Service (E or F). If a project is forecast to cause an operational traffic impact, feasible improvements that will reduce the operational impact to an acceptable LOS are identified. Improvements can be in many forms, including the addition of lanes, traffic control modification, or demand management measures. If no feasible improvements can be identified for an operationally deficient facility, the operational traffic impact will remain deficient. 7 Garvey Walnut Mixed Use Project Traffic Impact Analysis 8 19302 3. EXISTING CONDITIONS EXISTING ROADWAY SYSTEM Figure 3 identifies the lane geometry and intersection traffic controls for Existing conditions based on a field survey of the study area. Regional access to the project area is provided by the I-10 Freeway north of the project site. The key north-south roadway providing local circulation is Walnut Grove Avenue. The key east- west roadways providing local circulation are Hellman Avenue and Garvey Avenue. Walnut Grove Avenue is a 4-lane undivided to divided roadway in the study area. Walnut Grove Avenue is classified as a Major Arterial in the City of Rosemead Circulation Plan. On-street parking is generally permitted in the project area south of Hellman Avenue and prohibited north of Hellman Avenue. No bicycle facilities are provided in the study area. Sidewalks are provided on both sides of the roadway south of Hellman Avenue and on the west side of the roadway north of Hellman Avenue. Hellman Avenue is a 2-lane undivided roadway in the study area. Hellman Avenue is classified as a Collector in the City of Rosemead Circulation Plan. On-street parking is intermittently permitted in the project area. On- street bicycle facilities are provided in the study area. No bicycle facilities are provided in the study area. Sidewalks are provided on both sides of the roadway. Garvey Avenue is a 4-lane divided roadway in the study area. Garvey Avenue is classified as a Major Arterial in the City of Rosemead Circulation Plan. On-street parking is intermittently permitted in the project area. On- street bicycle facilities are provided in the study area. No bicycle facilities are provided in the study area. Sidewalks are provided on both sides of the roadway. PEDESTRIAN FACILITIES Existing pedestrian facilities in the project vicinity are shown on Figure 4. BICYCLE ROUTES No on-street bicycle facilities are provided in the project area. The City of Rosemead Existing Bicycle Routes and Potential Future Routes is depicted on Figure 5, and shows potential future bicycle facilities in the project area along Walnut Grove Avenue and Garvey Avenue. TRANSIT FACILITIES Figure 6 and Figure 7 show the existing transit routes available in the project vicinity. As shown on Figure 6, Foothill Transit does not service the study area. As shown on Figure 7, Los Angeles County Metropolitan Transportation Authority Routes 176 and Rosemead Explorer service Walnut Grove Avenue, and Routes 70, 770, and Rosemead Explorer service Garvey Avenue. Bus stops are located along Garvey Avenue including on at the southwest corner of the Walnut Grove Avenue and Garvey Avenue intersection. GENERAL PLAN CONTEXT Figure 8 shows the City of Rosemead Circulation Plan roadway classifications map. This figure shows the nature and extent of arterial and collector highways that are needed to adequately serve the ultimate development depicted by the Land Use Element of the General Plan. 8 Garvey Walnut Mixed Use Project Traffic Impact Analysis 9 19302 EXISTING TRAFFIC VOLUMES Figure 9 shows the Existing average daily traffic volumes. The Existing average daily traffic volumes have been factored from peak hour intersection turning movement volumes using the following formula for each intersection leg: Evening Peak Hour (Approach Volume + Exit Volume) x 10 = Leg Volume. Existing peak hour volumes are based upon AM peak period and PM peak period intersection turning movement counts. The AM peak period was counted between 7:00 AM and 9:00 AM and the PM peak period was counted between 4:00 PM and 6:00 PM. The actual peak hour within the peak period is the four consecutive 15-minute periods with the highest total volume. Thus, the weekday PM peak hour at one intersection may be 4:45 PM to 5:45 PM if those four consecutive 15-minute periods have the highest combined volume. Intersection turning movement count worksheets are provided in Appendix C. The current COVID-19 pandemic and related stay-at-home orders imposed by state and local municipalities have resulted in a substantial decrease in traffic volumes. In addition to the current public health restrictions, it is anticipated that the pandemic may have a lasting effect on travel behaviors, such as an increase telecommuting. To provide a conservative analysis, the Existing conditions traffic volumes used in this analysis are based on historic counts provided by City of Rosemead staff with adjustments applied with the intent to represent pre-pandemic conditions for the current year. This approach is likely to overestimate actual volumes for the near future since many commuters are expected to continue working from home even as stay-at-home orders are eased. Historical intersection turning movement counts conducted in 2018 were obtained for the study intersections of Walnut Grove Avenue at Hellman Avenue and Walnut Grove Avenue at Hellman Avenue. The AM and PM peak hour traffic volumes based on these historical counts were adjusted by a growth rate of 0.8 percent per year over a two-year period to reflect existing year 2020 conditions prior to issuance of statewide stay-at- home orders. The growth rate was obtained from the County of Los Angeles Congestion Management Program. The combined AM and PM peak hour turning movement volumes from these modified traffic counts were then compared to the combined AM and PM peak hour turning movement volumes for the current traffic counts conducted in October 2020. An AM Peak hour increase of 91.91% was applied to bring the current traffic counts (October 2020) to a comparable level as calculated using the historic 2018 traffic counts with annual ambient growth rate (0.8%) applied. A PM Peak hour increase of 33.96% was applied to bring the current traffic counts (October 2020) to a comparable level as calculated using the historic 2018 traffic counts with annual ambient growth rate (0.8%) applied. Therefore, all of the current October 2020 turning movement counts were increased by 91.91% during the AM Peak Hour and 33.96% during the PM peak hour to reflect pre-pandemic conditions. These spreadsheets, and the growth rate increased intersection turning movement counts, are included in Appendix C. Figure 10 and Figure 11 show the Existing AM peak hour and PM peak hour intersection turning movement volumes. Peak hour volumes shown in the figures and Level of Service calculations throughout this report are based on the measured count data with adjustments described above. EXISTING INTERSECTION LEVEL OF SERVICE The intersection Levels of Service for Existing conditions have been calculated and are shown in Table 1. Existing intersection Level of Service worksheets are provided in Appendix D. 9 Garvey Walnut Mixed Use Project Traffic Impact Analysis 10 19302 As shown in Table 1, the study intersections currently operate at Levels of Service C or better during the peak hours for Existing conditions. 10 ICU2 LOS3 ICU2 LOS3 1. I-10 EB Ramps at Hellman Ave TS 0.591 A 0.583 A 2. Walnut Grove Ave at Hellman Ave TS 0.685 B 0.726 C 4. Walnut Grove Ave at Garvey Ave TS 0.696 B 0.765 C Delay2 LOS3 Delay2 LOS3 1. I-10 EB Ramps at Hellman Ave TS 34.3 C 34.0 C Notes: (1) TS = Traffic Signal (2) (3) LOS = Level of Service ICU = Intersection Capacity Utilization. Per the Highway Capacity Manual, overall average intersection delay and Level of Service are shown for intersections with all way stop control. Caltrans Highway Capacity Methodology Analysis ID Study Intersection Traffic Control1 AM Peak Hour PM Peak Hour Study IntersectionID Table 1 Existing Intersection Level of Service Traffic Control1 AM Peak Hour PM Peak Hour Walnut Garvey Mixed Use Project Traffic Impact Analysis 1930211 Figure 3 Existing Lane Geometry and Intersection Traffic Controls Garvey Walnut Mixed Use ProjectTraffic Impact Analysis 19302 N 10 WILLARD AVEWALNUT GROVE AVEBURTON AVELA PRESA AVE GARVEY AVE HELLMAN AVE 1 2 4 Site 3 1 2 3 4 4D4D 4U 4U 4D 2U 2U2U Traffic Signal #-Lane Divided Roadway #-Lane Undivided Roadway Existing Lane Legend #D #U I-10 EB Ramps (NS)/ Hellman Ave (EW) Walnut Grove Ave (NS)/ Hellman Ave (EW) Walnut Grove Ave (NS)/ Project Dwy (EW) Walnut Grove Ave (NS)/ Garvey Ave (EW) 12 Figure 4 Existing Pedestrian Facilities Garvey Walnut Mixed Use ProjectTraffic Impact Analysis 19302 N Site Sidewalk Legend Cross Walk Bus StopB B B B BWALNUT GROVE AVEGARVEY AVE 13 Figure 5 City of Rosemead Existing Bicycle Routes and Potential Future Routes Garvey Walnut Mixed Use ProjectTraffic Impact Analysis 19302 N Source: City of Rosemead Site 14 Figure 6 Foothill Transit System Map Garvey Walnut Mixed Use ProjectTraffic Impact Analysis 19302 N Site Source: Foothill Transit Agency 15 Figure 7 Los Angeles County Metropolitan Transportation Authority System Map Garvey Walnut Mixed Use ProjectTraffic Impact Analysis 19302 N Site Source: L.A. Metro 16 Figure 8 City of Rosemead Circulation Plan Garvey Walnut Mixed Use ProjectTraffic Impact Analysis 19302 N Source: City of Rosemead Site 17 Figure 9 Existing Average Daily Traffic Volumes Garvey Walnut Mixed Use ProjectTraffic Impact Analysis 19302 N 10 WILLARD AVEWALNUT GROVE AVEBURTON AVELA PRESA AVE GARVEY AVE HELLMAN AVE Site 15.5 16.2 15.9 21.4 4.9 8.1 5.5 23.0 25.0 Vehicles Per Day (1,000's) Legend ## 18 Figure 10 Existing AM Peak Hour IntersectionTurning Movement Volumes Garvey Walnut Mixed Use ProjectTraffic Impact Analysis 19302 N 10 WILLARD AVEWALNUT GROVE AVEBURTON AVELA PRESA AVE GARVEY AVE HELLMAN AVE 1 2 4 Site Study Intersection Legend # 3 1 I-10 EB Ramps (NS)/ Hellman Ave (EW)25313115154 159190 2 Walnut Grove Ave (NS)/ Hellman Ave (EW)1464701312757811523259115 086269 3 Walnut Grove Ave (NS)/ Project Dwy (EW)059486800 0 4 Walnut Grove Ave (NS)/ Garvey Ave (EW)10234713824642619611381869 102808134 19 Figure 11 Existing PM Peak Hour IntersectionTurning Movement Volumes Garvey Walnut Mixed Use ProjectTraffic Impact Analysis 19302 N 10 WILLARD AVEWALNUT GROVE AVEBURTON AVELA PRESA AVE GARVEY AVE HELLMAN AVE 1 2 4 Site Study Intersection Legend # 3 1 I-10 EB Ramps (NS)/ Hellman Ave (EW)2521747221 202130 2 Walnut Grove Ave (NS)/ Hellman Ave (EW)1256461916669915128510286 1158189 3 Walnut Grove Ave (NS)/ Project Dwy (EW)085177100 0 4 Walnut Grove Ave (NS)/ Garvey Ave (EW)117513165159505107141910102 146920197 20 Garvey Walnut Mixed Use Project Traffic Impact Analysis 21 19302 4. PROJECT FORECASTS This section describes how project trip generation, trip distribution, and trip assignment forecasts were developed. The forecast project volumes are illustrated on figures contained in this section. PROJECT DESCRIPTION The project site is located at the northwest corner of Walnut Grove Avenue and Garvey Avenue in the City of Rosemead. The project site is currently occupied with office land uses. The project is proposing to develop the site with 42 condominium dwelling units, 5,470 square feet of office, 5,500 square feet of community hall (plus 1,272 square feet storage area), 1,130 square feet of café/food service, 5,274 square feet of retail/service and ancillary uses including a recreation room, gym, library, and manager’s office. As a project design feature, the project is proposing full access to Walnut Grove Avenue. The proposed project is anticipated to be constructed and fully operational by year 2022. PROJECT DESIGN FEATURES The proposed project shall construct the following improvements as project design features to provide project site access: ▪ Construct the Walnut Grove Avenue (NS) at Project Driveway (EW) to provide one inbound lane and one outbound lane with eastbound stop-control and the following lane configurations: □ Northbound: two through lanes □ Southbound: one through lane and shared through/right turn lane □ Eastbound: one shared left/ right turn lane □ Westbound: not applicable PROJECT TRIP GENERATION Table 2 shows the project trip generation based upon trip generation rates obtained from the Institute of Transportation Engineers (ITE) Trip Generation Manual (10th Edition, 2017). The project trip generation forecast is determined by multiplying the trip generation rates by the land use quantity. Trip generation rates for multifamily housing (low-rise) (Land Use Code 221), recreational community center (Land Use Code 495), general office (Land Use Code 710), shopping center (Land Use Code 820), and coffee/donut shop without drive-through window (Land Use Code 936) were used. As shown in Table 2, the proposed project is forecast to generate a total of approximately 1,009 daily trips, including 143 trips during the AM peak hour and 65 trips during the PM peak hour. OTHER FACTORS AFFECTING TRIP GENERATION Land uses such as shopping centers, restaurants, gasoline stations, and convenience stores will often locate next to busy roadways to attract motorists already on the street. Since the trip generation rates contained in the ITE Trip Generation Manual represent vehicles entering and exiting at the site driveway(s), it is appropriate to reduce the initial trip generation forecast by the applicable pass-by trip rate when calculating the net new trips that will be added to the surrounding street system. This analysis applies a pass-by trip reduction for the commercial retail land use based upon rates from the ITE Trip Generation Handbook (3rd Edition, 2017). 21 Garvey Walnut Mixed Use Project Traffic Impact Analysis 22 19302 Traffic volumes shown in Table 2 consist of the total trips generated for each project land use. As a residential trip generated by the project may also interact with the commercial retail, office, or restaurant land uses within the project, a double counting of those trips occurs. To account for this internal interaction, the trips generated by the project site have been adjusted in accordance with procedures developed by the National Cooperative Highway Research Program 684 Internal Capture Estimation Tool as incorporated into the ITE Trip Generation Handbook (3rd Edition). Detailed internal capture worksheets are provided in the scoping agreement in Appendix B. PROJECT TRIP DISTRIBUTION AND ASSIGNMENT Figure 12 to Figure 17 show the forecast directional distribution patterns for the project generated trips. The project trip distribution patterns are based on review of existing volume data, surrounding land uses, and the local and regional roadway facilities in the project vicinity. Based on the identified project trip generation and distributions, project average daily traffic volumes have been calculated and shown on Figure 18. The project-generated AM and PM peak hour intersection turning movement volumes are shown on Figure 19 and Figure 20. TRANSIT TRIP GENERATION The Los Angeles County Metropolitan Transportation Authority 2010 Congestion Management Program, Appendix D - Guidelines for CMP Transportation Impact Analysis, utilizes a conversion factor based on the daily and AM and PM peak hour trip generation to provide for a transit analysis. The conversion is as follows:  Multiply the total trips generated by 1.4 to convert vehicle trips to person trips;  For each time period, multiply the result by one of the following factors: 3.5% of Total Person Trips Generated for most cases, except: 10% primarily Residential within 1/4 mile of a CMP transit center 15% primarily Commercial within 1/4 mile of a CMP transit center 7% primarily Residential within 1/4 mile of a CMP multi-modal transportation center 9% primarily Commercial within 1/4 mile of a CMP multi-modal transportation center 5% primarily Residential within 1/4 mile of a CMP transit corridor 7% primarily Commercial within 1/4 mile of a CMP transit corridor 0% if no fixed route transit services operate within one mile of the project Accordingly, the proposed project-generated transit trips are calculated as follows:  Daily: ((1,009 trips x 1.4) x 0.035) ≈ 49  Morning Peak Hour: ((143 trips x 1.4) x 0.035) ≈ 7  Evening Peak Hour: ((65 trips x 1.4) x 0.035) ≈ 3 The proposed project is forecast to generate approximately seven (7) transit trips during the AM peak hour and approximately three (3) transit trips during the PM peak hour. Based on the existing transit services available in the project vicinity and the relatively low transit trip generation, the proposed project is forecast to have a nominal impact on transit service. 22 % In % Out Rate % In % Out Rate Multifamily Housing (Mid-Rise)ITE 221 DU 26%74%0.36 61%39%0.44 5.44 Recreational Community Center ITE 495 TSF 66%34%1.76 47%53%2.31 28.82 General Office ITE 710 TSF 86%14%1.16 16%84%1.15 9.74 Shopping Center ITE 820 TSF 62%38%0.94 48%52%3.81 37.75 Coffee/Donut Shop without Drive-Through Window ITE 936 TSF 51%49%101.14 50%50%36.31 363.1 In Out Total In Out Total Condominiums 42 DU 4 11 15 11 7 18 228 Internal Capture 3 0 -2 -2 -5 -2 -7 -9 Community Hall4 5.500 TSF 6 3 9 6 7 13 159 Office 5.470 TSF 5 1 6 1 5 6 53 Internal Capture 3 -1 0 -1 0 -1 -1 -2 Retail5 5.274 TSF 3 2 5 10 10 20 199 Internal Capture 3 0 0 0 -7 -6 -13 -13 Pass-by Trips (34% PM)6 0 0 0 -1 -1 -2 -2 Café/Food Service 1.130 TSF 58 56 114 21 21 42 410 Internal Capture 3 -2 -1 -3 -4 -7 -11 -14 73 70 143 32 33 65 1,009 Notes: (1) ITE = Institute of Transportation Engineers Trip Generation Manual (10th Edition, 2017); ### = Land Use Code (2) TSF = Thousand Square Feet (3) Internal Capture calculated using the NCHRP 684 Internal Trip Capture Estimation Tool included in the ITE Trip Generation Handbook (3rd Edition, 2017). (6) Pass-by rates obtained from ITE Trip Generation Handbook (3rd Edition, 2017). Land Use (4) Trip generation for the community hall is based on the floor area used for occupancy and parking calculations; the additional 1,272 square feet of storage areas are considered ancillary and will not generate additional new trips. (5) The retail floor area includes 1,021 square feet of commercial manager's office. Source1 Unit2 Net New Trips Generated Daily Table 2 Project Trip Generation Trip Generation Rates Trips Generated Land Use Quantity Unit 2 AM Peak Hour PM Peak Hour AM Peak Hour PM Peak Hour Daily Rate Walnut Garvey Mixed Use Project Traffic Impact Analysis 1930223 Figure 12 Project Outbound Trip Distributon - Residential Garvey Walnut Mixed Use ProjectTraffic Impact Analysis 19302 N WILLARD AVEWALNUT GROVE AVEBURTON AVELA PRESA AVE GARVEY AVE HELLMAN AVE Site 10 20% 30% 20% 70% 100% 10% 20% 10% 10% 30% Percent From Project Legend 10% 24 Figure 13 Project Inbound Trip Distributon - Residential Garvey Walnut Mixed Use ProjectTraffic Impact Analysis 19302 N WILLARD AVEWALNUT GROVE AVEBURTON AVELA PRESA AVE GARVEY AVE HELLMAN AVE Site 10 Percent To Project Legend 10% 20% 30% 20% 70% 30% 10% 10% 20% 20% 10% 100% 25 Figure 14 Project Outbound Trip Distributon - Office Garvey Walnut Mixed Use ProjectTraffic Impact Analysis 19302 N WILLARD AVEWALNUT GROVE AVEBURTON AVELA PRESA AVE GARVEY AVE HELLMAN AVE Site 10 10% 30% 10% 50% 100% 15% 30% 15% 15% 50% Percent From Project Legend 10% 5% 26 Figure 15 Project Inbound Trip Distributon - Office Garvey Walnut Mixed Use ProjectTraffic Impact Analysis 19302 N WILLARD AVEWALNUT GROVE AVEBURTON AVELA PRESA AVE GARVEY AVE HELLMAN AVE Site 10 Percent To Project Legend 10% 30% 10% 50% 50% 15% 15% 10% 30% 15% 100% 5% 20% 27 Figure 16 Project Outbound Trip Distributon - Retail/Restaurant Garvey Walnut Mixed Use ProjectTraffic Impact Analysis 19302 N WILLARD AVEWALNUT GROVE AVEBURTON AVELA PRESA AVE GARVEY AVE HELLMAN AVE Site 10 20% 20% 20% 70% 100% 5% 20% 5% 5% 30% Percent From Project Legend 10% 5% 3% 2% 25% 2% 25% 3% 28 Figure 17 Project Inbound Trip Distributon - Retail/Restaurant Garvey Walnut Mixed Use ProjectTraffic Impact Analysis 19302 N WILLARD AVEWALNUT GROVE AVEBURTON AVELA PRESA AVE GARVEY AVE HELLMAN AVE Site 10 Percent To Project Legend 10% 20% 20% 20% 70% 30% 5% 5% 20% 20% 5% 100% 5% 2%2% 25% 3% 25% 3% 29 Figure 18 Project Average Daily Traffic Volumes Garvey Walnut Mixed Use ProjectTraffic Impact Analysis 19302 N 10 WILLARD AVEWALNUT GROVE AVEBURTON AVELA PRESA AVE GARVEY AVE HELLMAN AVE Site 0.2 0.7 0.3 0.2 NOM 0.1 0.2 0.2 Vehicles Per Day (1,000's) Legend ## Nominal; Less Than 50 Vehicles Per DayNOM 30 Figure 19 Project AM Peak Hour IntersectionTurning Movement Volumes Garvey Walnut Mixed Use ProjectTraffic Impact Analysis 19302 N 10 WILLARD AVEWALNUT GROVE AVEBURTON AVELA PRESA AVE GARVEY AVE HELLMAN AVE 1 2 4 Site Study Intersection Legend # 3 1 I-10 EB Ramps (NS)/ Hellman Ave (EW)5004 35 2 Walnut Grove Ave (NS)/ Hellman Ave (EW)81400160009 000 3 Walnut Grove Ave (NS)/ Project Dwy (EW)50002522 48 4 Walnut Grove Ave (NS)/ Garvey Ave (EW)01601715161700 0017 31 Figure 20 Project PM Peak Hour IntersectionTurning Movement Volumes Garvey Walnut Mixed Use ProjectTraffic Impact Analysis 19302 N 10 WILLARD AVEWALNUT GROVE AVEBURTON AVELA PRESA AVE GARVEY AVE HELLMAN AVE 1 2 4 Site Study Intersection Legend # 3 1 I-10 EB Ramps (NS)/ Hellman Ave (EW)3001 24 2 Walnut Grove Ave (NS)/ Hellman Ave (EW)670070004 000 3 Walnut Grove Ave (NS)/ Project Dwy (EW)22001113 20 4 Walnut Grove Ave (NS)/ Garvey Ave (EW)080776700 007 32 Garvey Walnut Mixed Use Project Traffic Impact Analysis 33 19302 5. FUTURE VOLUME FORECASTS This section describes how future volume forecasts for each analysis scenario were developed. Forecast study area volumes are illustrated on figures contained in this section. OTHER DEVELOPMENT To account for trips generated by future development, trips generated by approved other development projects in the Cities of Rosemead and Montebello were added to the study area. Table 3 shows the trip generation summary for other development projects. Figure 21 shows the other development location map. Figure 22 shows the forecast average daily traffic volumes for the other development. Figure 23 and Figure 24 show the forecast AM and PM peak hour intersection turning movement volumes for trips generated by other developments. AMBIENT GROWTH To account for ambient growth on roadways, existing traffic volumes were increased by a growth rate of one percent (0.8%) per year over a two-year period for Cumulative [Opening Year (2022)] conditions. This equates to a total growth factor of approximately 1.02 for Cumulative conditions. The ambient growth rate was conservatively applied to all movements at the study intersections. ANALYSIS SCENARIO VOLUME FORECASTS Existing Plus Project Existing Plus Project volume forecasts were derived by adding the project generated trips to Existing volumes. Existing Plus Project average daily traffic volumes are shown on Figure 25. Existing Plus Project AM and PM peak hour intersection turning movement volumes are shown on Figure 26 and Figure 27. Opening Year (2022) Without Project Opening Year (2022) Without Project volume forecasts were derived by adding the other development generated trips to Existing volumes with ambient growth. Opening Year (2020) Without Project average daily traffic volumes are shown on Figure 28. Opening Year (2020) Without Project AM and PM peak hour intersection turning movement volumes are shown on Figure 29 and Figure 30. Opening Year (2022) With Project Opening Year (2020) With Project volume forecasts were derived by adding project generated trips to Opening Year (2020) Without Project volumes. Opening Year (2020) With Project average daily traffic volumes are shown on Figure 31. Opening Year (2020) With Project AM and PM peak hour intersection turning movement volumes are shown on Figure 32 and Figure 33. 