CC - Item 5C - First Amendment to Professional Services Agreement with CEJ Engineers, Inc., to Provide Design Services for Safe Routes to School - Delta Ave from Mission Dr to Wells StROSEMEAD CITY COUNCIL STAFF REPORT TO: THE HONORABLE MAYOR AND CITY COUNCIL FROM: GLORIA MOLLEDA, CITY MANAGER DATE: FEBRUARY 8, 2022 SUBJECT: APPROVAL OF REINSTATEMENT AND FIRST AMENDMENT TO PROFESSIONAL SERVICES AGREEMENT WITH CEJ ENGINEERS, INC. TO PROVIDE DESIGN SERVICES FOR SAFE ROUTES TO SCHOOL - SIDEWALK GAP CLOSURE - DELTA AVENUE FROM MISSION DRIVE TO WELLS STREET SUMMARY As part of the City's Fiscal Year 2018-2019 Capital Improvement Program (CIP), the City Council approved the Safe Routes to School - Sidewalk Gap Closure - Delta Avenue from Mission Drive to Wells Street project (Project). On July 24, 2018, the City Council awarded a professional services agreement for design services to CEJ Engineers, Inc. In September 2018, prior Public Works staff directed CEJ Engineers, Inc. to place the design of the Project on hold, and the Project has been inactive since. The Project is now being restarted, and due to changes in existing field conditions during the Project's inactivity, the Project requires additional relocation of existing fixed structures within the public right-of-way on Delta Avenue. Therefore, additional services from CEJ Engineers, Inc. are needed to complete the final design. The required services include additional field assessment to reconfirm existing conditions, design of relocated fixed structures within the public right-of-way, and public outreach with property owners for such relocations. Staff is requesting to reinstate and amend the professional services agreement with CEJ Engineers, Inc. to extend the Contract Term and approve Compensation to perform the additional services. BACKGROUND In January 2018, staff applied for grant funds under the Caltrans' Active Transportation Program, formerly known as the Safe Route to School Program, for a sidewalk gap closure on Delta Avenue and was successfully awarded a grant in the amount of $1.1 million for the construction of the Project. The Project will install Americans with Disabilities Act (ADA) compliant concrete sidewalk and curb ramps, colored concrete crosswalks, parkway trees, restoration of damaged driveways and curb & gutter, and relocation of fence and walls encroaching into the public right- of-way. The proposed improvements will take place on Delta Avenue between Mission Drive and Wells Street. They will create a continuous sidewalk on both sides of Delta Avenue to enhance safety for pedestrians including Shuey Elementary school students that currently walk on the roadway due to lack of continuous sidewalks. The Project will be the second and final sidewalk AGENDA ITEM 5.0 City Council Meeting February 8, 2022 Page 2 of 3 gap closure around Shuey Elementary School. In 2017, the first sidewalk gap closure project around Shuey Elementary School was successfully completed on Earle Ave, which received a positive response from the Rosemead community. On July 24, 2018, the City Council awarded a professional services agreement to CEJ Engineers, Inc. for design services in the amount of $38,380 for the Project. The design services included the preparation of engineering calculations, construction plans, technical specifications, and cost estimates. In September 2018, 90% of the design package was completed, and prior Public Works staff directed CEJ Engineers to put the Project on hold; the Project has been inactive since. On December 31, 2018, the professional services agreement with CEJ Engineers, Inc. expired. The Project is now restarting, and due to changes in existing field conditions during the Project's inactivity, the Project requires additional relocation of existing fixed structures within the public right-of-way on Delta Avenue, including chain link fences and decorative walls, to install the proposed improvements. Therefore, additional services from CEJ Engineers, Inc. are needed to complete the final design. The required services include additional field assessment to reconfirm existing conditions, design of relocated fixed structures within the public right-of-way, and public outreach with property owners for such relocations. Furthermore, the grant funds obtained from Caltrans will require the City to execute Federal and/or State documents and agreements to advance the Project, which may include