ROSEMEAD CITY COUNCIL
STAFF REPORT
TO: THE HONORABLE MAYOR AND CITY COUNCIL
FROM: ANDREW C. LAZZARETTO, CITY MANAGE
DATE: MAY 29, 2007
SUBJECT: APPROVAL OF AMENDMENT TO 2006 ENGINEERING AND TRAFFIC
SURVEY
SUMMARY
On March 20, 2006, the City Council adopted the 2006 Engineering and Traffic (E&T)
Survey which provides recommendations for the posted speed limits on forty-two city
street segments. The California Vehicle Code (CVC) requires each city to complete an
E&T Survey every seven years in order to continue using radar for traffic speed
enforcement. The change in traffic conditions on Rush Street and Walnut Grove
Avenue due to the installation of new traffic signals serving the Wal-Mart Store requires
a resurvey of the posted speed limits for two affected street segments.
Staff Recommendation
Staff recommends that the City Council approve an amendment to the 2006
Engineering and Traffic Study.
ANALYSIS
As necessitated by the completion of the Wal-Mart Store and installation of two new
traffic signals on Rush Street and Walnut Grove Avenue serving the store, staff
resurveyed the posted speed limits on Rush Street between San Gabriel Boulevard and
Walnut Grove Avenue, and Walnut Grove Avenue between San Gabriel Boulevard and
Rush Street. The E&T surveys for these two segments were conducted in accordance
with the 2006 California Manual on Uniform Traffic Control Devices and Section 627 of
the CVC. The posted speed limits for both segments are recommended to remain
unchanged from the current posted speed limits. The attached supporting
documentation will amend the 2006 E&T Survey for these segments of Rush Street and
Walnut Grove Avenue.
PUBLIC NOTICE PROCESS
This item has been noticed through the regular agenda notification process.
Sub fitted by:
Kkavina, P.E.
City Engineer
Attachment A: E&T Survey AmIndment Documentation
APPROVED FOR CITY COUNCIL AGENDA: ( .
wILE*JAN •
Serving Public Agencies
May 1, 2007
Mr. Andy Lazarretto
City Manager.
City of Rosemead
8838 Valley Boulevard
Rosemead, CA 91770
Subject: 2007 Amended Engineering and Traffic Survey
Dear Mr. Lazarretto:
1'3171 Crossroads Parkwav North, Suite 405
Indusli~', Cali Iornia 01716-3497
562/908-b200Jax 562/695-2120
www.wll Ida n.com
As requested, Willdan has completed. an Engineering and Traffic Survey to justify and
update the posted speed limits along Rush Street between San Gabriel Boulevard and
Walnut Grove Avenue and Walnut Grove Avenue between San Gabriel Boulevard to
Rush Street. - The re-survey of the 2 street segments will amend the Engineering and
Traffic Survey dated March 2006. These 2 segments need to be updated to comply
with requirement set by the City of Rosemead when the Wal-Mart development was
approved.
We are pleased to submit the enclosed recommendations and supporting
documentation for the 2 street segments. The Engineering and Traffic Surveys for the 2
segments were conducted in accordance with procedures outlined in the California
Manual on Uniform Traffic Control Devices (California MUTCD) dated September 2006
and as required by Section 627 of the California Vehicle Code.
We appreciate the opportunity to serve the City of Rosemead and the assistance and
cooperation afforded to us during the course of this study.
Very truly yours,
Traffic
unoz P.E,T.E.
VM::jmk (06-160
16263/3000/R01
•
a~ m
a~
U) m
U ~
O
a~
~U
rn
c
i
N
N
G
O~
W
N
N
C
N
E
E
O
U
`o
c
0
U
N
(n
N
C
C
"C N
O N
U n
m ~
U co
O C
O. N
N
L_a
3 v
N c
c d
E 3
0)L
i n
n E
O N
O N
C/) II
r
r w
0 •
SEGMENTS WITH SPECIAL CONDITIONS
The following segments surveyed had recommended speed limits that were 5 miles per
hour (mph) or more below the critical speed due to conditions not readily apparent to
the driver. Each segment is discussed below.
