Loading...
TC - Item 3A - Traffic Calming Measures for Location 1: Pine Street between Garvey Avenue and Graves AvenueROSEMEAD TRAFFIC COMMISSION TO: TRAFFIC COMMISSION FROM: DIRECTOR OF PUBLIC WORKS DATE: SEPTEMBER 5, 2024 STAFF REPORT SUBJECT: TRAFFIC CALMING REVIEW ALONG PINE STREET BETWEEN GARVEY AVENUE AND GRAVES AVENUE SUMMARY On behalf of the City of Rosemead, engineering staff has completed a review of the road segment along Pine Street, as well as recommended appropriate improvements at the location of Pine Street between Garvey Avenue and Graves Avenue. The City of Rosemead has received a request to review the segment of Pine Street, between Garvey Avenue and Graves Avenue. The city is requesting to evaluate this segment for the installation of speed humps, and other traffic calming measures. In response to this request and on behalf of the City, engineering staff has completed a traffic review of this segment of Pine Street to determine if the street segment qualifies for the installation of traffic calming measures. ANALYSIS The traffic review included an analysis of the existing roadway conditions, a field review, and a review of approximately 3 -years of available collision data. Existing Conditions: Pine Street is a north/south roadway, classified as a local road per the California Road Systems Map by Caltrans. This segment of Pine Street extends from Graves Avenue, approximately 3100 - ft north to Garvey Avenue. Pine Street is stop controlled at the intersections with Garvey Avenue, Newmark Avenue, and Graves Avenue. At the intersection with Newmark Avenue, the north and south legs of Pine Street are offset by approximately 60 -ft. North of Newmark Avenue, Pine Street measures approximately 30 -ft in width, and south of Newmark Avenue, the street measures approximately 35 -ft in width. The speed limit along Pine Street is 25 MPH, however there is a City Traffic Commission Meeting September 5, 2024 Page 2 of 3 posted speed limit of 20 MPH. Based on the Citywide Speed Survey completed in 2023, the posted speed limit along Pine Street should be 25 MPH. The roadway has one lane of travel in each direction, and no marked centerline. There is white side striping along part of the street segment along Pine Street, near Jay Imperial Park. Parking is allowed along both sides of Pine Street, from Graves Avenue to Newmark Avenue, and along the east side of Pine Street, between Newmark Avenue and Garvey Avenue. Parking is prohibited along the west of Pine Street, from Newmark Avenue to Garvey Avenue, and during street sweeping times on Friday from loam to 2pm. Land use along this area of Pine Street consists mostly of single-family residential housing, Jay Imperial Park, and a commercial area near Garvey Avenue. Jay Imperial Park runs diagonal to Pine Street, and intersects with the street midblock, approximately 600 -ft north from Graves Avenue. Near Jay Imperial Park, there is an unprotected marked crosswalk that connects both sides of the park. STAFF RECOMMENDATION After a thorough review of existing field and traffic conditions and per the guidelines in the California Manual on Uniform Traffic Control Devices (CAMUTCD), California Vehicle Code (CVC), and based on engineering judgement, it was determined that the segment along Pine Street between Garvey Avenue and Graves Avenue meets the requirements for the installation of traffic calming devices along the street. Please refer to the Installation Exhibit in Attachment A for a conceptual exhibit representation of the proposed recommendations. These improvements include: 1. REMOVE AND REPLACE SPEED LIMIT SIGN (R2 —1): Remove the existing "20" Speed Limit sign that is located along the west side of Pine Avenue, approximately 960 -ft north of Graves Avenue. Replace sign with a "25" Speed Limit Sign (R2-1). a. The adopted Citywide Speed Survey for the City of Rosemead has a speed of 25 MPH along this segment. If the "20 MPH" sign is left posted along Pine Street, then it is not enforceable by the police department when using radar. 2. REMOVE AND REPLACE SPEED LIMIT SIGN (R2 —1): Remove the existing "20" Speed Limit sign that is located along the east side of Pine Avenue, approximately 630 -ft north of Graves Avenue. Replace sign with a "25" Speed Limit Sign (R2-1). a. The adopted Citywide Speed Survey for the City of Rosemead has a speed of 25 MPH along this segment. If the "20 MPH" sign is left posted along Pine Street, then it is not enforceable by the police department when using radar. City Traffic Commission Meeting September 5, 2024 Page 3 of 3 3. INSTALL NEW SPEED LIMIT SIGN (R2 —1): Install new "25" Speed Limit sign along the west side of Pine Avenue, approximately 160 -ft south of Garvey Avenue (R2-1). 