33 In Out Total In Out Total 7419 - 7459 Garvey Avenue Commercial ITE 820 20.000 TSF 12 7 19 37 40 77 755 - Pass-By (34% PM)3 -------13 -14 -27 -27 Residential ITE 220 218 DU 23 77 100 77 45 122 1,596 Subtotal 35 84 119 101 71 172 2,324 7801 - 7825 Garvey Avenue Commercial ITE 820 15.903 TSF 9 6 15 29 32 61 600 - Pass-By (34% PM)3 -------10 -11 -21 -21 Residential ITE 220 60 DU 6 21 27 21 12 33 439 Subtotal 15 27 42 40 33 73 1,018 8002 Garvey Avenue Commercial ITE 820 87.919 TSF 51 31 82 161 174 335 3,319 - Pass-By (34% PM)3 -------55 -59 -114 -114 Residential ITE 220 92 DU 10 33 43 32 19 51 673 Subtotal 61 64 125 138 134 272 3,878 8408 Garvey Avenue Commercial ITE 820 11.500 TSF 7 4 11 21 23 44 434 - Pass-By (34% PM)3 -------7 -8 -15 -15 Residential ITE 220 53 DU 6 19 25 19 11 30 388 Subtotal 13 23 36 33 26 59 807 8449 Garvey Avenue Commercial ITE 820 7.200 TSF 4 3 7 13 14 27 272 - Pass-By (34% PM)3 -------4 -5 -9 -9 Residential ITE 220 41 DU 4 15 19 14 8 22 300 Subtotal 8 18 26 23 17 40 563 6 8900 Glendon Way Hotel ITE 310 123 RM 34 24 58 38 36 74 1,028 7 3133 - 3141 Willard Avenue Residential ITE 220 31 DU 3 11 14 11 6 17 227 8 500 Montebello Boulevard Hotel ITE 310 199 RM 55 38 93 61 59 120 1,664 3001 Walnut Grove Avenue Commercial ITE 820 17.394 TSF 10 6 16 32 34 66 657 - Pass-By (34% PM)3 -------11 -12 -23 -23 Residential ITE 220 42 DU 4 15 19 15 9 24 307 Subtotal 14 21 35 36 31 67 941 3035 San Gabriel Boulevard Commercial ITE 820 56.258 TSF 33 20 53 103 111 214 2,124 - Pass-By (34% PM)3 -------35 -38 -73 -73 Residential ITE 220 144 DU 15 51 66 51 30 81 1,054 Subtotal 48 71 119 119 103 222 3,105 11 4316 Muscatel Avenue Residential ITE 220 10 DU 1 4 5 4 2 6 73 12 8399 Garvey Avenue Medical Clinic ITE 720 15.000 TSF 33 9 42 15 37 52 522 320 394 714 619 555 1,174 16,150 Notes: (2) DU = Dwelling Units; TSF = Thousand Square Feet 4 5 9 10 (3) ITE Trip Generation Handbook (3rd Edition, 2017). Total (1) ITE = Institute of Transportation Engineers Trip Generation Manual (10th Edition, 2017); ### = Land Use Code. 1 2 3 Table 3 Other Development Trip Generation Traffic Analysis Zone Land Use Source1 Quantity AM Peak Hour PM Peak Hour DailyUnits2Address Walnut Garvey Mixed Use Project Traffic Impact Analysis 1930234 Other Development LocationOther Development Location Legend N ____________________________________________________________________________________________________________________________________________________________________________________________________ Figure 21 Other Development Locaon Map Garvey Walnut Mixed Use Project Traffic Impact Analysis 19302 MAIN STSite 35 Figure 22 Other Development Average Daily Traffic Volumes Garvey Walnut Mixed Use ProjectTraffic Impact Analysis 19302 N 10 WILLARD AVEWALNUT GROVE AVEBURTON AVELA PRESA AVE GARVEY AVE HELLMAN AVE Site 0.4 0.3 0.3 0.7 0.8 0.4 1.3 0.7 Vehicles Per Day (1,000's) Legend ## 36 Figure 23 Other Development AM Peak Hour IntersectionTurning Movement Volumes Garvey Walnut Mixed Use ProjectTraffic Impact Analysis 19302 N 10 WILLARD AVEWALNUT GROVE AVEBURTON AVELA PRESA AVE GARVEY AVE HELLMAN AVE 1 2 4 Site Study Intersection Legend # 3 1 I-10 EB Ramps (NS)/ Hellman Ave (EW)00187 100 2 Walnut Grove Ave (NS)/ Hellman Ave (EW)03001110700 000 3 Walnut Grove Ave (NS)/ Project Dwy (EW)031100 0 4 Walnut Grove Ave (NS)/ Garvey Ave (EW)6300290187 0150 37 Figure 24 Other Development PM Peak Hour IntersectionTurning Movement Volumes Garvey Walnut Mixed Use ProjectTraffic Impact Analysis 19302 N 10 WILLARD AVEWALNUT GROVE AVEBURTON AVELA PRESA AVE GARVEY AVE HELLMAN AVE 1 2 4 Site Study Intersection Legend # 3 1 I-10 EB Ramps (NS)/ Hellman Ave (EW)00269 200 2 Walnut Grove Ave (NS)/ Hellman Ave (EW)03002120900 000 3 Walnut Grove Ave (NS)/ Project Dwy (EW)032100 0 4 Walnut Grove Ave (NS)/ Garvey Ave (EW)1230031802810 0290 38 Figure 25 Existing Plus Project Average Daily Traffic Volumes Garvey Walnut Mixed Use ProjectTraffic Impact Analysis 19302 N 10 WILLARD AVEWALNUT GROVE AVEBURTON AVELA PRESA AVE GARVEY AVE HELLMAN AVE Site 15.7 16.9 16.2 21.6 4.9 8.2 5.5 23.2 25.2 Vehicles Per Day (1,000's) Legend ## 39 Figure 26 Existing Plus Project AM Peak Hour IntersectionTurning Movement Volumes Garvey Walnut Mixed Use ProjectTraffic Impact Analysis 19302 N 10 WILLARD AVEWALNUT GROVE AVEBURTON AVELA PRESA AVE GARVEY AVE HELLMAN AVE 1 2 4 Site Study Intersection Legend # 3 1 I-10 EB Ramps (NS)/ Hellman Ave (EW)25813115158 162195 2 Walnut Grove Ave (NS)/ Hellman Ave (EW)1544841312759411523259124 086269 3 Walnut Grove Ave (NS)/ Project Dwy (EW)505948682522 48 4 Walnut Grove Ave (NS)/ Garvey Ave (EW)10236313826344121213081869 102808151 40 Figure 27 Existing Plus Project PM Peak Hour IntersectionTurning Movement Volumes Garvey Walnut Mixed Use ProjectTraffic Impact Analysis 19302 N 10 WILLARD AVEWALNUT GROVE AVEBURTON AVELA PRESA AVE GARVEY AVE HELLMAN AVE 1 2 4 Site Study Intersection Legend # 3 1 I-10 EB Ramps (NS)/ Hellman Ave (EW)2551747222 204134 2 Walnut Grove Ave (NS)/ Hellman Ave (EW)1316531916670615128510290 1158189 3 Walnut Grove Ave (NS)/ Project Dwy (EW)228517711113 20 4 Walnut Grove Ave (NS)/ Garvey Ave (EW)117521165166512113148910102 146920204 41 Figure 28 Opening Year (2022) Without Project Average Daily Traffic Volumes Garvey Walnut Mixed Use ProjectTraffic Impact Analysis 19302 N 10 WILLARD AVEWALNUT GROVE AVEBURTON AVELA PRESA AVE GARVEY AVE HELLMAN AVE Site 16.1 16.8 16.5 22.4 5.8 8.6 5.6 24.7 26.1 Vehicles Per Day (1,000's) Legend ## 42 Figure 29 Opening Year (2022) Without Project AM Peak Hour IntersectionTurning Movement Volumes Garvey Walnut Mixed Use ProjectTraffic Impact Analysis 19302 N 10 WILLARD AVEWALNUT GROVE AVEBURTON AVELA PRESA AVE GARVEY AVE HELLMAN AVE 1 2 4 Site Study Intersection Legend # 3 1 I-10 EB Ramps (NS)/ Hellman Ave (EW)25813135164 172194 2 Walnut Grove Ave (NS)/ Hellman Ave (EW)1494821313060112724460117 088274 3 Walnut Grove Ave (NS)/ Project Dwy (EW)060989600 0 4 Walnut Grove Ave (NS)/ Garvey Ave (EW)11035714125143720911585277 104839137 43 Figure 30 Opening Year (2022) Without Project PM Peak Hour IntersectionTurning Movement Volumes Garvey Walnut Mixed Use ProjectTraffic Impact Analysis 19302 N 10 WILLARD AVEWALNUT GROVE AVEBURTON AVELA PRESA AVE GARVEY AVE HELLMAN AVE 1 2 4 Site Study Intersection Legend # 3 1 I-10 EB Ramps (NS)/ Hellman Ave (EW)2571774234 226133 2 Walnut Grove Ave (NS)/ Hellman Ave (EW)1286621916973417430010488 1159193 3 Walnut Grove Ave (NS)/ Project Dwy (EW)087180700 0 4 Walnut Grove Ave (NS)/ Garvey Ave (EW)131526168162518127144956114 149967201 44 Figure 31 Opening Year (2022) With Project Average Daily Traffic Volumes Garvey Walnut Mixed Use ProjectTraffic Impact Analysis 19302 N 10 WILLARD AVEWALNUT GROVE AVEBURTON AVELA PRESA AVE GARVEY AVE HELLMAN AVE Site 16.3 17.5 16.8 22.6 5.8 8.7 5.6 24.9 26.3 Vehicles Per Day (1,000's) Legend ## 45 Figure 32 Opening Year (2022) With Project AM Peak Hour IntersectionTurning Movement Volumes Garvey Walnut Mixed Use ProjectTraffic Impact Analysis 19302 N 10 WILLARD AVEWALNUT GROVE AVEBURTON AVELA PRESA AVE GARVEY AVE HELLMAN AVE 1 2 4 Site Study Intersection Legend # 3 1 I-10 EB Ramps (NS)/ Hellman Ave (EW)26313135168 175199 2 Walnut Grove Ave (NS)/ Hellman Ave (EW)1574961313061712724460126 088274 3 Walnut Grove Ave (NS)/ Project Dwy (EW)506098962522 48 4 Walnut Grove Ave (NS)/ Garvey Ave (EW)11037314126845222513285277 104839154 46 Figure 33 Opening Year (2022) With Project PM Peak Hour IntersectionTurning Movement Volumes Garvey Walnut Mixed Use ProjectTraffic Impact Analysis 19302 N 10 WILLARD AVEWALNUT GROVE AVEBURTON AVELA PRESA AVE GARVEY AVE HELLMAN AVE 1 2 4 Site Study Intersection Legend # 3 1 I-10 EB Ramps (NS)/ Hellman Ave (EW)2601774235 228137 2 Walnut Grove Ave (NS)/ Hellman Ave (EW)1346691916974117430010492 1159193 3 Walnut Grove Ave (NS)/ Project Dwy (EW)228718071113 20 4 Walnut Grove Ave (NS)/ Garvey Ave (EW)131534168169525133151956114 149967208 47 Garvey Walnut Mixed Use Project Traffic Impact Analysis 48 19302 6. FUTURE OPERATIONAL ANALYSIS Detailed intersection Level of Service calculation worksheets for each of the following analysis scenarios are provided in Appendix D. EXISTING PLUS PROJECT Intersection Levels of Service The delay and Levels of Service for Existing Plus Project conditions are shown in Table 4. As shown in Table 4, the study intersections are forecast to operate at Levels of Service D or better during the peak hours for Existing Plus Project conditions. Operational Impact Evaluation Table 5 evaluates the project impact at the study intersections for Existing Plus Project conditions. As shown in Table 5, the proposed project is forecast to result in no operational traffic impacts at the study intersections for Existing Plus Project conditions. OPENING YEAR (2022) WITHOUT PROJECT Intersection Levels of Service The delay and Levels of Service for Opening Year (2022) Without Project conditions are shown in Table 6. As shown in Table 6, the study intersections are forecast to operate at Levels of Service D or better during the peak hours for Opening Year (2022) Without Project conditions. OPENING YEAR (2022) WITH PROJECT Intersection Levels of Service The delay and Levels of Service for Opening Year (2022) With Project conditions are shown in Table 7. As shown in Table 7, the study intersections are forecast to operate at Levels of Service D or better during the peak hours for Opening Year (2022) With Project conditions, except for the intersection of Walnut Grove Avenue at Project Driveway which is forecast to operate at LOS E during the AM peak hour. Operational Impact Evaluation Table 8 evaluates the project impact at the study intersections for Opening Year (2022) With Project conditions. As shown in Table 8, the proposed project is forecast to result in no operational traffic impacts at the study intersections for Opening Year (2022) With Project conditions. 48 ICU/Delay2 LOS3 ICU/Delay2 LOS3 1. I-10 EB Ramps at Hellman Ave TS 0.601 B 0.588 A 2. Walnut Grove Ave at Hellman Ave TS 0.694 B 0.731 C 3.Walnut Grove Ave at Project Dwy CSS 33.5 D 29.1 D 4. Walnut Grove Ave at Garvey Ave TS 0.724 C 0.777 C Delay2 LOS3 Delay2 LOS3 1. I-10 EB Ramps at Hellman Ave TS 34.6 C 34.1 C Notes: (1) TS = Traffic Signal; CSS = Cross Street Stop (2) (3) LOS = Level of Service ICU = Intersection Capacity Utilization. Per the Highway Capacity Manual, overall average intersection delay and Level of Service are shown for intersections with all way stop control. For intersections with cross street stop control, the delay and Level of Service for the worst individual movement (or movements sharing a single lane) are shown. Caltrans Highway Capacity Methodology Analysis ID Study Intersection Traffic Control1 AM Peak Hour PM Peak Hour ID Study Intersection Table 4 Existing Plus Project Intersection Level of Service Traffic Control1 AM Peak Hour PM Peak Hour Walnut Garvey Mixed Use Project Traffic Impact Analysis 1930249 ICU1 LOS2 ICU1 LOS2 ICU1 LOS2 ICU1 LOS2 1. I-10 EB Ramps at Hellman Ave 0.591 A 0.601 B +0.010 No 0.583 A 0.588 A +0.005 No 2. Walnut Grove Ave at Hellman Ave 0.685 B 0.694 B +0.009 No 0.726 C 0.731 C +0.005 No 4. Walnut Grove Ave at Garvey Ave 0.696 B 0.724 C +0.028 No 0.765 C 0.777 C +0.012 No Notes: Table 5 Existing Plus Project Operational Impact Assessment AM Peak Hour Operational Impact?3Project- Related ChangeStudy IntersectionID PM Peak Hour (3) In the Citiy of Rosemead, an operational impact occurs if the project-related increase in ICU equals or exceeds 0.02 when an intersection is operating at Level of Service F in the baseline. Existing Existing Plus Project (1) ICU = Intersection Capacity Utilization (2) LOS = Level of Service Project- Related Change Operational Impact?3Existing Plus ProjectExisting Walnut Garvey Mixed Use Project Traffic Impact Analysis 1930250 ICU/Delay2 LOS3 ICU/Delay2 LOS3 1. I-10 EB Ramps at Hellman Ave TS 0.620 B 0.623 B 2. Walnut Grove Ave at Hellman Ave TS 0.706 C 0.755 C 4. Walnut Grove Ave at Garvey Ave TS 0.713 C 0.787 C Delay2 LOS3 Delay2 LOS3 1. I-10 EB Ramps at Hellman Ave TS 34.7 C 34.5 C Notes: (1) TS = Traffic Signal (2) (3) LOS = Level of Service ICU = Intersection Capacity Utilization. Per the Highway Capacity Manual, overall average intersection delay and Level of Service are shown for intersections with all way stop control. Caltrans Highway Capacity Methodology Analysis ID Study Intersection Traffic Control1 AM Peak Hour PM Peak Hour Table 6 Opening Year (2022) Without Project Intersection Level of Service AM Peak Hour PM Peak Hour ID Study Intersection Traffic Control1 Walnut Garvey Mixed Use Project Traffic Impact Analysis 1930251 ICU/Delay2 LOS3 ICU/Delay2 LOS3 1. I-10 EB Ramps at Hellman Ave TS 0.629 B 0.628 B 2. Walnut Grove Ave at Hellman Ave TS 0.715 C 0.760 C 3.Walnut Grove Ave at Project Dwy CSS 35.3 E 30.9 D 4. Walnut Grove Ave at Garvey Ave TS 0.741 C 0.799 C Delay2 LOS3 Delay2 LOS3 1. I-10 EB Ramps at Hellman Ave TS 35.0 D 34.7 C Notes: (1) TS = Traffic Signal; CSS = Cross Street Stop (2) (3) LOS = Level of Service ICU = Intersection Capacity Utilization. Per the Highway Capacity Manual, overall average intersection delay and Level of Service are shown for intersections with all way stop control. For intersections with cross street stop control, the delay and Level of Service for the worst individual movement (or movements sharing a single lane) are shown. Caltrans Highway Capacity Methodology Analysis ID Study Intersection Traffic Control1 AM Peak Hour PM Peak Hour ID Study Intersection Table 7 Opening Year (2022) With Project Intersection Level of Service Traffic Control1 AM Peak Hour PM Peak Hour Walnut Garvey Mixed Use Project Traffic Impact Analysis 1930252 ICU1 LOS2 ICU1 LOS2 ICU1 LOS2 ICU1 LOS2 1. I-10 EB Ramps at Hellman Ave 0.620 B 0.629 B +0.009 No 0.623 B 0.628 B +0.005 No 2. Walnut Grove Ave at Hellman Ave 0.706 C 0.715 C +0.009 No 0.755 C 0.760 C +0.005 No 3. Walnut Grove Ave at Project Dwy 33.5 D 35.3 E +1.800 No 29.1 D 30.9 D +1.800 No 4. Walnut Grove Ave at Garvey Ave 0.713 C 0.741 C +0.028 No 0.787 C 0.799 C +0.012 No Notes: (3) In the Citiy of Rosemead, an operational impact occurs if the project-related increase in ICU equals or exceeds 0.02 when an intersection is operating at Level of Service F in the baseline. (1) ICU = Intersection Capacity Utilization (2) LOS = Level of Service Table 8 Opening Year (2022) With Project Operational Impact Assessment ID Study Intersection AM Peak Hour PM Peak Hour Without Project With Project Project- Related Change Operational Impact?3Without Project With Project Project- Related Change Operational Impact?3 Walnut Garvey Mixed Use Project Traffic Impact Analysis 1930253 Garvey Walnut Mixed Use Project Traffic Impact Analysis 54 19302 7. SITE ACCESS AND CIRCULATION This section includes a description of project improvements necessary to provide site access and an evaluation of site access and circulation. PROJECT DESIGN FEATURES The proposed project shall construct the following improvements as project design features to provide project site access:  Construct the Walnut Grove Avenue (NS) at Project Driveway (EW) to provide one inbound lane and one outbound lane with eastbound stop-control and the following lane configurations: □ Northbound: two through lanes □ Southbound: one through lane and shared through/right turn lane □ Eastbound: one shared left/ right turn lane □ Westbound: not applicable This analysis also assumes the project shall comply with the following conditions as part of the City of Rosemead standard development review process:  A construction work site traffic control plan shall comply with State standards set forth in the California Manual of Uniform Traffic Control Devices and shall be submitted to the City for review and approval prior to the issuance of a grading permit or start of construction. The plan shall identify any roadway, sidewalk, bike route, or bus stop closures and detours as well as haul routes and hours of operation. All construction related trips shall be restricted to off-peak hours to the extent possible.  All on-site and off-site roadway design, traffic signing and striping, and traffic control improvements relating to the proposed project shall be constructed in accordance with applicable State/Federal engineering standards and to the satisfaction of the City of Rosemead.  Site-adjacent roadways shall be constructed or repaired at their ultimate half-section width, including landscaping and parkway improvements in conjunction with development, or as otherwise required by the City of Rosemead.  Adequate off-street parking shall be provided to the satisfaction of City of Rosemead.  Adequate emergency vehicle access shall be provided to the satisfaction of the Rosemead Fire Department.  The final grading, landscaping, and street improvement plans shall demonstrate that sight distance requirements are met in accordance with applicable City of Rosemead/California Department of Transportation sight distance standards. COMMUNITY HALL OPERATIONS The community hall proposed for the project site has a total floor area of 5,500 square feet, including non- fixed stage area. As designed, the total occupancy could be up to 300 non-fixed seats. The existing Taiwan Center hours of operation are 9:00 AM to 5:00 PM daily, except for Mondays when it is closed. The hours of operation for the new community hall are expected to be the same. While the community hall can be rented 54 Garvey Walnut Mixed Use Project Traffic Impact Analysis 55 19302 out to the public, it is not expected to be rented out with any frequency since the existing hall rarely gets rented out by the public. The community hall will typically be used for lectures about once a month, and once a week painting and dancing classes. The estimated attendance for lectures is up to 120 people and up to 30 people for classes. Lectures and classes are typically done during the daytime in off-peak hours. An annual event of the Taiwan Center will continue to be held in the outside Hotel Convention Hall each year. Last year it was held at the San Gabriel Hilton and thus will not take place at this location. Holiday events occur 2 to 3 times per year, including New Year and Moon Festival. Attendees for these events are up to 200 people maximum. Hours of operation for event days are from 9:00 AM to 9:00 PM. The project applicant has stated that valet parking can be provided whenever it is needed. Although large scale events are only expected twice a year, it is recommended that a valet parking plan be prepared and submitted to the City for review. This valet parking plan will need to be approved by the City of Rosemead Fire Department. QUEUEING ANALYSIS A queuing analysis has been performed for Opening Year (2022) With Project conditions for the southbound through/right turn movements at the intersection of Walnut Grove Avenue at Garvey Avenue, which is a key movement for project access since the project driveway is located approximately 155 feet north of this intersection. The queuing analysis is based on a Poisson probability distribution for random vehicle arrivals and a uniform Los Angeles County 100 second cycle length. Queue calculation worksheets provided in Appendix E. Table 9 shows the queuing analysis summary based on the 95th-percentile queue length. The 95th-percentile queue length effectively represents the maximum queue length expected (to a 95 percent confidence level) and is an industry accepted standard for determining turning lane storage and intersection spacing requirements. Based on the queuing analysis shown in Table 9, the southbound through/right turn movements at the intersection of Walnut Grove Avenue at Garvey Avenue are forecast to queue past the project driveway. Therefore, there is potential for southbound vehicles to queue northbound along Walnut Grove Avenue from the Garvey Avenue intersection and block vehicular access in/out of the project driveway. Outbound trips at the project driveway would queue internally and not affect operations on Walnut Grove Avenue; however, vehicles heading northbound on Walnut Grove Avenue turning left into the project site may need to stop and wait for southbound vehicles to clear the project driveway. Since the northbound left turning vehicles would be doing so from a shared through/left turn lane, northbound motorists on Walnut Grove Avenue may be forced to stop and queue behind these northbound left turning vehicles into the project site. This would be a less than ideal situation for efficient traffic operations. Table 10 shows an Opening Year (2022) With Project intersection level of service analysis with driveway restrictions. For this analysis, the project driveway is assumed to provide right turns in/out only access. The project trip distributions were manually adjusted and are included in Appendix F. As shown in Table 10, the project driveway is forecast to operate at LOS B during both the AM and PM peak hours with these restrictions. As a full access driveway, the project driveway was forecast to operate at LOS E during the AM peak hour. Thus, the driveway is forecast to operate within acceptable LOS during the peak hours, while removing the opportunity for northbound left turning vehicles into the project site from stopping on Walnut Grove Avenue creating potential stacking and safety issues on this roadway, with these project driveway restrictions. It should be noted, a raised median would be required to effectively preclude the northbound left turn in movement. 55 Garvey Walnut Mixed Use Project Traffic Impact Analysis 56 19302 If the project driveway is restricted to right turns in/out only access, vehicles exiting the project intending to go northbound, and vehicles entering the project site coming northbound would need to change travel patterns circuitously around the roadway network near the project site. This would increase traffic volumes on nearby roadway segments and intersections while also increasing Vehicle Miles Traveled (VMT) since the direct routes to/from the project site that a full access driveway allows would be removed. Therefore, it is recommended that the project applicant and City of Rosemead evaluate the positives and negatives that project access restrictions would create and determine the best course of action regarding project access restrictions. ON-SITE PARKING The City of Rosemead Municipal Code Section 17.112.040.1 lists off-street parking requirements. Below are the parking spaces required and parking spaces provided for the project site based on the City of Rosemead Municipal Code: The proposed project is required to provide 200 parking spaces. The project site is proposing 204 parking spaces. Therefore, adequate parking is provided per City requirements. In addition, the project is providing 24 bicycle parking stalls with 21 bicycle parking stalls required. Appendix G exhibits the site plans for each floor showing parking space locations and allocation. TRASH TRUCK CIRCULATION Figure 34 and Figure 35 show trash truck circulation for the trash enclosures located on the project site. A modern garbage truck will not be able to access the trash enclosures within the project site. For mixed-use projects with parking garages, a contract is made with the trash company in which the trash company uses pickup trucks equipped to lift dumpsters to move the trash from the trash enclosures to the roadway. These pickup trucks will remove the trash from the enclosure and drop it off on Walnut Grove Avenue near the project driveway for a normal modern trash truck to pick up and dispose of the trash. The pickup truck will then return the dumpsters to the trash enclosure. Figure 34 and Figure 35 show what pickup trucks equipped to lift dumpsters. 56 Garvey Walnut Mixed Use Project Traffic Impact Analysis 57 19302 TRUCK ACCESS POINTS AND TURNING TEMPLATES Figure 36 and Figure 37 show the truck turning templates to access the project site to/from the loading area. Truck turning templates are provided for both inbound and outbound truck turning movements on Walnut Grove Avenue to/from the project site. As shown on Figure 36, inbound trucks servicing the project site will enter the driveway from Walnut Grove Avenue and proceed to the loading area. Trucks will then drive northbound through the drive aisle to the northwest portion of the project site. They will then leave the loading area and proceed to the driveway using the same path of travel they used to get to the loading area (see Figure 37). The truck turning templates used a common DL-23 delivery truck. Trucks can also temporarily use the fire lane on the northern portion of the project site for larger items and/or if the vehicles are too large to enter the parking garage. TRUCK DELIVERY SCHEDULE Truck deliveries shall occur only during off-peak hours so that any potential conflict between trucks and customers of the project site land uses will be minimal. ON-SITE VEHICULAR STACKING Figure 38 shows the on-site stacking for outbound vehicles leaving the project site. 57 AM Peak Hour PM Peak Hour 4. Walnut Grove Ave at Garvey Ave SBTR 155 325 325 Notes: (1) SB = Southbound; TR = Through/Right Existing Storage Length (Feet/Lane) Opening Year With Project Table 9 Queuing Analysis Summary ID Study Intersection Lane1 95th-Percentile Queue Length (Feet/Lane) Walnut Garvey Mixed Use Project Traffic Impact Analysis 1930258 ICU/Delay2 LOS3 ICU/Delay2 LOS3 1. I-10 EB Ramps at Hellman Ave TS 0.641 B 0.633 B 2. Walnut Grove Ave at Hellman Ave TS 0.718 C 0.761 C 3.Walnut Grove Ave at Project Dwy CSS 12.9 B 11.6 B 4. Walnut Grove Ave at Garvey Ave TS 0.726 C 0.793 C Notes: (1) TS = Traffic Signal; CSS = Cross Street Stop (2) (3) LOS = Level of Service ICU = Intersection Capacity Utilization. Per the Highway Capacity Manual, overall average intersection delay and Level of Service are shown for intersections with all way stop control. For intersections with cross street stop control, the delay and Level of Service for the worst individual movement (or movements sharing a single lane) are shown. Table 10 Opening Year (2022) With Project Intersection Level of Service - With Driveway Restrictions ID Study Intersection Traffic Control1 AM Peak Hour PM Peak Hour Walnut Garvey Mixed Use Project Traffic Impact Analysis 1930259 Figure 34 Trash Truck Circulation - Inbound Garvey Walnut Mixed Use ProjectTraffic Impact Analysis 19302 N Vehicle Centerline Vehicle Overhang Legend Vehicle Wheel Path Trash Enclosure 60 Figure 35 Trash Truck Circulation - Outbound Garvey Walnut Mixed Use ProjectTraffic Impact Analysis 19302 N Vehicle Centerline Vehicle Overhang Legend Vehicle Wheel Path Trash Enclosure 61 Figure 36 Truck Turning Templates - Inbound Garvey Walnut Mixed Use ProjectTraffic Impact Analysis 19302 N Vehicle Centerline Vehicle Overhang Legend Vehicle Wheel Path 62 Figure 37 Truck Turning Templates - Outbound Garvey Walnut Mixed Use ProjectTraffic Impact Analysis 19302 N Vehicle Centerline Vehicle Overhang Legend Vehicle Wheel Path 63 Figure 38 On-Site Stacking for Outbound Vehicles Garvey Walnut Mixed Use ProjectTraffic Impact Analysis 19302 N 64 Garvey Walnut Mixed Use Project Traffic Impact Analysis 65 19302 8. CONGESTION MANAGEMENT PROGRAM This section provides analysis of the project impacts at County facilities in accordance with typical Los Angeles County Congestion Management Program (CMP) requirements. CRITERIA FOR REQUIRING A TRAFFIC IMPACT ANALYSIS FOR CMP The Los Angeles County 2010 CMP provides the following thresholds for requiring a CMP-compliant traffic impact analysis:  All CMP arterial monitoring intersections, including monitored freeway on or off-ramp intersections, where the proposed project will add 50 or more trips during either the AM or PM weekday peak hours (of adjacent street traffic)  If CMP arterial segments are being analyzed rather than intersections, the study area must include all segments where the proposed project will add 50 or more peak hour trips (total of both directions).  