Loading...
CC - Item 4I - Engineering Proposal for Concrete Repairs• • TO: HONORABLE MAYOR AND MEMBERS ROSEMEATY COUNCIL FROM: BILL AVE, IVCITY MANAGER DATE: FEBRAURY 7, 2006 RE: ENGINEERING PROPOSAL FOR CONCRETE REPAIRS AT VARIOUS LOCATIONS Attached for your consideration is an engineering proposal from Willdan for preliminary and final engineering design, design and construction survey, utility coordination, monument restoration, construction observation, and contract administration services for the concrete repairs project at various locations throughout the City of Rosemead. The project includes removal and reconstruction of existing damaged and uplifted concrete sidewalk, curb and gutter, and drive approaches, as well as replacement of parkway trees with root control barriers, if it is determined that uplifting is a result of the tree. The locations for concrete repairs will be selected based on highest priority among streets that are not identified for near-future street pavement upgrading. Locations where citizen requests have been verified as needing concrete repairs as well as the Los Angeles County's maintenance list will also be included in this project. Also included in this project will be the construction of sidewalk on the south side of Pitkin Avenue west of Encinita Avenue to serve school children. The new sidewalk will lie in front of 9206 and 9216 Pitkin Avenue and along the side yard frontage of 4434 Encinita Avenue. The total construction cost for this project is estimated to be $155,000. The proposed project is currently programmed in the City's budget and utilizes SB 821 Sidewalk Grant and Gas Tax funds. Construction of the project is anticipated to begin in the summer of 2006. COUNCIL AGENDA FEB 14 2A!'lK!P_-' fTEM No.d,Li 9 TO: FROM: DATE: HONORABLE MAYOR AND MEMBERS ROSEMEAD CITY COUNCIL BILL AVE, CITY MANAGER FEBRAURY 7, 2006 E RE: ENGINEERING PROPOSAL FOR CONCRETE REPAIRS AT VARIOUS LOCATIONS Attached for your consideration is an engineering proposal from Willdan for preliminary and final engineering design, design and construction survey, utility coordination, monument restoration, construction observation, and contract administration services for the concrete repairs project at various locations throughout the City of Rosemead. The project includes removal and reconstruction of existing damaged and uplifted concrete sidewalk, curb and gutter, and drive approaches, as well as replacement of parkway trees with root control barriers, if it is determined that uplifting is a result of the tree. The locations for concrete repairs will be selected based on highest priority among streets that are not identified for near-future street pavement upgrading. Locations where citizen requests have been verified as needing concrete repairs as well as the Los Angeles County's maintenance list will also be included in this project. Also included in this project will be the construction of sidewalk on the south side of Pitkin Avenue west of Encinita Avenue to serve school children. The new sidewalk will lie in front of 9206 and 9216 Pitkin Avenue and along the side yard frontage of 4434 Encinita Avenue. The total construction cost for this project is estimated to be $155,000. The proposed project is currently programmed in the City's budget and utilizes SB 821 Sidewalk Grant and Gas Tax funds. Construction of the project is anticipated to begin in the summer of 2006. 0 February 7, 2006 Page 2 The proposed fixed fees are as follows • • Preliminary and Final Design $13,100 • Utility Coordination 2,950 • Design Survey 2,900 • Monument Restoration 4,950 • Construction Survey 1,400 • Construction Observation 8,700 • Contract Administration 1,800 Total Proposed Fixed Fee $35,800 RECOMMENDATION It is recommended that the Rosemead City Council: 1. Approve the attached engineering proposal. 2. Direct staff to begin the preparation of the necessary plans and specifications. Attachment • WILLDAN ,rr•,~~ 'r';';I, ,yep :c~ February 6, 2006 Mr. Bill Crowe City Manager City of Rosemead 8838 East Valley Boulevard Rosemead, CA 91770 0 3191 Cruz-;roads I arkway North, Suite 405 lndu:-trv, ('.+I it rri.~ I;17,1(,-i•1I+7 w~ti~c \ lld,ln nn Subject: Proposal for Professional Engineering Services for Concrete Repairs at Various Locations Dear Mr. Crowe: As requested, we are pleased to be given the opportunity to submit this proposal to provide preliminary and final engineering design, design and construction survey, utility coordination, monument restoration, construction observation, and contract administration services for the concrete repairs project. The project includes removal and reconstruction of existing damaged and uplifted concrete sidewalk, curb and gutter, and drive approaches, as well as replacement of parkway trees with root control barriers, if it is determined that uplifting is a result of the tree. The locations for concrete repairs will be selected based on highest priority among streets that are not identified for near-future street pavement upgrading. Locations where citizen requests have been verified as needing concrete repairs as well as the Los Angeles County's maintenance list will also be included in this project. We propose to provide the following basic services for the project: Design Survey 1. Provide locations of repairs by address. 