4. INSTALL SPEED FEEDBACK SIGN: Install Speed Feedback Sign at the following locations: a. Install one speed feedback sign under the proposed "25" speed limit sign, located along the west side of Pine Avenue, approximately 960 -ft north of Graves Avenue. b. Install one speed feedback sign under the proposed "25" speed limit sign, located along the east side of Pine Avenue, approximately 630 -ft north of Graves Avenue. 5. INSTALL "25" PAVEMENT LEGENDS ADJACENT TO SIGNAGE: Install "25" Pavement Legends adjacent to the new 25 MPH Speed Limit Signage along Pine Street, between Garvey Avenue and Graves Avenue. 6. INSTALL DOUBLE YELLOW CENTERLINE: Install double yellow centerline along Pine Street, from Garvey Avenue to Newmark Avenue, and along Pine Street from Newmark Avenue to Graves Avenue. Install the double yellow centerline along the entire segment of Pine Street. Prepared by: Allison Richter, Contract Traffic Engineering Division Attachments: A. Attachment A — Technical Traffic Engineering Report 4 'K TRANSTECIi TO: City of Rosemead, Department of Public Works FROM: Transtech Engineers, Inc. DATE: September 5, 2024 SUBJECT: TRAFFIC CALMING ALONG PINE STREET BETWEEEN GARVEY AVENUE AND GRAVES AVENUE INTRODUCTION The City of Rosemead has received a request to review the segment of Pine Street, between Garvey Avenue and Graves Avenue. The city is requesting to evaluate this segment for the installation of speed humps, and other traffic calming measures. In response to this request and on behalf of the City, engineering staff has completed a traffic review of this segment of Pine Street. The traffic review included a review of existing conditions of the segment, 3 -years of available collision data, Average Daily Traffic (ADT) counts and 24-hour speed survey counts. Figure 1: Vicinity Map i iJ=7=.1 ('YIYIl3y�WJ1�'1 LEGEND Segment: Pine Street between Garvey Avenue and Newmark Avenue (955 -Feet) Segment: Pine Street between Newmark Avenue and Graves Avenue (2,050 -Feet) COSA1 -f-M Prepared By: Transtech Engineers, Inc. I Page 1 of 14 TRAFFIC REVIEW OF PINE STREET BETWEEN GARVEY AVENUE AND GRAVES AVENUE EXISTING CONDITIONS Figure 2: Existing Conditions Diagram — Pine Street between Garvey Avenue and Graves Avenue {v � ` G 0 L �1 i L3 n h LEGEND "No Parking on ■ Stop Sign (111-1) Pedestrian Crossing PARKING Friday; 10AM —2PM; Warning sign (W11-2) treet 10ui-2FRIDAY SSweeping" r� SPEED (R30A(CA))Variation LIMIT Speed Limit AHEAD "AHEAD" Plaque E oy�y 2O (R2-1) (W16 -9P) PARKING No Parking Any Time Pointing Arrow ANYTIME (R28 (CA)) Variation v, Yield Here for Plaque (W16 -7P) 4-0.HERE PedestriansSign W (111-5) Rumble Strips Pine Street: Within the City of Rosemead, Pine Street is a north/south roadway, classified as a local road per the California Road Systems Map by Caltrans. This segment of Pine Street extends from Graves Avenue, approximately 3100 -ft north to Garvey Avenue. Pine Street is stop controlled at the intersections with Garvey Avenue, Newmark Avenue, and Graves Avenue. At the intersection with Newmark Avenue, the north and south legs of Pine Street are offset by approximately 60 -ft. North of Newmark Avenue, Pine Street measures approximately 30 -ft in width, and south of Newmark Avenue, the street measures approximately 35 -ft in width. The speed limit along Pine Street is 25 MPH, however there is a posted speed limit of 20 MPH. Based on the Citywide Speed Survey completed in 2023, the posted speed limit along Pine Street should be 25 MPH. The roadway has one lane of travel in each direction, and no marked centerline. There is white side striping along part of the street segment along Pine Street, nearJay Imperial Park. Parking is allowed along both sides of Pine Street, from Graves Avenue to Newmark Avenue, and along the east side of Pine Street, between Newmark Avenue and Garvey Avenue. Parking is prohibited along the west of Pine Street, from Newmark Avenue to Garvey Avenue, and during street sweeping times on Friday from 10am to 2pm. Land use along this area of Pine Street consists mostly of single-family t Cos-leAD ,oaT,=sm,row�ame,� Prepared By: Transtech Engineers, Inc. I Page 2 of 14 TRAFFIC REVIEW OF PINE STREET BETWEEN GARVEY AVENUE AND GRAVES AVENUE residential housing, Jay Imperial Park, and a commercial area near Garvey Avenue. Jay Imperial Park runs diagonal to Pine Street, and intersects with the street midblock, approximately 600 -ft north from Graves Avenue. Near Jay Imperial Park, there is an unprotected marked crosswalk that connects both sides of the park. COLLISION DATA Collision data was obtained from the computerized collision records system maintained by the State of California Statewide Integrated Traffic Records System (SWITRS). A review of collision history along this segment of Pine Street, between Garvey Avenue and Graves Avenue, was conducted over a 3 year period between January 2021 to the most recent available data, December 2023. Based on the information provided, a summary breakdown of the number of relevant collisions within the studied segment are listed below and shown in Table 1. 2023— 1 collisions 2022 — 0 collisions 2021— 3 collisions TOTAL: 4 collision Collision Breakdown - Type Veh vs. Veh vs. Veh vs. Veh Ped/Bike Obj/Pkd Veh 2 0 2 Collision Breakdown - Year 2023 2022 2021 1 0 3 Table 1: Collision Table, Pine Street between Garvey Avenue and Graves Avenue Cos-leAD ,oaT,=sm,row�ame,� Prepared By: Transtech Engineers, Inc. I Page 3 of 14 Severity 1- Fatal 2 - Severe Injury Motor Day Lighting 3 -Other Visible Vehicle, Collison Factor Primary Primary Secondary of (Day, Collision # Date Dist. Time Injury Pedestrian, and Detail Collision # inj Road Road the Night, Type 4-Complaintof Bicycle Descriptions Factor Week Etc.) Pain Involved 5 - Prop Dam Only (PDO) NB DRVR HIT WB 1 2/11/23 PINE ST GARVEYAVE 539 S 11:35 SAT DAY BROAD 5 OTHER MV DRVR AND TWO UNKNOWN 1 LIGHT SIDE NB PKD MV 2 6/17/21 PINE ST CONSTANCE 420N 19:00 THU DARK -ST SIDE 5 PKD MV NBDRVR HIT OTHER 0 ST SWIPE NB PKD MV EQUIPMENT DAY BROAD DRVR BACKING STRTNG/BC 4 3/6/21 PINE ST GARVEYAVE 82S 13:00 SAT 5 PKD MV HIT NB PRKD 0 LIGHT SIDE KING MV BROADSI D DRVR BACKING STRTNG/BC 3P PINE ST GARVEYAVE 550N 22:05 SAT DARK -ST OTHER 5 OTHER MV HIT NB PRKD 0 KING MV Cos-leAD ,oaT,=sm,row�ame,� Prepared By: Transtech Engineers, Inc. I Page 3 of 14 TRAFFIC REVIEW OF PINE STREET BETWEEN GARVEY AVENUE AND GRAVES AVENUE AVERAGE DAILY TRAFFIC (ADT) As a part of this traffic review, Average Daily Traffic (ADT) counts were recorded on three different days: on Thursday, March 21, on Friday, March 22, and on Saturday, April 20, 2024. This data was taken along Pine Street, between Garvey Avenue and Graves Avenue. A summary of ADT data is shown in Table 2: Average Daily Traffic (ADT). The Average Daily Traffic reports are attached (Attachment 1) at the end of the report. Table 1: Average Daily Traffic (ADT), taken on Thursday, March 21, 2024. Vehicles per Day (vpd) Vehicles per Day (vpd) Vehicles per Day (vpd) Location 3/21/2024 3/21/2024 3/21/2024 Pine Street between Garvey Avenue and Graves NB SB TOTAL 370 411 781 Avenue Table 2: Average Daily Traffic (ADT), taken on Friday, March 22, 2024. Vehicles per Day (vpd) Vehicles per Day (vpd) Vehicles per Day (vpd) Location 3/22/2024 3/22/2024 3/22/2024 Pine Street between Garvey Avenue and Graves NB SB TOTAL 366 362 728 Avenue Table 3: Average Daily Traffic (ADT), taken on Saturday, April 20, 2024. Vehicles per Day (vpd) Vehicles per Day (vpd) Vehicles per Day (vpd) Location 4/20/2024 4/20/2024 4/20/2024 Pine Street between Garvey Avenue and Graves NB SB TOTAL 318 317 635 Avenue SPEED SURVEY To assess the speed at which vehicles are traveling along this segment of Pine Street, between Garvey Avenue and Graves Avenue, 24-hour speed surveys were taken on three different days. Data was collected on Thursday, March 21, on Friday, March 22, and on Saturday, April 20, 2024. The average 85th percentile speed of vehicles traveling along the segment was found to be 33MPH, on all three days. This means that 85 percent of the vehicles sampled were traveling at 33 MPH or below, which is 13 MPH above the posted speed limit of 20 MPH. Table 4 below shows the Thursday, March 21, 2024, Friday, March 22, 2024, and Saturday, April 20, 2024, speed survey results. The speed summary is attached (Attachment 2) at the end of the report. t Cos-leAD ,oaT,=sm,row�ame,� Prepared By: Transtech Engineers, Inc. I Page 4 of 14 TRAFFIC REVIEW OF PINE STREET BETWEEN GARVEY AVENUE AND