certifications, applications, agreements, amendments, and payment requests. To complete the final design, staff is requesting to reinstate and amend CEJ Engineers, Inc.'s professional services agreement to extend the Contract Term to December 31, 2023, and increase Compensation by $12,940. STAFF RECOMMENDATION Staff recommends that the City Council: 1. Authorize the City Manager to reinstate and execute First Amendment to the professional services agreement with CEJ Engineers, Inc. for the Safe Routes to School - Sidewalk Gap Closure - Delta Avenue from Mission Drive to Wells Street project to extend the Contract Term to December 31, 2023; and increase Compensation by $12,940, to complete the final design. 2. Adopt Resolution No. 2022-11 authorizing the City Manager or her Designee to execute all required documents and agreements to complete the grant scope under Caltrans' Active Transportation Program. City Council Meeting February 8, 2022 Page 3 of 3 FINANCIAL IMPACT The Project is included in the Fiscal Year 2021-22 CIP with a design budget funded by Measure R funds in the amount of $75,000. The additional compensation requested does not financially impact the approved design budget. The City received $1.1 million from Caltrans under the Active Transportation Program to fund the Project's construction phase. STRATEGIC PLAN IMPACT The Project is consistent with the City of Rosemead's Strategic Plan Goal C - Infrastructure and Facilities, which is to enhance streets, sidewalks, and public infrastructure; coordinate with relevant utility agencies regarding safety and enhancements; and modernize facilities by expanding the use of wireless network technology and renewable energy. LEGAL REVIEW This staff report, First Amendment to the Agreement, and Resolution No. 2022-11 have been reviewed by the City Attorney. PUBLIC NOTICE PROCESS This item has been noticed through the regular agenda notification process. Prepared and submitted by: X�e-oz q� Michael Chung, P.E. Director of Public Works Attachment A: Reinstatement and First Amendment to Professional Services Agreement with CEJ Engineers, Inc. Attachment B: CEJ Engineers Proposal for Additional Services Attachment C: Resolution No. 2022-11 Attachment A Reinstatement and First Amendment to Professional Services Agreement with CEJ REINSTATEMENT AND FIRST AMENDMENT TO PROFESSIONAL SERVICES AGREEMENT SAFE ROUTES TO SCHOOL - SIDEWALK GAP CLOSURE - DELTA AVENUE FROM MISSION DRIVE TO WELLS STREET - DESIGN SERVICES (CEJ ENGINEERS, INC.) THIS REINSTATEMENT AND FIRST AMENDMENT ("Amendment") is made and entered into this day of , 2022, ("Effective Date"), by and between the City of Rosemead, a municipal corporation of the State of California, located at 8838 E. Valley Blvd., Rosemead, California 91770, ("City") and CEJ Engineers, Inc., with its principal place of business at 18800 Amar Road, Suite B13, Walnut, CA 91789 (hereinafter referred to as "Consultant"). WHEREAS, City and Consultant entered into a Professional Services Agreement dated July 24, 2018, for Consultant to render such services described in the Original Agreement; and WHEREAS, Section 3.1.2 of the Original Agreement defines Agreement term to expire in December 31, 2018; and WHEREAS, City requested Consultant to provide additional design services for the project, which were not included in the Original Agreement; and WHEREAS, City and Consultant desire to reinstate the Agreement and extend the term to expire in December 31, 2023, for Consultant to continue to render additional services requested by the City; and WHEREAS, Section 3.3.1 of the Original Agreement defines Agreement compensation not to exceed Thirty -Eight Thousand Three Hundred Eighty Dollars ($38,380.00); and WHEREAS, City and Consultant desire to increase the compensation by Twelve Thousand Nine Hundred and Forty Dollars ($12,940) to a not to exceed amount of Fifty - One Thousand Three Hundred and Twenty Dollars ($51,320). CEJ Engineers, Inc. Page 2 of 3 NOW, THEREFORE, for valuable consideration, the receipt and sufficiency of which is hereby acknowledged, the parties agree as follows: 1. The Original Agreement shall be reinstated. 2. Section 3.1.2 of the Original Agreement shall be amended to read as follows: 3.1.2 Term. The term of this Agreement shall be from Effective Date shown above to December 31, 2023, unless earlier terminated as provided herein. Consultant shall complete the Services within the term of this Agreement, and shall meet any other established schedules and deadlines. 