Mainline freeway monitoring locations were the project will add 150 or more trips, in either direction, during either the AM or PM weekday peak hours. As previously shown in Table 2, the proposed project is forecast to generate approximately 143 AM peak hour trips and 65 PM peak hour trips, which are distributed from the project site. The intersection of Walnut Grove Avenue at Garvey Avenue is not a CMP intersection. The project will not add 150 or more peak hour trips to the I-10 Freeway since the project generates less than this threshold in total during each peak hour. Therefore, the proposed project would not result in a CMP impact as it does not meet the thresholds requiring a traffic impact analysis for CMP purposes and no further CMP traffic analysis is warranted. CMP TRANSIT IMPACT REVIEW The Los Angeles County Metropolitan Transportation Authority 2010 Congestion Management Program Appendix D - Guidelines for CMP Transportation Impact Analysis 8.4 utilizes a conversion factor based on the daily and AM and PM peak hour trip generation to provide for a transit analysis. The conversion is as follows:  Multiply the total trips generated by 1.4 to convert vehicle trips to person trips;  For each time period, multiply the result by one of the following factors: 3.5% of Total Person Trips Generated for most cases, except: 10% primarily Residential within 1/4 mile of a CMP transit center 15% primarily Commercial within 1/4 mile of a CMP transit center 7% primarily Residential within 1/4 mile of a CMP multi-modal transportation center 9% primarily Commercial within 1/4 mile of a CMP multi-modal transportation center 5% primarily Residential within 1/4 mile of a CMP transit corridor 7% primarily Commercial within 1/4 mile of a CMP transit corridor 0% if no fixed route transit services operate within one mile of the project Accordingly, the proposed project-generated transit trips are calculated as follows:  Daily: ((1,009 trips x 1.4) x 0.035) ≈ 49  Morning Peak Hour: ((143 trips x 1.4) x 0.035) ≈ 7  Evening Peak Hour: ((65 trips x 1.4) x 0.035) ≈ 3 65 Garvey Walnut Mixed Use Project Traffic Impact Analysis 66 19302 The proposed project is forecast to generate approximately seven (7) transit trips during the AM peak hour and approximately three (3) transit trips during the PM peak hour. Based on the existing transit services available in the project vicinity and the relatively low transit trip generation, the proposed project is forecast to have a nominal impact on transit service. 66 Garvey Walnut Mixed Use Project Traffic Impact Analysis 67 19302 9. VEHICLE MILES TRAVELED (VMT) BACKGROUND California Senate Bill 743 (SB 743) directs the State Office of Planning and Research (OPR) to amend the California Environmental Quality Act (CEQA) Guidelines for evaluating transportation impacts to provide alternatives to Level of Service that “promote the reduction of greenhouse gas emissions, the development of multimodal transportation networks, and a diversity of land uses.” In December 2018, the California Natural Resources Agency certified and adopted the updated CEQA Guidelines package. The amended CEQA Guidelines, specifically Section 15064.3, recommend the use of Vehicle Miles Travelled (VMT) as the primary metric for the evaluation of transportation impacts associated with land use and transportation projects. In general terms, VMT quantifies the amount and distance of automobile travel attributable to a project or region. All agencies and projects State-wide are required to utilize the updated CEQA guidelines recommending use of VMT for evaluating transportation impacts as of July 1, 2020. The updated CEQA Guidelines allow for lead agency discretion in establishing methodologies and thresholds provided there is substantial evidence to demonstrate that the established procedures promote the intended goals of the legislation. Where quantitative models or methods are unavailable, Section 15064.3 allows agencies to assess VMT qualitatively using factors such as availability of transit and proximity to other destinations. The Office of Planning and Research (OPR) Technical Advisory on Evaluating Transportation Impacts in CEQA (State of California, December 2018) [“OPR Technical Advisory”] provides technical considerations regarding methodologies and thresholds with a focus on office, residential, and retail developments as these projects tend to have the greatest influence on VMT. SCREENING CRITERIA The City of Rosemead adopted its VMT guidelines and the City has provided this information for use in this analysis. Therefore, the project VMT impact has been assessed in accordance with the City of Rosemead VMT guidelines and guidance from City staff. Consistent with recommendations in the OPR Technical Advisory, the City of Rosemead has established screening criteria for certain projects that may be presumed to have a less than significant VMT impact, including projects located in low-VMT generating areas. The proposed project is located in a low-VMT generating area. Therefore, the proposed project satisfies the screening criteria for low-VMT generating area and may be presumed to result in a less than significant VMT impact in accordance with City of Rosemead VMT guidelines. The SGVCOG VMT Evaluation Report has been provided by the City of Rosemead staff and is included in Appendix H. 67 Garvey Walnut Mixed Use Project Traffic Impact Analysis 68 19302 10. CONCLUSIONS This section summarizes the findings and mitigation measures (if any) identified in previous sections of this study. FORECAST LEVELS OF SERVICE The proposed project is forecast to result in no Level of Service operational impacts at the off-site study intersections during the weekday AM and PM peak hours for the scenarios evaluated. No off-site operational improvements were identified since the proposed project is forecast to result in no operational traffic impact at the off-site study intersections for Opening Year (2022) With Project conditions. CONGESTION MANAGEMENT PROGRAM The proposed project would result in no operational CMP impact as it does not meet the thresholds requiring a traffic impact analysis for CMP purposes and no further CMP analysis is warranted. A transit impact review was conducted for compliance with the CMP requirements and found that the proposed project is forecast to have a nominal impact on transit service. SITE ACCESS AND CIRCULATION The proposed project shall construct the following improvements as project design features to provide project site access:  Construct the Walnut Grove Avenue (NS) at Project Driveway (EW) to provide one inbound lane and one outbound lane with eastbound stop-control and the following lane configurations: □ Northbound: two through lanes □ Southbound: one through lane and shared through/right turn lane □ Eastbound: one shared left/ right turn lane □ Westbound: not applicable Due to the potential for queued vehicles on Walnut Grove Avenue to block the project driveway, an access alternative access analysis assuming right in/out only access was performed. While right in/out only access would improve Level of Service operations at the project driveway and preclude the potential for project trips entering from northbound Walnut Grove Avenue to block northbound through traffic, such access restrictions would require construction of a raised median and result in more circuitous travel for project trips accessing the site. It is recommended that the project applicant and City of Rosemead evaluate the positives and negatives that project access restrictions would create and determine the best course of action regarding project access restrictions. VMT EVALUATION The proposed project satisfies the screening criteria for low-VMT generating area and may be presumed to result in a less than significant VMT impact in accordance with City of Rosemead VMT guidelines. 68 APPENDICES Appendix A Glossary Appendix B Scoping Agreement Appendix C Volume Count Worksheets Appendix D Level of Service Worksheets Appendix E Queuing Worksheets Appendix F Project Trip Distributions – Driveway Restrictions Appendix G Site Plans Appendix H VMT Worksheets Apx - 1 APPENDIX A GLOSSARY Apx - 2 GLOSSARY OF TERMS ACRONYMS AC Acres ADT Average Daily Traffic Caltrans California Department of Transportation DU Dwelling Unit ICU Intersection Capacity Utilization LOS Level of Service TSF Thousand Square Feet V/C Volume/Capacity VMT Vehicle Miles Traveled TERMS AVERAGE DAILY TRAFFIC: The average 24-hour volume for a stated period divided by the number of days in that period. For example, Annual Average Daily Traffic is the total volume during a year divided by 365 days. BANDWIDTH: The number of seconds of green time available for through traffic in a signal progression. BOTTLENECK: A point of constriction along a roadway that limits the amount of traffic that can proceed downstream from its location. CAPACITY: The maximum number of vehicles that can be reasonably expected to pass over a given section of a lane or a roadway in a given time period. CHANNELIZATION: The separation or regulation of conflicting traffic movements into definite paths of travel by the use of pavement markings, raised islands, or other suitable means to facilitate the safe and orderly movements of both vehicles and pedestrians. CLEARANCE INTERVAL: Nearly same as yellow time. If there is an all red interval after the end of a yellow, then that is also added into the clearance interval. CONTROL DELAY: The component of delay, typically expressed in seconds per vehicle, resulting from the type of traffic control at an intersection. Control delay is measured by comparison with the uncontrolled condition; it includes delay incurred by slowing down, stopping/waiting, and speeding up. CORDON: An imaginary line around an area across which vehicles, persons, or other items are counted (in and out). CORNER SIGHT DISTANCE: The minimum sight distance required by the driver of a vehicle to cross or enter the lanes of the major roadway without requiring approaching traffic travelling at a given speed to radically alter their speed or trajectory. Corner sight distance is measured from the driver’s eye at 42 inches above the pavement to an object height of 36 inches above the pavement in the center of the nearest approach lane. CYCLE LENGTH: The time period in seconds required for a traffic signal to complete one full cycle of indications. CUL-DE-SAC: A local street open at one end only and with special provisions for turning around. Apx - 3 DAILY CAPACITY: A theoretical value representing the daily traffic volume that will typically result in a peak hour volume equal to the capacity of the roadway. DELAY: The time consumed while traffic is impeded in its movement by some element over which it has no control, usually expressed in seconds per vehicle. DEMAND RESPONSIVE SIGNAL: Same as traffic-actuated signal. DENSITY: The number of vehicles occupying in a unit length of the through traffic lanes of a roadway at any given instant. Usually expressed in vehicles per mile. DETECTOR: A device that responds to a physical stimulus and transmits a resulting impulse to the signal controller. DESIGN SPEED: A speed selected for purposes of design. Features of a highway, such as curvature, superelevation, and sight distance (upon which the safe operation of vehicles is dependent) are correlated to design speed. DIRECTIONAL SPLIT: The percent of traffic in the peak direction at any point in time. DIVERSION: The rerouting of peak hour traffic to avoid congestion. FORCED FLOW: Opposite of free flow. FREE FLOW: Volumes are well below capacity. Vehicles can maneuver freely and travel is unimpeded by other traffic. GAP: Time or distance between successive vehicles in a traffic stream, rear bumper to front bumper. HEADWAY: Time or distance spacing between successive vehicles in a traffic stream, front bumper to front bumper. INTERCONNECTED SIGNAL SYSTEM: A number of intersections that are connected to achieve signal progression. LEVEL OF SERVICE: A qualitative measure of a number of factors, which include speed and travel time, traffic interruptions, freedom to maneuver, safety, driving comfort and convenience, and operating costs. LOOP DETECTOR: A vehicle detector consisting of a loop of wire embedded in the roadway, energized by alternating current and producing an output circuit closure when passed over by a vehicle. MINIMUM ACCEPTABLE GAP: Smallest time headway between successive vehicles in a traffic stream into which another vehicle is willing and able to cross or merge. MULTI-MODAL: More than one mode; such as automobile, bus transit, rail rapid transit, and bicycle transportation modes. OFFSET: The time interval in seconds between the beginning of green at one intersection and the beginning of green at an adjacent intersection. PLATOON: A closely grouped component of traffic that is composed of several vehicles moving, or standing ready to move, with clear spaces ahead and behind. Apx - 4 PASSENGER CAR EQUIVALENT (PCE): A metric used to assess the impact of larger vehicles, such as trucks, recreational vehicles, and buses, by converting the traffic volume of larger vehicles to an equivalent number of passenger cars. PEAK HOUR: The 60 consecutive minutes with the highest number of vehicles. PRETIMED SIGNAL: A type of traffic signal that directs traffic to stop and go on a predetermined time schedule without regard to traffic conditions. Also, fixed time signal. PROGRESSION: A term used to describe the progressive movement of traffic through several signalized intersections. QUEUE: The number of vehicles waiting at a service area such as a traffic signal, stop sign, or access gate. QUEUE LENGTH: The length of vehicle queue, typically expressed in feet, waiting at a service area such as a traffic signal, stop sign, or access gate. SCREEN-LINE: An imaginary line or physical feature across which all trips are counted, normally to verify the validity of mathematical traffic models. SHARED/RECIPROCAL PARKING AGREEMENT: A written binding document executed between property owners to provide a designated number of off-street parking stalls within a designated area to be available for specified businesses or land uses. SIGHT DISTANCE: The continuous length of roadway visible to a driver or roadway user. SIGNAL CYCLE: The time period in seconds required for one complete sequence of signal indications. SIGNAL PHASE: The part of the signal cycle allocated to one or more traffic movements. STACKING DISTANCE: The length of area available behind a service area, such as a traffic signal or gate, for vehicle queueing to occur. STARTING DELAY: The delay experienced in initiating the movement of queued traffic from a stop to an average running speed through an intersection. STOPPING SIGHT DISTANCE: The minimum distance required by the driver of a vehicle on the major roadway travelling at a given speed to bring the vehicle to a stop after an object on the road becomes visible. Stopping sight distance is measured from the driver’s eye at 42 inches above the pavement to an object height of 6 inches above the pavement. TRAFFIC-ACTUATED SIGNAL: A type of traffic signal that directs traffic to stop and go in accordance with the demands of traffic, as registered by the actuation of detectors. TRIP: The movement of a person or vehicle from one location (origin) to another (destination). For example, from home to store to home is two trips, not one. TRIP-END: One end of a trip at either the origin or destination (i.e., each trip has two trip-ends). A trip-end occurs when a person, object, or message is transferred to or from a vehicle. TRIP GENERATION RATE: The quantity of trips produced and/or attracted by a specific land use stated in terms of units such as per dwelling, per acre, and per 1,000 square feet of floor space. TRUCK: A vehicle having dual tires on one or more axles, or having more than two axles. Apx - 5 TURNING RADIUS: The circular arc formed by the smallest turning path radius of the front outside tire of a vehicle, such as that performed by a U-turn maneuver. This is based on the length and width of the wheel base as well as the steering mechanism of the vehicle. UNBALANCED FLOW: Heavier traffic flow in one direction than the other. On a daily basis, most facilities have balanced flow. During the peak hours, flow is seldom balanced in an urban area. VEHICLE MILES OF TRAVEL: A measure of the amount of usage of a section of highway, obtained by multiplying the average daily traffic by length of facility in miles. Apx - 6 APPENDIX B SCOPING AGREEMENT Apx - 7 Apx - 8 Apx - 9 Apx - 10 Apx - 11 Apx - 12 Apx - 13 Apx - 14 Apx - 15 Apx - 16 Apx - 17 Apx - 18 Apx - 19 Apx - 20 Apx - 21 Apx - 22 Apx - 23 1 | P a g e Date: October 12, 2020 To: Annie Lao Associate Planner alao@cityofrosemead.org Office: (626) 569-2144 Pages: 3 From: Jana Robbins, PTP, RSP jana.robbins@transtech.org; T: 909-595-8599, 133 Job #: Jn#20967 Re: Traffic Scoping for the Proposed Mixed Use Development to be Located at the NW Corner of Walnut Grove Avenue and Garvey Avenue in the City of Rosemead Cc: Lily Valenzuela: Planning and Economic Dev Manager Chris Daste: PW Director Angelica Frausto-Lupo: CDD Dir Michael Ackerman: City Engineer Transtech Engineers has completed a review of the preliminary Traffic Scoping that was submitted to the City by the applicants Traffic Consultant Ganddini Group, Inc with Mr. Bryan Crawford. The proposed project as we understand will be comprised of the following: • 42 Condo Units • 5,470 sqf of Office • 5,520 sqf of Community Hall • 1,130 sqf of Café/Food Service • 5,274 sqf of Retail/Service • Ancillary uses such as a recreation room, gym, library and managers office for the condo units The project is projected to generate, after taking allowances for internal trips and pass-by allowances for the retail use, 1,009 daily trips with 143 trips in the AM peak and 65 trips in the PM Peak. The City of Rosemead in July 2020 adopted VMT thresholds to be in line with State mandates for SB 743 using Vehicle Miles Travelled (VMT) as the matrix to determine traffic impacts under CEQA. However, the City also chose to continue using LOS for transportation planning and analysis purposes. There are three ways a project can be screened from providing a project level VMT assessment. One: The project is located in a Transit Priority Area (TPA); two can be considered as located in a LOW VMT Area; or three a Project Type Screening where, based on OPR guidelines, certain types of projects have been identified as having the presumption of a less than significant VMT impact. The SGVCOG’s traffic consultant Fehr and Peers is in the process of finalizing the Traffic Study Guidelines for the City of Rosemead. As part of these guidelines a screening tool will be available for applicants to use to see if their project can be screened. Until the City gets the final TIA guidelines, the City ran the project through the Screening Tool and found that this project is eligible for screening from a full VMT analysis based on being located in a LOW VMT Area. The output is provided for your review as an attachment. However, the project will still need to Apx - 24 2 | P a g e provide a traffic study as well as provide justification that the project is consistent with existing land use and that there is nothing unique that would otherwise preclude the project from being screened. The following should be included in the Traffic Analysis for this project: 1. Existing Traffic Counts should be taken on a weekday during AM and PM peak hours. Depending on the description and types of events to be held at the Community Center additional counts may need to be taken either in the evening or on a weekend. Due to Covid, traffic has been lighter with schools not doing in-person classes and more people working at home. If no Historical counts are available from the City then new counts will need to be taken with a growth factor applied to account for these conditions. (recent counts show that there has been on average a 30% reduction in AM peak and 20% reduction in PM peak travel due to Covid). Consultant should submit to the City the factors and method they will be using for counts for this project. The following intersections should be included: a. Walnut Grove Avenue at Garvey Avenue b. Walnut Grove Avenue at Hellman Avenue c. I-10 EB Ramp at Hellman Avenue d. Proposed Driveway (for trip generation, and queuing) The Circulation Element of the City’s General Plan has established maintaining level of service D or better at intersections. The City uses the Intersection Capacity Utilization (ICU) methodology to evaluate AM and PM peak hour LOS at signalized intersections. The following parameters should be used in determining the LOS at the intersections within the City. (note that lane capacities have changed from previous ICU standards) ICU Methodology (signalized intersections) • A minimum clearance interval of 0.10 of green time. • Lane capacities of 1,800 per hour per lane for through and turn lanes. • Lane capacities of 3,240 per hour for dual turn lanes 2. Trip Generation of Project Traffic using the 10th Edition Trip Generation Manual. The report should include justification for any internal capture and pass-by credits. Credits taken for existing use must demonstrate that the existing use is open and occupied. 3. Trip Distribution of Project Traffic (project trips and percent assignment) 4. Analysis Scenarios: a. Existing Conditions b. Existing Plus Project c. Opening Year (existing + growth factor + cumulative projects within 1 to 1.5 miles of project) d. Opening Year + Project 5. On-Site Parking and Circulation (parking per code versus supply and the locations dedicated to retail versus residential spaces) 6. Description of the project in general 7. Description of the Community Hall to include i. Types of uses/events Apx - 25 3 | P a g e ii. Occupancy levels iii. Typical days and hours will be utilizing for events – this may require a separate analysis at the driveway and the intersection of Walnut Grove Avenue and Garvey Avenue iv. Parking on event days (number of spaces needed and circulation at driveway) 8. Access and Circulation at Project Driveway. If applicant is proposing full access than it must be demonstrated that striping and lane widths on Walnut Grove Avenue can accommodate full movements in and out as well as sufficient space from main signal. 9. Queue analysis for NB left entering the driveway and the relationship between the SB left turn pocket at Walnut Grove Avenue and Garvey Avenue. 10. On-site stacking for vehicles leaving the site 11. Truck access to loading/unloading and trash pickup – Truck Turning Templates into, on and out of site driveway. 