Loading...
ADDENDUM 1, ROSEMEAD, DOG PARK AT GARVEY PARK, 6-17-22 CITY OF ROSEMEAD CALIFORNIA CONTRACT DOCUMENTS SPECIFICATIONS AND STANDARD DRAWINGS FOR DOG PARK AT GARVEY PARK PROJECT No. 41022 Date Issued: June 17, 2022 Addendum 1, Dog Park at Garvey Park, Project No: 41022 Document Control Page 1 of 10 Addendum 1, Page 1 of 2 Addendum for: Dog Park at Garvey Park, Project No. 41022 Addendum No.: 1 Addendum Date: June 17, 2022 Issued by: City of Rosemead Reminder 1: Please sign Addenda Acknowledgement on page CBF-6 of Bid Package Section Titled “Contract Bid Forms”. Entire Contract Bid Forms section shall be submitted as Bidder’s Proposal. Reminder 2: The bids are due at 10:30 AM, Wednesday, June 22, 2022. Addendum 1 reissues Bid Schedule on pages CBF-2 through CBF-5 of Bid Package. See Attachment A - Revised Bid Schedule per Addendum 1. Bid Item 42 quantity is revised from 5 ea to 3 ea. Contractors shall submit this revised bid schedule to be considered responsive. Addendum 1 also reissues Sheet 6 of 14 (Sheet LC.2) of Bid Package, Section titled “Appendix A-Project Plans”. See Attachment B - Revised Sheet 6 of 14 (Sheet LC.2). This addendum also provides responses to the following questions received: Question 1: Refer to sheet LI.1, please confirm the type of existing irrigation controller. Is it conventional or 2-wire system. Also, please confirm if there are existing wire sleeves under existing paved areas that can be utilized for new wires installation along existing mainline. Response 1: The existing irrigation controller is conventional. It is unknown if there are existing sleeves under existing paving. Install new sleeves where necessary. Question 2: Refer to specification 02 9000, two ratios are provided for planting backfill, one per article 1.03F and the other one per article 3.06 C. Please clarify which ratio shall be used for bidding purposes. Response 2: Please use ratio specified in section 1.03F for bidding. Question 3: Per construction material schedule on sheet LC.1, three call-outs are shown for boulders (A, B & C). However, only callout "A" is shown for all the boulders on sheet LC.2. Please revise accordingly if they marked incorrectly. Also, confirm that boulders table shown on detail 6/ LC.3 does not apply to this project. Response 3: LC.2 is revised with appropriate callout for boulders. Boulder table on Detail 6/ LC.3 does not apply. Question 4: Per bid item no.42, 5 EA dog waste bag dispenser is required for this project. However, only 3 EA are shown on plans. Please clarify. Addendum 1, Dog Park at Garvey Park, Project No: 41022 Document Control Page 2 of 10 Addendum 1, Page 2 of 2 Response 4: There are only 3 dog waste bag dispensers, bid Item no. 42 revised to show 3 ea. Question 5: Refer to specifications section 02 90 00, part 2.02 states "Topsoil if required in planting area shall be class A topsoil". Please confirm that no import topsoil is required for this project and existing site soil can be re-used for planting purposes. Also, please provide the soil report rot he site if it’s available. Response 5: Existing top soil may be used for planting. Any additional topsoil needed will be per specifications. Question 6: Per Greenbook standard 2018, section 800-2.2.7, Valve boxes shall be constructed of precast concrete. However, refer to irrigation legend on sheet LI.1, Carson plastic valve box are shown. Please clarify which one shall be used. Response 6: Plastic valve boxes as shown in irrigation legend on sheet LI.1 are to be used. Question 7: Refer to sheet LI.2, the irrigation note in the box shows: do not install valves in turf. Please confirm that the same requirements per installation detail applies for valves installation at decomposed granite paving areas. Otherwise, please advise. Response 7: Note incorrect. Valves may be installed in turf. Question 8: Refer to Irrigation legend on sheet LI.1, mainline material is shown as schedule 40 PVC pipe. However, per specifications section 02 81 00, part 2.02A, Class 315 solvent weld PVC pipe shall be used. Please