GRAVES AVENUE 4: Speed Survey along Pine Street between Garvey Avenue and Graves Avenue (Data taken on 3/21/24, Z4, and 4/20/24) Dir. of Date/Time of Location 85%ile Speed Posted Speed Limit Travel Survey Pine Street between Garvey Avenue and Graves Avenue NB/SB 3/21/2024 24-hour 33 MPH 33 MPH 25 MPH (20 MPH) Pine Street between Garvey NB/SB 3/22/2024 Avenue and Graves Avenue 24-hour 25 MPH (20 MPH) Pine Street between Garvey NB/SB 4/20/2024 33 MPH Avenue and Graves Avenue 24-hour 25 MPH (20 MPH) *The Speed Limit along Pine Street should be posted as 25 MPH on the segment, according to the 2023 Citywide Speed Survey for the City of Rosemead. If the posted speed remains at "20 MPH" it is not enforceable by the police department radar. PROPOSED SPEED HUMP CRITERIA The City is in the process of developing a Traffic Calming Policy that would include criteria for the installation of speed humps. The policy would need to be considered and approved by City Council prior to the recommendation and installation of a speed hump. Within the proposed traffic calming policy that is currently being developed, a street must meet the following criteria to be considered for a speed hump, including: Items that are typically required for the installation of speed humps includes: • Residential Street, or a Local Road • Posted Speed Limit of 30 MPH or below • ADT (Average Daily Traffic) of 500 to 2500 vehicles • One lane each direction, with a roadway width of 40 -feet or less • Resident Petition Although the residents asked for speed hump installation at this location, speed humps cannot be considered at this time without official policy review and approval by City Council. RECOMMENDATIONS After a review of existing traffic conditions and following the proposed speed hump criteria, the California Manual on Uniform Traffic Control Devices (CAMUTCD), California Vehicle Code (CVC), and based on engineering judgement, it was determined that the segment of Pine Street, between Garvey Avenue and Graves Avenue would qualify for installation of speed humps, as well as other traffic calming measures. Speed Humps cannot be considered for installation at this time, however, should the City Council approve the Traffic Calming Policy and the proposed speed hump criteria, the street segment could be reevaluated for the installation of speed humps. A traffic review to reevaluate the segment would take place 6 months after the recommendations outlined within this report have been implemented. The following improvements are being recommended and are shown in the Exhibit: �_ �t,ai ROSE► OND Prepared By: Transtech Engineers, Inc. I Page 5 of 14 TRAFFIC REVIEW OF PINE STREET BETWEEN GARVEY AVENUE AND GRAVES AVENUE 1. REMOVE AND REPLACE SPEED LIMIT SIGN (112 —1): Remove the existing "20" Speed Limit sign that is located along the west side of Pine Avenue, approximately 960 -ft north of Graves Avenue. Replace sign with a "25" Speed Limit Sign (R2-1). a. The adopted Citywide Speed Survey for the City of Rosemead has a speed of 25 MPH along this segment. If the "20 MPH" sign is left posted along Pine Street, then it is not enforceable by the police department when using radar. 2. REMOVE AND REPLACE SPEED LIMIT SIGN (112 —1): Remove the existing "20" Speed Limit sign that is located along the east side of Pine Avenue, approximately 630 -ft north of Graves Avenue. Replace sign with a "25" Speed Limit Sign (R2-1). a. The adopted Citywide Speed Survey for the City of Rosemead has a speed of 25 MPH along this segment. If the "20 MPH" sign is left posted along Pine Street, then it is not enforceable by the police department when using radar. 3. INSTALL NEW SPEED LIMIT SIGN (R2-1): Install new "25" Speed Limit sign along the west side of Pine Avenue, approximately 160 -ft south of Garvey Avenue (R2-1). 4. INSTALL SPEED FEEDBACK SIGN: Install Speed Feedback Sign at the following locations: a. Install one speed feedback sign under the proposed "25" speed limit sign, located along the west side of Pine Avenue, approximately 960 -ft north of Graves Avenue. b. Install one speed feedback sign under the proposed "25" speed limit sign, located along the east side of Pine Avenue, approximately 630 -ft north of Graves Avenue. 5. INSTALL "25" PAVEMENT LEGENDS ADJACENT TO SIGNAGE: Install "25" Pavement Legends adjacent to the new 25 MPH Speed Limit Signage along Pine Street, between Garvey Avenue and Graves Avenue. 