2. Provide existing topographic features at locations of concrete repairs. 3. Provide length of curb and gutter to be removed and replaced. 4. Provide area of sidewalk and drive approach to be removed and replaced. 5. Provide area of street pavement to be removed and replaced along curb, gutter, and drive approach. 6. Provide locations of parkway trees to be removed and replaced. • February 6, 2006 Page 2 Preliminary Design • Confer with City staff to review, in full detail, the requirements for the project. Review available information and data assembled by City staff. Review compiled data. 3. Prepare a schedule of concrete repair locations. 4. Determine drainage correction requirements. 5. Review concrete repair locations for possible tree removal. 6. Develop preliminary cost estimates for construction. Submit preliminary concrete repairs schedule to all affected agencies and utility companies for review. Final Design Phase Prepare detailed final schedule and attend coordination meetings, as necessary, with City personnel at various times during the design phase to obtain additional input and review work. 2. Prepare specifications and contract documents to conform to applicable requirements of the City of Rosemead. 3. Prepare final project cost estimates. Utility Coordination Submit copies of final concrete repairs schedule to all affected utilities and agencies. 2. Send notification to affected utility companies, other agencies, contractor, and City staff, and attend and coordinate the preconstruction conference. Monument Restoration Tie out any monuments (public or private) to be destroyed by construction and file corner record with County. 2. Reset destroyed monuments and file comer record with County. • February 6, 2006 Page 3 Construction Survey 1. Mark the areas of various types of concrete repairs with paint. 2. Mark with paint the trees to be removed. Contract Administration 1. Provide the City with 20 sets of final specifications for bidding. 2. Assist the City in securing bids and awarding project. 3. Attend preconstruction conference and prepare minutes. 4. Provide contract administration for proper enforcement of the contract plans and specifications. 5. Provide engineering support, as needed, to make as-built revisions to the original concrete repairs schedule. 6. Provide the necessary consulting services required to coordinate the efforts between the City and contractor. 7. Review and approve progress payment requests. 8. Answer inquiries and complaints for the City relating to the project. Construction Observation 1. Provide daily construction observation during the construction period. 2. Provide the necessary weekly, monthly, and final reports as needed. 3. Provide copies of daily construction observation reports on a weekly basis, if requested. 4. Provide necessary coordination with other agencies to provide final inspection of the project. 5. Perform as-built corrections on original concrete repairs schedule. 6. Provide report to City following final inspection stating that the project has been completed, and provide necessary data for Agency acceptance of the project. February 6, 2006 Page 4 Our proposed fixed fees are as follows: • Preliminary and Final Design $13,100 • Utility Coordination 2,950 • Design Survey 2,900 • Monument Restoration 4,950 • Construction Survey 1,400 • Construction Observation 8,700 • Contract Administration .1,800. Total Proposed Fixed Fee $35,800 The total estimated construction cost for the project is $155,000. The construction contract period is estimated to be 20-working days. The design fee is based on the fee curve schedule from the American Society of Civil Engineers. The total fee, excluding utility coordination and monument restoration is in conformance with that portion of the City's agreement with Willdan which pertains to design engineering services. Compensation for weekend inspection and inspection beyond the allocated working days of the construction contract will be on time-and-materials basis. If you have any questions regarding this proposal, please contact me at (562) 908-6200. Respectfully submitted, WILLDAN William C. Pagett, P.E. Senior Vice President AF: mh 95610-06/06-155/P06-034