3. Section 3.3.1 of the Original Agreement shall be amended to read as follows: 3.3.1 Compensation. Consultant shall receive compensation, including authorized reimbursements, for all Services rendered under this Agreement, as specified in the attached Consultant proposal (i.e., hourly rates, expenses, etc.), but not to exceed Fifty -One Thousand Three Hundred and Twenty Dollars ($51,320). Such payments shall be made on an as -needed basis as directed by the City. Extra Work may be authorized, as described below, and if authorized, will be compensated at the rates and manner set forth in this Agreement. 4. All terms not defined herein shall have the same meaning and use as set forth in the Original Agreement. 5. All other terms, conditions, and provisions of the Original Agreement shall remain in full force and effect. IN WITNESS WHEREOF, City and Consultant have executed this reinstatement and Amendment as of the date set forth above. (SIGNATURES ON NEXT PAGE] CEJ Engineers, Inc. Page 3 of 3 CITY OF ROSEMEAD CEJ ENGINEERS, INC. By: Gloria Molleda, City Manager Date Signature Name: Print Attest: Title: Ericka Hernandez, City Clerk Date Date [If Corporation, TWO SIGNATURES, President OR Vice President AND Secretary, AND CORPORATE SEAL OF CONTRACTOR REQUIRED] Approved as to Form: Rachel Richman, City Clerk Date Name: Title: Attachment B CEJ Engineers Proposal for Additional Services January 31, 2022 CITY OF ROSEMEAD Michael Chung, P.E. Director of Public Works 8838 E. Valley Boulevard Rosemead, CA 91770 `• I'ugrueert leie �JJ SUBJECT: PROPOSAL FOR UPDATE AND REVISE PLANS OF SR2S SIDEWALK GAP CLOSURE PROJECT AT DELTA AVENUE FROM MISSION DRIVE TO WELLS STREET (RFP NO. 2018-15) Dear i 1r. Chung, CEJ Engineers is pleased to have the opportunity to submit this proposal for professional engineering services related to the City's project. CEJ Engineers specializes in street design and street improvement projects. Our staff has extensive experience in preparing street construction plans, drainage studies, utility coordination, master plans, and preparing PS&E for various projects in accordance with local and regional standards and policies. Our key personnel has more than 40 years of experience in working and communicating with a wide spectrum of relevant public agencies throughout Orange County and the Los Angeles County. CEFs personnel have provided professional consulting services to cities, special districts, and other governmental agencies within Southern California and Caltrans. CEJ is dedicated to professional quality and technical excellence through a proactive QA/QC program. The CEJ team will provide services for the aspects required for this project as per the scope of work. The following Exhibits are enclosed: ❑ Exhibit A — Scope of work ❑ Exhibit B — Proposed Fee We believe the CEJ Team provides the right combination of experienced staff, Project understanding, and local knowledge to successfully assist the City of Rosemead with Engineering Services. Please feel free to contact us to discuss any aspects of this proposal or to arrange for an interview at (626) 667-8675 or at j cervantes@cej-eng. com. Respectfully Submitted, Joaquin Cervantes, P.E. Principal CEJ Engineers, Inc. 18800 Amar Rd., Suite 813 Walnut CA 91789 Engineers e Surveyors • Planners Q 18800 Amar Rd. Suite B 13, Walnut CA., 91789 / 626-667-8675 SR2S SIDEWALK GAP CLOSURE PROJECT AT DELTA AVENUE FROM MISSSION DRIVE TO WELLS STREET Table of Contents ScopeOf Work.............................................................................................................................................. 3 ProjectManagement.................................................................................................................................... 3 ProjectUnderstanding.................................................................................................:................................ 4 Plans, Specifications & Estimates.................................................................................................................. 4 ProjectSubmittals......................................................................................................................................... 