CC - 2023-37 - Approving A List of Projects for Fiscal Year 2023-24 Funded By SB 1: The Road Repair and Accountability Act of 2017RESOLUTION NO. 2023-37
A RESOLUTION OF THE CITY COUNCIL OF THE CITY
OF ROSEMEAD, CALIFORNIA, APPROVING A LIST OF
PROJECTS FOR FISCAL YEAR 2023-24 FUNDED BY
SB 1: THE ROAD REPAIR AND ACCOUNTABILITY
ACT OF 2017
WHEREAS, Senate Bill 1 (SB 1), the Road Repair and Accountability Act of 2017
(Chapter 5, Statutes of 2017) was passed by the Legislature and Signed into law by the Governor
in April 2017 to address the significant multi -modal transportation funding shortfalls statewide;
and
WHEREAS, SB 1 includes accountability and transparency provisions that will ensure
the residents of our City are aware of the projects proposed for funding in our community and
which projects have been completed each fiscal year; and
WHEREAS, the City must adopt by resolution a list of projects proposed to receive
fiscal year funding from the Road Maintenance and Rehabilitation Account (RMRA), created by
SB 1, which must include a description and the location of each proposed project, a proposed
schedule for the project's completion, and the estimated useful life of the improvement; and
WHEREAS, the City, will receive an estimated $1,263,723 in RMRA funding in Fiscal
Year 2023-24 from SB 1; and
WHEREAS, this is the seventh year in which the City is receiving SB 1 funding and will
enable the City to continue essential road maintenance and rehabilitation projects, safety
improvements, and increasing access and mobility options for the traveling public that would not
have otherwise been possible without SB 1; and
WHEREAS, the City has undergone a robust public process to ensure public input into
our community's transportation priorities/the project list; and
WHEREAS, the City used a Pavement Management System to develop the SB 1 project
list to ensure revenues are being used on the most high-priority and cost-effective projects that
also meet the communities priorities for transportation investment; and
WHEREAS, the funding from SB I will help the City maintain and rehabilitate the
following streets listed below throughout the City this year; and
WHEREAS, the 2018 California Statewide Local Streets and Roads Needs Assessment
found that the City's streets and roads are in a "good" condition and this revenue will help us
increase the overall quality of our road system and over the next decade will bring our streets and
roads into a better condition; and
WHEREAS, the SB 1 project list and overall investment in our local streets and roads
infrastructure with a focus on basic maintenance and safety, investing in complete streets
infrastructure, and using cutting-edge technology, materials and practices, will have an
immediate impact for our community providing roadway safety and enhancements.
THE ROSEMEAD CITY COUNCIL HEREBY RESOLVES AS FOLLOWS:
SECTION 1. The foregoing recitals are true and correct.
SECTION 2. The following list of newly proposed projects will be funded in -part or solely with
fiscal year 2023-24 Road Maintenance and Rehabilitation Account revenues:
There are no new projects proposed.
SECTION 3. The following previously proposed and adopted projects may utilize fiscal year
2023-24 Road Maintenance and Rehabilitation Account revenues in their delivery. With the
relisting of these projects in the adopted fiscal year resolution, the City is reaffirming to the
public and the State our intent to fund these projects with Road Maintenance and Rehabilitation
Account revenues:
Project Title: Citywide Arterial Street Improvement Projects
Project Description: Roadway reconstruction and rehabilitation (asphalt cold -mill &
overlay), installation of ADA curb ramps, replacement of sidewalk, curb and gutter,
restoration of traffic loops, striping and pavement markings.
Project Location: Temple City Blvd, Ivar Ave, Marshall St and Rosemead PI
Estimated Project Schedule: Start (07/2023)- Completion (05/2024)
Estimated Project Useful Life: 10-15 Years
Project Title: Valley Blvd Resurfacing Project (Phase I&II)
Project Description: Roadway reconstruction and rehabilitation (asphalt cold -mill &
overlay), installation of ADA curb ramps, replacement of sidewalk, curb and gutter,
restoration of traffic loops, striping and pavement markings.
Project Location: Valley Blvd between west city limit and east city limit
Estimated Project Schedule: Start (09/2023)- Completion (05/2025)
Estimated Project Useful Life: 10-15 Years
Project Title: Various Residential Street Resurfacing
Project Description: Cold Milling and asphalt pavement, construction of rubberized
asphalt overlay.
Project Location: Quadrant 4
Estimated Project Schedule: Start (09/2023)- Completion (06/2024)
Estimated Project Useful Life: 10-15 Years
- 2 -
SECTION 4. The City Clerk shall certify the adoption of this Resolution.
PASSED, APPROVED AND ADOPTED this 27th day of June, 2023.
SeaWang, Mayor
APPROVED AS TO FORM:
az I)gl, —
ac ►el Richman, City Attorney
- 3 -
ATTEST:
Ericka Hernandez, City Clerk
STATE OF CALIFORNIA )
COUNTY OF LOS ANGELES) §
CITY OF ROSEMEAD )
I, Ericka Hernandez, City Clerk of the City Council of the City of Rosemead, California,
do hereby certify that the foregoing City Council Resolution No. 2023-37 was duly adopted
by the City Council of the City of Rosemead, California, at a regular meeting thereof held on
the 27`x' day of June, 2023, by the following vote, to wit:
AYES: ARMENTA, DANG, LOW, LY
NOES: NONE
ABSENT: CLARK
ABSTAIN: NONE
- 4 -
Ericka Hernandez, City Clerk