6. INSTALL DOUBLE YELLOW CENTERLINE: Install double yellow centerline along Pine Street, from Garvey Avenue to Newmark Avenue, and along Pine Street from Newmark Avenue to Graves Avenue. Install the double yellow centerline along the entire segment of Pine Street. OSE►WE'AD Prepared By: Transtech Engineers, Inc. I Page 6 of 14 RECOMMENDATION EXHIBIT: CITY OF ROSEMEAD, CA— PINE STREET BETWEEN GRAVES AVENUE AND GARVEY AVENUE Date Prepared. 9-5-24. - � 5 - 4b 3 5 6 2 00 0 o IB b Ala YI Illi; F 4a ® 5 FIGU REA l t OREMOVE AND REPLACE SPEED LIMIT SIGN (112-1): Remove the existing "20" Speed Limit sign that is located along the west side of Pine Avenue, approximately 960 -ft north of Graves Avenue. Replace sign with a "25" Speed Limit Sign. 2 O REMOVE AND REPLACE SPEED LIMIT SIGN (R2-1): Remove the existing "20" Speed Limit sign that is located along the east side of Pine SPEED LIMIT Avenue, approximately 630 -ft north of Graves Avenue. Replace sign with a "25" Speed Limit Sign. OINSTALL NEW SPEED LIMIT SIGN (R2-1): Install new "25" Speed Limit sign along the west side of Pine Avenue, approximately 160 -ft south of Garvey Avenue. OINSTALL SPEED FEEDBACK SIGN: Install Speed Feedback Sign at the following locations: (a) Install one speed feedback sign under the proposed "25" speed limit sign, located along the west side of Pine Avenue, approximately 960 -ft north of Graves Avenue. (b) Install one speed feedback sign under the proposed "25" speed limit sign, located along the east side of Pine Avenue, approximately YOUR 630 -ft north of Graves Avenue. SPEED OINSTALL "25" PAVEMENT LEGENDS ADJACENT TO SIGNAGE: Install "25" Pavement Legends adjacent to the new 25 MPH Speed Limit Signage along Pine Street, between Garvey Avenue and Graves Avenue OINSTALL DOUBLE YELLOW CENTERLINE: Install double yellow centerline along Pine Street, from Garvey Avenue to Graves Avenue, with 50 -ft of solid yellow centerline approaching the intersections with Garvey Avenue, Newmark Avenue, and Graves Avenue. TRAFFIC REVIEW OF PINE STREET BETWEEN GARVEY AVENUE AND GRAVES AVENUE ATTACHMENTS 1. Average Daily Traffic (ADT) Count (VOLUME): along Pine Street, between Garvey Avenue and Graves Avenue. Counts taken on: a. Thursday, March 21, 2024 b. Friday, March 22, 2024 c. Saturday, April 20, 2024 2. 24 Hour Speed Counts (SPEED): along Pine Street, between Garvey Avenue and Graves Avenue. Counts taken on: a. Thursday, March 21, 2024 b. Friday, March 22, 2024 c. Saturday, April 20, 2024 OSE►eE'AD Prepared By: Transtech Engineers, Inc. I Page 8 of 14 TRAFFIC REVIEW OF PINE STREET BETWEEN GARVEY AVENUE AND GRAVES AVENUE Attachment 1A. Average Daily Traffic (ADT) Count, along Pine Street, between Garvey Avenue and Graves Avenue. Thursday, March 21, 2024. Prepared by National Data & Surveying Services VOLUME Pine St Bet Garvey Ave & Graves Ave Day: Thursday Date: 3/21/2024 City: Rosemead Project 4: CA24_02OD90_001 1^ COAI-4EAD ,oaTnsm�rows ame,w Prepared By: Transtech Engineers, Inc. I Page 9 of 14 DAILY TOTALS NB SB EB WB Total F 411 t t 781 AM Period NB SB EB WB TOTAL PM Period NB SB EB WB TOTAL 00:00 0 0 0 0 12:00 3 10 0 0 13 00:15 0 0 0 0 12:15 8 12 0 0 20 00:30 1 0 0 0 1 12:30 6 6 0 0 12 00:45 0 1 r 0 r 0 r 0 1 12:45 5 22 r 5 33 r 0 r 0 10 55 01:00 0 0 0 0 13:00 10 9 0 0 19 01:15 3 1 0 0 4 13:15 9 7 0 0 16 01:30 0 1 0 0 1 13:30 9 6 0 0 15 01:45 0 3 r 0 2 r 0 r 0 5 13:4S 5 33 r 4 26 r 0 r 0 9 59 02:00 0 0 0 0 14:00 7 11 0 0 18 02:15 1 0 0 0 1 14:15 15 9 0 0 24 02:30 0 1 0 0 1 14:30 5 5 0 0 10 02:45 1 1 2 r 0 1 r 0 r 0 1 3 14:45 1 9 36 r 11 36 r 0 r 0 20 72 0300 0 0 0 0 1S00 5 13 0 0 18 03:15 0 0 0 0 15:15 5 9 0 0 14 03:30 1 1 0 0 2 15:30 7 10 0 0 17 03:45 0 1 r 1 2 r 0 r 0 1 3 15:45 8 25 r 13 45 r 0 r 0 21 70 04:00 0 0 0 016.100 6 6 0 0 12 04:15 0 0 0 0 16:15 13 12 0 0 25 04:30 0 0 0 0 16:30 7 6 0 0 13 04:45 0 r 0 r 0 r 0 16:45 8 34 r 10 34 r 0 r 0 18 68 0500 0 0 0 0 17:00 5 9 0 0 14 05:15 0 1 0 0 1 17:15 5 3 0 0 8 05:30 1 0 0 0 1 17:30 6 4 0 0 10 05:45 1 1 2 r 0 1 r 0 r 0 1 3 17:45 1 6 22 r 7 23 r 0 r 0 13 45 06:00 2 1 0 0 3 1800 7 11 0 0 18 06:15 2 0 0 0 2 18:15 6 17 0 0 23 06:30 0 2 0 0 2 18:30 9 8 0 0 17 05:45 2 6 r 0 3 r 0 r 0 2 9 18:45 2 24 r 10 46 r 0 r 0 12 70 07:00 4 1 0 0 5 19.100 2 9 0 0 11 07:15 3 2 0 0 5 19:1S 7 5 0 0 12 07:30 2 3 0 0 5 19:30 4 6 0 0 10 07:45 4 13 r 6 12 r 0 r 0 10 25 19:45 1 14 r 2 22 r 0 r 0 3 36 08:00 8 8 0 0 16 20.100 3 3 0 0 6 08:15 8 3 0 0 11 20:15 3 1 