5 Engineers • Surveyors • Planners OSE�E-1 18800 Amar Rd. Suite BI 3, Walnut CA. 91789 / 626-667-8675 SR2S SIDEWALK GAP CLOSURE PROJECT AT DELTA AVENUE FROM MISSSION DRIVE TO WELLS STREET Scope Of Work The following tasks will give a detailed description of the professional services included in this Scope of Work and our Project Approach. Project Management The, team management and close coordination with all parties involved in the project is critical to the successful completion of any project. CEJ takes pride in the high level of service we provide to our clients. Three key elements to successful project management include a Project Kick-off Meeting, and Project meetings. Project Kick-off Meeting A Project Kick-off Meeting will be scheduled to include the decision makers and policy enforcement staff from the governing agencies and utility companies associated with this project (Project Team). Project Meetings CEJ will attend project meetings as required. We anticipate we will need to attend a total of 3 meetings (kick-off and 2 design meetings). Quality Control Approach The primary and most important fundamental aspects to the execution of any construction contract is the adherence to an established Quality Assurance/Quality Control (QA/QC) plan. CEJ proposes Carlos Alvarado as QA/QC manager for all task orders. He has over 40 years of experience in management and oversight of public agency projects. These QA/QC procedures are implemented from initial scoping through agency review and approval. As the QA/QC manager, Carlos Alvarado's responsibilities will include the following: ➢ Review project scope, schedule, and budget after the kick-off meetings, ➢ Review progress at critical stages of the project, ➢ Make technical suggestions, ➢ Provide management recommendations, ➢ Review deliverables prior to submission ➢ Review the overall project to make certain the projects standards are being achieved SR2S SIDEWALK GAP CLOSURE PROJECT AT DELTA AVENUE FROM MISSSION DRIVE TO WELLS STREET Project Understanding CEJ conducted a field review of the subject street within the Project limits. The project is located at Delta Avenue from Mission drive to Wells street. The Improvements include grading, removals and installation of new sidewalk, retaining curbs, driveways and curb gutter reconstruction, tree planting and appurtenant improvements. The following describes the scope of work: Delta Avenue — (Mission Drive to Wells Street.) Delta Avenue is a two lane road, classified as Residential Street. It is 40 feet wide with a total distance of approximately 1,700 LF. Existing Conditions: There is currently no sidewalk on both sides of the street except for a few locations and large sections of damaged driveways and curb and gutter. Proposed Scope Updated Scope as requested by the City: CEJ will review existing improvements that are interfering with the proposed improvements (sidewalk, etc.) within public right of way. CEJ will include the proposed relocations and/or reconstruction of such existing improvements, specifications, and estimates. CEJ will coordinate the necessary public outreach with the affected property owners and prepare right of entry letters for work impacting each private property/existing improvements, and outreach to affected properties and obtain right of entry for the proposed improvements. Right of way entry forms will be obtained from all impacted properties prior to Final Construction plans, specifications and estimates. The City's construction budget will determine the extent of the improvements, sidewalk and curb and gutter replacements. Plans, Specifications & Estimates Task 1- Field Condition Assessment 1.1 Prepare a field reviews to assess the physical conditions of the site and utilities within the project area. 1.2 Meet with City staff to define and clarify the work plan and project elements and obtain all project data from the City. We will review all City -supplied information and neighborhood concerns. SR2S SIDEWALK GAP CLOSURE PROJECT AT DELTA AVENUE FROM MISSSION DRIVE TO WELLS STREET Task 2- Construction Plans The Plans, Specifications, and Estimates will conform to the City of Rosemead's standards and practices. 2.1 CEJ will provide clear, concise, and complete drawings with Latest version of AutoCAD and Civil3D software. The design will be plotted using permanent drafting ink on mylar, and drafted on twenty- four inch by thirty-six inch (24"x36") mylar sheets. The plans will be prepared under the supervision of a Civil Engineer registered in the state of California who will sign the final plans. The original drawings and the electronic data of these drawings will be submitted to the City, along with a CD in AutoCAD format upon completion. 