Loading...
CC - 1993-16 - Amending the Schedule Fees for Engineering Services0 0 RESOLUTION NO. 93-16 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF ROSEMEAD AMMENDING THE SCHEDULE OF FEES FOR ENGINEERING SERVICES WHEREAS, pursuant to the provisions of the California Constitution and the laws of the State of California, the City of Rosemead is authorized to adopt, implement, or modify a schedule of fees for municipal services; provided, however, that such fees do not exceed the estimated reasonable cost of providing such services; and WHEREAS, Ordinance No. 719 provides that a schedule of fees is to be adopted by resolution; and WHEREAS, the Legislative Body has determined a need exists to modify certain engineering fees as provided for in Resolution No. 92-16. NOW, THEREFORE, BE IT RESOLVED AS FOLLOWS: SECTION 1. The modified schedule of fees for Engineering Services as set forth in Exhibit 'A," is hereby adopted. SECTION 2. Pursuant to Government Code Section 66017, this Resolution shall become effective no sooner than 60 days following its adoption. PASSED, APPROVED, AND ADOPTED this 9th day of March, 1993. 2&::, G~,t4 Mar ret Clark, Mayor City of Rosemead I hereby certify that the foregoing Resolution ATTEST: No. 93-16 was duly and regularly adopted by the City Council of the City of Rosemead at a regular meeting thereof held on the 9th day of March, 1993, by the following vote: Yes: Bruesch, Clark, Vasquez, McDonald =Ja~iice Warner, City Clerk No: Taylor Absent: None Abstain: None c:\wp51\ccstaff\47 u lNa'~' ~e~/ TY CLERK Res. 93-16 • • Pg. 2 EXHIBIT "A" FEE SCHEDULE ENGINEERING SERVICES Tract Mao Tentative Tract Map (establish engineering and public $270 improvement conditions) Record Map Analysis $2,850 plus $50/lot and 1. Monument review $370 2. Verification that map is consistent with condi- $255 tions to tentative approval 3. Map clearance and review of agreement and/or $300 improvement securities 4. Fourth and each subsequent check submittal $450 submittal Parcel Mao Tentative Parcel Map (establish engineering and public $270 improvement conditions) Record Map Analysis $2,000 plus $50/ parcel and 1. Dedications $750 2. Monument review $370 3. Verification that map is consistent with condi- $225 tions of tentative approval 4. Map clearance and review agreements and/or $300 improvements securities 5. Fourth and each subsequent check submittal $450/ submittal Res. 93-16 • Pg. 3 Tract Mao Deferred Monuments Monument Review Certificate of Compliance (Lot Line Adjustment) Record document analysis, clearance, and processing 1. Verification of compliance with conditions of approval 2. Review of agreements and/or improvement securities Plan Checkina 1. Initial 2. Revision 9 $300 $600 plus $50 parcel and $225 $225 $300 plus 2Z percent of the first $50,000 plus 2 percent of next $100,000 plus 1? percent thereafter of the estimated construction cost Actual Cost Construction Permits 1. Issuance Fee $50 and 2. Initial Observation $500 plus 6 percent of first $100,000 plus 5 percent of next $100,000 plus 4 percent thereafter of the estimated construction cost Res. 93-16 • Pg. 4 Tract Mao 3. Modifications Observation Actual cost (an initial deposit is required) for all modification requiring plan revisions or as-builts Road Permit Fees (applicable to improvements not subject to Section 3) $50 issuance fee for all construction and encroach- ment permits plus corresponding observation fee Construction Permits 1. Residential Driveway $150/driveway 2. Commercial Driveway $250/driveway 3. Concrete Driveway Fill-in $100/driveway 4. Individual sidewalk or sidewalk fill-in $200/location 5. Individual curb and gutter $200/location 6. Individual alley improvement $3/sq. ft./ location 7. Street trees $50/location for first tree plus $25/tree thereafter 8. Residential Curb Drain $50/drain 9. Commercial Curb drain (curb only) $150/drain 10. Parkway drain $300/drain 11. Relocate existing drainage structure $1,000/structure B. Excavation Permits 1. Service cut $17.50/pothole cut and $1.00/sq. ft. excavation 2. Main line $1.00/sq. ft. "excavation 3. Sewer cuts (residential) $250/connection to main 4. Sewer cut commercial $350/connection to main C. Encroachment Permits 1. Stockpile material or waste in street $200/stockpile right-of-way or easement 2. Placing container for material or waste in $250/container (refundable a street right-of-way or easement deposit) Res. 93-16 Pg. 5 Tract Map 3. 4. 5. 6. 7 Placing temporary structure or parking $200/structure or piece of equipment in street right-of-way or ease- equipment ment Pedestrian protection required by build- $200/location ing code. (Construction at parkway grade.) Street closures $200/location Commercial filming $400/working day plus $800- Other encroachments /night, Saturday, Sunday, or holiday $50 issuance fee plus actual cost (deposit required) 8. Single Trip Oversize Moving $15 (issuance and permit fee)