0 0 4 08:30 6 7 0 0 13 20:30 2 7 0 0 9 08:45 1 4 26 r 1 19 r 0 r 0 5 45 20:45 1 1 9 r 1 12 r 0 r 0 2 21 09:00 2 7 0 0 9 2100 2 1 0 0 3 09:15 4 4 0 0 8 21:15 2 2 0 0 4 09:30 2 3 0 0 5 21:30 5 2 0 0 7 WAS 5 13 r 2 16 r 0 r 0 7 29 21:45 0 9 r 0 5 r 0 r 0 14 10:00 11 6 0 0 17 2200 3 3 0 0 6 10:15 9 12 0 0 21 22:15 0 1 0 0 1 10:30 6 10 0 0 16 22:30 2 0 0 0 2 10:45 14 40 r 6 34 r 0 r 0 20 74 22:45 1 6 r 3 7 r 0 r 0 4 13 11:00 6 13 0 0 19 2300 1 0 0 0 1 11:15 3 7 0 0 10 23:15 0 3 0 0 3 11:30 7 4 0 0 11 23:30 0 0 0 0 11:45 1 11 27 r 5 29 r 0 r 0 16 56 23:45 1 2 r 0 3 r 0 r 0 1 5 TOTALS 134 339 253 TOTALS 236 292 528 SPLIT% 53.0% 47.0% 32.4% SPLIT% 44.7% 55.3% 67.6% DAILY • c t 421 0 r AM Peak Hour 10:00 1015 10:15 PM Peak Hour 13:30 18:00 15:30 AM Pk Volume 40 41 76 PM Pk Volume 36 46 75 Pk Hr Factor 0.714 0.788 0.905 Pk Hr Factor 0.600 0.676 0.750 7-9 Volume 39 31 70 4-6 Volume 56 57 113 7- eak Hour 07:45 0745 07:45 4-6Peak Hour 16:00 1615 16:15 , 26 24 50 4-6Pk 34 37 70 Pk Hr Factor 0.813 0.750 0.781 Pk Hr Factor 0.654 0.771 0.700 1^ COAI-4EAD ,oaTnsm�rows ame,w Prepared By: Transtech Engineers, Inc. I Page 9 of 14 TRAFFIC REVIEW OF PINE STREET BETWEEN GARVEY AVENUE AND GRAVES AVENUE Attachment 1B. Average Daily Traffic (ADT) Count, along Pine Street, between Garvey Avenue and Graves Avenue. Friday, March 22, 2024. Prepared by National Data & Surveying Services VOLUME Pine St Bet Garvey Ave & Graves Ave Day: Friday Date: 3/22/2024 City: Rosemead Project#: CA24 02OD90 001 AM Peak Hour DA I LY TOTALS 1230 1315 NB SB 36 EB 58 PM Pk Volume WB 39 76 Pk Hr Factor 0.818 0.722 Total 0.813 0.750 0.905 7-9Volume 43 32 366 362 56 r rn• r 07.45 07:45 - cen 17.130 1630 16:30 728 24 22 Period NB 31 SB Pk Hr Factor EB WB TOTALAM 0.705 0.697 00:00 0 0 0 0 12:00 10 5 0 0 15 00:15 0 0 0 0 12:15 4 5 0 0 9 00:30 1 0 0 0 1 12:30 11 3 0 0 14 00:45 1 2 r 0 r 0 r 0 1 2 12:45 6 31 r 9 22 r 0 r 0 15 53 01:00 0 0 0 0 13:00 10 3 0 0 13 01:15 0 0 0 0 13:15 12 9 0 0 21 01:30 0 0 0 0 13:30 7 9 0 0 16 01:45 1 1 r 0 r 0 r 0 1 1 13:45 6 35 r 13 34 r 0 r 0 19 69 02:00 0 0 0 0 14:00 12 8 0 0 20 02:15 0 0 0 0 14:15 5 7 0 0 12 02:30 0 1 0 0 1 14:30 6 7 0 0 13 02:45 0 r 0 1 r 0 r 0 1 14:45 8 31 r 9 31 r 0 r 0 17 62 03:00 0 0 0 0 1S-00 4 3 0 0 7 03:15 0 0 0 0 1SAS 8 12 0 0 20 03:30 2 1 0 0 3 1S:30 7 12 0 0 19 03:45 0 2 r 0 1 r 0 r 0 3 1S:4S 5 24 r 8 35 r 0 r 0 13 59 04:00 0 0 0 0 16:00 6 6 0 0 12 04:15 0 1 0 0 1 16:15 2 3 0 0 5 04:30 0 0 0 0 16:30 8 11 0 0 19 04:45 0 r 0 1 r 0 r 0 1 16:45 3 19 r 6 26 r 0 r 0 9 45 05:00 0 1 0 0 1 17:00 5 7 0 0 12 05:15 1 0 0 0 1 WAS 6 7 0 0 13 05:30 2 1 0 0 3 17:30 8 5 0 0 13 05:45 1 4 r 0 2 r 0 r 0 1 5 17:45 4 23 r 11 30 r 0 r 0 15 53 06:00 3 1 0 0 4 18:00 7 7 0 0 14 06:15 0 0 0 0 18:15 4 5 0 0 9 06:30 4 1 0 0 5 1830 5 4 0 0 9 06:45 3 10 r 2 4 r 0 r 0 5 14 18:45 6 22 r 4 20 r 0 r 0 10 42 07:00 4 2 0 0 6 19:00 3 10 0 0 13 07:15 3 2 0 0 5 19:15 6 4 0 0 10 07:30 5 2 0 0 7 19:30 5 6 0 0 11 07:45 9 21 r 7 13 r 0 r 0 16 34 19:45 4 18 r 4 24 r 0 r 0 8 42 08:00 7 7 0 0 14 20:00 3 4 0 0 7 08:15 3 3 0 0 6 20:15 3 1 0 0 4 08:30 4 5 0 0 9 20:30 3 4 0 0 7 08:45 8 22 r 4 19 r 0 r 0 12 41 20:45 0 9 r 1 10 r 0 r 0 1 19 09:00 3 3 0 0 6 21:00 1 3 0 0 4 09:15 7 2 0 0 9 21:15 1 4 0 0 5 09:30 8 8 0 0 16 21:30 4 2 0 0 5 09:45 5 23 r 4 17 r 0 r 0 9 40 21:45 0 6 r 2 11 r 0 r 0 2 17 10:00 11 7 0 0 18 22:00 1 4 0 0 5 10:15 9 6 0 0 15 22:15 1 2 0 0 3 10:30 7 8 0 0 15 22:30 0 1 0 0 1 10:45 1 28 r 3 24 r 0 r 0 4 52 22:45 2 4 r 2 9 r 0 r 0 4 13 11:00 7 9 0 0 16 23:00 1 1 0 0 2 11:15 7 5 0 0 12 23:15 1 1 0 0 2 11:30 3 7 0 0 10 23:30 1 0 0 0 1 11:45 11 28 4 25 r 0 r 0 15 53 23:45 0 3 r 1 3 r 0 r 0 1 6 TOTALS 141 107 248 TOTALS 225 255 480 SPLIT% 56.9% 43.1% 34.1°< SPLIT?/, 45.916 53, 1�'- 65.9% DA TOTALS NB SBWB iY. Total 366 362 1W 09W r 728 AM Peak Hour 11:45 1015 09:30 PM Peak Hour 1230 1315 13:15 AM Pk Volume 36 26 58 PM Pk Volume 39 39 76 Pk Hr Factor 0.818 0.722 0.806 Pk Hr Factor 0.813 0.750 0.905 7-9Volume 43 32 75 4-6Volume 42 56 98 rn• 07:15 07.45 07:45 - cen 17.130 1630 16:30 a 24 22 45 - re 23 31 53 Pk Hr Factor 0.667 0.786 0.703 Pk Hr Factor 0.719 0.705 0.697 1^ COAI-4EAD ,oaTnsm�rows ame,ra Prepared By: Transtech Engineers, Inc. I Page 10 of 14 TRAFFIC REVIEW OF PINE STREET BETWEEN GARVEY AVENUE AND GRAVES AVENUE Attachment 1C. Average Daily Traffic (ADT) Count, along Pine Street, between Garvey Avenue and Graves Avenue. Saturday, April 20, 2024. Prepared 6y Nauo..I Oar. & Sur