2.2 CEJ will conduct all necessary research to establish precise location of all utilities and utility easements for each project. CEJ will provide the utility with a preliminary notification/request for current information letter and up to three relocation notices via certified mail CEJ will consult with affected utility companies requiring relocations, and resolve any conflicts, keeping City staff informed in writing, including the possibility of undergrounding utilities presently on poles along the project area. Comply with Caltrans' "Manual on High and Low Risk Underground Facilities within Highway Rights -of -Way. Construction plans will include telephone numbers of utilities and other affected agencies; power poles; driveway approaches; edge of pavement; water service relocation and/or installation if necessary; sewer manhole cover and water valve cover adjustment if necessary; and other utility's that are of benefit to the design of the project. 2.3 Retaining wall plans and Structural calculations. CEJ will prepare retaining wall plans and structural calculations for the proposed retaining wall along the segment of homes as necessary. Structural calculations will be prepared and submitted to the City for review and approval. 2.4 CEJ will address all comments and obtain final design approval from the City of Rosemead. During the bidding process remain "on-call" to provide analysis and interpretation of the drawings and Specifications. When requested to do so, prepare and issue addenda to address concerns of potential bidders. Task 3- Public Outreach During the design process, CEJ will conduct public outreach to inform affected homeowners of the impacted properties. Project Submittals The final plans will be submitted in three (3) submittals and will consist of the following submittals and materials. SR2S SIDEWALK GAP CLOSURE PROJECT AT DELTA AVENUE FROM MISSSION DRIVE TO WELLS STREET The 60% submittal materials will include the following: 60% Improvement Plans • Title Sheet with vicinity map, General Notes, Signature Blocks, Legend, Sheet Index, Utility Contact Information. • Utility Plans • Sidewalk Plans, Profiles, Sections, Details, and Construction Notes • Construction Plans with base mapping including survey and utility locations. The 90% submittal materials will include the following: • 90% Improvement Plans • 90% Specifications • 90% Engineers Estimate - Including Quantity Calculations and Cost Data. 100% Final Submittal Material will include the following item: • 100% Improvement Plans —On mylar and stamped by the Engineer • 100% Specifications — Stamped by the Engineer • 100% Engineers Estimate - Including Quantity Calculations and Cost Data. Final plans, specifications, and estimates will be provided on "D" size mylar, three sets of copy's and in electronic format to the City on a CD and PDF version. Schedule: CEJ will prepare and complete 100% PSE within 4 weeks after NTP. CEJ will work closely with City Staff and affected property owners in order to meet the Citys schedule SR2S SIDEWALK GAP CLOSURE PROJECT AT DELTA AVENUE FROM MISSS/ON DRIVE TO WELLS STREET Proposed Fee Our proposed fee is based on the proposal required format and is not to exceed lump sum fee amount of $12,940, based on established hourly rates. CLIENT: city of Rosemead CEJ Engineers Inc_ PROJ: SR2S Sidewalk Gap Closure Project -Delta Ave JOB NO: SUMMARY PROPOSAL FEE DATE: 01/31/22 Page 1 of 1 LABOR Task 1 FIELD REVIEW ASSESSMENT B Engineer/ Senior Designer 10 $150 $1 500 $1,500 LABOR Task 2 CONSTRUCTIONDRAWINGS Street Plans Senior Engineer 24 ' $160 1 $3,840 B Ret Wall Engineer/ Senior Designer 16 $150 $2,400 C iCADD Designer/ Technician 19 $100 $1,900 D Struc Calcs Sructural Engineer 4 $150 $600 $8,740 LABOR Task 3 PUBLIC OUTREACH Class Position/Name Hours Rate Subtotal A Engineer/ Senior Designer 18 $150 $2,700 LABOR: $2,700 OTHER EXPENSES PROPOSEDFEE Total Labor at Billing... Rates........ _.... ....... . . $12,940......... Reimbursable Expenses $0 PROPOSED FEE: 12,940 Proposal By/ Project Manager Joaquin Cervantes, P.E CEJ ENGINEERS, INC. Effective July 1, 2021 to June 30, 2022 Hourly Rate Schedule ENGINEERING DIVISION Principal Engineer.....................................200.00 Project Manager ....................................... 