Loading...
CC - 1992-61 - Schedule of Fees for Planning and Engineering ServicesRESOLUTION NO. 92-61 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF ROSEMEAD ESTABLISHING A SCHEDULE OF FEES FOR PLANNING AND ENGINEERING SERVICES WHEREAS, pursuant to the provisions of the California Constitution and the laws of the State of California, the City of Rosemead is authorized to adopt and implement a schedule of fees for municipal services; provided, however, that such fees do not exceed the estimated reasonable cost of providing such services; and WHEREAS, Ordinance No. 719 provides that a schedule of fees is to be adopted by resolution; and . WHEREAS, the Legislative Body shall adjust said fees either up or down on an annual basis; and WHEREAS, based upon a fee study report on file with the City Clerk, the City Council finds that the fees included in this Resolution will reasonably recover the estimated costs incurred by the City; and WHEREAS, on December 15, 1992, the City Council conducted a properly noticed public hearing to consider adoption of this Resolution pursuant to Government Code Sections 66016 and 66018. NOW, THEREFORE, BE IT RESOLVED AS FOLLOWS: SECTION 1. The schedule of fees for Planning and Engineering Services as set forth in Exhibit 'A," as further described below is hereby adopted. SECTION 2. Pursuant to Government Code Section 66017, this Resolution shall become effective no sooner than 60 days following its adoption. PASSED, APPROVED, AND ADOPTED this 15th day of December, 1992. MAYOR I hereby certify that the foregoing Resolution No. 92-61 was duly and regularly adopted by the ATTEST: City Council of the City of Rosemead at an adjourned meeting thereof held on the 15th day of December, 1992, by the following vote: t ~2tiiz(iL ?CITY CLERK c: \wp51 \ccstaff\47 Yes: Bruesch, Clark, Vasquez, McDonald No: Taylor Absent: None Abstain: None ....i C CLERK. ~7 6 0 0 EXHIBIT "A" FEE SCHEDULE PLANNING SERVICES Conditional Use Permit (CUP) Design Review General Plan Amendment Municipal Code (Zoning Text) Amendment Planned Development Review Subdivision: Tentative Map Fee Subdivision: Tentative Map Per Lot Zone Change Zone Variance Environmental Impact Report Review (plus outside consultant costs) Environmental Quality Review (Initial Study) Lot Line Adjustment Oak Tree Permit Occupancy Permit Site/Sign Plan Review Geologic Report Appeal to City Council Filing Fee E.35:2 $ 875.00 $ 390.00 $ 950.00 $ 925.00 $ 635.00 $1,385.00 $ 100.00 $1,050.00 $ 975.00 $2,900.00 $ 300.00 $ 290.00 $ 800.00 $ 225.00 $ 225.00 $ 325.00 $ 300.00 3 ENGINEERING SERVICES Tract Map Tentative Tract Map (establish engineering and public $270 improvement conditions) Record Map Analysis $2,850 plus $50/lot and 1. Monument review $370 2. Verification that map is consistent with condi- $255 tions to tentative approval 3. Map clearance and review of agreement and/or $300 improvement securities 4. Fourth and each subsequent check submittal $450 submittal Parcel Map Tentative Parcel Map (establish engineering and public $270 improvement conditions) Record Map Analysis $2,000 plus $50/ parcel and 1. Dedications $750 2. Monument review $370 3. Verification that map is consistent with condi- $225 tions of tentative approval 4. Map clearance and review agreements and/or $300 improvements securities 5. Fourth and each subsequent check submittal $450 submittal Tract Map Deferred Monuments Monument Review Certificate of Compliance (Lot Line Adjustment) Record document analysis, clearance, and processing 1. Verification of compliance with conditions of approval 2. Review of agreements and/or improvement securities Plan Checkina 1. Initial 2. Revision Actual Cost Construction Permits 1. Issuance Fee $50 and 2. Initial Observation 0 $300 $600 plus $50 parcel and $225. $225 $300 plus 22 percent of the first $50,000 plus 2 percent of next $100,000 plus 12 percent thereafter of the estimated construction cost Same $25 and $500 plus 6 percent of first $100,000 plus 5 percent of next $100,000 plus 4 percent thereafter of the estimated construction cost jam, 9~.~, • • 3. Modifications Observation Actual cost (an initial deposit is required) for all modification requiring plan revisions or as-builts Road Permit Fees (applicable to improvements not subject to Section 3) $50 issuance fee for all construction and encroach- ment permits plus corresponding observation fee Construction Permits 1. Driveway $250/driveway 2. Close existing driveway opening $250/driveway 3. Individual sidewalk or sidewalk fill-in $250/location 4. Individual curb and gutter $200/location 5. Individual alley improvement $3/sq. ft./ location 6. Street trees $50/location for first tree plus $25/tree thereafter 7. Curb drain (curb only) $150/drain 8. Parkway drain $300/drain 9. Relocate existing drainage structure $1,000/structure B. Excavation Permits 1. Service cut $17.50/cut and $2.00 for each sq. ft. excavation 2. Main line $2.00 sq. ft. for each sq. ft. of excavation 3. Sewer cuts (residential) $250/connection to main 4. Sewer cut commercial $350/connection to main C. Encroachment Permits 1. Stockpile material or waste in street $200/stockpile right-of-way or easement 2. Placing container for material or waste in $250/container (refundable a street right-of-way or easement deposit) 3. Placing temporary structure or parking $200/structure or piece of equipment in street right-of-way or ease- equipment ment 4. Pedestrian protection required by build- $200/location ing code. (Construction at parkway grade.) 5. Street closures $200/location 6. Commercial filming $400/working day plus $800- /night, Saturday, Sunday, or holiday 7. Other encroachments $50 issuance fee plus actual cost (deposit required)