Ymg Seances VOLUME Pine St Bet Garvey Ave & Graves Ave Day: Saturday Date: 4/20/2024 City: Rosemead Project#: CA24_020090_001 AM Peak Hour DAILY O 11:45 N13 318 S13 317 16:45 EB 0 PM Period 12:00 —a 10 W13 r S8 6 EB 0 W8 0 Total TOTAL 16 635 AM Period 00:00 NB SB EB WB 0 0 0 0 TOTAL 00:15 0 0 0 0 0.800 0.750 12:15 6 8 0 0 14 56 0030 1 0 0 0 1 16:45 12:30 8 7 0 0 15 00:45 0 1 ' 1 1 0 ' 0 1 2 12:45 6 30 ' 5 26 ' 0 ' 0 11 56 01:00 0 1 0 0 1 13:00 6 5 0 0 11 01:15 0 0 0 0 13:15 3 2 0 0 5 01:30 0 0 0 0 13:30 6 7 0 0 13 01:45 1 1 ' 0 1' 0 ' 0 1 13:45 4 19 ' 5 19 ' 0 ' 0 9 38 02:00 1 1 0 0 2 14:00 5 4 0 0 9 02:15 0 0 0 0 14:15 7 4 0 0 11 02:30 1 2 0 0 3 14:30 6 12 0 0 18 02:45 0 2' 1 4' 0 ' 0 1 6 14:45 4 22 ' 4 24 ' 0 ' 0 8 46 03:00 0 0 0 0 15:00 5 7 0 0 12 03:15 0 0 0 0 15:15 9 7 0 0 16 03:30 1 1 0 0 2 15:30 3 5 0 0 8 WAS 0 1 ' 1 2' 0 ' 0 1 3 15:45 5 22 ' 8 27 ' 0 ' 0 13 49 04:00 0 0 0 0 16:00 8 5 0 0 13 04:15 0 0 0 0 16:15 3 7 0 0 10 04:30 2 0 0 0 2 16:30 4 4 0 0 8 04:45 0 2 ' 1 1 ' 0 ' 0 1 3 16:45 8 23 ' 10 26 ' 0 ' 0 18 49 05:00 1 0 0 0 1 17:00 5 5 0 0 10 05:15 1 0 0 0 1 17:15 5 7 0 0 12 05:30 0 0 0 0 17:30 10 10 0 0 20 05:45 1 3 ' 0 ' 0 ' 0 1 3 17:45 2 22 ' 8 30 ' 0 ' 0 10 52 06:00 0 0 0 0 18:00 5 5 0 0 10 06:15 1 0 0 0 1 18:15 5 7 0 0 12 06:30 1 1 0 0 2 18:30 8 6 0 0 14 06:45 1 3 ' 0 1' 0 ' 0 1 4 18:45 4 22 ' 4 22 ' 0 ' 0 8 44 07:00 2 3 0 0 5 19:00 5 5 0 0 10 07:15 1 1 0 0 2 19:15 3 6 0 0 9 07:30 0 2 0 0 2 19:30 5 5 0 0 11 07:45 4 7 ' 0 6' 0 ' 0 4 13 19:45 5 18 ' 4 21 ' 0 ' 0 9 39 08:00 3 2 0 0 5 20:00 2 3 0 0 5 08:15 4 1 0 0 5 20:15 4 4 0 0 8 08:30 3 4 0 0 7 20:30 2 3 0 0 5 08:45 1 4 14 ' 5 12 ' 0 ' 0 9 26 20:45 3 11 ' 3 13 ' 0 ' 0 6 24 09:00 10 4 0 0 14 21:00 1 2 0 0 3 09:15 3 5 0 0 8 21:15 3 3 0 0 6 09:30 8 1 0 0 9 21:30 3 5 0 0 8 09:45 5 26 ' 7 17 ' 0 ' 0 12 43 21:45 1 8 ' 0 10 ' 0 ' 0 1 18 10:00 10 3 0 0 13 22:00 1 1 0 0 2 10:15 6 7 0 0 13 22:15 0 2 0 0 2 10:30 8 5 0 0 13 22:30 0 0 0 0 10:45 5 29 ' 4 19 ' 0 ' 0 9 48 22:45 1 2 ' 1 4 ' 0 ' 0 2 6 11:00 4 9 0 0 13 23:00 3 1 0 0 4 11:15 10 3 0 0 13 23:15 1 1 0 0 2 11:30 3 6 0 0 9 23:30 1 0 0 0 1 11:45 7 24 ' 9 27 ' 0 ' 0 16 51 23:45 1 6 ' 2 4 ' 0 ' 0 3 10 TOTALS 113 91 204 TOTALS 205 226 431 SPLIT% 55,44E 44.6% 32.1% SPLIT% 47.6% 52.4% 67.9% DAILY TOTALS NB SB EB WB �T.Z?' 318 317 t t AM Peak Hour 11:45 11:45 11:45 PM P.ak Hour 12:00 16:45 16:45 AM Pk Volume 31 30 61 PM Pk Volume 30 32 60 Pk Hr Factor 0.775 0.833 0.953 Pk Hr Factor 0.750 0.800 0.750 7-9 Volume 21 18 39 4-6 Volum. 45 56 101 eaa 07:45 08:00 08:00 _ 16:45 16:45 16:45 14 12 26 28 32 60 Pk Hr Factor 0.875 0.600 0.722 Pk Hr Factor 0.700 0.800 0.750 1^ COAI-4EAD ,oaTnsm�rows ame,w Prepared By: Transtech Engineers, Inc. I Page 11 of 14 TRAFFIC REVIEW OF PINE STREET BETWEEN GARVEY AVENUE AND GRAVES AVENUE Attachment 2A. 24 Hour Speed Counts (SPEED), along Pine Street, between Garvey Avenue and Graves Avenue. Counts taken on Thursday, March 21, 2024. 55 87 4J l0 2 0 0 0 C C Pree dby N—A nota N—ymq 5 -- %AM 3 , 4% 7% 11% 6% 1% 0% SPEED 32% AM Peak Hour — lOW low 1100 Pine St Bet Garvey Ave & Graves Ave 09_ Day: Thursday low Volume 7 12 18 25 City: Rosemead 2 Date: 3/21/2024 74 PMVPlumea Project #: CA24 020090 001 Summary Ti.e 15 15-19 20-24 25-29 30-34 35-39 40-44 45-49 50-54 55-59 60-64 65-69 70- Ttal OO:OD AM 0 1 0 0 0 0 0 0 0 0 0 0 0 1 01:OD 0 0 1 1 3 0 0 0 0 0 0 0 0 5 02:00 0 1 1 1 0 0 0 0 0 0 0 0 0 3 03:00 1 1 0 1 0 0 0 0 0 0 D 0 0 3 04:00 0 0 0 0 0 0 0 0 0 0 0 0 0 D 05:D0 1 2 0 0 0 0 0 0 0 0 0 0 0 3 06:00 1 1 3 4 0 0 0 0 D D D 0 0 9 07:00 0 2 4 11 6 2 0 0 0 D 0 0 0 25 08:00 4 5 11 18 4 3 0 0 0 0 0 0 0 45 09:00 4 4 5 7 6 1 2 0 0 0 0 0 0 29 10:00 7 12 18 19 16 2 0 0 0 0 0 0 0 74 11:OD 2 3 12 25 12 2 0 0 0 0 0 0 0 56 12:00 PM 4 3 8 24 13 2 1 0 0 0 0 0 0 55 13:01D 5 4 12 27 7 4 0 0 0 0 0 0 0 59 14:00 0 6 26 23 14 3 0 0 0 0 0 0 0 72 15:0D 5 7 19 19 13 7 0 0 0 0 0 0 0 70 16:00 1 5 21 18 19 3 1 0 0 0 0 0 0 68 17:00 2 4 11 18 7 1 2 D 0 0 0 0 0 45 18:00 4 11 14 24 12 5 0 0 0 0 0 0 0 70 19:00 3 10 14 6 1 2 0 0 0 0 0 0 0 36 20:00 1 6 7 3 4 0 0 D 0 0 0 0 0 21 21:0D 1 3 3 3 3 1 0 0 0 0 0 0 0 14 22:00 0 3 5 0 3 2 0 0 0 0 0 0 0 13 23:OD 0 1 1 2 0 1 0 0 0 0 0 0 0 5 %of Totals 6% 12% 25% 33% 10% 5% 1% 100% AM Volu mes 20 32 55 87 4J l0 2 0 0 0 C C o 253 %AM 3 , 4% 7% 11% 6% 1% 0% 32% AM Peak Hour — lOW low 1100 .,00 0890 09_ low Volume 7 12 18 25 16 3 2 74 PMVPlumea 26 63 141 167 96 31 4 0 0 0 C C 0 528 %PM 3% 9% 19% 21% 12% 4% 1% 68% PM Peak Hour 13W 18W 14W ISM 16W 15W 17,W 1 111 14W sssssss Volume 5 ll 26 27 19 7 2 72 Directional Peak Periods AM 7-9 NOON 12-2 PM 4-6 Off Peak Volumes All Speeds volume % volume % volume % Volume % 70 916 114 15% 113 14% 484 62% 15t1 50th Average 85th 95th ADT Pine St Summary 19 Z6 26 33 3b 7B1 1^ COAI-4EAD ,yaTnsm�l Tyw� ame,w Prepared By: Transtech Engineers, Inc. I Page 12 of 14 TRAFFIC REVIEW OF PINE STREET BETWEEN GARVEY AVENUE AND GRAVES AVENUE Attachment 2B. 24 Hour Speed Counts (SPEED), along Pine Street, between Garvey Avenue and Graves Avenue. Counts taken on Friday, March 22, 2024. 