180.00 Senior Project Engineer ........................... 160.00 Senior Engineer ...................................... 150.00 Associate Engineer .................................. 140.00 Design Engineer ...................................... 130.00 Designer/CADD Drafter ........................... 100.00 Clerical/Technical Aide ............................... 85.00 LANDSCAPE ARCHITECTURE Senior Landscape Architect ......................120.00 Associate Landscape Architect ................ 105.00 REIMBURSABLE EXPENSES SURVEYING DIVISION Senior Surveyor........................................180.00 Senior Survey Analyst..............................160.00 Survey Analyst II ......................................140.00 Survey Analyst I .......................................120.00 Survey Party Chief ...................................130.00 Field Party (Three) ...................................240.00 Field Party (Two) ...................................... 200.00 Field Party (One)..................................125.00 CONSTRUCTION MANAGEMENT/ INSPECTION Construction Manager..............................150.00 Supervising Public Works Observer ......... 120.00 Senior Public Works Observer .................110.00 Public Works Observer.............................100.00 Construction Engineer................................95.00 Reproduction....................................Cost plus 10% Subconsultant Services ..................... Cost plus 10% Automobile Transportation ..................Current rate Delivery, Freight, Courier .....................Cost Agency Fees ....................................Cost Commercial Travel / Subsistence......... Cost Additional billing classifications may be added to the above listing during the year as new positions are created. The above schedule is for straight time. Blueprinting, reproduction, messenger services, and printing will be invoiced at cost plus ten percent (10%). A subconsultant management fee of ten percent (10%) will be added to the direct cost of all subconsultant services to provide for the cost of administration, consultation, and coordination., the rates may be raised once per year to the value of change of the Consumer Price Index for the Los Angeles/Orange County area, but not more than five percent per year. Attachment C Resolution No. 2022-11 RESOLUTION NO. 2022-11 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF ROSEMEAD, CALIFORNIA, AUTHORIZING CITY MANAGER OR HER DESIGNEE TO EXECUTE AGREEMENTS WITH THE CALIFORNIA DEPARTMENT OF TRANSPORTATION FOR THE ACTIVE TRANSPORTATION PROGRAM WHEREAS, the City of Rosemead is eligible to receive Federal and/or State funding for certain active transportation projects, through the California Department of Transportation (Caltrans); and WHEREAS, the City of Rosemead has applied for and received a funding approval of $1,100,000 from the Caltrans' Active Transportation Program; and WHEREAS, Federal and/or State documents and agreements are required to be executed in relation to each phase of funded work such as Engineering, Environmental Studies, Right -of - Way, Construction, and Reimbursement and Closeout with the Caltrans before such funds can be claimed through the Caltrans' Active Transportation Program; and WHEREAS, the City of Rosemead wishes to delegate authorization to the City Manager or her Designee to execute these documents, agreements, and any amendments thereto THE ROSEMEAD CITY COUNCIL HEREBY RESOLVES AS FOLLOWS: SECTION 1. The City Council hereby authorizes the City Manager or her Designee to execute all required documents and agreements for the completion of the grant scope under Caltrans' Active Transportation Program SECTION 2. The City Clerk shall certify to the adoption of this Resolution. PASSED, APPROVED, AND ADOPTED this 8th day of February, 2022. Polly Low, Mayor APPROVED AS TO FORM: ATTEST: Rachel Richman, City Attorney Ericka Hernandez, City Clerk STATE OF CALIFORNIA COUNTY OF LOS ANGELES) § CITY OF ROSEMEAD ) I, Ericka Hernandez, City Clerk of the City Council of the City of Rosemead, California, do hereby certify that the foregoing City Council Resolution No. 2022-11, was duly adopted by the City Council of the City of Rosemead, California, at a regular meeting thereof held on the 8th day of February, 2022, by the following vote, to wit: AYES: NOES: ABSENT: ABSTAIN: Ericka Hernandez, City Clerk