12. Construction discussion – staging and hours 13. Justification for screening from a full VMT analysis We look forward to working with the applicant on this project. If there are questions or comments please contact me at jana.robbins@transtech.org Apx - 26 APPENDIX C VOLUME COUNT WORKSHEETS Apx - 27 91.91% 33.96% Left Through Right Left Through Right Left Through Right Left Through Right 0 0 0 132 0 7 60 80 0 0 83 99 461 Left Through Right Left Through Right Left Through Right Left Through Right 0 0 0 188 0 13 35 165 0 0 151 97 649 Left Through Right Left Through Right Left Through Right Left Through Right 0 0 0 253 0 13 115 154 0 0 159 190 884 Left Through Right Left Through Right Left Through Right Left Through Right 0 0 0 252 0 17 47 221 0 0 202 130 869 Left Through Right Left Through Right Left Through Right Left Through Right 76 245 7 66 301 60 121 31 60 0 45 140 1,152 Left Through Right Left Through Right Left Through Right Left Through Right 93 482 14 124 522 113 213 76 64 8 43 141 1,893 Left Through Right Left Through Right Left Through Right Left Through Right 146 470 13 127 578 115 232 59 115 0 86 269 2,210 Left Through Right Left Through Right Left Through Right Left Through Right 125 646 19 166 699 151 285 102 86 11 58 189 2,537 PM Peak Hour Northbound Southbound Eastbound Westbound Total Walnut Grove Avenue (NS) at Hellman Avenue (EW) Northbound Southbound Eastbound Westbound Total PM Peak Hour Northbound Southbound Eastbound Westbound Total Modified 2020 Traffic Count AM Peak Hour Northbound Southbound Eastbound Westbound Total Southbound Eastbound Westbound AM Peak Hour I-10 EB Ramps (NS) at Hellman Avenue (EW) Modified 2020 Traffic Count AM Peak Hour Modified Traffic Counts to Convert Existing Traffic Counts to Pre Pandemic Conditions AM Peak Hour Growth Rate to Convert Existing Traffic Counts to Pre Pandemic Conditions: PM Peak Hour Growth Rate to Convert Existing Traffic Counts to Pre Pandemic Conditions: Existing 2020 Traffic Count (Pandemic Conditions) AM Peak Hour Existing 2020 Traffic Count (Pandemic Conditions) Total PM Peak Hour Northbound Southbound Eastbound Westbound Total Northbound Northbound Southbound Eastbound Westbound Total PM Peak Hour Northbound Southbound Eastbound Westbound Total Walnut Garvey Mixed Use Project Traffic Impact Analysis 19302 Apx - 28 Left Through Right Left Through Right Left Through Right Left Through Right 53 181 72 128 222 55 59 426 36 53 421 70 1,776 Left Through Right Left Through Right Left Through Right Left Through Right 87 383 123 119 377 80 105 679 76 109 687 147 2,972 Left Through Right Left Through Right Left Through Right Left Through Right 102 347 138 246 426 106 113 818 69 102 808 134 3,409 Left Through Right Left Through Right Left Through Right Left Through Right 117 513 165 159 505 107 141 910 102 146 920 197 3,982 Walnut Grove Avenue (NS) at Garvey Avenue (EW) Existing 2020 Traffic Count (Pandemic Conditions) AM Peak Hour Northbound Southbound Eastbound Westbound Total PM Peak Hour Northbound Southbound Eastbound Westbound Total Modified 2020 Traffic Count AM Peak Hour Northbound Southbound Eastbound Westbound Total PM Peak Hour Northbound Southbound Eastbound Westbound Total Walnut Garvey Mixed Use Project Traffic Impact Analysis 19302 Apx - 29 Walnut Grove Ave at Hellman Ave Walnut Grove Ave at Garvey Ave AM 2,296 3,323 5,619 PM 2,734 3,783 6,517 Walnut Grove Ave at Hellman Ave Walnut Grove Ave at Garvey Ave AM 1,152 1,776 2,928 PM 1,893 2,972 4,865 91.91% 33.96% AM Peak Hour Growth Rate to Factor Modified Historical Traffic Count and Existing Traffic Count (Pandemic Conditions) to 2020 Pre-Pandemic Conditions: PM Peak Hour Growth Rate to Factor Modified Historical Traffic Count and Existing Traffic Count (Pandemic Conditions) to 2020 Pre-Pandemic Conditions: Pandemic Factorization Calculation Summary Modified Historical Traffic Count Intersection Peak Hour Total Turning Movement Volumes Total Existing Traffic Count (Pandemic Conditions) Peak Hour Total Turning Movement Volumes Intersection Total Garvey Walnut Mixed Use Project Traffic Impact Analysis 19302 Apx - 30 Left Through Right Left Through Right Left Through Right Left Through Right 136 516 13 60 654 101 143 58 115 1 247 216 2,260 Left Through Right Left Through Right Left Through Right Left Through Right 127 880 13 160 669 127 287 71 79 7 33 237 2,690 Left Through Right Left Through Right Left Through Right Left Through Right 138 524 13 61 665 103 145 59 117 1 251 219 2,296 Left Through Right Left Through Right Left Through Right Left Through Right 129 894 13 163 680 129 292 72 80 7 34 241 2,734 Left Through Right Left Through Right Left Through Right Left Through Right 76 245 7 66 301 60 121 31 60 0 45 140 1,152 Left Through Right Left Through Right Left Through Right Left Through Right 93 482 14 124 522 113 213 76 64 8 43 141 1,893 99.31% 44.43% AM Peak Hour Growth Rate to Factor Modified Historical Traffic Count and Existing Traffic Count (Pandemic Conditions) to 2020 Pre- Pandemic Conditions: PM Peak Hour Growth Rate to Factor Modified Historical Traffic Count and Existing Traffic Count (Pandemic Conditions) to 2020 Pre- Pandemic Conditions: PM Peak Hour Northbound Southbound Eastbound Westbound Total Existing Traffic Count (Pandemic Conditions) 2020 AM Peak Hour Northbound Southbound Eastbound Westbound Total (1) Provided by City of Rosemead Staff. Notes: PM Peak Hour Northbound Southbound Eastbound Westbound Total AM Peak Hour Northbound Southbound Eastbound Westbound Total Walnut Grove Ave (NS) at Hellman Ave (EW) Modified Traffic Count 0.800%Annual Ambient Growth Rate: Modified Historical Traffic Count 2020 Historical Traffic Count1 2018 Total PM Peak Hour Northbound Southbound Eastbound Westbound Total Northbound Southbound Eastbound Westbound AM Peak Hour Garvey Walnut Mixed Use Project Traffic Impact Analysis 19302 Apx - 31 Left Through Right Left Through Right Left Through Right Left Through Right 124 377 102 196 592 102 90 682 83 130 676 116 3,270 Left Through Right Left Through Right Left Through Right Left Through Right 122 727 128 154 462 98 135 743 78 136 766 175 3,724 Left Through Right Left Through Right Left Through Right Left Through Right 126 383 104 199 602 104 91 693 84 132 687 118 3,323 Left Through Right Left Through Right Left Through Right Left Through Right 124 739 130 156 469 100 137 755 79 138 778 178 3,783 Left Through Right Left Through Right Left Through Right Left Through Right 53 181 72 128 222 55 59 426 36 53 421 70 1,776 Left Through Right Left Through Right Left Through Right Left Through Right 87 383 123 119 377 80 105 679 76 109 687 147 2,972 87.11% 27.29% AM Peak Hour Growth Rate to Factor Modified Historical Traffic Count and Existing Traffic Count (Pandemic Conditions) to 2020 Pre- Pandemic Conditions: PM Peak Hour Growth Rate to Factor Modified Historical Traffic Count and Existing Traffic Count (Pandemic Conditions) to 2020 Pre- Pandemic Conditions: PM Peak Hour Northbound Southbound Eastbound Westbound Total Notes: (1) Provided by City of Rosemead Staff. Existing Traffic Count (Pandemic Conditions) 2020 AM Peak Hour Northbound Southbound Eastbound Westbound Total PM Peak Hour Northbound Southbound Eastbound Westbound Total Annual Ambient Growth Rate:0.800% Modified Historical Traffic Count 2020 AM Peak Hour Northbound Southbound Eastbound Westbound Total PM Peak Hour Northbound Southbound Eastbound Westbound Total Walnut Grove Ave (NS) at Garvey Ave (EW) Modified Traffic Count Historical Traffic Count1 2018 AM Peak Hour Northbound Southbound Eastbound Westbound Total Garvey Walnut Mixed Use Project Traffic Impact Analysis 19302 Apx - 32 DATE:LOCATION:PROJECT #:SC2702 Wed, Oct 21, 20 NORTH & SOUTH:LOCATION #:3EAST & WEST:CONTROL:SIGNAL NOTES:AM ▲ PM N MD ◄ W E ► OTHER S OTHER ▼ NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND NL NT NR SL ST SR EL ET ER WL WT WR TOTALLANES:X X X 0.5 X 0.5 0 1 X X 1 0 7:00 AM 0 0 0 21 0 4 6 10 0 0 5 20 66 7:15 AM 0 0 0 28 0 2 6 10 0 0 11 14 71 7:30 AM 0 0 0 19 0 2 12 10 0 0 17 24 84 7:45 AM 0 0 0 28 0 2 13 23 0 0 20 27 113 8:00 AM 0 0 0 33 0 0 12 22 0 0 19 21 107 8:15 AM 0 0 0 34 0 1 18 20 0 0 18 26 117 8:30 AM 0 0 0 28 0 2 15 15 0 0 26 31 117 8:45 AM 0 0 0 37 0 4 15 23 0 0 20 21 120 VOLUMES 0 0 0 228 0 17 97 133 0 0 136 184 795 APPROACH %0%0%0%93%0%7%42%58%0%0%43%58% APP/DEPART 0 /282 245 /0 230 /360 320 /153 0 BEGIN PEAK HR VOLUMES 0 0 0 132 0 7 60 80 0 0 83 99 461 APPROACH %0%0%0%95%0%5%43%57%0%0%46%54% PEAK HR FACTOR 0.000 0.848 0.921 0.798 0.960 APP/DEPART 0 /159 139 /0 140 /212 182 /90 0 4:00 PM 0 0 0 44 0 0 11 40 0 0 25 18 138 4:15 PM 0 0 0 37 0 1 10 40 0 0 43 28 159 4:30 PM 0 0 0 40 0 4 9 30 0 0 25 20 128 4:45 PM 0 0 0 31 0 5 13 34 0 0 24 23 130 5:00 PM 0 0 0 35 0 5 16 45 0 0 27 30 158 5:15 PM 0 0 0 50 0 1 7 45 0 0 43 20 166 5:30 PM 0 0 0 49 0 3 7 44 0 0 38 25 166 5:45 PM 0 0 0 54 0 4 5 31 0 0 43 22 159 VOLUMES 0 0 0 340 0 23 78 309 0 0 268 186 1,204 APPROACH %0%0%0%94%0%6%20%80%0%0%59%41% APP/DEPART 0 /264 363 /0 387 /649 454 /291 0 BEGIN PEAK HR VOLUMES 0 0 0 188 0 13 35 165 0 0 151 97 649 APPROACH %0%0%0%94%0%6%18%83%0%0%61%39% PEAK HR FACTOR 0.000 0.866 0.820 0.954 0.977 APP/DEPART 0 /132 201 /0 200 /353 248 /164 0AM8:00 AM PM5:00 PM I-10 EB Ramps I-10 EB Ramps Hellman Hellman INTERSECTION TURNING MOVEMENT COUNTS PREPARED BY: AimTD LLC. tel: 714 253 7888 cs@aimtd.com Rosemead I-10 EB Ramps Hellman Apx - 33 608 40 0 568 TOTAL 546 363 23 0 340 PM 264 245 17 0 228 AM 282 320 454 774 444 291 153 184 186 370 136 268 404 TOTALPMAM0 0 0 175 78 97 AMPMTOTAL442 309 133 0 0 0 360 649 1,009 617 387 230 0 AM 0 0 0 0 0 PM 0 0 0 0 0 TOTAL 0 0 0 0 340 20 0 320 TOTAL 291 201 13 0 188 PM 132 139 7 0 132 AM 159 182 248 430 254 164 90 99 97 196 83 151 234 TOTALPMAMAM 8:00 AM 8:45 AM 0 0 0 95 35 60 #N/A AMPMTOTAL245 165 80 PM 5:00 PM 5:45 PM 0 0 0 212 353 565 340 200 140 0 AM 0 0 0 0 0 PM 0 0 0 0 0 Total 0 0 0 0 I-10 EB Ramps I-10 EB Ramps I-10 EB Ramps HellmanHellmanPEAK HOUR AimTD LLC TURNING MOVEMENT COUNTS I-10 EB Ramps HellmanHellmanSC2702 ALL HOURS Rosemead Apx - 34 DATE:LOCATION:PROJECT #:SC2702 Wed, Oct 21, 20 NORTH & SOUTH:LOCATION #:2EAST & WEST:CONTROL:SIGNAL NOTES:AM ▲ PM N MD ◄ W E ► OTHER S OTHER ▼ NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND NL NT NR SL ST SR EL ET ER WL WT WR TOTALLANES:1 2 0 1 2 0 0.5 0.5 1 0.5 0.5 1 7:00 AM 13 48 3 10 39 4 14 10 7 0 8 27 183 7:15 AM 9 40 0 7 33 6 18 4 14 0 11 29 171 7:30 AM 15 58 0 12 51 10 18 0 9 1 15 32 221 7:45 AM 21 62 2 12 60 15 31 6 16 0 10 40 275 8:00 AM 16 51 0 19 77 17 31 6 18 0 7 27 269 8:15 AM 19 57 3 12 74 11 32 6 15 0 14 32 275 8:30 AM 25 78 3 22 76 19 23 5 15 0 13 28 307 8:45 AM 16 59 1 13 74 13 35 14 12 0 11 53 301 VOLUMES 134 453 12 107 484 95 202 51 106 1 89 268 2,002 APPROACH %22%76%2%16%71%14%56%14%30%0%25%75% APP/DEPART 599 /925 686 /591 359 /168 358 /318 0 BEGIN PEAK HR VOLUMES 76 245 7 66 301 60 121 31 60 0 45 140 1,152 APPROACH %23%75%2%15%70%14%57%15%28%0%24%76% PEAK HR FACTOR 0.774 0.912 0.869 0.723 0.938 APP/DEPART 328 /507 427 /361 212 /103 185 /181 0 4:00 PM 23 124 7 22 120 13 45 12 28 0 7 27 428 4:15 PM 27 110 5 27 131 29 40 12 25 1 16 31 454 4:30 PM 16 144 5 33 139 20 47 13 9 2 8 27 463 4:45 PM 24 107 3 37 120 20 41 12 12 2 3 25 406 5:00 PM 23 111 4 39 124 23 51 16 13 2 13 38 457 5:15 PM 23 135 7 23 114 28 52 24 19 1 11 26 463 5:30 PM 20 111 2 27 140 29 55 23 16 3 14 42 482 5:45 PM 27 125 1 35 144 33 55 13 16 2 5 35 491 VOLUMES 183 967 34 243 1,032 195 386 125 138 13 77 251 3,644 APPROACH %15%82%3%17%70%13%59%19%21%4%23%74% APP/DEPART 1,184 /1,604 1,470 /1,183 649 /402 341 /455 0 BEGIN PEAK HR VOLUMES 93 482 14 124 522 113 213 76 64 8 43 141 1,893 APPROACH %16%82%2%16%69%15%60%22%18%4%22%73% PEAK HR FACTOR 0.892 0.895 0.929 0.814 0.964 APP/DEPART 589 /836 759 /594 353 /214 192 /249 0AM8:00 AM PM5:00 PM Walnut Grove Walnut Grove Hellman-Ramona Hellman-Ramona INTERSECTION TURNING MOVEMENT COUNTS PREPARED BY: AimTD LLC. tel: 714 253 7888 cs@aimtd.com Rosemead Walnut Grove Hellman Apx - 35 2,156 290 1,516 350 TOTAL 2,529 1,470 195 1,032 243 PM 1,604 686 95 484 107 AM 925 358 341 699 773 455 318 268 251 519 89 77 166 TOTALPMAM1 13 14 588 386 202 AMPMTOTAL176 125 51 244 138 106 168 402 570 1,008 649 359 591 AM 134 453 12 599 1,183 PM 183 967 34 1,184 1,774 TOTAL 317 1,420 46 1,783 1,186 173 823 190 TOTAL 1,343 759 113 522 124 PM 836 427 60 301 66 AM 507 185 192 377 430 249 181 140 141 281 45 43 88 TOTALPMAMAM 8:00 AM 8:45 AM 0 8 8 334 213 121 #N/A AMPMTOTAL107 76 31 PM 5:00 PM 5:45 PM 124 64 60 103 214 317 565 353 212 361 AM 76 245 7 328 594 PM 93 482 14 589 955 Total 169 727 21 917 Walnut Grove Walnut Grove Walnut Grove Hellman-RamonaHellman-RamonaPEAK HOUR AimTD LLC TURNING MOVEMENT COUNTS Walnut Grove Hellman-RamonaHellman-RamonaSC2702 ALL HOURS Rosemead Apx - 36 DATE:LOCATION:PROJECT #:SC2702 Wed, Oct 21, 20 NORTH & SOUTH:LOCATION #:1EAST & WEST:CONTROL:SIGNAL NOTES:AM ▲ PM N MD ◄ W E ► OTHER S OTHER ▼ NORTHBOUND SOUTHBOUND EASTBOUND WESTBOUND NL NT NR SL ST SR EL ET ER WL WT WR TOTALLANES:1 2 0 1 2 0 1 2 0 1 2 0 7:00 AM 6 42 6 7 43 5 7 52 10 6 51 18 253 7:15 AM 9 28 9 8 26 11 7 80 3 8 73 17 279 7:30 AM 12 44 7 20 47 10 16 94 6 10 70 13 349 7:45 AM 14 36 11 17 41 10 14 106 8 17 88 19 381 8:00 AM 20 47 15 35 64 11 10 99 7 10 74 8 400 8:15 AM 9 42 17 29 60 13 11 117 8 18 110 17 451 8:30 AM 11 54 23 34 42 14 21 95 8 10 116 21 449 8:45 AM 13 38 17 30 56 17 17 115 13 15 121 24 476 VOLUMES 94 331 105 180 379 91 103 758 63 94 703 137 3,038 APPROACH %18%62%20%28%58%14%11%82%7%10%75%15% APP/DEPART 530 /571 650 /536 924 /1,043 934 /888 0 BEGIN PEAK HR VOLUMES 53 181 72 128 222 55 59 426 36 53 421 70 1,776 APPROACH %17%59%24%32%55%14%11%82%7%10%77%13% PEAK HR FACTOR 0.869 0.920 0.898 0.850 0.933 APP/DEPART 306 /310 405 /311 521 /626 544 /529 0 4:00 PM 26 77 30 37 80 27 35 178 16 20 175 39 740 4:15 PM 21 78 30 40 86 23 25 187 17 37 131 28 703 4:30 PM 16 114 34 27 106 14 24 161 16 29 167 41 749 4:45 PM 17 77 25 25 101 18 19 159 24 23 179 32 699 5:00 PM 30 96 32 26 81 24 35 185 20 22 170 41 762 5:15 PM 24 96 32 41 89 24 27 174 16 35 171 33 762 5:30 PM 21 76 39 34 100 22 22 160 14 26 177 43 734 5:45 PM 19 92 21 36 90 28 31 154 21 19 162 36 709 VOLUMES 174 706 243 266 733 180 218 1,358 144 211 1,332 293 5,858 APPROACH %15%63%22%23%62%15%13%79%8%11%73%16% APP/DEPART 1,123 /1,216 1,179 /1,085 1,720 /1,870 1,836 /1,687 0 BEGIN PEAK HR VOLUMES 87 383 123 119 377 80 105 679 76 109 687 147 2,972 APPROACH %15%65%21%21%65%14%12%79%9%12%73%16% PEAK HR FACTOR 0.904 0.935 0.896 0.986 0.975 APP/DEPART 593 /634 576 /561 860 /922 943 /855 0 INTERSECTION TURNING MOVEMENT COUNTS PREPARED BY: AimTD LLC. tel: 714 253 7888 cs@aimtd.com Rosemead Walnut Grove Garvey Walnut Grove Walnut Grove Garvey Garvey AM8:00 AM PM4:30 PM Apx - 37 1,829 271 1,112 446 TOTAL 1,787 1,179 180 733 266 PM 1,216 650 91 379 180 AM 571 934 1,836 2,770 2,575 1,687 888 137 293 430 703 1,332 2,035 TOTALPMAM94 211 305 321 218 103 AMPMTOTAL2,116 1,358 758 207 144 63 1,043 1,870 2,913 2,644 1,720 924 536 AM 94 331 105 530 1,085 PM 174 706 243 1,123 1,621 TOTAL 268 1,037 348 1,653 981 135 599 247 TOTAL 944 576 80 377 119 PM 634 405 55 222 128 AM 310 544 943 1,487 1,384 855 529 70 147 217 421 687 1,108 TOTALPMAMAM 8:00 AM 8:45 AM 53 109 162 164 105 59 #N/A AMPMTOTAL1,105 679 426 PM 4:30 PM 5:45 PM 112 76 36 626 922 1,548 1,381 860 521 311 AM 53 181 72 306 561 PM 87 383 123 593 872 Total 140 564 195 899 AimTD LLC TURNING MOVEMENT COUNTS Walnut Grove GarveyGarveySC2702 ALL HOURS Rosemead Walnut Grove Walnut Grove Walnut Grove GarveyGarveyPEAK HOUR Apx - 38 Turning Movement Count Prepared by: G.E. Traffic Surveys AM PEAK COUNT TURNING MOVEMENT COUNT PROJECT NAME:CITY OF ROSEMEAD TRAFFIC ANALYSIS PROJECT NO:18480 DATE:26-Sep-18 PASSENGER CARS N-S STREET:WALNUT GROVE AVE E-W STREET:HELLMAN AVE TIME NORTH BOUND SOUTH BOUND N-S EAST BOUND WEST BOUND E-W ADULT PED COUNT LEFT THRU RIGHT LEFT THRU RIGHT TOTAL LEFT THRU RIGHT LEFT THRU RIGHT TOTAL NL SL EL WL 07:00-07:15 18 52 1 11 72 15 169 16 7 25 18 31 97 1 07:15-07:30 16 91 1 12 93 6 219 26 4 14 1 10 50 105 07:30-07:45 32 115 2 8 114 18 289 32 10 24 1 202 74 343 07:45-08:00 36 156 2 17 160 27 398 39 7 33 20 58 157 2 08:00-08:15 30 123 1 21 195 23 393 39 15 33 13 40 140 2 2 1 08:15-08:30 36 119 8 14 183 32 392 33 26 25 12 44 140 1 08:30-08:45 28 99 4 15 188 24 358 47 23 21 1 14 51 157 08:45-09:00 33 102 3 22 177 25 362 46 12 31 1 19 45 154 SCHOOL AGE PED COUNT3+ AXLE TRUCKS NL SL EL WL 07:00-07:15 1 1 2 0 07:15-07:30 0 0 1 07:30-07:45 0 0 07:45-08:00 0 0 08:00-08:15 2 1 1 1 5 0 08:15-08:30 0 0 08:30-08:45 1 1 2 0 08:45-09:00 1 1 0 BIKE COUNT NL SL EL WL 07:00-07:15 0 0 1 07:15-07:30 0 0 1 07:30-07:45 0 0 1 1 07:45-08:00 0 0 2 3 08:00-08:15 0 0 2 08:15-08:30 0 0 5 08:30-08:45 0 0 08:45-09:00 0 0 1 PEAK-HOUR VOLUME ANALYSIS CALCULATED PEAK HOUR VOLUMES-AM ADJUSTED PEAK HOUR VOLUMES- TOTAL PCE AM 100 652 60 102 656 60 SR ST SL SR ST SL 143 EL WR 216 143 EL WR 216 58 ET 07:30-08:30 WT 247 58 ET TOTAL PCE WT 247 115 ER CARS WL 1 115 ER ALL VEHICLES WITH PCE WL 1 NL NT NR \NL NT NR 134 513 13 138 519 13 CALCULATED PEAK HOUR VOLUMES- 3 AXLE TRUCKS ADJUSTED PEAK HOUR VOLUMES AFTER PCE OF 2.0 1 2 0 2 4 0 SR ST SL SR ST SL 0 EL WR 0 0 EL WR 0 0 ET 08:00-09:00 WT 0 0 ET 08:00-09:00 WT 0 0 ER WL 0 0 ER PCE 3 AXLE TRUCKS WL 0 NL NT NR NL NT NR 2 3 0 4 6 0 CALCULATED PEAK HOUR VOLUMES ADJUSTED PEAK HOUR VOLUMES AFTER PCE OF 3.0 0 0 0 0 0 0 SR ST SL SR ST SL 0 EL WR 0 0 EL WR 0 0 ET 07:00-08:00 WT 0 0 ET 07:00-08:00 WT 0 0 ER WL 0 0 ER WL 0 NL NT NR NL NT NR 0 0 0 0 0 0 Apx - 39 Turning Movement Count Prepared by: G.E. Traffic Surveys PM PEAK COUNT TURNING MOVEMENT COUNT PROJECT NAME:CITY OF ROSEMEAD TRAFFIC ANALYSIS PROJECT NO:18480 DATE:26-Sep-18 PASSENGER CARS N-S STREET:WALNUT GROVE AVE E-W STREET:HELLMAN AVE TIME NORTH BOUND SOUTH BOUND N-S EAST BOUND WEST BOUND E-W ADULT PED COUNT LEFT THRU RIGHT LEFT THRU RIGHT TOTAL LEFT THRU RIGHT LEFT THRU RIGHT TOTAL NL SL EL WL 16:00-16:15 35 174 2 28 162 23 424 55 27 16 1 8 35 142 2 1 16:15-16:30 22 197 1 30 176 21 447 57 18 23 1 6 34 139 16:30-16:45 36 139 3 22 137 26 363 60 21 18 2 8 41 150 16:45-17:00 24 167 1 30 153 20 395 70 22 19 4 47 162 17:00-17:15 36 223 3 39 155 26 482 63 13 16 2 6 52 152 17:15-17:30 34 220 4 43 174 36 511 60 18 17 1 11 53 160 1 1 17:30-17:45 26 210 2 27 148 28 441 76 21 31 3 3 64 198 17:45-18:00 31 227 4 51 192 37 542 88 19 15 1 13 68 204 2 SCHOOL AGE PED COUNT3+ AXLE TRUCKS NL SL EL WL 16:00-16:15 0 0 2 2 16:15-16:30 0 0 16:30-16:45 0 0 16:45-17:00 0 0 1 1 1 17:00-17:15 0 0 17:15-17:30 0 0 1 17:30-17:45 0 0 17:45-18:00 0 0 BIKE COUNT NL SL EL WL 16:00-16:15 1 1 0 1 16:15-16:30 0 0 1 16:30-16:45 0 1 1 16:45-17:00 0 0 1 17:00-17:15 0 1 1 17:15-17:30 0 0 1 17:30-17:45 0 0 1 17:45-18:00 0 1 1 PEAK-HOUR VOLUME ANALYSIS CALCULATED PEAK HOUR VOLUMES-PM ADJUSTED PEAK HOUR VOLUMES- TOTAL PCE PM 127 669 160 127 672 160 SR ST SL SR ST SL 287 EL WR 237 287 EL WR 237 71 ET 17:00-18:00 WT 33 71 ET TOTAL PCE WT 33 79 ER CARS WL 7 79 ER ALL VEHICLES PCE WL 10 NL NT NR NL NT NR 127 880 13 127 880 13 CALCULATED PEAK HOUR VOLUMES-TRUCKS ADJUSTED PEAK HOUR VOLUMES AFTER PCE OF 2.0 0 0 0 0 0 0 SR ST SL SR ST SL 0 EL WR 0 0 EL WR 0 0 ET 16:00-17:00 WT 0 0 ET 16:00-17:00 WT 0 0 ER WL 0 0 ER PCE 3 AXLE TRUCKS WL 0 NL NT NR NL NT NR 0 0 0 0 0 0 CALCULATED PEAK HOUR VOLUMES ADJUSTED PEAK HOUR VOLUMES AFTER PCE OF 3.0 0 1 0 0 3 0 SR ST SL SR ST SL 0 EL WR 0 0 EL WR 0 0 ET 16:00-17:00 WT 0 0 ET 16:00-17:00 WT 0 0 ER WL 1 0 ER WL 3 NL NT NR NL NT NR 0 0 0 0 0 0 Apx - 40 Turning Movement Count Prepared by: G.E. Traffic Surveys AM PEAK COUNT TURNING MOVEMENT COUNT PROJECT NAME:CITY OF ROSEMEAD TRAFFIC ANALYSIS PROJECT NO:18480 DATE:26-Sep-18 PASSENGER CARS N-S STREET:WALNUT GROVE AVE E-W STREET:GARVEY AVE TIME NORTH BOUND SOUTH BOUND N-S EAST BOUND WEST BOUND E-W ADULT PED COUNT LEFT THRU RIGHT LEFT THRU RIGHT TOTAL LEFT THRU RIGHT LEFT THRU RIGHT TOTAL NL SL EL WL 07:00-07:15 13 69 8 8 93 11 202 8 67 9 17 144 24 269 3 5 2 4 07:15-07:30 23 104 16 32 77 24 276 19 68 6 17 155 32 297 8 6 1 5 07:30-07:45 21 107 22 31 131 33 345 23 105 17 36 190 34 405 7 5 2 3 07:45-08:00 50 113 21 43 148 30 405 29 141 24 35 165 35 429 5 9 3 3 08:00-08:15 34 82 19 54 144 33 366 26 190 21 46 182 20 485 15 5 6 6 08:15-08:30 23 113 40 56 153 19 404 14 186 21 21 143 29 414 7 3 5 4 08:30-08:45 17 67 21 43 145 20 313 21 165 16 28 184 32 446 1 9 4 08:45-09:00 15 88 21 58 166 31 379 24 146 17 35 175 22 419 4 11 1 7 SCHOOL AGE PED COUNT3+ AXLE TRUCKS NL SL EL WL 07:00-07:15 1 1 2 0 1 07:15-07:30 1 1 2 2 2 1 1 07:30-07:45 0 1 1 4 2 9 07:45-08:00 1 1 0 3 1 08:00-08:15 0 2 2 2 08:15-08:30 0 1 1 2 1 08:30-08:45 1 1 1 1 1 1 08:45-09:00 0 0 BIKE COUNT NL SL EL WL 07:00-07:15 0 0 1 2 1 07:15-07:30 0 0 2 1 1 07:30-07:45 0 0 1 1 1 2 07:45-08:00 0 0 3 5 2 1 08:00-08:15 0 0 2 4 08:15-08:30 0 0 1 3 08:30-08:45 0 0 2 2 1 08:45-09:00 0 0 4 2 3 PEAK-HOUR VOLUME ANALYSIS CALCULATED PEAK HOUR VOLUMES-AM ADJUSTED PEAK HOUR VOLUMES- TOTAL PCE AM 102 590 196 102 594 196 SR ST SL SR ST SL 90 EL WR 116 90 EL WR 116 682 ET 07:45-08:45 WT 674 682 ET TOTAL PCE WT 678 82 ER CARS WL 130 84 ER ALL VEHICLES WITH PCE WL 130 NL NT NR \NL NT NR 124 375 101 124 379 103 CALCULATED PEAK HOUR VOLUMES- 3 AXLE TRUCKS ADJUSTED PEAK HOUR VOLUMES AFTER PCE OF 2.0 0 2 0 0 4 0 SR ST SL SR ST SL 0 EL WR 0 0 EL WR 0 0 ET 07:00-08:00 WT 2 0 ET 07:00-08:00 WT 4 1 ER WL 0 2 ER PCE 3 AXLE TRUCKS WL 0 NL NT NR NL NT NR 0 2 1 0 4 2 CALCULATED PEAK HOUR VOLUMES ADJUSTED PEAK HOUR VOLUMES AFTER PCE OF 3.0 0 0 0 0 0 0 SR ST SL SR ST SL 0 EL WR 0 0 EL WR 0 0 ET 07:00-08:00 WT 0 0 ET 07:00-08:00 WT 0 0 ER WL 0 0 ER WL 0 NL NT NR NL NT NR 0 0 0 0 0 0 Apx - 41 Turning Movement Count Prepared by: G.E. Traffic Surveys PM PEAK COUNT TURNING MOVEMENT COUNT PROJECT NAME:CITY OF ROSEMEAD TRAFFIC ANALYSIS PROJECT NO:18480 DATE:26-Sep-18 PASSENGER CARS N-S STREET:WALNUT GROVE AVE E-W STREET:GARVEY AVE TIME NORTH BOUND SOUTH BOUND N-S EAST BOUND WEST BOUND E-W ADULT PED COUNT LEFT THRU RIGHT LEFT THRU RIGHT TOTAL LEFT THRU RIGHT LEFT THRU RIGHT TOTAL NL SL EL WL 16:00-16:15 16 150 23 50 110 19 368 24 155 21 31 159 48 438 5 1 6 1 16:15-16:30 14 144 33 39 112 25 367 27 196 24 22 159 34 462 5 3 6 8 16:30-16:45 17 146 26 43 119 19 370 32 190 19 38 149 48 476 3 5 1 2 16:45-17:00 23 156 37 39 103 20 378 28 184 20 23 159 51 465 2 1 17:00-17:15 26 164 25 38 109 20 382 35 166 22 28 192 59 502 4 1 3 7 17:15-17:30 25 189 35 28 117 33 427 31 206 18 33 211 44 543 3 4 3 3 17:30-17:45 37 189 30 49 116 31 452 27 184 21 48 186 28 494 3 6 2 4 17:45-18:00 34 185 38 38 119 13 427 42 186 16 27 176 44 491 9 4 7 5 SCHOOL AGE PED COUNT3+ AXLE TRUCKS NL SL EL WL 16:00-16:15 1 1 1 1 16:15-16:30 1 1 0 2 16:30-16:45 1 1 0 1 3 2 1 16:45-17:00 0 1 1 2 2 1 17:00-17:15 0 1 1 1 3 17:15-17:30 0 0 17:30-17:45 0 0 17:45-18:00 0 1 1 5 1 BIKE COUNT NL SL EL WL 16:00-16:15 0 0 2 16:15-16:30 0 0 2 2 1 2 16:30-16:45 0 0 1 16:45-17:00 0 0 5 1 2 17:00-17:15 0 0 3 2 1 17:15-17:30 0 0 4 1 3 17:30-17:45 0 0 3 1 1 17:45-18:00 0 0 3 1 6 PEAK-HOUR VOLUME ANALYSIS CALCULATED PEAK HOUR VOLUMES-PM ADJUSTED PEAK HOUR VOLUMES- TOTAL PCE PM 97 461 153 99 463 155 SR ST SL SR ST SL 135 EL WR 175 135 EL WR 175 742 ET 17:00-18:00 WT 765 744 ET TOTAL PCE WT 767 77 ER CARS WL 136 79 ER ALL VEHICLES PCE WL 136 NL NT NR NL NT NR 122 727 128 122 727 128 CALCULATED PEAK HOUR VOLUMES-TRUCKS ADJUSTED PEAK HOUR VOLUMES AFTER PCE OF 2.0 1 1 1 2 2 2 SR ST SL SR ST SL 0 EL WR 0 0 EL WR 0 1 ET 16:00-17:00 WT 1 2 ET 16:00-17:00 WT 2 1 ER WL 0 2 ER PCE 3 AXLE TRUCKS WL 0 NL NT NR NL NT NR 0 0 0 0 0 0 CALCULATED PEAK HOUR VOLUMES ADJUSTED PEAK HOUR VOLUMES AFTER PCE OF 3.0 0 0 0 0 0 0 SR ST SL SR ST SL 0 EL WR 0 0 EL WR 0 0 ET 16:00-17:00 WT 0 0 ET 16:00-17:00 WT 0 0 ER WL 0 0 ER WL 0 NL NT NR NL NT NR 0 0 0 0 0 0 Apx - 42 APPENDIX D LEVEL OF SERVICE WORKSHEETS Apx - 43 EXISTING Apx - 44 Intersection Analysis Summary 11/12/2020Report File: C:\...\AME.pdf Scenario 1 Existing AM Peak HourVistro File: C:\...\AME.vistro V/C, Delay, LOS: For two-way stop, these values are taken from the movement with the worst (highest) delay value. For all other control types, they are taken for the whole intersection. B-0.696WB RightICU 1SignalizedWalnut Grove Ave (NS) at Garvey Ave (EW)4 B-0.685SB ThruICU 1SignalizedWalnut Grove Ave (NS) at Hellman Ave (EW)2 A-0.591WB ThruICU 1SignalizedI-10 EB Ramps (NS) at Hellman Ave (EW)1 LOSDelay (s/veh)V/CWorst MvmtMethodControl TypeIntersection NameID 11/12/20201 Scenario 1: 1 Existing AM Peak HourVersion 6.00-03 Generated with Apx - 45 0.591Volume to Capacity (v/c): ALevel Of Service: -Delay (sec / veh): 15 minutesAnalysis Period: ICU 1Analysis Method: SignalizedControl Type: Intersection 1: I-10 EB Ramps (NS) at Hellman Ave (EW) Intersection Level Of Service Report YesYesNoCrosswalk 0.000.000.00Grade [%] 30.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruThruLeftRightLeftTurning Movement Lane Configuration WestboundEastboundSouthboundApproach Name Intersection Setup 000Bicycle Volume [bicycles/h] 000Pedestrian Volume [ped/h] 19015915411513253Total Analysis Volume [veh/h] 48403929363Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.0000Peak Hour Factor 19015915411513253Total Hourly Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 000000Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 000000Site-Generated Trips [veh/h] 000000In-Process Volume [veh/h] 1.001.001.001.001.001.00Growth Factor 2.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 19015915411513253Base Volume Input [veh/h] Name Volumes 11/12/20202 Scenario 1: 1 Existing AM Peak HourVersion 6.00-03 Generated with Apx - 46 0.591Intersection V/C AIntersection LOS 0.190.190.150.060.150.14V/C, Movement V/C Ratio Movement, Approach, & Intersection Results -----LeadLead / Lag Auxiliary Signal Groups 048001Signal group SplitSplitSplitSplitPermissivePermissiveControl Type Phasing & Timing 10.00Lost time [s] 100Cycle Length [s] Intersection Settings 11/12/20203 Scenario 1: 1 Existing AM Peak HourVersion 6.00-03 Generated with Apx - 47 0.685Volume to Capacity (v/c): BLevel Of Service: -Delay (sec / veh): 15 minutesAnalysis Period: ICU 1Analysis Method: SignalizedControl Type: Intersection 2: Walnut Grove Ave (NS) at Hellman Ave (EW) Intersection Level Of Service Report YesYesNoYesCrosswalk 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Name Intersection Setup 0000Bicycle Volume [bicycles/h] 0000Pedestrian Volume [ped/h] 2698601155923211557812713470146Total Analysis Volume [veh/h] 672202915582914532311837Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 2698601155923211557812713470146Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.001.001.001.001.001.001.001.001.00Growth Factor 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 2698601155923211557812713470146Base Volume Input [veh/h] Name Volumes 11/12/20204 Scenario 1: 1 Existing AM Peak HourVersion 6.00-03 Generated with Apx - 48 0.685Intersection V/C BIntersection LOS 0.150.050.000.060.160.130.190.190.070.130.130.08V/C, Movement V/C Ratio Movement, Approach, & Intersection Results --------Lead--LeadLead / Lag Auxiliary Signal Groups 040080061025Signal group SplitSplitSplitSplitSplitSplitPermissPermissProtectePermissPermissProtecteControl Type Phasing & Timing 10.00Lost time [s] 100Cycle Length [s] Intersection Settings 11/12/20205 Scenario 1: 1 Existing AM Peak HourVersion 6.00-03 Generated with Apx - 49 0.696Volume to Capacity (v/c): BLevel Of Service: -Delay (sec / veh): 15 minutesAnalysis Period: ICU 1Analysis Method: SignalizedControl Type: Intersection 4: Walnut Grove Ave (NS) at Garvey Ave (EW) Intersection Level Of Service Report YesYesYesYesCrosswalk 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Name Intersection Setup 0000Bicycle Volume [bicycles/h] 0000Pedestrian Volume [ped/h] 13480810269818113196426246138347102Total Analysis Volume [veh/h] 342022617205284910762358726Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 13480810269818113196426246138347102Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.001.001.001.001.001.001.001.001.00Growth Factor 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 13480810269818113196426246138347102Base Volume Input [veh/h] Name Volumes 11/12/20206 Scenario 1: 1 Existing AM Peak HourVersion 6.00-03 Generated with Apx - 50 0.696Intersection V/C BIntersection LOS 0.260.260.060.250.250.060.170.170.140.130.130.06V/C, Movement V/C Ratio Movement, Approach, & Intersection Results --Lead--Lead--Lead--LeadLead / Lag Auxiliary Signal Groups 047083061025Signal group PermissPermissProtectePermissPermissProtectePermissPermissProtectePermissPermissProtecteControl Type Phasing & Timing 10.00Lost time [s] 100Cycle Length [s] Intersection Settings 11/12/20207 Scenario 1: 1 Existing AM Peak HourVersion 6.00-03 Generated with Apx - 51 Intersection Analysis Summary 11/12/2020Report File: C:\...\PME.pdf Scenario 1 Existing PM Peak HourVistro File: C:\...