49 80 50 18 6 0 -C C- Prer+re4 6y National Data k 6—&g 5—i— %AM 2% 4% 7% 11% 7% 23o 1% SPEED 34% AM Peak Hour 0800 0790 1300 09.0 Pine St Bet Garvey Ave & Graves Ave 0890 Day: Friday 11.0 Volume 4 7 13 17 City: Rosemead 2 Date: 3/22/2024 53 PM Volumes Project M CA24_020090_001 Summary rime 15 15-19 20-24 25-29 30-34 35-39 40-44 45-49 50-54 55-59 r70. 0 0 Total 00:00 AM 0 1 0 1 0 0 0 0 0 0 0 0 0 2 01:00 0 0 0 1 0 0 0 0 0 0 0 0 0 1 02:00 0 0 1 0 0 0 0 0 0 0 0 0 0 1 03:00 1 1 1 0 0 0 0 0 0 0 0 0 0 3 04:00 0 0 1 0 0 0 0 0 0 0 0 0 0 1 05:00 2 1 0 2 0 0 1 0 0 0 0 0 0 6 06:00 0 2 6 5 1 0 0 0 0 0 0 0 0 14 07:00 1 7 4 15 6 0 1 0 0 0 0 0 0 34 08:00 4 5 8 14 5 3 2 0 0 0 0 0 0 41 09:00 0 2 6 17 13 2 0 0 0 0 0 0 0 40 10:00 4 5 9 17 10 5 2 0 0 0 0 0 0 52 11:00 3 6 13 8 15 8 0 0 D 0 0 0 0 53 12:00 PM 5 2 12 11 14 8 1 0 0 0 0 0 0 53 13:00 2 8 14 27 13 4 1 0 D 0 0 0 0 69 14:00 3 6 16 23 9 4 1 0 0 0 0 0 0 62 15:00 1 8 12 27 7 2 2 0 D 0 0 0 0 59 16:00 1 6 13 11 11 3 0 0 0 0 0 0 0 45 17:00 0 7 12 16 15 2 1 0 0 0 0 0 0 53 18:00 0 7 9 16 7 2 1 0 0 0 0 0 0 42 19:00 3 5 6 15 10 2 1 0 0 0 0 0 0 42 20:00 0 3 8 3 5 0 0 0 0 0 0 0 0 19 21:00 3 1 5 4 2 1 1 0 D 0 0 0 0 17 22:00 0 2 2 4 3 1 1 0 0 0 0 0 0 13 23:00 1 0 0 2 2 2 0 0 0 0 0 0 0 0 6 %of Totals 5% 12% 22% 33% 20% - 2% I .CC'S AM Volumes 15 30 49 80 50 18 6 0 -C C- - 268 %AM 2% 4% 7% 11% 7% 23o 1% 34% AM Peak Hour 0800 0790 1300 09.0 11:00 1100 0890 11.0 Volume 4 7 13 17 15 8 2 53 PM Volumes 18 55 111 159 98 29 10 0 _ 0 0 0 0 480 %PM 2% 8% 15% 22% 13% 1% 66% PM Peak Hour 1200 1390 1490 1390 1790 12:00 1590 1390 Volume 5 8 16 27 15 82 69 Directional Peak Periods AM 7-9 NOON 12-2 PM 4-6 Off Peak Volumes All Speeds Volume % volume % volume % Volume % 75 10% 122 17% 1 98 13% 1 433 59% 15th I 50th I Average 85th I 95th ADT Pi -St ISummaryl 19 1 27 1 26 1 33 1 38 1 728 1^ Cos-leAD ,o4Tnsm�7ow� 4me,w Prepared By: Transtech Engineers, Inc. I Page 13 of 14 TRAFFIC REVIEW OF PINE STREET BETWEEN GARVEY AVENUE AND GRAVES AVENUE Attachment 2C. 24 Hour Speed Counts (SPEED), along Pine Street, between Garvey Avenue and Graves Avenue. Counts taken on Saturday, April 20, 2024 SPEED Pine St Bet Garvey Ave & Graves Ave Day: q=tr, Date: -,_--- Summary City: Rosemead Project#: CA24_020090_001 AM Volumes 28 46 79 35 10 2 0 0 0 0 0 0 204 00:00 AM 0 0 0 2 0 0 0 0 0 0 0 0 0 2 01:00 0 0 0 2 0 0 0 0 0 0 0 0 0 2 02:00 0 1 0 3 1 1 0 0 0 0 0 0 0 6 03:00 0 0 0 1 1 1 0 0 0 0 0 0 0 3 04:00 0 1 0 1 1 0 0 0 0 0 0 0 0 3 05:00 0 1 1 0 0 1 0 0 0 0 0 0 0 3 06:00 0 0 0 3 1 0 0 0 0 0 0 0 0 4 07:00 0 3 1 4 3 1 1 0 0 0 0 0 0 13 08:00 0 5 8 7 5 1 0 0 0 0 0 0 0 26 09:00 1 2 11 17 7 4 1 0 0 0 0 0 0 43 10:00 2 5 13 17 10 1 0 0 0 0 0 0 0 48 11:00 1 10 12 22 6 0 0 0 0 0 0 0 0 51 12:00 PM 2 8 21 18 4 3 0 0 0 0 0 0 0 56 13:00 2 3 10 13 8 1 1 0 0 0 0 0 0 38 14:00 1 5 11 16 9 3 1 0 0 0 0 0 0 46 15:00 0 5 11 12 14 5 2 0 0 0 0 0 0 49 16:00 0 6 16 11 8 6 2 0 0 0 0 0 0 49 17:00 0 6 9 17 16 3 1 0 0 0 0 0 0 52 18:00 3 5 11 15 8 2 0 0 0 0 0 0 0 44 19:00 1 7 12 14 4 0 1 0 0 0 0 0 0 39 20:00 2 3 9 5 2 2 1 0 0 0 0 0 0 24 21:00 0 0 8 8 2 0 0 0 0 0 0 0 0 18 22:00 1 1 0 1 3 0 0 0 0 0 0 0 0 6 23:00 1 1 5 1 2 0 0 0 0 0 0 0 0 30 Totals %atrotak 17 3% 78 —1 169 27% 210 —1 115 18% 35 -1 11 2% 1 1100% 63S AM Volumes 28 46 79 35 10 2 0 0 0 0 0 0 204 %AM 1% 4% 7% 12% 6% 21 0% 32% AM Peak Hour 1000 11,00 low 1100 1090 09W 07W 1100 Volume 2 30 13 22 10 9 1 51 PM Volumes 13 50 123 131 80 25 9 0 0 0 0 a O 431 %PM 2% 8% 19% 21% 13% 4% 1% 68% PM Peak Hour 18,00 12W 12.,00 12W 17W 16W 15,00 12.,00 Volume 3 8 21 18 16 6 2 56 Directional Peak Periods AM 7-9 NOON 12-2 PM 4-6 Off Peak Volumes All Speeds Volume % volume % volume % volume % 39 6% 94 15% 1 101 16% 1 401 63% 1110 15th 50th Average I 85th I 951h ADT Pine St Summary 1 20 1 26 26 1 33 1 37 1 635 1^ Cos-leAD ,4aTnsm�7ow� am4,w Prepared By: Transtech Engineers, Inc. I Page 14 of 14