Segment #29 - Rush Street - San Gabriel Boulevard to Walnut Grove Avenue
This segment is currently posted at 40 mph and has 2 through lanes in each direction
with an ADT.of 10,470 vehicles per day. The adjacent land use is residential within the
vicinity of a school. The critical speed is 44 mph and would normally justify a 45 mph
posted speed limit. However, due to various hidden driveways, a vertical curve, and
moderate pedestrian traffic that may not be apparent to unfamiliar drivers, a lower
speed limit is prudent. It is recommended that the speed limit remain at 40 mph for the
above reasons. In addition, 25 mph school zones are recommended per Section 22352
of the California Vehicle Code.
Segment #37 - Walnut Grove Avenue - San Gabriel Boulevard to Rush Street
This segment is currently posted at 45 mph and has 2 through lanes in each direction
with an ADT of 19,816 vehicles per day. The adjacent land use is residential fronted by
a golf course and university. The critical speed is 49 mph and would normally justify a
50 mph posted speed limit. However, due to the adjacent posted speed limit, steep
vertical curve, and moderate pedestrian traffic that may not be apparent to unfamiliar
drivers, a lower speed limit is prudent. It is recommended that the speed limit remain at
45 mph for the above reasons.
Engineering and Traffic Survey
City of Rosemead
•
APPENDIX A
Street Segment Data
Engineering and Traffic Survey
City of Rosemead
• CITY OF ROSEMEA? 29
ENGINEERING AND TRAFFIC SURVEY
STREET RUSH STREET
CERTIFICATION DATE 5/1/2007
FROM SAN GABRIEL BLVD
TO WALNUT GROVE AVE
SPEED FACTORS
Date of Speed Survey
4/19/2007 Posted Speed Limit 40/25' mph
Time of Speed Survey
10:20AM Speed Justification
50th Percentile Speed (Mean Speed)
37 mph HIDDEN DWYS., VERT. CURVE,
85th Percentile Speed
44 mph PEDESTRIANS
10 mph Pace Speed
34-43 Recommended Speed Limit 40/25 mph
Percentage of Vehicles in Pace
66
Number of Survey Samples
112
COLLISION HISTORY
Number of Years Studied
3 years
Total Collisions
0
Annual Collision Rate
0 accidents/year.
Collisions per Million Vehicle Miles
0.000
TRAFFIC FACTORS
Average Daily Traffic
10,470 Date Counted 4/24/2007
Number of Lanes
4 LANES - DIVIDED
Type of Traffic Control
T.S. @ SAN GABRIEL, WALNUT GROVE, WALMART
Crosswalks?
@ ALL T.S., ANGELUS
Pedestrian Traffic
LIGHT
Truck Traff ic
LIGHT
On-Street Parking
BOTH SIDES, FRIDAY RESTRICTION
Sidewalks?
YES, BOTH SIDES
Driveways?
YES, BOTH SIDES
ROADWAY FACTORS
Length of Segment
0.490 miles
Width
87 feet
Vertical Curve?
YES, W/O WALNUT GROVE AVE
Horizontal Curve?
YES, E/O SAN GABRIEL BLVD
Visibility
GOOD
Roadway Conditions
FAIR
Lighting
BOTH SIDES ALSO ON MEDIAN
Adjacent Land Use
RESIDENTIAL, SCHOOL, BUSINESS
Field Study By J.A.
Checked By V.M.
CERTIFICATION: 1, Vanessa Munoz, do hereby certify that this Engineering and Traffic Survey within
the City of Rosemead was performed u
nder my supervision and is accurate and complete. I am duly
registered in the St a of California as a Professional Engineer (Traffic).
