Loading...
BidResultList (2) (1)City of RosemeadBid Results for Project Rosemead Park Restroom Renovation Adjacent To Aquatic Center, Project No. 41026Issued on 09/24/2024Bid Due on October 23, 2024 10:30 AM (PDT)Exported on 10/23/2024 Line Totals (Unit Price * Quantity)Item NumSection Item CodeDescription ReferenceManufacturerModel NuBrand RequirementBrand SpecDelivery Loc Unit of Measure QuantityBRIDGEROCK CONSTRUCTION INC. - Unit Price BRIDGEROCK CONSTRUCTION INC. - Line Total BRIDGEROCK CONSTRUCTION INC. - Response BRIDGEROCK CONSTRUCTION INC. - Comment R Dependable Const Inc - Unit Price R Dependable Const Inc - Line Total R Dependable Const Inc - Response R Dependable Const Inc - Comment Corral Construction & Development Inc - Unit Price Corral Construction & Development Inc - Line Total Corral Construction & Development Inc - Response Corral Construction & Development Inc - Comment Global Builders Inc - Unit Price Global Builders Inc - Line Total Global Builders Inc - Response Global Builders Inc - Comment 1Section 1 1 Temporary Restroom Facilities - work shall include rental of two portable restrooms and two hand washing stations. The contractor shall ensure that the portable restrooms and hand washing stations are regularly maintained (cleaned and stocked) throughout the construction duration LS 1 $10,000.00 $10,000.00Yes $3,000.00 $3,000.00Yes $4,989.00 $4,989.00 Yes $25,200.00 $25,200.00Yes 2Section 1 2 Site Work: Demolition- Removal and disposal of toilet partitions, Interior fixtures, walls, curbs, plumbing, pavement (includes sawcut slab on grade, tile (mortar base) electrical incidentals per plans and specifications LS 1 $18,000.00 $18,000.00Yes $18,000.00 $18,000.00Yes $25,000.00 $25,000.00 Yes $32,800.00 $32,800.00Yes3Section 1 3 Concrete Foundation/ Slab: Construct new slab and level floors as necessary incidentals per plans and specifications LS 1 $18 000 00 $18 000 00Yes $19 430 00 $19 430 00Yes $30 000 00 $30 000 00 Yes $12 300 00 $12 300 00Yes 4Section 1 4 Interior Walls: Metal Stud framing 6” @ 16” OC Add Blocking/sheathing to chase wall Gypsum board to walls/ceilings Incidentals per plans and specifications LS 1 $24 000 00 $24 000 00Yes $21 600 00 $21 600 00Yes $15 000 00 $15 000 00 Yes $23 588 00 $23 588 00Yes5Section 1 5 Roofing: Patch & Repair Roofing LS 1 $3 000 00 $3 000 00Yes $3 000 00 $3 000 00Yes $4 000 00 $4 000 00 Yes $5 800 00 $5 800 00Yes6Section 1 6 Caulk and Sealants LS 1 $2 000 00 $2 000 00Yes $1 500 00 $1 500 00Yes $2 500 00 $2 500 00 Yes $3 800 00 $3 800 00Yes7Section 1 7 Doors/Frames/Hardware: Metal gate Exterior lever hardware hold open latches kick plates incidentals per plans and specifications LS 1 $16 500 00 $16 500 00Yes $17 000 00 $17 000 00Yes $12 000 00 $12 000 00 Yes $12 800 00 $12 800 00Yes8Section 1 8 Ceramic Tile Base LS 1 $7 000 00 $7 000 00Yes $3 760 00 $3 760 00Yes $7 500 00 $7 500 00 Yes $32 000 00 $32 000 00Yes9Section 1 9 Epoxy Flooring LS 1 $15 000 00 $15 000 00Yes $12 600 00 $12 600 00Yes $15 000 00 $15 000 00 Yes $6 300 00 $6 300 00Yes 10Section 1 10 Paint/Wall Covering: Power wash interior walls, paint to interior walls & ceiling. FRP Wall Paneling, skim coat on CMU