\PME.vistro V/C, Delay, LOS: For two-way stop, these values are taken from the movement with the worst (highest) delay value. For all other control types, they are taken for the whole intersection. C-0.765WB RightICU 1SignalizedWalnut Grove Ave (NS) at Garvey Ave (EW)4 C-0.726SB RightICU 1SignalizedWalnut Grove Ave (NS) at Hellman Ave (EW)2 A-0.583WB RightICU 1SignalizedI-10 EB Ramps (NS) at Hellman Ave (EW)1 LOSDelay (s/veh)V/CWorst MvmtMethodControl TypeIntersection NameID 11/12/20201 Scenario 1: 1 Existing PM Peak HourVersion 6.00-03 Generated with Apx - 52 0.583Volume to Capacity (v/c): ALevel Of Service: -Delay (sec / veh): 15 minutesAnalysis Period: ICU 1Analysis Method: SignalizedControl Type: Intersection 1: I-10 EB Ramps (NS) at Hellman Ave (EW) Intersection Level Of Service Report YesYesNoCrosswalk 0.000.000.00Grade [%] 30.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruThruLeftRightLeftTurning Movement Lane Configuration WestboundEastboundSouthboundApproach Name Intersection Setup 000Bicycle Volume [bicycles/h] 000Pedestrian Volume [ped/h] 1302022214717252Total Analysis Volume [veh/h] 33515512463Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.0000Peak Hour Factor 1302022214717252Total Hourly Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 000000Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 000000Site-Generated Trips [veh/h] 000000In-Process Volume [veh/h] 1.001.001.001.001.001.00Growth Factor 2.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 1302022214717252Base Volume Input [veh/h] Name Volumes 11/12/20202 Scenario 1: 1 Existing PM Peak HourVersion 6.00-03 Generated with Apx - 53 0.583Intersection V/C AIntersection LOS 0.180.180.150.030.150.14V/C, Movement V/C Ratio Movement, Approach, & Intersection Results -----LeadLead / Lag Auxiliary Signal Groups 048001Signal group SplitSplitSplitSplitPermissivePermissiveControl Type Phasing & Timing 10.00Lost time [s] 100Cycle Length [s] Intersection Settings 11/12/20203 Scenario 1: 1 Existing PM Peak HourVersion 6.00-03 Generated with Apx - 54 0.726Volume to Capacity (v/c): CLevel Of Service: -Delay (sec / veh): 15 minutesAnalysis Period: ICU 1Analysis Method: SignalizedControl Type: Intersection 2: Walnut Grove Ave (NS) at Hellman Ave (EW) Intersection Level Of Service Report YesYesNoYesCrosswalk 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Name Intersection Setup 0000Bicycle Volume [bicycles/h] 0000Pedestrian Volume [ped/h] 18958118610228515169916619646125Total Analysis Volume [veh/h] 471532226713817542516231Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 18958118610228515169916619646125Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.001.001.001.001.001.001.001.001.00Growth Factor 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 18958118610228515169916619646125Base Volume Input [veh/h] Name Volumes 11/12/20204 Scenario 1: 1 Existing PM Peak HourVersion 6.00-03 Generated with Apx - 55 0.726Intersection V/C CIntersection LOS 0.110.040.010.050.220.160.240.240.090.180.180.07V/C, Movement V/C Ratio Movement, Approach, & Intersection Results --------Lead--LeadLead / Lag Auxiliary Signal Groups 040080061025Signal group SplitSplitSplitSplitSplitSplitPermissPermissProtectePermissPermissProtecteControl Type Phasing & Timing 10.00Lost time [s] 100Cycle Length [s] Intersection Settings 11/12/20205 Scenario 1: 1 Existing PM Peak HourVersion 6.00-03 Generated with Apx - 56 0.765Volume to Capacity (v/c): CLevel Of Service: -Delay (sec / veh): 15 minutesAnalysis Period: ICU 1Analysis Method: SignalizedControl Type: Intersection 4: Walnut Grove Ave (NS) at Garvey Ave (EW) Intersection Level Of Service Report YesYesYesYesCrosswalk 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Name Intersection Setup 0000Bicycle Volume [bicycles/h] 0000Pedestrian Volume [ped/h] 197920146102910141107505159165513117Total Analysis Volume [veh/h] 4923037262283527126404112829Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 197920146102910141107505159165513117Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.001.001.001.001.001.001.001.001.00Growth Factor 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 197920146102910141107505159165513117Base Volume Input [veh/h] Name Volumes 11/12/20206 Scenario 1: 1 Existing PM Peak HourVersion 6.00-03 Generated with Apx - 57 0.765Intersection V/C CIntersection LOS 0.310.310.080.280.280.080.170.170.090.190.190.07V/C, Movement V/C Ratio Movement, Approach, & Intersection Results --Lead--Lead--Lead--LeadLead / Lag Auxiliary Signal Groups 047083061025Signal group PermissPermissProtectePermissPermissProtectePermissPermissProtectePermissPermissProtecteControl Type Phasing & Timing 10.00Lost time [s] 100Cycle Length [s] Intersection Settings 11/12/20207 Scenario 1: 1 Existing PM Peak HourVersion 6.00-03 Generated with Apx - 58 EXISTING PLUS PROJECT Apx - 59 Intersection Analysis Summary 11/12/2020Report File: C:\...\AMEP.pdf Scenario 2 Existing Plus Projct AM Peak HourVistro File: C:\...\AME.vistro V/C, Delay, LOS: For two-way stop, these values are taken from the movement with the worst (highest) delay value. For all other control types, they are taken for the whole intersection. C-0.724WB ThruICU 1SignalizedWalnut Grove Ave (NS) at Garvey Ave (EW)4 D33.50.151EB LeftHCM 6th EditionTwo-way stopWalnut Grove Ave (NS) at Project Dwy (EW)3 B-0.694SB RightICU 1SignalizedWalnut Grove Ave (NS) at Hellman Ave (EW)2 B-0.601WB RightICU 1SignalizedI-10 EB Ramps (NS) at Hellman Ave (EW)1 LOSDelay (s/veh)V/CWorst MvmtMethodControl TypeIntersection NameID 11/12/20201 Scenario 2: 2 Existing Plus Projct AM Peak HourVersion 6.00-03 Generated with Apx - 60 0.601Volume to Capacity (v/c): BLevel Of Service: -Delay (sec / veh): 15 minutesAnalysis Period: ICU 1Analysis Method: SignalizedControl Type: Intersection 1: I-10 EB Ramps (NS) at Hellman Ave (EW) Intersection Level Of Service Report YesYesNoCrosswalk 0.000.000.00Grade [%] 30.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruThruLeftRightLeftTurning Movement Lane Configuration WestboundEastboundSouthboundApproach Name Intersection Setup 000Bicycle Volume [bicycles/h] 000Pedestrian Volume [ped/h] 19516215811513258Total Analysis Volume [veh/h] 49414029365Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.0000Peak Hour Factor 19516215811513258Total Hourly Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 000000Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 534005Site-Generated Trips [veh/h] 000000In-Process Volume [veh/h] 1.001.001.001.001.001.00Growth Factor 2.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 19015915411513253Base Volume Input [veh/h] Name Volumes 11/12/20202 Scenario 2: 2 Existing Plus Projct AM Peak HourVersion 6.00-03 Generated with Apx - 61 0.601Intersection V/C BIntersection LOS 0.200.200.150.060.150.14V/C, Movement V/C Ratio Movement, Approach, & Intersection Results -----LeadLead / Lag Auxiliary Signal Groups 048001Signal group SplitSplitSplitSplitPermissivePermissiveControl Type Phasing & Timing 10.00Lost time [s] 100Cycle Length [s] Intersection Settings 11/12/20203 Scenario 2: 2 Existing Plus Projct AM Peak HourVersion 6.00-03 Generated with Apx - 62 0.694Volume to Capacity (v/c): BLevel Of Service: -Delay (sec / veh): 15 minutesAnalysis Period: ICU 1Analysis Method: SignalizedControl Type: Intersection 2: Walnut Grove Ave (NS) at Hellman Ave (EW) Intersection Level Of Service Report YesYesNoYesCrosswalk 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Name Intersection Setup 0000Bicycle Volume [bicycles/h] 0000Pedestrian Volume [ped/h] 2698601245923211559412713484154Total Analysis Volume [veh/h] 672203115582914932312139Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 2698601245923211559412713484154Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 00090001600148Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.001.001.001.001.001.001.001.001.00Growth Factor 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 2698601155923211557812713470146Base Volume Input [veh/h] Name Volumes 11/12/20204 Scenario 2: 2 Existing Plus Projct AM Peak HourVersion 6.00-03 Generated with Apx - 63 0.694Intersection V/C BIntersection LOS 0.150.050.000.070.160.130.200.200.070.140.140.09V/C, Movement V/C Ratio Movement, Approach, & Intersection Results --------Lead--LeadLead / Lag Auxiliary Signal Groups 040080061025Signal group SplitSplitSplitSplitSplitSplitPermissPermissProtectePermissPermissProtecteControl Type Phasing & Timing 10.00Lost time [s] 100Cycle Length [s] Intersection Settings 11/12/20205 Scenario 2: 2 Existing Plus Projct AM Peak HourVersion 6.00-03 Generated with Apx - 64 0.151Volume to Capacity (v/c): DLevel Of Service: 33.5Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: Two-way stopControl Type: Intersection 3: Walnut Grove Ave (NS) at Project Dwy (EW) Intersection Level Of Service Report YesYesYesCrosswalk 0.000.000.00Grade [%] 30.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] RightLeftRightThruThruLeftTurning Movement Lane Configuration EastboundSouthboundNorthboundApproach Name Intersection Setup 000Pedestrian Volume [ped/h] 48222586859450Total Analysis Volume [veh/h] 126621714913Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.0000Peak Hour Factor 48222586859450Total Hourly Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 000000Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 4822250050Site-Generated Trips [veh/h] 000000In-Process Volume [veh/h] 1.001.001.001.001.001.00Growth Factor 2.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 0008685940Base Volume Input [veh/h] Name Volumes 11/12/20206 Scenario 2: 2 Existing Plus Projct AM Peak HourVersion 6.00-03 Generated with Apx - 65 DIntersection LOS 1.23d_I, Intersection Delay [s/veh] CAAApproach LOS 20.930.000.78d_A, Approach Delay [s/veh] 22.5622.560.000.002.655.3095th-Percentile Queue Length [ft/ln] 0.900.900.000.000.110.2195th-Percentile Queue Length [veh/ln] CDAAABMovement LOS 15.1833.470.000.000.0010.10d_M, Delay for Movement [s/veh] 0.090.150.000.010.010.07V/C, Movement V/C Ratio Movement, Approach, & Intersection Results 000Number of Storage Spaces in Median NoTwo-Stage Gap Acceptance 000Storage Area [veh] NoFlared Lane StopFreeFreePriority Scheme Intersection Settings 11/12/20207 Scenario 2: 2 Existing Plus Projct AM Peak HourVersion 6.00-03 Generated with Apx - 66 0.724Volume to Capacity (v/c): CLevel Of Service: -Delay (sec / veh): 15 minutesAnalysis Period: ICU 1Analysis Method: SignalizedControl Type: Intersection 4: Walnut Grove Ave (NS) at Garvey Ave (EW) Intersection Level Of Service Report YesYesYesYesCrosswalk 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Name Intersection Setup 0000Bicycle Volume [bicycles/h] 0000Pedestrian Volume [ped/h] 15180810269818130212441263138363102Total Analysis Volume [veh/h] 382022617205335311066359126Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 15180810269818130212441263138363102Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 170000171615170160Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.001.001.001.001.001.001.001.001.00Growth Factor 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 13480810269818113196426246138347102Base Volume Input [veh/h] Name Volumes 11/12/20208 Scenario 2: 2 Existing Plus Projct AM Peak HourVersion 6.00-03 Generated with Apx - 67 0.724Intersection V/C CIntersection LOS 0.270.270.060.250.250.070.180.180.150.140.140.06V/C, Movement V/C Ratio Movement, Approach, & Intersection Results --Lead--Lead--Lead--LeadLead / Lag Auxiliary Signal Groups 047083061025Signal group PermissPermissProtectePermissPermissProtectePermissPermissProtectePermissPermissProtecteControl Type Phasing & Timing 10.00Lost time [s] 100Cycle Length [s] Intersection Settings 11/12/20209 Scenario 2: 2 Existing Plus Projct AM Peak HourVersion 6.00-03 Generated with Apx - 68 Intersection Analysis Summary 11/12/2020Report File: C:\...\PMEP.pdf Scenario 2 Existing Plus Project PM Peak HourVistro File: C:\...\PME.vistro V/C, Delay, LOS: For two-way stop, these values are taken from the movement with the worst (highest) delay value. For all other control types, they are taken for the whole intersection. C-0.777WB RightICU 1SignalizedWalnut Grove Ave (NS) at Garvey Ave (EW)4 D29.10.081EB LeftHCM 6th EditionTwo-way stopWalnut Grove Ave (NS) at Project Dwy (EW)3 C-0.731SB ThruICU 1SignalizedWalnut Grove Ave (NS) at Hellman Ave (EW)2 A-0.588WB ThruICU 1SignalizedI-10 EB Ramps (NS) at Hellman Ave (EW)1 LOSDelay (s/veh)V/CWorst MvmtMethodControl TypeIntersection NameID 11/12/20201 Scenario 2: 2 Existing Plus Project PM Peak HourVersion 6.00-03 Generated with Apx - 69 0.588Volume to Capacity (v/c): ALevel Of Service: -Delay (sec / veh): 15 minutesAnalysis Period: ICU 1Analysis Method: SignalizedControl Type: Intersection 1: I-10 EB Ramps (NS) at Hellman Ave (EW) Intersection Level Of Service Report YesYesNoCrosswalk 0.000.000.00Grade [%] 30.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruThruLeftRightLeftTurning Movement Lane Configuration WestboundEastboundSouthboundApproach Name Intersection Setup 000Bicycle Volume [bicycles/h] 000Pedestrian Volume [ped/h] 1342042224717255Total Analysis Volume [veh/h] 34515612464Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.0000Peak Hour Factor 1342042224717255Total Hourly Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 000000Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 421003Site-Generated Trips [veh/h] 000000In-Process Volume [veh/h] 1.001.001.001.001.001.00Growth Factor 2.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 1302022214717252Base Volume Input [veh/h] Name Volumes 11/12/20202 Scenario 2: 2 Existing Plus Project PM Peak HourVersion 6.00-03 Generated with Apx - 70 0.588Intersection V/C AIntersection LOS 0.190.190.150.030.150.14V/C, Movement V/C Ratio Movement, Approach, & Intersection Results -----LeadLead / Lag Auxiliary Signal Groups 048001Signal group SplitSplitSplitSplitPermissivePermissiveControl Type Phasing & Timing 10.00Lost time [s] 100Cycle Length [s] Intersection Settings 11/12/20203 Scenario 2: 2 Existing Plus Project PM Peak HourVersion 6.00-03 Generated with Apx - 71 0.731Volume to Capacity (v/c): CLevel Of Service: -Delay (sec / veh): 15 minutesAnalysis Period: ICU 1Analysis Method: SignalizedControl Type: Intersection 2: Walnut Grove Ave (NS) at Hellman Ave (EW) Intersection Level Of Service Report YesYesNoYesCrosswalk 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Name Intersection Setup 0000Bicycle Volume [bicycles/h] 0000Pedestrian Volume [ped/h] 18958119010228515170616619653131Total Analysis Volume [veh/h] 471532326713817742516333Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 18958119010228515170616619653131Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000400070076Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.001.001.001.001.001.001.001.001.00Growth Factor 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 18958118610228515169916619646125Base Volume Input [veh/h] Name Volumes 11/12/20204 Scenario 2: 2 Existing Plus Project PM Peak HourVersion 6.00-03 Generated with Apx - 72 0.731Intersection V/C CIntersection LOS 0.110.040.010.050.220.160.240.240.090.190.190.07V/C, Movement V/C Ratio Movement, Approach, & Intersection Results --------Lead--LeadLead / Lag Auxiliary Signal Groups 040080061025Signal group SplitSplitSplitSplitSplitSplitPermissPermissProtectePermissPermissProtecteControl Type Phasing & Timing 10.00Lost time [s] 100Cycle Length [s] Intersection Settings 11/12/20205 Scenario 2: 2 Existing Plus Project PM Peak HourVersion 6.00-03 Generated with Apx - 73 0.081Volume to Capacity (v/c): DLevel Of Service: 29.1Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: Two-way stopControl Type: Intersection 3: Walnut Grove Ave (NS) at Project Dwy (EW) Intersection Level Of Service Report YesYesYesCrosswalk 0.000.000.00Grade [%] 30.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] RightLeftRightThruThruLeftTurning Movement Lane Configuration EastboundSouthboundNorthboundApproach Name Intersection Setup 000Pedestrian Volume [ped/h] 20131177185122Total Analysis Volume [veh/h] 5331932136Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.0000Peak Hour Factor 20131177185122Total Hourly Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 000000Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 2013110022Site-Generated Trips [veh/h] 000000In-Process Volume [veh/h] 1.001.001.001.001.001.00Growth Factor 2.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 0007718510Base Volume Input [veh/h] Name Volumes 11/12/20206 Scenario 2: 2 Existing Plus Project PM Peak HourVersion 6.00-03 Generated with Apx - 74 DIntersection LOS 0.50d_I, Intersection Delay [s/veh] CAAApproach LOS 19.050.000.24d_A, Approach Delay [s/veh] 9.559.550.000.001.022.0495th-Percentile Queue Length [ft/ln] 0.380.380.000.000.040.0895th-Percentile Queue Length [veh/ln] BDAAAAMovement LOS 12.5229.090.000.000.009.45d_M, Delay for Movement [s/veh] 0.030.080.000.010.010.03V/C, Movement V/C Ratio Movement, Approach, & Intersection Results 000Number of Storage Spaces in Median NoTwo-Stage Gap Acceptance 000Storage Area [veh] NoFlared Lane StopFreeFreePriority Scheme Intersection Settings 11/12/20207 Scenario 2: 2 Existing Plus Project PM Peak HourVersion 6.00-03 Generated with Apx - 75 0.777Volume to Capacity (v/c): CLevel Of Service: -Delay (sec / veh): 15 minutesAnalysis Period: ICU 1Analysis Method: SignalizedControl Type: Intersection 4: Walnut Grove Ave (NS) at Garvey Ave (EW) Intersection Level Of Service Report YesYesYesYesCrosswalk 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Name Intersection Setup 0000Bicycle Volume [bicycles/h] 0000Pedestrian Volume [ped/h] 204920146102910148113512166165521117Total Analysis Volume [veh/h] 5123037262283728128424113029Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 204920146102910148113512166165521117Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 700007677080Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.001.001.001.001.001.001.001.001.00Growth Factor 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 197920146102910141107505159165513117Base Volume Input [veh/h] Name Volumes 11/12/20208 Scenario 2: 2 Existing Plus Project PM Peak HourVersion 6.00-03 Generated with Apx - 76 0.777Intersection V/C CIntersection LOS 0.310.310.080.280.280.080.170.170.090.190.190.07V/C, Movement V/C Ratio Movement, Approach, & Intersection Results --Lead--Lead--Lead--LeadLead / Lag Auxiliary Signal Groups 047083061025Signal group PermissPermissProtectePermissPermissProtectePermissPermissProtectePermissPermissProtecteControl Type Phasing & Timing 10.00Lost time [s] 100Cycle Length [s] Intersection Settings 11/12/20209 Scenario 2: 2 Existing Plus Project PM Peak HourVersion 6.00-03 Generated with Apx - 77 OPENING YEAR (2022) WITHOUT PROJECT Apx - 78 Intersection Analysis Summary 11/12/2020Report File: C:\...\AMOYWO.pdf Scenario 3 Opening Year (2022) Without Project AM Peak HourVistro File: C:\...\AME.vistro V/C, Delay, LOS: For two-way stop, these values are taken from the movement with the worst (highest) delay value. For all other control types, they are taken for the whole intersection. C-0.713WB ThruICU 1SignalizedWalnut Grove Ave (NS) at Garvey Ave (EW)4 C-0.706SB ThruICU 1SignalizedWalnut Grove Ave (NS) at Hellman Ave (EW)2 B-0.620WB ThruICU 1SignalizedI-10 EB Ramps (NS) at Hellman Ave (EW)1 LOSDelay (s/veh)V/CWorst MvmtMethodControl TypeIntersection NameID 11/12/20201 Scenario 3: 3 Opening Year (2022) Without Project AM Peak HourVersion 6.00-03 Generated with Apx - 79 0.620Volume to Capacity (v/c): BLevel Of Service: -Delay (sec / veh): 15 minutesAnalysis Period: ICU 1Analysis Method: SignalizedControl Type: Intersection 1: I-10 EB Ramps (NS) at Hellman Ave (EW) Intersection Level Of Service Report YesYesNoCrosswalk 0.000.000.00Grade [%] 30.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruThruLeftRightLeftTurning Movement Lane Configuration WestboundEastboundSouthboundApproach Name Intersection Setup 000Bicycle Volume [bicycles/h] 000Pedestrian Volume [ped/h] 19417216413513258Total Analysis Volume [veh/h] 49434134365Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.0000Peak Hour Factor 19417216413513258Total Hourly Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 000000Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 01071800Site-Generated Trips [veh/h] 000000In-Process Volume [veh/h] 1.021.021.021.021.021.02Growth Factor 2.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 19015915411513253Base Volume Input [veh/h] Name Volumes 11/12/20202 Scenario 3: 3 Opening Year (2022) Without Project AM Peak HourVersion 6.00-03 Generated with Apx - 80 0.620Intersection V/C BIntersection LOS 0.200.200.170.080.150.14V/C, Movement V/C Ratio Movement, Approach, & Intersection Results -----LeadLead / Lag Auxiliary Signal Groups 048001Signal group SplitSplitSplitSplitPermissivePermissiveControl Type Phasing & Timing 10.00Lost time [s] 100Cycle Length [s] Intersection Settings 11/12/20203 Scenario 3: 3 Opening Year (2022) Without Project AM Peak HourVersion 6.00-03 Generated with Apx - 81 0.706Volume to Capacity (v/c): CLevel Of Service: -Delay (sec / veh): 15 minutesAnalysis Period: ICU 1Analysis Method: SignalizedControl Type: Intersection 2: Walnut Grove Ave (NS) at Hellman Ave (EW) Intersection Level Of Service Report YesYesNoYesCrosswalk 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Name Intersection Setup 0000Bicycle Volume [bicycles/h] 0000Pedestrian Volume [ped/h] 2748801176024412760113013482149Total Analysis Volume [veh/h] 692202915613215033312137Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 2748801176024412760113013482149Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 00000710110030Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.021.021.021.021.021.021.021.021.021.021.021.02Growth Factor 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 2698601155923211557812713470146Base Volume Input [veh/h] Name Volumes 11/12/20204 Scenario 3: 3 Opening Year (2022) Without Project AM Peak HourVersion 6.00-03 Generated with Apx - 82 0.706Intersection V/C CIntersection LOS 0.150.050.000.070.170.140.200.200.070.140.140.08V/C, Movement V/C Ratio Movement, Approach, & Intersection Results --------Lead--LeadLead / Lag Auxiliary Signal Groups 040080061025Signal group SplitSplitSplitSplitSplitSplitPermissPermissProtectePermissPermissProtecteControl Type Phasing & Timing 10.00Lost time [s] 100Cycle Length [s] Intersection Settings 11/12/20205 Scenario 3: 3 Opening Year (2022) Without Project AM Peak HourVersion 6.00-03 Generated with Apx - 83 0.713Volume to Capacity (v/c): CLevel Of Service: -Delay (sec / veh): 15 minutesAnalysis Period: ICU 1Analysis Method: SignalizedControl Type: Intersection 4: Walnut Grove Ave (NS) at Garvey Ave (EW) Intersection Level Of Service Report YesYesYesYesCrosswalk 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Name Intersection Setup 0000Bicycle Volume [bicycles/h] 0000Pedestrian Volume [ped/h] 13783910477852115209437251141357110Total Analysis Volume [veh/h] 342102619213295210963358928Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 13783910477852115209437251141357110Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 01507180920036Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.021.021.021.021.021.021.021.021.021.021.021.02Growth Factor 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 13480810269818113196426246138347102Base Volume Input [veh/h] Name Volumes 11/12/20206 Scenario 3: 3 Opening Year (2022) Without Project AM Peak HourVersion 6.00-03 Generated with Apx - 84 0.713Intersection V/C CIntersection LOS 0.270.270.060.260.260.060.180.180.140.140.140.06V/C, Movement V/C Ratio Movement, Approach, & Intersection Results --Lead--Lead--Lead--LeadLead / Lag Auxiliary Signal Groups 047083061025Signal group PermissPermissProtectePermissPermissProtectePermissPermissProtectePermissPermissProtecteControl Type Phasing & Timing 10.00Lost time [s] 100Cycle Length [s] Intersection Settings 11/12/20207 Scenario 3: 3 Opening Year (2022) Without Project AM Peak HourVersion 6.00-03 Generated with Apx - 85 Intersection Analysis Summary 11/12/2020Report File: C:\...\PMOYWO.pdf Scenario 3 Opening Year (2022) Without Project PM Peak HourVistro File: C:\...\PME.vistro V/C, Delay, LOS: For two-way stop, these values are taken from the movement with the worst (highest) delay value. For all other control types, they are taken for the whole intersection. C-0.787WB ThruICU 1SignalizedWalnut Grove Ave (NS) at Garvey Ave (EW)4 C-0.755SB ThruICU 1SignalizedWalnut Grove Ave (NS) at Hellman Ave (EW)2 B-0.623WB ThruICU 1SignalizedI-10 EB Ramps (NS) at Hellman Ave (EW)1 LOSDelay (s/veh)V/CWorst MvmtMethodControl TypeIntersection NameID 11/12/20201 Scenario 3: 3 Opening Year (2022) Without Project PM Peak HourVersion 6.00-03 Generated with Apx - 86 0.623Volume to Capacity (v/c): BLevel Of Service: -Delay (sec / veh): 15 minutesAnalysis Period: ICU 1Analysis Method: SignalizedControl Type: Intersection 1: I-10 EB Ramps (NS) at Hellman Ave (EW) Intersection Level Of Service Report YesYesNoCrosswalk 0.000.000.00Grade [%] 30.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruThruLeftRightLeftTurning Movement Lane Configuration WestboundEastboundSouthboundApproach Name Intersection Setup 000Bicycle Volume [bicycles/h] 000Pedestrian Volume [ped/h] 1332262347417257Total Analysis Volume [veh/h] 33575919464Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.0000Peak Hour Factor 1332262347417257Total Hourly Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 000000Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 02092600Site-Generated Trips [veh/h] 000000In-Process Volume [veh/h] 1.021.021.021.021.021.02Growth Factor 2.