TE 2341
Vanessa Munoz
ate State Registration Number
• CITY OF ROSEMEA91
ENGINEERING AND TRAFFIC SURVEY
STREET WALNUT GROVE
CERTIFICATION DATE 5/1/2007
37
FROM SAN GABRIEL BLVD
TO RUSH STREET
SPEED FACTORS
Date of Speed Survey
4/19/2007
Posted Speed Limit 45 mph
Time of Speed Survey
10:OOAM
Speed Justification
50th Percentile Speed (Mean Speed)
44 mph
ADJ. SEG SPEED, VERT. CURVE,
85th Percentile Speed
49 mph
PEDESTRIANS
10 mph Pace Speed
40-49
Recommended Speed Limit 45 mph
Percentage of Vehicles in Pace
73
Number of Survey Samples
111
COLLISION HISTORY
Number of Years Studied
3 years
Total Collisions
6
Annual Collision Rate
2 accidents/year
Collisions per Million Vehicle Miles
0.374
TRAFFIC FACTORS
Average Daily Traffic 19,816 Date Counted 4/24/2007
Number of Lanes 4 LANES + 2WY LT LAN
Type of Traffic Control T.S. @ SAN GABRIEL, RUSH, WALMART, LANDIS VIEW LN
Crosswalks? @ ALL T.S. EXCEPT WALMART
Pedestrian Traffic MODERATE
Truck Traffic LIGHT
On-Street Parking NO PARKING BOTH SIDES
Sidewalks? YES, BOTH SIDES
Driveways? FEW, BOTH SIDES
ROADWAY FACTORS
Length of Segment
0.740 miles
Width
65 feet
Vertical Curve?
YES, UPHILL SOUTHBOUND
Horizontal Curve?
SLIGHT, SOUTH OF VILLAGE
Visibility
FAIR
Roadway Conditions
FAIR
Lighting
YES, BOTH SIDES
Adjacent Land Use
UNVIERSITY, GOLF COURSE, RESIDENTIAL, COMMERCIAL
Field Study By J.A.
Checked By V.M.
CERTIFICATION: I, Vanessa Munoz,
do hereby certify that this Engineering and Traffic Survey within
the City of Rosemead was performed under my supervision and is accurate and complete. I am duly
registered in the S to of California a
s a Professional Engineer (Traffic).
TE 2341
Vanessa Muno
D Ate State Registration Number
•
•
Radar Speed Distribution Forms
Engineering and Traffic Survey
City of Rosemead
CITY OF ROSEMEAD
SPOT SPEED SURVEY
Street RUSH STREET Date 4/19/2007
Location Begin 10:20 End 10:55
Direction E-W Weather CLEAR
Remarks SAN GABRIEL BL TO WALNUT GROVE AVE Recorded by J.A.
50th % 37 MPH
85th % 44 MPH
10MPH 34 43
% in Pace 66%
MPH
NUMBER OF VEHICLES
5 10 15 20 25 30
Number of
Vehicles
Percent of
Total
Cumulative
Percents e
65
0
0%
100.0%
0
0%
100.0%
0
0%
100.0%
0
0%
100.0%
v
0
0%
100.0%
60
0
0%
100.0%
0
0%
100.0%
0
0%
100.0%
0
0%
100.0%
0
0%
100.0%
55
0
0%
100.0%
0
0%
100.0%
0
0%
100.0%
0
0%
100.0%
0
0%
100.0%
50
0
0%
100.0%
0
0%
100.0%
X
X
2
2%
100.0%
X
0
0
3
3%
98.2%
X
X
0
0
4
4%
95.5%
45
X
X
0
0
4
4%
92.0%
X
X
X
0
0
5
4%
88.4%
X
X
X
X
0
0
6
5%
83.9%
X
X
X
0
0
0
6
5%
78.6%
X
X
X
0
0
5
4%
73.2%
40
X
X
X
X
0
0
0
10
8
7%
68.8%
X
X
X
IX
0
0
0
7
6%
61.6%
X
X
X
0
0
0
6
5%
55.4%
x
x
X
X
X
X
0
10
8
7%
50.0%
X
X
X
X
X
0
0
0
8
7%
42.9%
35
X
X
X
X
X
0
0
0
0
0
0
11
10%
35.7%
X
X
X
10
10
10
10
10
0
9
8%
25.9%
X
X
0
0
0
0
6
5%
17.9%
X
0
0
0
4
4%
12.5%
X
X
X
0
0
0
6
5%
8.9%
30
x
0
0
10
1
4
4%
3.6%
0
0%
0.0%
0
0%
0.0%
0
0%
0.0%
0
0%
0.0%
25
0
0%
0.0%
0
0%
0.0%
0
0%
0.0%
0
0%
0.0%
0
0%
0.0%
20
0
0%
0.0%
0
0%
0.0%
0
0%
0.0%
0
0%
0.0%
0
0%
0.0%
15
0
0%
0.0%
X - East bound 0 - West bound To
tal Observed
112
100
WAM
Street
Location
Direction
Remarks
WALNUT GROVE AVENUE
CITY OF ROSEMEAD
SPOT SPEED SURVEY
Date 4/19/2007
FRONT OF COUNTRYWIDE BLDG Begin 10:00 End 10:15
S-N Weather CLEAR
SAN GABRIEL SL TO RUSH ST Recorded by J.A.