clarify. Response 8: Use Class 315 per Specifications. Question 9: Refer to detail H on sheet LI.3, 90% clean backfill shall be used for sleeve installation. However, specifications section 02 81 00, part 3.03E states providing sand backfill for all pipe under paved areas. Please confirm that excavated native materials can be used for backfilling pipes & sleeves. Response 9: Native material can be used as backfill for pipes and sleeves. If any rocky soils are discovered sand is to be used per note 2 on Detail G, Sheet LI.3. Attachments: Attachment A - Revised Bid Schedule per Addendum 1 Attachment B - Revised Sheet 6 of 14 (Sheet LC.2) For all other questions, please contact via email: Okan Demirci, PE Project Manager City of Rosemead E: okan.demirci@transtech.org Addendum 1, Dog Park at Garvey Park, Project No: 41022 Document Control Page 3 of 10 ATTACHMENT A - REVISED BID SCHEDULE PER ADDENDUM 1 Addendum 1, Dog Park at Garvey Park, Project No: 41022 Document Control Page 4 of 10 BIDDER: ________________________ Revised per Addendum 1, CBF - 2 REVISED BID SCHEDULE PER ADDENDUM 1 SCHEDULE OF PRICES FOR DOG PARK AT GARVEY PARK PROJECT No. 41022 NO. ITEM DESCRIPTION EST. QTY. UNIT UNIT PRICE ITEM COST 1 Mobilization (Not to Exceed 5%) 1 LS $___________ $__________________ 2 Traffic Control 1 LS $___________ $__________________ 3 Demolition and Site Clearing 1 LS $___________ $__________________ 4 Earthwork, Removal and Grading 1 LS $___________ $__________________ 5 Dust Control and BMP 1 LS $___________ $__________________ 6 Remove and Reconstruct Curb and Gutter 20 LF $___________ $__________________ 7 Remove and Reconstruct Curb 50 LF $___________ $__________________ 8 Construct Curb 160 LF $___________ $__________________ 9 Curb Ramp 1 EA $___________ $__________________ 10 Concrete Block Slough Wall 60 LF $___________ $__________________ 11 8" Diameter PVC SDR 35 Drain Pipe 345 LF $___________ $__________________ 12 8" Diameter PVC SDR 35 Drain Pipe in Gravel Bed 100 LF $___________ $__________________ 13 NDS 1212 Catch Basin with Solid Cover 1 EA $___________ $__________________ 14 Drain Inlet 8 EA $___________ $__________________ 15 Overflow Drain Structure per Detail on Plans 1 EA $___________ $__________________ 16 Remove and Reconstruct Asphalt Pavement 50 TON $___________ $__________________ Addendum 1, Dog Park at Garvey Park, Project No: 41022 Document Control Page 5 of 10 BIDDER: ________________________ Revised per Addendum 1, CBF - 3 NO. ITEM DESCRIPTION EST. QTY. UNIT UNIT PRICE ITEM COST 17 2" Water Service 1 EA $___________ $__________________ 18 1" Water Service 2 EA $___________ $__________________ 19 Traffic Striping and Signage 1 LS $___________ $__________________ 20 Surveying 1 LS $___________ $__________________ 21 4" Thick Concrete Flatwork 2,100 SF $___________ $__________________ 22 Concrete Header (6" Wide) 530 LF $___________ $__________________ 23 Concrete Header (9" Wide) 170 LF $___________ $__________________ 24 Stabilized Decomposed Granite 8250 SF $___________ $__________________ 25 Boulder 2' x 3' 5 EA $___________ $__________________ 26 Boulder 3' x 4' 3 EA $___________ $__________________ 27 Boulder 3' x 5' 5 EA $___________ $__________________ 28 Chain Link Fencing - 5' High 60 LF $___________ $__________________ 29 Chain Link Fencing - 5' High w/ Baseboard 145 LF $___________ $__________________ 30 Chain Link Fencing - 8' High 105 LF $___________ $__________________ 31 Chain Link Fencing - 12' High 150 LF $___________ $__________________ 32 Chain Link Double Gate - 8' High (12' Opening) 1 EA $___________ $__________________ 33 Chain Link Double Gate - 5' High (12' Opening) 1 EA $___________ $__________________ 34 Chain Link Single Gate - 8' High (4' Opening) 1 EA $___________ $__________________ Addendum 1, Dog Park at Garvey Park, Project No: 41022 Document Control Page 6 of 10 BIDDER: ________________________ Revised per Addendum 1, CBF - 4 NO. ITEM DESCRIPTION EST. QTY. UNIT UNIT PRICE ITEM COST 35 Chain Link Single Gate - 5' High (4' Opening) 2 EA $___________ $__________________ 36 Baseboard - 2' High 320 LF $___________ $__________________ 37 Table (ADA) 3 EA $___________ $__________________ 38 Table 3 EA $___________ $__________________ 39 Bench 6 EA $___________ $__________________ 40 Drinking Fountain 2 EA $___________ $__________________ 41 Dog Play Equipment (including equipment, freight, tax, and installation) 1 LS $___________ $__________________ 42 Dog Waste Bag Dispenser 3 EA $___________ $__________________ 43 Trash Receptacle 4 EA $___________ $__________________ 44 Shade Structures (including structures, engineering, freight, taxes and installation 3 EA $___________ $__________________ 45 Dog Wash Station 1 EA $___________ $__________________ 46 Irrigation System 1 LS $___________ $__________________ 47 Soil Prep and Grading 9,500 SF $___________ $__________________ 48 Weed Abatement 9,500 SF $___________ $__________________ 49 Tree - 24" box 5 EA $___________ $__________________ 50 Tree - 36" box 6 EA $___________ $__________________ 51 Shrub - 15 gallon 10 EA $___________ $__________________ 52 Shrub - 5 gallon 63 EA $___________ $__________________ 53 Turf - Sod 8,900 SF $___________ $__________________ Addendum 1, Dog Park at Garvey Park, Project No: 41022 Document Control Page 7 of 10 BIDDER: ________________________ Revised per Addendum 1, CBF - 5 NO. ITEM DESCRIPTION EST. QTY. UNIT UNIT PRICE ITEM COST 54 Mulch (3" Depth) 6 CY $___________ $__________________ 55 90 Days Maintenance Period 1 LS $___________ $__________________ TOTAL BID AMOUNT IN NUMBERS $__________________ TOTAL BID AMOUNT IN WORDS: _____________________________________________ ______________________________________________________________________________ Note: The City of Rosemead reserves the right to reduce or increase the quantities of any items in the schedule of bid items above, within the limits define in Section 3-2.2.1 of the Standard Specifications, to stay within the budgeted amount of this project. If the Bid Documents specify alternate bid items, the following Alternate Bid amounts shall be added to or deducted from the Total Bid Price entered above. The owner can choose to include one or more of the alternates in the Total Bid Price of the Project. If any of the Alternate Bids are utilized by the Owner, the resulting amount shall be considered the Total Bid Price for the Project. The undersigned agrees that these Contract Bid Forms constitute a firm offer to the Owner which cannot be withdrawn for the number of Working Days indicated in the Notice Inviting Bids from and after the bid opening date, or until a Contract for the Work is fully executed by the Owner and a third party, whichever is earlier. The undersigned also agrees that if there is a discrepancy between the written amount of the Bid Price and the numerical amount of the Bid Price, the written amount shall govern. Attached hereto is a certified check, a cashier's check or a bid bond in the amount of __________________ Dollars ($__________________) said amount being not less than ten percent (10%) of the Total Bid Price. The undersigned agrees that said amount shall be retained by the Owner if, upon award, we fail or refuse to execute the Contract and furnish the required bonds, certificates and endorsements of insurance and other certifications within the time provided. If awarded a Contract, the undersigned agrees to execute the formal Contract, which will be prepared by the Owner for execution, within five (5) Calendar Days following the Letter of Award for the Contract, and will deliver to the Owner within that same period the necessary original Certificates of Insurance, Endorsements of Insurance, Performance Bond, Payment Bond and all other documentation and certification required by the Contract. Addendum 1, Dog Park at Garvey Park, Project No: 41022 Document Control Page 8 of 10 ATTACHMENT B - REVISED SHEET 6 OF 14 (SHEET LC.2) Addendum 1, Dog Park at Garvey Park, Project No: 41022 Document Control Page 9 of 10 Addendum 1, Dog Park at Garvey Park, Project No: 41022Document Control Page 10 of 10