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 1302022214717252Base Volume Input [veh/h] Name Volumes 11/12/20202 Scenario 3: 3 Opening Year (2022) Without Project PM Peak HourVersion 6.00-03 Generated with Apx - 87 0.623Intersection V/C BIntersection LOS 0.200.200.170.040.150.14V/C, Movement V/C Ratio Movement, Approach, & Intersection Results -----LeadLead / Lag Auxiliary Signal Groups 048001Signal group SplitSplitSplitSplitPermissivePermissiveControl Type Phasing & Timing 10.00Lost time [s] 100Cycle Length [s] Intersection Settings 11/12/20203 Scenario 3: 3 Opening Year (2022) Without Project PM Peak HourVersion 6.00-03 Generated with Apx - 88 0.755Volume to Capacity (v/c): CLevel Of Service: -Delay (sec / veh): 15 minutesAnalysis Period: ICU 1Analysis Method: SignalizedControl Type: Intersection 2: Walnut Grove Ave (NS) at Hellman Ave (EW) Intersection Level Of Service Report YesYesNoYesCrosswalk 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Name Intersection Setup 0000Bicycle Volume [bicycles/h] 0000Pedestrian Volume [ped/h] 19359118810430017473416919662128Total Analysis Volume [veh/h] 481532226754418442516632Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 19359118810430017473416919662128Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 00000920210030Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.021.021.021.021.021.021.021.021.021.021.021.02Growth Factor 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 18958118610228515169916619646125Base Volume Input [veh/h] Name Volumes 11/12/20204 Scenario 3: 3 Opening Year (2022) Without Project PM Peak HourVersion 6.00-03 Generated with Apx - 89 0.755Intersection V/C CIntersection LOS 0.110.040.010.050.220.170.250.250.090.190.190.07V/C, Movement V/C Ratio Movement, Approach, & Intersection Results --------Lead--LeadLead / Lag Auxiliary Signal Groups 040080061025Signal group SplitSplitSplitSplitSplitSplitPermissPermissProtectePermissPermissProtecteControl Type Phasing & Timing 10.00Lost time [s] 100Cycle Length [s] Intersection Settings 11/12/20205 Scenario 3: 3 Opening Year (2022) Without Project PM Peak HourVersion 6.00-03 Generated with Apx - 90 0.787Volume to Capacity (v/c): CLevel Of Service: -Delay (sec / veh): 15 minutesAnalysis Period: ICU 1Analysis Method: SignalizedControl Type: Intersection 4: Walnut Grove Ave (NS) at Garvey Ave (EW) Intersection Level Of Service Report YesYesYesYesCrosswalk 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Name Intersection Setup 0000Bicycle Volume [bicycles/h] 0000Pedestrian Volume [ped/h] 201967149114956144127518162168526131Total Analysis Volume [veh/h] 5024237292393632130414213233Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 201967149114956144127518162168526131Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 02901028018300312Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.021.021.021.021.021.021.021.021.021.021.021.02Growth Factor 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 197920146102910141107505159165513117Base Volume Input [veh/h] Name Volumes 11/12/20206 Scenario 3: 3 Opening Year (2022) Without Project PM Peak HourVersion 6.00-03 Generated with Apx - 91 0.787Intersection V/C CIntersection LOS 0.320.320.080.300.300.080.180.180.090.190.190.07V/C, Movement V/C Ratio Movement, Approach, & Intersection Results --Lead--Lead--Lead--LeadLead / Lag Auxiliary Signal Groups 047083061025Signal group PermissPermissProtectePermissPermissProtectePermissPermissProtectePermissPermissProtecteControl Type Phasing & Timing 10.00Lost time [s] 100Cycle Length [s] Intersection Settings 11/12/20207 Scenario 3: 3 Opening Year (2022) Without Project PM Peak HourVersion 6.00-03 Generated with Apx - 92 OPENING YEAR (2022) WITH PROJECT Apx - 93 Intersection Analysis Summary 11/12/2020Report File: C:\...\AMOYW.pdf Scenario 4 Opening Year (2022) With Project AM Peak HourVistro File: C:\...\AME.vistro V/C, Delay, LOS: For two-way stop, these values are taken from the movement with the worst (highest) delay value. For all other control types, they are taken for the whole intersection. C-0.741WB RightICU 1SignalizedWalnut Grove Ave (NS) at Garvey Ave (EW)4 E35.30.160EB LeftHCM 6th EditionTwo-way stopWalnut Grove Ave (NS) at Project Dwy (EW)3 C-0.715SB ThruICU 1SignalizedWalnut Grove Ave (NS) at Hellman Ave (EW)2 B-0.629WB ThruICU 1SignalizedI-10 EB Ramps (NS) at Hellman Ave (EW)1 LOSDelay (s/veh)V/CWorst MvmtMethodControl TypeIntersection NameID 11/12/20201 Scenario 4: 4 Opening Year (2022) With Project AM Peak HourVersion 6.00-03 Generated with Apx - 94 0.629Volume to Capacity (v/c): BLevel Of Service: -Delay (sec / veh): 15 minutesAnalysis Period: ICU 1Analysis Method: SignalizedControl Type: Intersection 1: I-10 EB Ramps (NS) at Hellman Ave (EW) Intersection Level Of Service Report YesYesNoCrosswalk 0.000.000.00Grade [%] 30.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruThruLeftRightLeftTurning Movement Lane Configuration WestboundEastboundSouthboundApproach Name Intersection Setup 000Bicycle Volume [bicycles/h] 000Pedestrian Volume [ped/h] 19917516813513263Total Analysis Volume [veh/h] 50444234366Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.0000Peak Hour Factor 19917516813513263Total Hourly Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 000000Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 513111805Site-Generated Trips [veh/h] 000000In-Process Volume [veh/h] 1.021.021.021.021.021.02Growth Factor 2.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 19015915411513253Base Volume Input [veh/h] Name Volumes 11/12/20202 Scenario 4: 4 Opening Year (2022) With Project AM Peak HourVersion 6.00-03 Generated with Apx - 95 0.629Intersection V/C BIntersection LOS 0.210.210.170.080.150.15V/C, Movement V/C Ratio Movement, Approach, & Intersection Results -----LeadLead / Lag Auxiliary Signal Groups 048001Signal group SplitSplitSplitSplitPermissivePermissiveControl Type Phasing & Timing 10.00Lost time [s] 100Cycle Length [s] Intersection Settings 11/12/20203 Scenario 4: 4 Opening Year (2022) With Project AM Peak HourVersion 6.00-03 Generated with Apx - 96 0.715Volume to Capacity (v/c): CLevel Of Service: -Delay (sec / veh): 15 minutesAnalysis Period: ICU 1Analysis Method: SignalizedControl Type: Intersection 2: Walnut Grove Ave (NS) at Hellman Ave (EW) Intersection Level Of Service Report YesYesNoYesCrosswalk 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Name Intersection Setup 0000Bicycle Volume [bicycles/h] 0000Pedestrian Volume [ped/h] 2748801266024412761713013496157Total Analysis Volume [veh/h] 692203215613215433312439Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 2748801266024412761713013496157Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000907102700178Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.021.021.021.021.021.021.021.021.021.021.021.02Growth Factor 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 2698601155923211557812713470146Base Volume Input [veh/h] Name Volumes 11/12/20204 Scenario 4: 4 Opening Year (2022) With Project AM Peak HourVersion 6.00-03 Generated with Apx - 97 0.715Intersection V/C CIntersection LOS 0.150.050.000.070.170.140.210.210.070.140.140.09V/C, Movement V/C Ratio Movement, Approach, & Intersection Results --------Lead--LeadLead / Lag Auxiliary Signal Groups 040080061025Signal group SplitSplitSplitSplitSplitSplitPermissPermissProtectePermissPermissProtecteControl Type Phasing & Timing 10.00Lost time [s] 100Cycle Length [s] Intersection Settings 11/12/20205 Scenario 4: 4 Opening Year (2022) With Project AM Peak HourVersion 6.00-03 Generated with Apx - 98 0.160Volume to Capacity (v/c): ELevel Of Service: 35.3Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: Two-way stopControl Type: Intersection 3: Walnut Grove Ave (NS) at Project Dwy (EW) Intersection Level Of Service Report YesYesYesCrosswalk 0.000.000.00Grade [%] 30.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] RightLeftRightThruThruLeftTurning Movement Lane Configuration EastboundSouthboundNorthboundApproach Name Intersection Setup 000Pedestrian Volume [ped/h] 48222589660950Total Analysis Volume [veh/h] 126622415213Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.0000Peak Hour Factor 48222589660950Total Hourly Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 000000Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 48222511350Site-Generated Trips [veh/h] 000000In-Process Volume [veh/h] 1.021.021.021.021.021.02Growth Factor 2.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 0008685940Base Volume Input [veh/h] Name Volumes 11/12/20206 Scenario 4: 4 Opening Year (2022) With Project AM Peak HourVersion 6.00-03 Generated with Apx - 99 EIntersection LOS 1.24d_I, Intersection Delay [s/veh] CAAApproach LOS 21.860.000.78d_A, Approach Delay [s/veh] 23.8123.810.000.002.725.4495th-Percentile Queue Length [ft/ln] 0.950.950.000.000.110.2295th-Percentile Queue Length [veh/ln] CEAAABMovement LOS 15.7135.290.000.000.0010.24d_M, Delay for Movement [s/veh] 0.090.160.000.010.010.07V/C, Movement V/C Ratio Movement, Approach, & Intersection Results 000Number of Storage Spaces in Median NoTwo-Stage Gap Acceptance 000Storage Area [veh] NoFlared Lane StopFreeFreePriority Scheme Intersection Settings 11/12/20207 Scenario 4: 4 Opening Year (2022) With Project AM Peak HourVersion 6.00-03 Generated with Apx - 100 0.741Volume to Capacity (v/c): CLevel Of Service: -Delay (sec / veh): 15 minutesAnalysis Period: ICU 1Analysis Method: SignalizedControl Type: Intersection 4: Walnut Grove Ave (NS) at Garvey Ave (EW) Intersection Level Of Service Report YesYesYesYesCrosswalk 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Name Intersection Setup 0000Bicycle Volume [bicycles/h] 0000Pedestrian Volume [ped/h] 15483910477852132225452268141373110Total Analysis Volume [veh/h] 392102619213335611367359328Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 15483910477852132225452268141373110Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 17150718172517170196Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.021.021.021.021.021.021.021.021.021.021.021.02Growth Factor 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 13480810269818113196426246138347102Base Volume Input [veh/h] Name Volumes 11/12/20208 Scenario 4: 4 Opening Year (2022) With Project AM Peak HourVersion 6.00-03 Generated with Apx - 101 0.741Intersection V/C CIntersection LOS 0.280.280.060.260.260.070.190.190.150.140.140.06V/C, Movement V/C Ratio Movement, Approach, & Intersection Results --Lead--Lead--Lead--LeadLead / Lag Auxiliary Signal Groups 047083061025Signal group PermissPermissProtectePermissPermissProtectePermissPermissProtectePermissPermissProtecteControl Type Phasing & Timing 10.00Lost time [s] 100Cycle Length [s] Intersection Settings 11/12/20209 Scenario 4: 4 Opening Year (2022) With Project AM Peak HourVersion 6.00-03 Generated with Apx - 102 Intersection Analysis Summary 11/12/2020Report File: C:\...\PMOYW.pdf Scenario 4 Opening Year (2022) With Project PM Peak HourVistro File: C:\...\PME.vistro V/C, Delay, LOS: For two-way stop, these values are taken from the movement with the worst (highest) delay value. For all other control types, they are taken for the whole intersection. C-0.799WB RightICU 1SignalizedWalnut Grove Ave (NS) at Garvey Ave (EW)4 D30.90.087EB LeftHCM 6th EditionTwo-way stopWalnut Grove Ave (NS) at Project Dwy (EW)3 C-0.760SB RightICU 1SignalizedWalnut Grove Ave (NS) at Hellman Ave (EW)2 B-0.628WB ThruICU 1SignalizedI-10 EB Ramps (NS) at Hellman Ave (EW)1 LOSDelay (s/veh)V/CWorst MvmtMethodControl TypeIntersection NameID 11/12/20201 Scenario 4: 4 Opening Year (2022) With Project PM Peak HourVersion 6.00-03 Generated with Apx - 103 0.628Volume to Capacity (v/c): BLevel Of Service: -Delay (sec / veh): 15 minutesAnalysis Period: ICU 1Analysis Method: SignalizedControl Type: Intersection 1: I-10 EB Ramps (NS) at Hellman Ave (EW) Intersection Level Of Service Report YesYesNoCrosswalk 0.000.000.00Grade [%] 30.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruThruLeftRightLeftTurning Movement Lane Configuration WestboundEastboundSouthboundApproach Name Intersection Setup 000Bicycle Volume [bicycles/h] 000Pedestrian Volume [ped/h] 1372282357417260Total Analysis Volume [veh/h] 34575919465Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.0000Peak Hour Factor 1372282357417260Total Hourly Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 000000Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 422102603Site-Generated Trips [veh/h] 000000In-Process Volume [veh/h] 1.021.021.021.021.021.02Growth Factor 2.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 1302022214717252Base Volume Input [veh/h] Name Volumes 11/12/20202 Scenario 4: 4 Opening Year (2022) With Project PM Peak HourVersion 6.00-03 Generated with Apx - 104 0.628Intersection V/C BIntersection LOS 0.200.200.170.040.150.14V/C, Movement V/C Ratio Movement, Approach, & Intersection Results -----LeadLead / Lag Auxiliary Signal Groups 048001Signal group SplitSplitSplitSplitPermissivePermissiveControl Type Phasing & Timing 10.00Lost time [s] 100Cycle Length [s] Intersection Settings 11/12/20203 Scenario 4: 4 Opening Year (2022) With Project PM Peak HourVersion 6.00-03 Generated with Apx - 105 0.760Volume to Capacity (v/c): CLevel Of Service: -Delay (sec / veh): 15 minutesAnalysis Period: ICU 1Analysis Method: SignalizedControl Type: Intersection 2: Walnut Grove Ave (NS) at Hellman Ave (EW) Intersection Level Of Service Report YesYesNoYesCrosswalk 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Name Intersection Setup 0000Bicycle Volume [bicycles/h] 0000Pedestrian Volume [ped/h] 19359119210430017474116919669134Total Analysis Volume [veh/h] 481532326754418542516734Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 19359119210430017474116919669134Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000409202800106Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.021.021.021.021.021.021.021.021.021.021.021.02Growth Factor 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 18958118610228515169916619646125Base Volume Input [veh/h] Name Volumes 11/12/20204 Scenario 4: 4 Opening Year (2022) With Project PM Peak HourVersion 6.00-03 Generated with Apx - 106 0.760Intersection V/C CIntersection LOS 0.110.040.010.050.220.170.250.250.090.190.190.07V/C, Movement V/C Ratio Movement, Approach, & Intersection Results --------Lead--LeadLead / Lag Auxiliary Signal Groups 040080061025Signal group SplitSplitSplitSplitSplitSplitPermissPermissProtectePermissPermissProtecteControl Type Phasing & Timing 10.00Lost time [s] 100Cycle Length [s] Intersection Settings 11/12/20205 Scenario 4: 4 Opening Year (2022) With Project PM Peak HourVersion 6.00-03 Generated with Apx - 107 0.087Volume to Capacity (v/c): DLevel Of Service: 30.9Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: Two-way stopControl Type: Intersection 3: Walnut Grove Ave (NS) at Project Dwy (EW) Intersection Level Of Service Report YesYesYesCrosswalk 0.000.000.00Grade [%] 30.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] RightLeftRightThruThruLeftTurning Movement Lane Configuration EastboundSouthboundNorthboundApproach Name Intersection Setup 000Pedestrian Volume [ped/h] 20131180787122Total Analysis Volume [veh/h] 5332022186Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.0000Peak Hour Factor 20131180787122Total Hourly Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 000000Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 20131121322Site-Generated Trips [veh/h] 000000In-Process Volume [veh/h] 1.021.021.021.021.021.02Growth Factor 2.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 0007718510Base Volume Input [veh/h] Name Volumes 11/12/20206 Scenario 4: 4 Opening Year (2022) With Project PM Peak HourVersion 6.00-03 Generated with Apx - 108 DIntersection LOS 0.50d_I, Intersection Delay [s/veh] CAAApproach LOS 20.010.000.24d_A, Approach Delay [s/veh] 10.1810.180.000.001.052.1095th-Percentile Queue Length [ft/ln] 0.410.410.000.000.040.0895th-Percentile Queue Length [veh/ln] BDAAAAMovement LOS 12.8930.950.000.000.009.59d_M, Delay for Movement [s/veh] 0.030.090.000.010.010.03V/C, Movement V/C Ratio Movement, Approach, & Intersection Results 000Number of Storage Spaces in Median NoTwo-Stage Gap Acceptance 000Storage Area [veh] NoFlared Lane StopFreeFreePriority Scheme Intersection Settings 11/12/20207 Scenario 4: 4 Opening Year (2022) With Project PM Peak HourVersion 6.00-03 Generated with Apx - 109 0.799Volume to Capacity (v/c): CLevel Of Service: -Delay (sec / veh): 15 minutesAnalysis Period: ICU 1Analysis Method: SignalizedControl Type: Intersection 4: Walnut Grove Ave (NS) at Garvey Ave (EW) Intersection Level Of Service Report YesYesYesYesCrosswalk 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Name Intersection Setup 0000Bicycle Volume [bicycles/h] 0000Pedestrian Volume [ped/h] 208967149114956151133525169168534131Total Analysis Volume [veh/h] 5224237292393833131424213433Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 208967149114956151133525169168534131Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 7290102872410701112Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.021.021.021.021.021.021.021.021.021.021.021.02Growth Factor 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 197920146102910141107505159165513117Base Volume Input [veh/h] Name Volumes 11/12/20208 Scenario 4: 4 Opening Year (2022) With Project PM Peak HourVersion 6.00-03 Generated with Apx - 110 0.799Intersection V/C CIntersection LOS 0.330.330.080.300.300.080.180.180.090.200.200.07V/C, Movement V/C Ratio Movement, Approach, & Intersection Results --Lead--Lead--Lead--LeadLead / Lag Auxiliary Signal Groups 047083061025Signal group PermissPermissProtectePermissPermissProtectePermissPermissProtectePermissPermissProtecteControl Type Phasing & Timing 10.00Lost time [s] 100Cycle Length [s] Intersection Settings 11/12/20209 Scenario 4: 4 Opening Year (2022) With Project PM Peak HourVersion 6.00-03 Generated with Apx - 111 CALTRANS Apx - 112 Intersection Analysis Summary 11/12/2020Report File: C:\...\AME.pdf Scenario 1 Existing AM Peak HourVistro File: C:\...\AME.vistro V/C, Delay, LOS: For two-way stop, these values are taken from the movement with the worst (highest) delay value. For all other control types, they are taken for the whole intersection. C34.30.545SB LeftHCM 6th EditionSignalizedI-10 EB Ramps (NS) at Hellman Ave (EW)1 LOSDelay (s/veh)V/CWorst MvmtMethodControl TypeIntersection NameID 11/12/20201 Scenario 1: 1 Existing AM Peak HourVersion 6.00-03 Generated with Apx - 113 0.545Volume to Capacity (v/c): CLevel Of Service: 34.3Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: SignalizedControl Type: Intersection 1: I-10 EB Ramps (NS) at Hellman Ave (EW) Intersection Level Of Service Report YesYesNoCrosswalk NoNoNoCurb Present 0.000.000.00Grade [%] 30.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruThruLeftRightLeftTurning Movement Lane Configuration WestboundEastboundSouthboundApproach Name Intersection Setup 000Bicycle Volume [bicycles/h] 000v_ab, Corner Pedestrian Volume [ped/h] 000v_ci, Inbound Pedestrian Volume crossing mi 000v_co, Outbound Pedestrian Volume crossing 000v_di, Inbound Pedestrian Volume crossing m 000v_do, Outbound Pedestrian Volume crossing 000000Local Bus Stopping Rate [/h] 000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoPresence of On-Street Parking 19015915411513253Total Analysis Volume [veh/h] 48403929363Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.0000Peak Hour Factor 19015915411513253Total Hourly Volume [veh/h] 000000Right-Turn on Red Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 000000Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 000000Site-Generated Trips [veh/h] 000000In-Process Volume [veh/h] 1.001.001.001.001.001.00Growth Factor 2.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 19015915411513253Base Volume Input [veh/h] Name Volumes 11/12/20202 Scenario 1: 1 Existing AM Peak HourVersion 6.00-03 Generated with Apx - 114 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.0Detector Location [ft] NoNoNoPedestrian Recall NoNoNoMaximum Recall NoNoNoMinimum Recall 0.02.02.00.00.02.0l2, Clearance Lost Time [s] 0.02.02.00.00.02.0l1, Start-Up Lost Time [s] NoNoNoRest In Walk 010100010Pedestrian Clearance [s] 055005Walk [s] 0.03.03.00.00.03.0Vehicle Extension [s] 030230047Split [s] 0.01.01.00.00.01.0All red [s] 0.03.03.00.00.03.0Amber [s] 030300030Maximum Green [s] 077007Minimum Green [s] -----LeadLead / Lag Auxiliary Signal Groups 048001Signal group SplitSplitSplitSplitPermissivePermissiveControl Type Phasing & Timing 8.00Lost time [s] SingleBandPermissive Mode LeadGreenOffset Reference 0.0Offset [s] Fully actuatedActuation Type Time of Day Pattern IsolatedCoordination Type 100Cycle Length [s] -Signal Coordination Group NoLocated in CBD Intersection Settings 11/12/20203 Scenario 1: 1 Existing AM Peak HourVersion 6.00-03 Generated with Apx - 115 292.95220.38280.4395th-Percentile Queue Length [ft/ln] 11.728.8211.2295th-Percentile Queue Length [veh/ln] 182.25127.71172.6750th-Percentile Queue Length [ft/ln] 7.295.116.9150th-Percentile Queue Length [veh/ln] YesYesYesCritical Lane Group CCDLane Group LOS 30.3426.5147.41d, Delay for Lane Group [s/veh] 0.580.420.86X, volume / capacity Lane Group Results 1.001.001.00PF, progression factor 1.001.001.00Rp, platoon ratio 0.000.000.00d3, Initial Queue Delay [s] 4.031.977.21d2, Incremental Delay [s] 1.001.001.00I, Upstream Filtering Factor 0.500.500.11k, delay calibration 26.3224.5440.19d1, Uniform Delay [s] 602647308c, Capacity [veh/h] 170618311771s, saturation flow rate [veh/h] 0.200.150.15(v / s)_i Volume / Saturation Flow Rate 0.350.350.17g / C, Green / Cycle 353517g_i, Effective Green Time [s] 2.002.002.00l2, Clearance Lost Time [s] 0.000.000.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.00L, Total Lost Time per Cycle [s] 100100100C, Cycle Length [s] CCCLane Group Lane Group Calculations 11/12/20204 Scenario 1: 1 Existing AM Peak HourVersion 6.00-03 Generated with Apx - 116 Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]47.41 47.41 26.51 26.51 30.34 30.34 Movement LOS D D C C C C d_A, Approach Delay [s/veh]47.41 26.51 30.34 Approach LOS D C C d_I, Intersection Delay [s/veh]34.31 Intersection LOS C Intersection V/C 0.545 Other Modes g_Walk,mi, Effective Walk Time [s]0.0 9.0 9.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 d_p, Pedestrian Delay [s]0.00 41.41 41.41 I_p,int, Pedestrian LOS Score for Intersection 0.000 1.936 2.193 Crosswalk LOS F A B s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]0 0 0 d_b, Bicycle Delay [s]50.00 50.00 50.00 I_b,int, Bicycle LOS Score for Intersection 4.571 4.576 4.708 Bicycle LOS E E E ----------------Ring 4 ----------------Ring 3 ----------------Ring 2 -------------841Ring 1 Sequence 11/12/20205 Scenario 1: 1 Existing AM Peak HourVersion 6.00-03 Generated with Apx - 117 Intersection Analysis Summary 11/12/2020Report File: C:\...\PME.pdf Scenario 1 Existing PM Peak HourVistro File: C:\...\PME.vistro V/C, Delay, LOS: For two-way stop, these values are taken from the movement with the worst (highest) delay value. For all other control types, they are taken for the whole intersection. C34.00.529SB LeftHCM 6th EditionSignalizedI-10 EB Ramps (NS) at Hellman Ave (EW)1 LOSDelay (s/veh)V/CWorst MvmtMethodControl TypeIntersection NameID 11/12/20201 Scenario 1: 1 Existing PM Peak HourVersion 6.00-03 Generated with Apx - 118 0.529Volume to Capacity (v/c): CLevel Of Service: 34.0Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: SignalizedControl Type: Intersection 1: I-10 EB Ramps (NS) at Hellman Ave (EW) Intersection Level Of Service Report YesYesNoCrosswalk NoNoNoCurb Present 0.000.000.00Grade [%] 30.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruThruLeftRightLeftTurning Movement Lane Configuration WestboundEastboundSouthboundApproach Name Intersection Setup 000Bicycle Volume [bicycles/h] 000v_ab, Corner Pedestrian Volume [ped/h] 000v_ci, Inbound Pedestrian Volume crossing mi 000v_co, Outbound Pedestrian Volume crossing 000v_di, Inbound Pedestrian Volume crossing m 000v_do, Outbound Pedestrian Volume crossing 000000Local Bus Stopping Rate [/h] 000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoPresence of On-Street Parking 1302022214717252Total Analysis Volume [veh/h] 33515512463Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.0000Peak Hour Factor 1302022214717252Total Hourly Volume [veh/h] 000000Right-Turn on Red Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 000000Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 000000Site-Generated Trips [veh/h] 000000In-Process Volume [veh/h] 1.001.001.001.001.001.00Growth Factor 2.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 1302022214717252Base Volume Input [veh/h] Name Volumes 11/12/20202 Scenario 1: 1 Existing PM Peak HourVersion 6.00-03 Generated with Apx - 119 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.0Detector Location [ft] NoNoNoPedestrian Recall NoNoNoMaximum Recall NoNoNoMinimum Recall 0.02.02.00.00.02.0l2, Clearance Lost Time [s] 0.02.02.00.00.02.0l1, Start-Up Lost Time [s] NoNoNoRest In Walk 010100010Pedestrian Clearance [s] 055005Walk [s] 0.03.03.00.00.03.0Vehicle Extension [s] 029230048Split [s] 0.01.01.00.00.01.0All red [s] 0.03.03.00.00.03.0Amber [s] 030300030Maximum Green [s] 077007Minimum Green [s] -----LeadLead / Lag Auxiliary Signal Groups 048001Signal group SplitSplitSplitSplitPermissivePermissiveControl Type Phasing & Timing 8.00Lost time [s] SingleBandPermissive Mode LeadGreenOffset Reference 0.0Offset [s] Fully actuatedActuation Type Time of Day Pattern IsolatedCoordination Type 100Cycle Length [s] -Signal Coordination Group NoLocated in CBD Intersection Settings 11/12/20203 Scenario 1: 1 Existing PM Peak HourVersion 6.00-03 Generated with Apx - 120 275.78219.36282.9195th-Percentile Queue Length [ft/ln] 11.038.7711.3295th-Percentile Queue Length [veh/ln] 169.14126.96174.5750th-Percentile Queue Length [ft/ln] 6.775.086.9850th-Percentile Queue Length [veh/ln] YesYesYesCritical Lane Group CCDLane Group LOS 29.2826.4547.33d, Delay for Lane Group [s/veh] 0.540.410.87X, volume / capacity Lane Group Results 1.001.001.00PF, progression factor 1.001.001.00Rp, platoon ratio 0.000.000.00d3, Initial Queue Delay [s] 3.361.917.23d2, Incremental Delay [s] 1.001.001.00I, Upstream Filtering Factor 0.500.500.11k, delay calibration 25.9224.5540.10d1, Uniform Delay [s] 616653311c, Capacity [veh/h] 174918541767s, saturation flow rate [veh/h] 0.190.140.15(v / s)_i Volume / Saturation Flow Rate 0.350.350.17g / C, Green / Cycle 353518g_i, Effective Green Time [s] 2.002.002.00l2, Clearance Lost Time [s] 0.000.000.