50th % 44 MPH
85th % 49 MPH
10MPH 40 49
% in Pace 73% .
MPH
NUMBER OF VEHICLES
5 10 15 20 25 30
Number of
Vehicles
Percent of
Total
Cumulative
Percents e
65
0
0%
100.0%
0
0%
100.0%
0
0%
100.0%
0
0%
100.0%
0
0%
100.0%
60
0
0%
100.0%
x
1
1%
100.0%
X
1
1%
99.1%
0
0%
98.2%
0
0%
98.2%
55
x
1
1%
98.2%
X
0
2
- 2%
97.3%
0
X
X
3
3%
95.5%
0
X
2
2%
92.8%
X
0
X
3
3%
91.0%
50
X
O
X
o
4
4%
88.3%
X
0
X
0
0
X
0
7
6%
84.7%
0
0
X
01
1
4
4%
78.4%
0
0
X
01
0
X I
X
7
6%
74.8%
X
o
o
01
0
O I
X
0
X
0
0
X1
0
13
12%
68.5%
45
X
0
X
X1
0
X I
X
XI
1
8
7%
56.8%
X
x
x
01
0
X I
X
O
X
0
0
X
12
11%
49.5%
o
0
X
0
0
X
0
0
8
7%
38.7%
0
X
0
X
X
0
6
5%
31.5%
X
X
X
X
0
0
0
0
8
7%
26.1%
40
X
X
X
X
o
x
X
O
8
7%
18.9%
X
X
X
O
X
0
1
1
6
5%
11.7%
0
X
0
3
3%
6.3%
0
0
2
2%
3.6%
0
1
1%
1.8%
35
o
1
1%
0.9%
0
0%
0.0%
0
0%
0.0%
0
0%
0.0%
0
0%
0.0%
30
0
0%
0.0%
0
0%
0.0%
0
0%
0.0%
0
0%
0.0%
0
0%
0.0%
25
0
0%
0.0%
0
0%
0.0%
0
0%
0.0%
0
0%
0.0%
0
0%
0.0%
20
0
0%
0.0%
0
0%
0.0%
0
0%
0.0%
0
0%
0.0%
0
0%
0.0%
15
0
0%
0.0%
X - North bound 0 -Sout
h Bound To
tal Observed
111
100
• •
APPENDIX B
Collision Rates
Engineering and Traffic Survey
City of Rosemead
•
0
m m
a~
U ~
N cc
~ O
cU
m
c
a~
m
c
W
• •
APPENDIX C
Survey Equipment
Engineering and Traffic Survey
City of Rosemead
SURVEY EQUIPMENT USED
I-
L-1
The radar equipment used to collect speed measurements for this survey include one
Genesis VersaPak Hand-Held traffic Radar manufactured by Decatur Electronics, of
Decatur, Illinois. The calibration of the unit was checked before each series of
measurements were taken. Tests of the unit were conducted in accordance with the
manufacturer's specifications. The Genesis VersaPak Hand Held Traffic Radar was last
calibrated on October 5,'2006 by R.H. F, Inc.
Engineering and Traffic Survey
City of Rosemead