Walls, Graffiti Resistance Coating, incidentals per plans and specifications LS 1 $28,000.00 $28,000.00Yes $12,360.00 $12,360.00Yes $14,000.00 $14,000.00 Yes $18,300.00 $18,300.00Yes 11Section 1 11 Toilet Accessories: Toilet partitions – ADA- solid plastic, Toilet Partitions – Solid Plastic, Urinal Partitions – Solid Plastic, Grab bars, Toilet Paper Dispensers – Vandal Resistant, Seat Cover Dispensers – Vandal Resistant, Soap Dispensers – Vandal Resistant, Mirrors with Graffiti Protection Film, Electric Hand Dryers, incidentals per plans and specifications LS 1 $24,000.00 $24,000.00Yes $20,900.00 $20,900.00Yes $35,000.00 $35,000.00 Yes $54,000.00 $54,000.00Yes12Section 1 12 Misc Specialties: Door signage ADA Striping at Parking Lot incidentals per plans and specifications LS 1 $7 800 00 $7 800 00Yes $8 200 00 $8 200 00Yes $10 000 00 $10 000 00 Yes $5 300 00 $5 300 00Yes 13Section 1 13 Plumbing: Water Closets, add Water Closet, Lavatories, Urinals, Trap Primers with access panels, Water Hammer Arrestors, Sewer Lateral Replacement, Flush and Inspect to street Floor Drains Rough in @ fixtures Rough in to fixtures at new locations incidentals per plans and specifications LS 1 $63,000.00 $63,000.00Yes $76,000.00 $76,000.00Yes $90,000.00 $90,000.00 Yes $32,300.00 $32,300.00Yes14Section 1 14 HVAC: Exhaust Fans Roof Penetrations and Flashings G I Duct Work Round incidentals per plans and specifications LS 1 $9 000 00 $9 000 00Yes $16 840 00 $16 840 00Yes $8 000 00 $8 000 00 Yes $8 300 00 $8 300 00Y 15Section 1 15 Electrical Systems: Lighting: (1x4) Surf Mt – Vandal Resistant – Integ OCC Sensors – 43 W LED, Exit Sign/Bud Eye Combo w/ batt. Backup – 5W LED, Occupancy Sensors incidentals per plans and specifications LS 1 $7,000.00 $7,000.00Yes $15,460.00 $15,460.00Yes $9,000.00 $9,000.00 Yes $22,300.00 $22,300.00Yes16Section 1 16 Electrical Systems: Power: J Boxes Motor Connections Conduit and Wire incidentals per plans and specifications LS 1 $6 500 00 $6 500 00Yes $12 920 00 $12 920 00Yes $8 000 00 $8 000 00 Yes $3 800 00 $3 800 00YesSubtotal$258,800.00 $262,570.00 $289,989.00 $298,888.00Total$258,800.00 $262,570.00 $289,989.00 $298,888.00 MLC Constructors - Unit Price MLC Constructors - Line Total MLC Constructors - Response MLC Constructors - CommentZuma Construction Group Inc - Unit Price Zuma Construction Group Inc - Line Total Zuma Construction Group Inc - Response Zuma Construction Group Inc - Comment Corner Keystone Construction Corporation - Unit Price Corner Keystone Construction Corporation - Line Total Corner Keystone Construction Corporation - Response Corner Keystone Construction Corporation - Comment Venture Construction & Management - Unit Price Venture Construction & Management - Line Total Venture Construction & Management - Response Venture Construction & Management - Comment RAMSA CONSTRUCTION INC - Unit Price RAMSA CONSTRUCTION INC - Line Total RAMSA CONSTRUCTION INC - ResponseRAMSA CONSTRUCTION INC Commenstallworth construction and management corp - Unit Price $5,490.00 $5,490.00 Yes $12,000.00 $12,000.00Yes $27,751.96 $27,751.96Yes $11,000.00 $11,000.00 Yes $15,000.00 $15,000.00 Yes $2,000.00 $29,221.00 $29,221.00 Yes $45,000.00 $45,000.00Yes $67,292.14 $67,292.14Yes $50,700.00 $50,700.00 Yes $40,000.00 $40,000.00 Yes $30,000.00$27,358.00 $27,358.00 Yes $55,000.00 $55,000.00Yes $33,719.54 $33,719.54Yes $17,000.00 $17,000.00 Yes $30,000.00 $30,000.00 Yes $72,250.00 $9,516.00 $9,516.00 Yes $25,000.00 $25,000.00Yes $20,108.51 $20,108.51Yes $23,700.00 $23,700.00 Yes $25,000.00 $25,000.00 Yes $40,000.00$3,965.00 $3,965.00 Yes $12,000.00 $12,000.00Yes $13,363.21 $13,363.21Yes $8,500.00 $8,500.00 Yes $20,000.00 $20,000.00 Yes $12,000.00$1,830.00 $1,830.00 Yes $2,000.00 $2,000.00Yes $6,524.44 $6,524.44Yes $5,000.00 $5,000.00 Yes $10,000.00 $10,000.00 Yes $11,000.00$14,274.00 $14,274.00 Yes $15,000.00 $15,000.00Yes $4,125.24 $4,125.24Yes $27,000.00 $27,000.00 Yes $35,000.00 $35,000.00 Yes $10,000.00$4,758.00 $4,758.00 Yes $5,000.00 $5,000.00Yes $12,058.77 $12,058.77Yes $10,100.00 $10,100.00 Yes $26,000.00 $26,000.00 Yes $6,000.00$27,755.00 $27,755.00 Yes $5,000.00 $5,000.00Yes $11,602.98 $11,602.98Yes $15,200.00 $15,200.00 Yes $21,000.00 $21,000.00 Yes $50,000.00 $39,650.00 $39,650.00 Yes $15,000.00 $15,000.00Yes $11,026.60 $11,026.60Yes $32,100.00 $32,100.00 Yes $27,000.00 $27,000.00 Yes $42,000.00 $40,839.00 $40,839.00 Yes $30,000.00 $30,000.00Yes $28,125.00 $28,125.00Yes $23,670.00 $23,670.00 Yes $25,000.00 $25,000.00 Yes $31,500.00$4,123.00 $4,123.00 Yes $2,500.00 $2,500.00Yes $19,580.69 $19,580.69Yes $8,500.00 $8,500.00 Yes $15,000.00 $15,000.00 Yes $2,000.00 $71,370.00 $71,370.00 Yes $75,000.00 $75,000.00Yes $77,875.72 $77,875.72Yes $116,600.00 $116,600.00 Yes $40,000.00 $40,000.00 Yes $81,250.00$15,860.00 $15,860.00 Yes $15,000.00 $15,000.00Yes $10,859.30 $10,859.30Yes $23,700.00 $23,700.00 Yes $41,000.00 $41,000.00 Yes $45,000.00 $9,198.00 $9,198.00 Yes $10,000.00 $10,000.00Yes $23,296.97 $23,296.97Yes $8,500.00 $8,500.00 Yes $30,000.00 $30,000.00 Yes $15,000.00$7,930.00 $7,930.00 Yes $5,000.00 $5,000.00Yes $21,077.72 $21,077.72Yes $8,500.00 $8,500.00 Yes $30,000.00 $30,000.00 Yes $15,000.00$313,137.00 $328,500.00 $388,388.79 $389,770.00 $430,000.00$313,137.00 $328,500.00 $388,388.79 $389,770.00 $430,000.00 stallworth construction and management corp - Line Total stallworth construction and management corp - Response stallworth construction and management corp - Comment $2,000.00Yes $30,000.00Yes$72,250.00Yes $40,000.00Yes$12,000.00Yes$11,000.00Yes$10,000.00Yes$6,000.00Yes$50,000.00Yes $42,000.00Yes $31,500.00Yes$2,000.00Yes $81,250.00Yes$45,000.00Yes $15,000.00Yes$15,000.00Yes$465,000.00$465,000.00 City of Rosemead Bid Results for Project Rosemead Park Restroom Renovation Adjacent To Aquatic Center, Project No. 41026 Issued on 09/24/2024 Bid Due on October 23, 2024 10:30 AM (PDT) Exported on 10/23/2024 Section/Bidder Bid Amount Responsive Section 1 BRIDGEROCK CONSTRUCTION INC.$258,800.00 R Dependable Const Inc $262,570.00 Corral Construction & Development Inc $289,989.00 Global Builders Inc $298,888.00 MLC Constructors $313,137.00 Zuma Construction Group Inc $328,500.00 Corner Keystone Construction Corporation $388,388.79 Venture Construction & Management $389,770.00 RAMSA CONSTRUCTION INC $430,000.00 stallworth construction and management corp $465,000.00