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.00L, Total Lost Time per Cycle [s] 100100100C, Cycle Length [s] CCCLane Group Lane Group Calculations 11/12/20204 Scenario 1: 1 Existing PM Peak HourVersion 6.00-03 Generated with Apx - 121 Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]47.33 47.33 26.45 26.45 29.28 29.28 Movement LOS D D C C C C d_A, Approach Delay [s/veh]47.33 26.45 29.28 Approach LOS D C C d_I, Intersection Delay [s/veh]33.99 Intersection LOS C Intersection V/C 0.529 Other Modes g_Walk,mi, Effective Walk Time [s]0.0 9.0 9.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 d_p, Pedestrian Delay [s]0.00 41.41 41.41 I_p,int, Pedestrian LOS Score for Intersection 0.000 1.959 2.208 Crosswalk LOS F A B s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]0 0 0 d_b, Bicycle Delay [s]50.00 50.00 50.00 I_b,int, Bicycle LOS Score for Intersection 4.576 4.575 4.680 Bicycle LOS E E E ----------------Ring 4 ----------------Ring 3 ----------------Ring 2 -------------841Ring 1 Sequence 11/12/20205 Scenario 1: 1 Existing PM Peak HourVersion 6.00-03 Generated with Apx - 122 Intersection Analysis Summary 11/12/2020Report File: C:\...\AMEP.pdf Scenario 2 Existing Plus Projct AM Peak HourVistro File: C:\...\AME.vistro V/C, Delay, LOS: For two-way stop, these values are taken from the movement with the worst (highest) delay value. For all other control types, they are taken for the whole intersection. C34.60.556SB LeftHCM 6th EditionSignalizedI-10 EB Ramps (NS) at Hellman Ave (EW)1 LOSDelay (s/veh)V/CWorst MvmtMethodControl TypeIntersection NameID 11/12/20201 Scenario 2: 2 Existing Plus Projct AM Peak HourVersion 6.00-03 Generated with Apx - 123 0.556Volume to Capacity (v/c): CLevel Of Service: 34.6Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: SignalizedControl Type: Intersection 1: I-10 EB Ramps (NS) at Hellman Ave (EW) Intersection Level Of Service Report YesYesNoCrosswalk NoNoNoCurb Present 0.000.000.00Grade [%] 30.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruThruLeftRightLeftTurning Movement Lane Configuration WestboundEastboundSouthboundApproach Name Intersection Setup 000Bicycle Volume [bicycles/h] 000v_ab, Corner Pedestrian Volume [ped/h] 000v_ci, Inbound Pedestrian Volume crossing mi 000v_co, Outbound Pedestrian Volume crossing 000v_di, Inbound Pedestrian Volume crossing m 000v_do, Outbound Pedestrian Volume crossing 000000Local Bus Stopping Rate [/h] 000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoPresence of On-Street Parking 19516215811513258Total Analysis Volume [veh/h] 49414029365Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.0000Peak Hour Factor 19516215811513258Total Hourly Volume [veh/h] 000000Right-Turn on Red Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 000000Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 534005Site-Generated Trips [veh/h] 000000In-Process Volume [veh/h] 1.001.001.001.001.001.00Growth Factor 2.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 19015915411513253Base Volume Input [veh/h] Name Volumes 11/12/20202 Scenario 2: 2 Existing Plus Projct AM Peak HourVersion 6.00-03 Generated with Apx - 124 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.0Detector Location [ft] NoNoNoPedestrian Recall NoNoNoMaximum Recall NoNoNoMinimum Recall 0.02.02.00.00.02.0l2, Clearance Lost Time [s] 0.02.02.00.00.02.0l1, Start-Up Lost Time [s] NoNoNoRest In Walk 010100010Pedestrian Clearance [s] 055005Walk [s] 0.03.03.00.00.03.0Vehicle Extension [s] 030220048Split [s] 0.01.01.00.00.01.0All red [s] 0.03.03.00.00.03.0Amber [s] 030300030Maximum Green [s] 077007Minimum Green [s] -----LeadLead / Lag Auxiliary Signal Groups 048001Signal group SplitSplitSplitSplitPermissivePermissiveControl Type Phasing & Timing 8.00Lost time [s] SingleBandPermissive Mode LeadGreenOffset Reference 0.0Offset [s] Fully actuatedActuation Type Time of Day Pattern IsolatedCoordination Type 100Cycle Length [s] -Signal Coordination Group NoLocated in CBD Intersection Settings 11/12/20203 Scenario 2: 2 Existing Plus Projct AM Peak HourVersion 6.00-03 Generated with Apx - 125 301.21224.01284.5395th-Percentile Queue Length [ft/ln] 12.058.9611.3895th-Percentile Queue Length [veh/ln] 188.60130.38175.8050th-Percentile Queue Length [ft/ln] 7.545.227.0350th-Percentile Queue Length [veh/ln] YesYesYesCritical Lane Group CCDLane Group LOS 30.9026.7547.28d, Delay for Lane Group [s/veh] 0.600.420.87X, volume / capacity Lane Group Results 1.001.001.00PF, progression factor 1.001.001.00Rp, platoon ratio 0.000.000.00d3, Initial Queue Delay [s] 4.312.047.23d2, Incremental Delay [s] 1.001.001.00I, Upstream Filtering Factor 0.500.500.11k, delay calibration 26.5924.7140.05d1, Uniform Delay [s] 600644313c, Capacity [veh/h] 170618311771s, saturation flow rate [veh/h] 0.210.150.15(v / s)_i Volume / Saturation Flow Rate 0.350.350.18g / C, Green / Cycle 353518g_i, Effective Green Time [s] 2.002.002.00l2, Clearance Lost Time [s] 0.000.000.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.00L, Total Lost Time per Cycle [s] 100100100C, Cycle Length [s] CCCLane Group Lane Group Calculations 11/12/20204 Scenario 2: 2 Existing Plus Projct AM Peak HourVersion 6.00-03 Generated with Apx - 126 Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]47.28 47.28 26.75 26.75 30.90 30.90 Movement LOS D D C C C C d_A, Approach Delay [s/veh]47.28 26.75 30.90 Approach LOS D C C d_I, Intersection Delay [s/veh]34.57 Intersection LOS C Intersection V/C 0.556 Other Modes g_Walk,mi, Effective Walk Time [s]0.0 9.0 9.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 d_p, Pedestrian Delay [s]0.00 41.41 41.41 I_p,int, Pedestrian LOS Score for Intersection 0.000 1.940 2.198 Crosswalk LOS F A B s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]0 0 0 d_b, Bicycle Delay [s]50.00 50.00 50.00 I_b,int, Bicycle LOS Score for Intersection 4.580 4.583 4.721 Bicycle LOS E E E ----------------Ring 4 ----------------Ring 3 ----------------Ring 2 -------------841Ring 1 Sequence 11/12/20205 Scenario 2: 2 Existing Plus Projct AM Peak HourVersion 6.00-03 Generated with Apx - 127 Intersection Analysis Summary 11/12/2020Report File: C:\...\PMEP.pdf Scenario 2 Existing Plus Project PM Peak HourVistro File: C:\...\PME.vistro V/C, Delay, LOS: For two-way stop, these values are taken from the movement with the worst (highest) delay value. For all other control types, they are taken for the whole intersection. C34.10.535SB LeftHCM 6th EditionSignalizedI-10 EB Ramps (NS) at Hellman Ave (EW)1 LOSDelay (s/veh)V/CWorst MvmtMethodControl TypeIntersection NameID 11/12/20201 Scenario 2: 2 Existing Plus Project PM Peak HourVersion 6.00-03 Generated with Apx - 128 0.535Volume to Capacity (v/c): CLevel Of Service: 34.1Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: SignalizedControl Type: Intersection 1: I-10 EB Ramps (NS) at Hellman Ave (EW) Intersection Level Of Service Report YesYesNoCrosswalk NoNoNoCurb Present 0.000.000.00Grade [%] 30.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruThruLeftRightLeftTurning Movement Lane Configuration WestboundEastboundSouthboundApproach Name Intersection Setup 000Bicycle Volume [bicycles/h] 000v_ab, Corner Pedestrian Volume [ped/h] 000v_ci, Inbound Pedestrian Volume crossing mi 000v_co, Outbound Pedestrian Volume crossing 000v_di, Inbound Pedestrian Volume crossing m 000v_do, Outbound Pedestrian Volume crossing 000000Local Bus Stopping Rate [/h] 000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoPresence of On-Street Parking 1342042224717255Total Analysis Volume [veh/h] 34515612464Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.0000Peak Hour Factor 1342042224717255Total Hourly Volume [veh/h] 000000Right-Turn on Red Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 000000Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 421003Site-Generated Trips [veh/h] 000000In-Process Volume [veh/h] 1.001.001.001.001.001.00Growth Factor 2.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 1302022214717252Base Volume Input [veh/h] Name Volumes 11/12/20202 Scenario 2: 2 Existing Plus Project PM Peak HourVersion 6.00-03 Generated with Apx - 129 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.0Detector Location [ft] NoNoNoPedestrian Recall NoNoNoMaximum Recall NoNoNoMinimum Recall 0.02.02.00.00.02.0l2, Clearance Lost Time [s] 0.02.02.00.00.02.0l1, Start-Up Lost Time [s] NoNoNoRest In Walk 010100010Pedestrian Clearance [s] 055005Walk [s] 0.03.03.00.00.03.0Vehicle Extension [s] 029230048Split [s] 0.01.01.00.00.01.0All red [s] 0.03.03.00.00.03.0Amber [s] 030300030Maximum Green [s] 077007Minimum Green [s] -----LeadLead / Lag Auxiliary Signal Groups 048001Signal group SplitSplitSplitSplitPermissivePermissiveControl Type Phasing & Timing 8.00Lost time [s] SingleBandPermissive Mode LeadGreenOffset Reference 0.0Offset [s] Fully actuatedActuation Type Time of Day Pattern IsolatedCoordination Type 100Cycle Length [s] -Signal Coordination Group NoLocated in CBD Intersection Settings 11/12/20203 Scenario 2: 2 Existing Plus Project PM Peak HourVersion 6.00-03 Generated with Apx - 130 281.57220.44285.3795th-Percentile Queue Length [ft/ln] 11.268.8211.4195th-Percentile Queue Length [veh/ln] 173.55127.75176.4450th-Percentile Queue Length [ft/ln] 6.945.117.0650th-Percentile Queue Length [veh/ln] YesYesYesCritical Lane Group CCDLane Group LOS 29.6326.5547.25d, Delay for Lane Group [s/veh] 0.550.410.87X, volume / capacity Lane Group Results 1.001.001.00PF, progression factor 1.001.001.00Rp, platoon ratio 0.000.000.00d3, Initial Queue Delay [s] 3.531.937.24d2, Incremental Delay [s] 1.001.001.00I, Upstream Filtering Factor 0.500.500.11k, delay calibration 26.1024.6240.01d1, Uniform Delay [s] 614651314c, Capacity [veh/h] 174818541768s, saturation flow rate [veh/h] 0.190.150.15(v / s)_i Volume / Saturation Flow Rate 0.350.350.18g / C, Green / Cycle 353518g_i, Effective Green Time [s] 2.002.002.00l2, Clearance Lost Time [s] 0.000.000.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.00L, Total Lost Time per Cycle [s] 100100100C, Cycle Length [s] CCCLane Group Lane Group Calculations 11/12/20204 Scenario 2: 2 Existing Plus Project PM Peak HourVersion 6.00-03 Generated with Apx - 131 Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]47.25 47.25 26.55 26.55 29.63 29.63 Movement LOS D D C C C C d_A, Approach Delay [s/veh]47.25 26.55 29.63 Approach LOS D C C d_I, Intersection Delay [s/veh]34.14 Intersection LOS C Intersection V/C 0.535 Other Modes g_Walk,mi, Effective Walk Time [s]0.0 9.0 9.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 d_p, Pedestrian Delay [s]0.00 41.41 41.41 I_p,int, Pedestrian LOS Score for Intersection 0.000 1.960 2.212 Crosswalk LOS F A B s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]0 0 0 d_b, Bicycle Delay [s]50.00 50.00 50.00 I_b,int, Bicycle LOS Score for Intersection 4.581 4.576 4.690 Bicycle LOS E E E ----------------Ring 4 ----------------Ring 3 ----------------Ring 2 -------------841Ring 1 Sequence 11/12/20205 Scenario 2: 2 Existing Plus Project PM Peak HourVersion 6.00-03 Generated with Apx - 132 Intersection Analysis Summary 11/12/2020Report File: C:\...\AMOYWO.pdf Scenario 3 Opening Year (2022) Without Project AM Peak HourVistro File: C:\...\AME.vistro V/C, Delay, LOS: For two-way stop, these values are taken from the movement with the worst (highest) delay value. For all other control types, they are taken for the whole intersection. C34.70.577SB LeftHCM 6th EditionSignalizedI-10 EB Ramps (NS) at Hellman Ave (EW)1 LOSDelay (s/veh)V/CWorst MvmtMethodControl TypeIntersection NameID 11/12/20201 Scenario 3: 3 Opening Year (2022) Without Project AM Peak HourVersion 6.00-03 Generated with Apx - 133 0.577Volume to Capacity (v/c): CLevel Of Service: 34.7Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: SignalizedControl Type: Intersection 1: I-10 EB Ramps (NS) at Hellman Ave (EW) Intersection Level Of Service Report YesYesNoCrosswalk NoNoNoCurb Present 0.000.000.00Grade [%] 30.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruThruLeftRightLeftTurning Movement Lane Configuration WestboundEastboundSouthboundApproach Name Intersection Setup 000Bicycle Volume [bicycles/h] 000v_ab, Corner Pedestrian Volume [ped/h] 000v_ci, Inbound Pedestrian Volume crossing mi 000v_co, Outbound Pedestrian Volume crossing 000v_di, Inbound Pedestrian Volume crossing m 000v_do, Outbound Pedestrian Volume crossing 000000Local Bus Stopping Rate [/h] 000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoPresence of On-Street Parking 19417216413513258Total Analysis Volume [veh/h] 49434134365Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.0000Peak Hour Factor 19417216413513258Total Hourly Volume [veh/h] 000000Right-Turn on Red Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 000000Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 01071800Site-Generated Trips [veh/h] 000000In-Process Volume [veh/h] 1.021.021.021.021.021.02Growth Factor 2.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 19015915411513253Base Volume Input [veh/h] Name Volumes 11/12/20202 Scenario 3: 3 Opening Year (2022) Without Project AM Peak HourVersion 6.00-03 Generated with Apx - 134 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.0Detector Location [ft] NoNoNoPedestrian Recall NoNoNoMaximum Recall NoNoNoMinimum Recall 0.02.02.00.00.02.0l2, Clearance Lost Time [s] 0.02.02.00.00.02.0l1, Start-Up Lost Time [s] NoNoNoRest In Walk 010100010Pedestrian Clearance [s] 055005Walk [s] 0.03.03.00.00.03.0Vehicle Extension [s] 029230048Split [s] 0.01.01.00.00.01.0All red [s] 0.03.03.00.00.03.0Amber [s] 030300030Maximum Green [s] 077007Minimum Green [s] -----LeadLead / Lag Auxiliary Signal Groups 048001Signal group SplitSplitSplitSplitPermissivePermissiveControl Type Phasing & Timing 8.00Lost time [s] SingleBandPermissive Mode LeadGreenOffset Reference 0.0Offset [s] Fully actuatedActuation Type Time of Day Pattern IsolatedCoordination Type 100Cycle Length [s] -Signal Coordination Group NoLocated in CBD Intersection Settings 11/12/20203 Scenario 3: 3 Opening Year (2022) Without Project AM Peak HourVersion 6.00-03 Generated with Apx - 135 309.43244.88284.5395th-Percentile Queue Length [ft/ln] 12.389.8011.3895th-Percentile Queue Length [veh/ln] 194.94145.85175.8050th-Percentile Queue Length [ft/ln] 7.805.837.0350th-Percentile Queue Length [veh/ln] YesYesYesCritical Lane Group CCDLane Group LOS 31.2827.5447.28d, Delay for Lane Group [s/veh] 0.610.460.87X, volume / capacity Lane Group Results 1.001.001.00PF, progression factor 1.001.001.00Rp, platoon ratio 0.000.000.00d3, Initial Queue Delay [s] 4.532.417.23d2, Incremental Delay [s] 1.001.001.00I, Upstream Filtering Factor 0.500.500.11k, delay calibration 26.7525.1340.05d1, Uniform Delay [s] 602643313c, Capacity [veh/h] 171018291771s, saturation flow rate [veh/h] 0.210.160.15(v / s)_i Volume / Saturation Flow Rate 0.350.350.18g / C, Green / Cycle 353518g_i, Effective Green Time [s] 2.002.002.00l2, Clearance Lost Time [s] 0.000.000.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.00L, Total Lost Time per Cycle [s] 100100100C, Cycle Length [s] CCCLane Group Lane Group Calculations 11/12/20204 Scenario 3: 3 Opening Year (2022) Without Project AM Peak HourVersion 6.00-03 Generated with Apx - 136 Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]47.28 47.28 27.54 27.54 31.28 31.28 Movement LOS D D C C C C d_A, Approach Delay [s/veh]47.28 27.54 31.28 Approach LOS D C C d_I, Intersection Delay [s/veh]34.72 Intersection LOS C Intersection V/C 0.577 Other Modes g_Walk,mi, Effective Walk Time [s]0.0 9.0 9.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 d_p, Pedestrian Delay [s]0.00 41.41 41.41 I_p,int, Pedestrian LOS Score for Intersection 0.000 1.957 2.203 Crosswalk LOS F A B s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]0 0 0 d_b, Bicycle Delay [s]50.00 50.00 50.00 I_b,int, Bicycle LOS Score for Intersection 4.580 4.626 4.736 Bicycle LOS E E E ----------------Ring 4 ----------------Ring 3 ----------------Ring 2 -------------841Ring 1 Sequence 11/12/20205 Scenario 3: 3 Opening Year (2022) Without Project AM Peak HourVersion 6.00-03 Generated with Apx - 137 Intersection Analysis Summary 11/12/2020Report File: C:\...\PMOYWO.pdf Scenario 3 Opening Year (2022) Without Project PM Peak HourVistro File: C:\...\PME.vistro V/C, Delay, LOS: For two-way stop, these values are taken from the movement with the worst (highest) delay value. For all other control types, they are taken for the whole intersection. C34.50.572SB LeftHCM 6th EditionSignalizedI-10 EB Ramps (NS) at Hellman Ave (EW)1 LOSDelay (s/veh)V/CWorst MvmtMethodControl TypeIntersection NameID 11/12/20201 Scenario 3: 3 Opening Year (2022) Without Project PM Peak HourVersion 6.00-03 Generated with Apx - 138 0.572Volume to Capacity (v/c): CLevel Of Service: 34.5Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: SignalizedControl Type: Intersection 1: I-10 EB Ramps (NS) at Hellman Ave (EW) Intersection Level Of Service Report YesYesNoCrosswalk NoNoNoCurb Present 0.000.000.00Grade [%] 30.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruThruLeftRightLeftTurning Movement Lane Configuration WestboundEastboundSouthboundApproach Name Intersection Setup 000Bicycle Volume [bicycles/h] 000v_ab, Corner Pedestrian Volume [ped/h] 000v_ci, Inbound Pedestrian Volume crossing mi 000v_co, Outbound Pedestrian Volume crossing 000v_di, Inbound Pedestrian Volume crossing m 000v_do, Outbound Pedestrian Volume crossing 000000Local Bus Stopping Rate [/h] 000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoPresence of On-Street Parking 1332262347417257Total Analysis Volume [veh/h] 33575919464Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.0000Peak Hour Factor 1332262347417257Total Hourly Volume [veh/h] 000000Right-Turn on Red Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 000000Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 02092600Site-Generated Trips [veh/h] 000000In-Process Volume [veh/h] 1.021.021.021.021.021.02Growth Factor 2.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 1302022214717252Base Volume Input [veh/h] Name Volumes 11/12/20202 Scenario 3: 3 Opening Year (2022) Without Project PM Peak HourVersion 6.00-03 Generated with Apx - 139 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.0Detector Location [ft] NoNoNoPedestrian Recall NoNoNoMaximum Recall NoNoNoMinimum Recall 0.02.02.00.00.02.0l2, Clearance Lost Time [s] 0.02.02.00.00.02.0l1, Start-Up Lost Time [s] NoNoNoRest In Walk 010100010Pedestrian Clearance [s] 055005Walk [s] 0.03.03.00.00.03.0Vehicle Extension [s] 028240048Split [s] 0.01.01.00.00.01.0All red [s] 0.03.03.00.00.03.0Amber [s] 030300030Maximum Green [s] 077007Minimum Green [s] -----LeadLead / Lag Auxiliary Signal Groups 048001Signal group SplitSplitSplitSplitPermissivePermissiveControl Type Phasing & Timing 8.00Lost time [s] SingleBandPermissive Mode LeadGreenOffset Reference 0.0Offset [s] Fully actuatedActuation Type Time of Day Pattern IsolatedCoordination Type 100Cycle Length [s] -Signal Coordination Group NoLocated in CBD Intersection Settings 11/12/20203 Scenario 3: 3 Opening Year (2022) Without Project PM Peak HourVersion 6.00-03 Generated with Apx - 140 300.43251.96287.0095th-Percentile Queue Length [ft/ln] 12.0210.0811.4895th-Percentile Queue Length [veh/ln] 188.00151.15177.7050th-Percentile Queue Length [ft/ln] 7.526.057.1150th-Percentile Queue Length [veh/ln] YesYesYesCritical Lane Group CCDLane Group LOS 30.5127.7947.20d, Delay for Lane Group [s/veh] 0.580.480.87X, volume / capacity Lane Group Results 1.001.001.00PF, progression factor 1.001.001.00Rp, platoon ratio 0.000.000.00d3, Initial Queue Delay [s] 4.002.497.24d2, Incremental Delay [s] 1.001.001.00I, Upstream Filtering Factor 0.500.500.11k, delay calibration 26.5125.3139.96d1, Uniform Delay [s] 616648316c, Capacity [veh/h] 175518481768s, saturation flow rate [veh/h] 0.200.170.16(v / s)_i Volume / Saturation Flow Rate 0.350.350.18g / C, Green / Cycle 353518g_i, Effective Green Time [s] 2.002.002.00l2, Clearance Lost Time [s] 0.000.000.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.00L, Total Lost Time per Cycle [s] 100100100C, Cycle Length [s] CCCLane Group Lane Group Calculations 11/12/20204 Scenario 3: 3 Opening Year (2022) Without Project PM Peak HourVersion 6.00-03 Generated with Apx - 141 Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]47.20 47.20 27.79 27.79 30.51 30.51 Movement LOS D D C C C C d_A, Approach Delay [s/veh]47.20 27.79 30.51 Approach LOS D C C d_I, Intersection Delay [s/veh]34.48 Intersection LOS C Intersection V/C 0.572 Other Modes g_Walk,mi, Effective Walk Time [s]0.0 9.0 9.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 d_p, Pedestrian Delay [s]0.00 41.41 41.41 I_p,int, Pedestrian LOS Score for Intersection 0.000 1.990 2.223 Crosswalk LOS F A B s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]0 0 0 d_b, Bicycle Delay [s]50.00 50.00 50.00 I_b,int, Bicycle LOS Score for Intersection 4.585 4.641 4.725 Bicycle LOS E E E ----------------Ring 4 ----------------Ring 3 ----------------Ring 2 -------------841Ring 1 Sequence 11/12/20205 Scenario 3: 3 Opening Year (2022) Without Project PM Peak HourVersion 6.00-03 Generated with Apx - 142 Intersection Analysis Summary 11/12/2020Report File: C:\...\AMOYW.pdf Scenario 4 Opening Year (2022) With Project AM Peak HourVistro File: C:\...\AME.vistro V/C, Delay, LOS: For two-way stop, these values are taken from the movement with the worst (highest) delay value. For all other control types, they are taken for the whole intersection. D35.00.587SB LeftHCM 6th EditionSignalizedI-10 EB Ramps (NS) at Hellman Ave (EW)1 LOSDelay (s/veh)V/CWorst MvmtMethodControl TypeIntersection NameID 11/12/20201 Scenario 4: 4 Opening Year (2022) With Project AM Peak HourVersion 6.00-03 Generated with Apx - 143 0.587Volume to Capacity (v/c): DLevel Of Service: 35.0Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: SignalizedControl Type: Intersection 1: I-10 EB Ramps (NS) at Hellman Ave (EW) Intersection Level Of Service Report YesYesNoCrosswalk NoNoNoCurb Present 0.000.000.00Grade [%] 30.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruThruLeftRightLeftTurning Movement Lane Configuration WestboundEastboundSouthboundApproach Name Intersection Setup 000Bicycle Volume [bicycles/h] 000v_ab, Corner Pedestrian Volume [ped/h] 000v_ci, Inbound Pedestrian Volume crossing mi 000v_co, Outbound Pedestrian Volume crossing 000v_di, Inbound Pedestrian Volume crossing m 000v_do, Outbound Pedestrian Volume crossing 000000Local Bus Stopping Rate [/h] 000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoPresence of On-Street Parking 19917516813513263Total Analysis Volume [veh/h] 50444234366Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.0000Peak Hour Factor 19917516813513263Total Hourly Volume [veh/h] 000000Right-Turn on Red Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 000000Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 513111805Site-Generated Trips [veh/h] 000000In-Process Volume [veh/h] 1.021.021.021.021.021.02Growth Factor 2.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 19015915411513253Base Volume Input [veh/h] Name Volumes 11/12/20202 Scenario 4: 4 Opening Year (2022) With Project AM Peak HourVersion 6.00-03 Generated with Apx - 144 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.0Detector Location [ft] NoNoNoPedestrian Recall NoNoNoMaximum Recall NoNoNoMinimum Recall 0.02.02.00.00.02.0l2, Clearance Lost Time [s] 0.02.02.00.00.02.0l1, Start-Up Lost Time [s] NoNoNoRest In Walk 010100010Pedestrian Clearance [s] 055005Walk [s] 0.03.03.00.00.03.0Vehicle Extension [s] 029230048Split [s] 0.01.01.00.00.01.0All red [s] 0.03.03.00.00.03.0Amber [s] 030300030Maximum Green [s] 077007Minimum Green [s] -----LeadLead / Lag Auxiliary Signal Groups 048001Signal group SplitSplitSplitSplitPermissivePermissiveControl Type Phasing & Timing 8.00Lost time [s] SingleBandPermissive Mode LeadGreenOffset Reference 0.0Offset [s] Fully actuatedActuation Type Time of Day Pattern IsolatedCoordination Type 100Cycle Length [s] -Signal Coordination Group NoLocated in CBD Intersection Settings 11/12/20203 Scenario 4: 4 Opening Year (2022) With Project AM Peak HourVersion 6.00-03 Generated with Apx - 145 318.05248.70288.6295th-Percentile Queue Length [ft/ln] 12.729.9511.5495th-Percentile Queue Length [veh/ln] 201.62148.71178.9350th-Percentile Queue Length [ft/ln] 8.065.957.1650th-Percentile Queue Length [veh/ln] YesYesYesCritical Lane Group CCDLane Group LOS 31.8827.8047.15d, Delay for Lane Group [s/veh] 0.620.470.87X, volume / capacity Lane Group Results 1.001.001.00PF, progression factor 1.001.001.00Rp, platoon ratio 0.000.000.00d3, Initial Queue Delay [s] 4.862.497.24d2, Incremental Delay [s] 1.001.001.00I, Upstream Filtering Factor 0.500.500.11k, delay calibration 27.0325.3139.92d1, Uniform Delay [s] 599641318c, Capacity [veh/h] 170918291771s, saturation flow rate [veh/h] 0.220.170.16(v / s)_i Volume / Saturation Flow Rate 0.350.350.18g / C, Green / Cycle 353518g_i, Effective Green Time [s] 2.002.002.00l2, Clearance Lost Time [s] 0.000.000.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.00L, Total Lost Time per Cycle [s] 100100100C, Cycle Length [s] CCCLane Group Lane Group Calculations 11/12/20204 Scenario 4: 4 Opening Year (2022) With Project AM Peak HourVersion 6.00-03 Generated with Apx - 146 Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]47.15 47.15 27.80 27.80 31.88 31.88 Movement LOS D D C C C C d_A, Approach Delay [s/veh]47.15 27.80 31.88 Approach LOS D C C d_I, Intersection Delay [s/veh]35.01 Intersection LOS D Intersection V/C 0.587 Other Modes g_Walk,mi, Effective Walk Time [s]0.0 9.0 9.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 d_p, Pedestrian Delay [s]0.00 41.41 41.41 I_p,int, Pedestrian LOS Score for Intersection 0.000 1.961 2.208 Crosswalk LOS F A B s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]0 0 0 d_b, Bicycle Delay [s]50.00 50.00 50.00 I_b,int, Bicycle LOS Score for Intersection 4.588 4.632 4.750 Bicycle LOS E E E ----------------Ring 4 ----------------Ring 3 ----------------Ring 2 -------------841Ring 1 Sequence 11/12/20205 Scenario 4: 4 Opening Year (2022) With Project AM Peak HourVersion 6.00-03 Generated with Apx - 147 Intersection Analysis Summary 11/12/2020Report File: C:\...\PMOYW.pdf Scenario 4 Opening Year (2022) With Project PM Peak HourVistro File: C:\...\PME.vistro V/C, Delay, LOS: For two-way stop, these values are taken from the movement with the worst (highest) delay value. For all other control types, they are taken for the whole intersection. C34.70.578SB LeftHCM 6th EditionSignalizedI-10 EB Ramps (NS) at Hellman Ave (EW)1 LOSDelay (s/veh)V/CWorst MvmtMethodControl TypeIntersection NameID 11/12/20201 Scenario 4: 4 Opening Year (2022) With Project PM Peak HourVersion 6.00-03 Generated with Apx - 148 0.578Volume to Capacity (v/c): CLevel Of Service: 34.7Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: SignalizedControl Type: Intersection 1: I-10 EB Ramps (NS) at Hellman Ave (EW) Intersection Level Of Service Report YesYesNoCrosswalk NoNoNoCurb Present 0.000.000.00Grade [%] 30.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruThruLeftRightLeftTurning Movement Lane Configuration WestboundEastboundSouthboundApproach Name Intersection Setup 000Bicycle Volume [bicycles/h] 000v_ab, Corner Pedestrian Volume [ped/h] 000v_ci, Inbound Pedestrian Volume crossing mi 000v_co, Outbound Pedestrian Volume crossing 000v_di, Inbound Pedestrian Volume crossing m 000v_do, Outbound Pedestrian Volume crossing 000000Local Bus Stopping Rate [/h] 000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoPresence of On-Street Parking 1372282357417260Total Analysis Volume [veh/h] 34575919465Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.0000Peak Hour Factor 1372282357417260Total Hourly Volume [veh/h] 000000Right-Turn on Red Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 000000Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 422102603Site-Generated Trips [veh/h] 000000In-Process Volume [veh/h] 1.021.021.021.021.021.02Growth Factor 2.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 1302022214717252Base Volume Input [veh/h] Name Volumes 11/12/20202 Scenario 4: 4 Opening Year (2022) With Project PM Peak HourVersion 6.00-03 Generated with Apx - 149 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.0Detector Location [ft] NoNoNoPedestrian Recall NoNoNoMaximum Recall NoNoNoMinimum Recall 0.02.02.00.00.02.0l2, Clearance Lost Time [s] 0.02.02.00.00.02.0l1, Start-Up Lost Time [s] NoNoNoRest In Walk 010100010Pedestrian Clearance [s] 055005Walk [s] 0.03.03.00.00.03.0Vehicle Extension [s] 028240048Split [s] 0.01.01.00.00.01.0All red [s] 0.03.03.00.00.03.0Amber [s] 030300030Maximum Green [s] 077007Minimum Green [s] -----LeadLead / Lag Auxiliary Signal Groups 048001Signal group SplitSplitSplitSplitPermissivePermissiveControl Type Phasing & Timing 8.00Lost time [s] SingleBandPermissive Mode LeadGreenOffset Reference 0.0Offset [s] Fully actuatedActuation Type Time of Day Pattern IsolatedCoordination Type 100Cycle Length [s] -Signal Coordination Group NoLocated in CBD Intersection Settings 11/12/20203 Scenario 4: 4 Opening Year (2022) With Project PM Peak HourVersion 6.00-03 Generated with Apx - 150 306.56253.14289.4595th-Percentile Queue Length [ft/ln] 12.2610.1311.5895th-Percentile Queue Length [veh/ln] 192.73152.03179.5750th-Percentile Queue Length [ft/ln] 7.716.087.1850th-Percentile Queue Length [veh/ln] YesYesYesCritical Lane Group CCDLane Group LOS 30.9027.9147.12d, Delay for Lane Group [s/veh] 0.590.480.87X, volume / capacity Lane Group Results 1.001.001.00PF, progression factor 1.001.001.00Rp, platoon ratio 0.000.000.00d3, Initial Queue Delay [s] 4.212.527.25d2, Incremental Delay [s] 1.001.001.00I, Upstream Filtering Factor 0.500.500.11k, delay calibration 26.7025.3939.87d1, Uniform Delay [s] 614647319c, Capacity [veh/h] 175418481768s, saturation flow rate [veh/h] 0.210.170.16(v / s)_i Volume / Saturation Flow Rate 0.350.350.18g / C, Green / Cycle 353518g_i, Effective Green Time [s] 2.002.002.00l2, Clearance Lost Time [s] 0.000.000.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.00L, Total Lost Time per Cycle [s] 100100100C, Cycle Length [s] CCCLane Group Lane Group Calculations 11/12/20204 Scenario 4: 4 Opening Year (2022) With Project PM Peak HourVersion 6.00-03 Generated with Apx - 151 Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]47.12 47.12 27.91 27.91 30.90 30.90 Movement LOS D D C C C C d_A, Approach Delay [s/veh]47.12 27.91 30.90 Approach LOS D C C d_I, Intersection Delay [s/veh]34.65 Intersection LOS C Intersection V/C 0.578 Other Modes g_Walk,mi, Effective Walk Time [s]0.0 9.0 9.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 d_p, Pedestrian Delay [s]0.00 41.41 41.41 I_p,int, Pedestrian LOS Score for Intersection 0.000 1.992 2.226 Crosswalk LOS F A B s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]0 0 0 d_b, Bicycle Delay [s]50.00 50.00 50.00 I_b,int, Bicycle LOS Score for Intersection 4.589 4.642 4.735 Bicycle LOS E E E ----------------Ring 4 ----------------Ring 3 ----------------Ring 2 -------------841Ring 1 Sequence 11/12/20205 Scenario 4: 4 Opening Year (2022) With Project PM Peak HourVersion 6.00-03 Generated with Apx - 152 DRIVEWAY RESTRICTIONS Apx - 153 Intersection Analysis Summary 11/12/2020Report File: C:\...\AMOYW.pdf Scenario 4 Opening Year (2022) With Project AM Peak HourVistro File: C:\...\AME.vistro V/C, Delay, LOS: For two-way stop, these values are taken from the movement with the worst (highest) delay value. For all other control types, they are taken for the whole intersection. C-0.726WB ThruICU 1SignalizedWalnut Grove Ave (NS) at Garvey Ave (EW)4 B12.90.133EB RightHCM 6th EditionTwo-way stopWalnut Grove Ave (NS) at Project Dwy (EW)3 C-0.718SB ThruICU 1SignalizedWalnut Grove Ave (NS) at Hellman Ave (EW)2 B-0.641WB ThruICU 1SignalizedI-10 EB Ramps (NS) at Hellman Ave (EW)1 LOSDelay (s/veh)V/CWorst MvmtMethodControl TypeIntersection NameID 11/12/20201 Scenario 4: 4 Opening Year (2022) With Project AM Peak HourVersion 6.00-03 Generated with Apx - 154 0.641Volume to Capacity (v/c): BLevel Of Service: -Delay (sec / veh): 15 minutesAnalysis Period: ICU 1Analysis Method: SignalizedControl Type: Intersection 1: I-10 EB Ramps (NS) at Hellman Ave (EW) Intersection Level Of Service Report YesYesNoCrosswalk 0.000.000.00Grade [%] 30.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruThruLeftRightLeftTurning Movement Lane Configuration WestboundEastboundSouthboundApproach Name Intersection Setup 000Bicycle Volume [bicycles/h] 000Pedestrian Volume [ped/h] 19417219114013263Total Analysis Volume [veh/h] 49434835366Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.0000Peak Hour Factor 19417219114013263Total Hourly Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 000000Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 010342305Site-Generated Trips [veh/h] 000000In-Process Volume [veh/h] 1.021.021.021.021.021.02Growth Factor 2.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 19015915411513253Base Volume Input [veh/h] Name Volumes 11/12/20202 Scenario 4: 4 Opening Year (2022) With Project AM Peak HourVersion 6.00-03 Generated with Apx - 155 0.641Intersection V/C BIntersection LOS 0.200.200.180.080.150.15V/C, Movement V/C Ratio Movement, Approach, & Intersection Results -----LeadLead / Lag Auxiliary Signal Groups 048001Signal group SplitSplitSplitSplitPermissivePermissiveControl Type Phasing & Timing 10.00Lost time [s] 100Cycle Length [s] Intersection Settings 11/12/20203 Scenario 4: 4 Opening Year (2022) With Project AM Peak HourVersion 6.00-03 Generated with Apx - 156 0.718Volume to Capacity (v/c): CLevel Of Service: -Delay (sec / veh): 15 minutesAnalysis Period: ICU 1Analysis Method: SignalizedControl Type: Intersection 2: Walnut Grove Ave (NS) at Hellman Ave (EW) Intersection Level Of Service Report YesYesNoYesCrosswalk 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Name Intersection Setup 0000Bicycle Volume [bicycles/h] 0000Pedestrian Volume [ped/h] 2748801356025812761713013482149Total Analysis Volume [veh/h] 692203415653215433312137Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 2748801356025812761713013482149Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 0001802110270030Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.021.021.021.021.021.021.021.021.021.021.021.02Growth Factor 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 2698601155923211557812713470146Base Volume Input [veh/h] Name Volumes 11/12/20204 Scenario 4: 4 Opening Year (2022) With Project AM Peak HourVersion 6.00-03 Generated with Apx - 157 0.718Intersection V/C CIntersection LOS 0.150.050.000.080.180.140.210.210.070.140.140.08V/C, Movement V/C Ratio Movement, Approach, & Intersection Results --------Lead--LeadLead / Lag Auxiliary Signal Groups 040080061025Signal group SplitSplitSplitSplitSplitSplitPermissPermissProtectePermissPermissProtecteControl Type Phasing & Timing 10.00Lost time [s] 100Cycle Length [s] Intersection Settings 11/12/20205 Scenario 4: 4 Opening Year (2022) With Project AM Peak HourVersion 6.00-03 Generated with Apx - 158 0.133Volume to Capacity (v/c): BLevel Of Service: 12.9Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: Two-way stopControl Type: Intersection 3: Walnut Grove Ave (NS) at Project Dwy (EW) Intersection Level Of Service Report YesYesYesCrosswalk 0.000.000.00Grade [%] 30.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] RightLeftRightThruThruLeftTurning Movement Lane Configuration EastboundSouthboundNorthboundApproach Name Intersection Setup 000Pedestrian Volume [ped/h] 700758966090Total Analysis Volume [veh/h] 180192241520Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.0000Peak Hour Factor 700758966090Total Hourly Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 000000Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 700751130Site-Generated Trips [veh/h] 000000In-Process Volume [veh/h] 1.021.021.021.021.021.02Growth Factor 2.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 0008685940Base Volume Input [veh/h] Name Volumes 11/12/20206 Scenario 4: 4 Opening Year (2022) With Project AM Peak HourVersion 6.00-03 Generated with Apx - 159 BIntersection LOS 0.55d_I, Intersection Delay [s/veh] BAAApproach LOS 12.860.000.00d_A, Approach Delay [s/veh] 11.380.000.000.000.000.0095th-Percentile Queue Length [ft/ln] 0.460.000.000.000.000.0095th-Percentile Queue Length [veh/ln] BAAAMovement LOS 12.860.000.000.000.000.00d_M, Delay for Movement [s/veh] 0.130.000.000.010.010.00V/C, Movement V/C Ratio Movement, Approach, & Intersection Results 000Number of Storage Spaces in Median NoTwo-Stage Gap Acceptance 000Storage Area [veh] Flared Lane StopFreeFreePriority Scheme Intersection Settings 11/12/20207 Scenario 4: 4 Opening Year (2022) With Project AM Peak HourVersion 6.00-03 Generated with Apx - 160 0.726Volume to Capacity (v/c): CLevel Of Service: -Delay (sec / veh): 15 minutesAnalysis Period: ICU 1Analysis Method: SignalizedControl Type: Intersection 4: Walnut Grove Ave (NS) at Garvey Ave (EW) Intersection Level Of Service Report YesYesYesYesCrosswalk 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Name Intersection Setup 0000Bicycle Volume [bicycles/h] 0000Pedestrian Volume [ped/h] 13785610477852115249451267141357126Total Analysis Volume [veh/h] 342142619213296211367358932Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 13785610477852115249451267141357126Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 032071804916160322Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.021.021.021.021.021.021.021.021.021.021.021.02Growth Factor 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 13480810269818113196426246138347102Base Volume Input [veh/h] Name Volumes 11/12/20208 Scenario 4: 4 Opening Year (2022) With Project AM Peak HourVersion 6.00-03 Generated with Apx - 161 0.726Intersection V/C CIntersection LOS 0.280.280.060.260.260.060.190.190.150.140.140.07V/C, Movement V/C Ratio Movement, Approach, & Intersection Results --Lead--Lead--Lead--LeadLead / Lag Auxiliary Signal Groups 047083061025Signal group PermissPermissProtectePermissPermissProtectePermissPermissProtectePermissPermissProtecteControl Type Phasing & Timing 10.00Lost time [s] 100Cycle Length [s] Intersection Settings 11/12/20209 Scenario 4: 4 Opening Year (2022) With Project AM Peak HourVersion 6.00-03 Generated with Apx - 162 Intersection Analysis Summary 11/12/2020Report File: C:\...\PMOYW.pdf Scenario 4 Opening Year (2022) With Project PM Peak HourVistro File: C:\...\PME.vistro V/C, Delay, LOS: For two-way stop, these values are taken from the movement with the worst (highest) delay value. For all other control types, they are taken for the whole intersection. C-0.793WB RightICU 1SignalizedWalnut Grove Ave (NS) at Garvey Ave (EW)4 B11.60.057EB RightHCM 6th EditionTwo-way stopWalnut Grove Ave (NS) at Project Dwy (EW)3 C-0.761SB RightICU 1SignalizedWalnut Grove Ave (NS) at Hellman Ave (EW)2 B-0.633WB ThruICU 1SignalizedI-10 EB Ramps (NS) at Hellman Ave (EW)1 LOSDelay (s/veh)V/CWorst MvmtMethodControl TypeIntersection NameID 11/12/20201 Scenario 4: 4 Opening Year (2022) With Project PM Peak HourVersion 6.00-03 Generated with Apx - 163 0.633Volume to Capacity (v/c): BLevel Of Service: -Delay (sec / veh): 15 minutesAnalysis Period: ICU 1Analysis Method: SignalizedControl Type: Intersection 1: I-10 EB Ramps (NS) at Hellman Ave (EW) Intersection Level Of Service Report YesYesNoCrosswalk 0.000.000.00Grade [%] 30.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruThruLeftRightLeftTurning Movement Lane Configuration WestboundEastboundSouthboundApproach Name Intersection Setup 000Bicycle Volume [bicycles/h] 000Pedestrian Volume [ped/h] 1332262457817260Total Analysis Volume [veh/h] 33576120465Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.0000Peak Hour Factor 1332262457817260Total Hourly Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 000000Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 020203003Site-Generated Trips [veh/h] 000000In-Process Volume [veh/h] 1.021.021.021.021.021.02Growth Factor 2.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 1302022214717252Base Volume Input [veh/h] Name Volumes 11/12/20202 Scenario 4: 4 Opening Year (2022) With Project PM Peak HourVersion 6.00-03 Generated with Apx - 164 0.633Intersection V/C BIntersection LOS 0.200.200.180.040.150.14V/C, Movement V/C Ratio Movement, Approach, & Intersection Results -----LeadLead / Lag Auxiliary Signal Groups 048001Signal group SplitSplitSplitSplitPermissivePermissiveControl Type Phasing & Timing 10.00Lost time [s] 100Cycle Length [s] Intersection Settings 11/12/20203 Scenario 4: 4 Opening Year (2022) With Project PM Peak HourVersion 6.00-03 Generated with Apx - 165 0.761Volume to Capacity (v/c): CLevel Of Service: -Delay (sec / veh): 15 minutesAnalysis Period: ICU 1Analysis Method: SignalizedControl Type: Intersection 2: Walnut Grove Ave (NS) at Hellman Ave (EW) Intersection Level Of Service Report YesYesNoYesCrosswalk 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Name Intersection Setup 0000Bicycle Volume [bicycles/h] 0000Pedestrian Volume [ped/h] 19359119510430717474116919662128Total Analysis Volume [veh/h] 481532426774418542516632Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 19359119510430717474116919662128Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000701620280030Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.021.021.021.021.021.021.021.021.021.021.021.02Growth Factor 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 18958118610228515169916619646125Base Volume Input [veh/h] Name Volumes 11/12/20204 Scenario 4: 4 Opening Year (2022) With Project PM Peak HourVersion 6.00-03 Generated with Apx - 166 0.761Intersection V/C CIntersection LOS 0.110.040.010.050.230.170.250.250.090.190.190.07V/C, Movement V/C Ratio Movement, Approach, & Intersection Results --------Lead--LeadLead / Lag Auxiliary Signal Groups 040080061025Signal group SplitSplitSplitSplitSplitSplitPermissPermissProtectePermissPermissProtecteControl Type Phasing & Timing 10.00Lost time [s] 100Cycle Length [s] Intersection Settings 11/12/20205 Scenario 4: 4 Opening Year (2022) With Project PM Peak HourVersion 6.00-03 Generated with Apx - 167 0.057Volume to Capacity (v/c): BLevel Of Service: 11.6Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: Two-way stopControl Type: Intersection 3: Walnut Grove Ave (NS) at Project Dwy (EW) Intersection Level Of Service Report YesYesYesCrosswalk 0.000.000.00Grade [%] 30.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] RightLeftRightThruThruLeftTurning Movement Lane Configuration EastboundSouthboundNorthboundApproach Name Intersection Setup 000Pedestrian Volume [ped/h] 330328078710Total Analysis Volume [veh/h] 8082022180Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.0000Peak Hour Factor 330328078710Total Hourly Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 000000Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 330322130Site-Generated Trips [veh/h] 000000In-Process Volume [veh/h] 1.021.021.021.021.021.02Growth Factor 2.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 0007718510Base Volume Input [veh/h] Name Volumes 11/12/20206 Scenario 4: 4 Opening Year (2022) With Project PM Peak HourVersion 6.00-03 Generated with Apx - 168 BIntersection LOS 0.22d_I, Intersection Delay [s/veh] BAAApproach LOS 11.550.000.00d_A, Approach Delay [s/veh] 4.490.000.000.000.000.0095th-Percentile Queue Length [ft/ln] 0.180.000.000.000.000.0095th-Percentile Queue Length [veh/ln] BAAAMovement LOS 11.550.000.000.000.000.00d_M, Delay for Movement [s/veh] 0.060.000.000.010.010.00V/C, Movement V/C Ratio Movement, Approach, & Intersection Results 000Number of Storage Spaces in Median NoTwo-Stage Gap Acceptance 000Storage Area [veh] Flared Lane StopFreeFreePriority Scheme Intersection Settings 11/12/20207 Scenario 4: 4 Opening Year (2022) With Project PM Peak HourVersion 6.00-03 Generated with Apx - 169 0.793Volume to Capacity (v/c): CLevel Of Service: -Delay (sec / veh): 15 minutesAnalysis Period: ICU 1Analysis Method: SignalizedControl Type: Intersection 4: Walnut Grove Ave (NS) at Garvey Ave (EW) Intersection Level Of Service Report YesYesYesYesCrosswalk 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Name Intersection Setup 0000Bicycle Volume [bicycles/h] 0000Pedestrian Volume [ped/h] 201974149114956144147525168168526139Total Analysis Volume [veh/h] 5024437292393637131424213235Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 201974149114956144147525168168526139Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 036010280381060320Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.021.021.021.021.021.021.021.021.021.021.021.02Growth Factor 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 197920146102910141107505159165513117Base Volume Input [veh/h] Name Volumes 11/12/20208 Scenario 4: 4 Opening Year (2022) With Project PM Peak HourVersion 6.00-03 Generated with Apx - 170 0.793Intersection V/C CIntersection LOS 0.330.330.080.300.300.080.190.190.090.190.190.08V/C, Movement V/C Ratio Movement, Approach, & Intersection Results --Lead--Lead--Lead--LeadLead / Lag Auxiliary Signal Groups 047083061025Signal group PermissPermissProtectePermissPermissProtectePermissPermissProtectePermissPermissProtecteControl Type Phasing & Timing 10.00Lost time [s] 100Cycle Length [s] Intersection Settings 11/12/20209 Scenario 4: 4 Opening Year (2022) With Project PM Peak HourVersion 6.00-03 Generated with Apx - 171 APPENDIX E QUEUING WORKSHEETS Apx - 172 Project Name:Walnut Garvey Mixed Use Project Project Number: 19302 Study Intersection: Walnut Grove Avenue at Garvey Avenue Scenario:Opening Year With Project - AM Street Name: Direction: Movement: 100 sec 339 veh/ln/hr 0.95 25 feet 0.0942 veh/ln/sec 9.4167 veh/ln/cycle 325 feet Poisson Distribution Formula: Output Input P(x) = x! (λT)x * e-λT 13Vehicles/Cycle at Avg. Veh/Cycle, λ * T = Avg. Veh/Sec, λ = 0.95 probability vehicle(s) 95th-Percentile Queue = Based on Poisson Probability Distribution Queue Length Calculation SB Queue length / car Probability Volume Cycle Length E-WN-S Garvey Avenue Minor Street Walnut Grove Avenue Major Street Walnut Garvey Mixed Use Project Traffic Impact Analysis 19302 Apx - 173 Project Name:Walnut Garvey Mixed Use Project Project Number: 19302 Study Intersection: Walnut Grove Avenue at Garvey Avenue Scenario:Opening Year With Project - PM Street Name: Direction: Movement: 100 sec 329 veh/ln/hr 0.95 25 feet 0.0914 veh/ln/sec 9.1389 veh/ln/cycle 325 feet Poisson Distribution Formula: 95th-Percentile Queue = P(x) =(λT)x * e-λT x! Probability Queue length / car Output Avg. Veh/Sec, λ = Avg. Veh/Cycle, λ * T = Vehicles/Cycle at 13 vehicle(s)0.95 probability Volume Queue Length Calculation Based on Poisson Probability Distribution Major Street Minor Street Walnut Grove Avenue Garvey Avenue N-S E-W SB Input Cycle Length Walnut Garvey Mixed Use Project Traffic Impact Analysis 19302 Apx - 174 APPENDIX F PROJECT TRIP DISTRIBUTIONS – DRIVEWAY RESTRICTIONS Apx - 175 Figure A Project Outbound Trip Distributon - Residential With Driveway Restrictions Garvey Walnut Mixed Use ProjectTraffic Impact Analysis 19302 N WILLARD AVEWALNUT GROVE AVEBURTON AVELA PRESA AVE GARVEY AVE HELLMAN AVE Site 10 20% 30% 20% 100% 10% 20% 10% 10% Percent From Project Legend 10% 50% 30% Apx - 176 Figure B Project Inbound Trip Distributon - Residential With Driveway Restrictions Garvey Walnut Mixed Use ProjectTraffic Impact Analysis 19302 N WILLARD AVEWALNUT GROVE AVEBURTON AVELA PRESA AVE GARVEY AVE HELLMAN AVE Site 10 Percent To Project Legend 10% 20% 30% 20% 10% 10% 20% 20% 10% 100% 50% 70% 30% Apx - 177 Figure C Project Outbound Trip Distributon - Office With Driveway Restrictions Garvey Walnut Mixed Use ProjectTraffic Impact Analysis 19302 N WILLARD AVEWALNUT GROVE AVEBURTON AVELA PRESA AVE GARVEY AVE HELLMAN AVE Site 10 15% 30% 10% 100% 15%30% 15% 15% Percent From Project Legend 10% 60% 45% Apx - 178 Figure D Project Inbound Trip Distributon - Office With Driveway Restrictions Garvey Walnut Mixed Use ProjectTraffic Impact Analysis 19302 N WILLARD AVEWALNUT GROVE AVEBURTON AVELA PRESA AVE GARVEY AVE HELLMAN AVE Site 10 Percent To Project Legend 10% 30% 10% 15% 15%30% 15% 100% 40% 60% 15% Apx - 179 Figure E Project Outbound Trip Distributon - Retail/Restaurant With Driveway Restrictions Garvey Walnut Mixed Use ProjectTraffic Impact Analysis 19302 N WILLARD AVEWALNUT GROVE AVEBURTON AVELA PRESA AVE GARVEY AVE HELLMAN AVE Site 10 25% 20% 20% 100% 5%20% 5% 5% Percent From Project Legend 10% 55% 28% 2%2% 3% 25% 3% 25% Apx - 180 Figure F Project Inbound Trip Distributon - Retail/Restaurant With Driveway Restrictions Garvey Walnut Mixed Use ProjectTraffic Impact Analysis 19302 N WILLARD AVEWALNUT GROVE AVEBURTON AVELA PRESA AVE GARVEY AVE HELLMAN AVE Site 10 Percent To Project Legend 10% 20% 20% 5% 5% 10% 20% 5% 100% 45% 57% 43% 2%2% 3% 25% 3% 15% Apx - 181 APPENDIX G SITE PLANS Apx - 182 Apx - 183 Apx - 184 Apx - 185 Apx - 186 Apx - 187 Apx - 188 Apx - 189 Apx - 190 Apx - 191 Apx - 192 Apx - 193 Apx - 194 Apx - 195 Apx - 196 Apx - 197 Apx - 198 Apx - 199 Apx - 200 APPENDIX H VMT WORKSHEETS Apx - 201 SGVCOG VMT Evaluation Tool Report Page 1 Project Details Timestamp of Analysis: October 08, 2020, 10:06:45 AM Project Name: Walnut Grove Mixed Use Housing Community Development Project Description: NW corner of Walnut Grove and Garvey42 Condos, 5,470 sqf O3ce, 1,1/0 Cafe, 5,274 RetailLGymLJibrary and 5,520 Community Center Project Jocation Iurisdiction: Rosemead ?nside a TPA( No F)ailZ APN TA-5288B001B040 22176200 5288B001B041 22176200 5288B001B042 22176200 5288B001B04/22176200 Analysis Details Data Version: SCAG Regional Travel Demand Model 2016 RTP Yase hear 2012 Analysis MetKodology: TA- Yaseline hear: 2020 Project Jand Use Residential: Single )amily DU: Multifamily DU: 42 Total DUs: 42 NonBResidential: O3ce wS): 5 Jocal Serving Retail wS): 11 ?ndustrial wS): Residential Affordability Fpercent of all unitsZ: Extremely Jo% ?ncome: 0 k Very Jo% ?ncome: 0 k Jo% ?ncome: 0 k Par.ing: Motor VeKicle Par.ing: 204 Yicycle Par.ing: /1 Apx - 202 SGVCOG VMT Evaluation Tool Report Page 2 Residential VeKicle Miles Traveled FVMTZ Screening Results Jand Use Type 1: Residential VMT WitKout Project 1: Total VMT per Service Population VMT Yaseline Description 1: SGVCOG Average VMT Yaseline Value 1: /5&14 VMT TKresKold Description 1: B15k Jand Use 1 Kas been PreBScreened by tKe Jocal Iurisdiction: NLA WitKout Project WitK Project 9 Tier 1B/ VMT Reductions WitK Project 9 All VMT Reductions Project Generated VeKicle Miles Traveled FVMTZ Rate 27&G 27&G 27&G Jo% VMT Screening Analysis hes FPassZ hes FPassZ hes FPassZ Apx - 203 SGVCOG VMT Evaluation Tool Report Page / Commercial VeKicle Miles Traveled FVMTZ Screening Results Jand Use Type 2: Commercial VMT WitKout Project 2: Total VMT per Service Population VMT Yaseline Description 2: SGVCOG Average VMT Yaseline Value 2: /5&14 VMT TKresKold Description 2: B15k Jand Use 2 Kas been PreBScreened by tKe Jocal Iurisdiction: NLA WitKout Project WitK Project 9 Tier 1B/ VMT Reductions WitK Project 9 All VMT Reductions Project Generated VeKicle Miles Traveled FVMTZ Rate 27&G 27&G 27&G Jo% VMT Screening Analysis hes FPassZ hes FPassZ hes FPassZ Apx - 204 GANDDINI GROUP, INC. 550 Parkcenter Drive, Suite 202, Santa Ana, CA 92705 714.795.3100 | www.ganddini.com