Loading...
CC - Item 6C - Citywide Engineering and Traffic StudyF_1 L • TO: HONORABLE MAYOR AND MEMBERS ROSEMEAD CITY COUNCIL FROM: ANDY LAZZARETTO, CITY MANAGE DATE: MARCH 20, 2006 RE: ADOPTION OF CITYWIDE ENGINEERING AND TRAFFIC STUDY Attached for the City Council's consideration is a copy of the 2006 Engineering and Traffic Study (E & T). The California Vehicle Code (CVC) requires that cities complete an E & T survey every five years in order to continue using radar traffic enforcement, but this time is extended to seven years under certain circumstances. The last survey was adopted in 1999. The attached report was conducted in accordance with applicable provisions of the CVC, flowing procedures outlined in the 2003 Manual on Uniform Traffic Control Devices (MUTCD), the 2004 MUTCD California Supplement and as required by Section 627 of the CVC; and is intended to satisfy the requirements of CVC Section 40802 to enable the continued use of radar for traffic speed enforcement. Forty-two selected street segments were studied. The posted speed limits on each segment are recommended to remain unchanged from that which is currently posted. Attached is Table 1 of the report that lists a complete summary of recommendations. RECOMMENDATION It is recommended that City Council adopt the Engineering and Traffic Study. Attachment - Summary of Re commendat ions Posted Speed C ritical Recommended No. Street From To Limit S peed Speed Limit Comments 1 DE ADELENA STREET ROSEMEAD BLVD ELLIS LANE 30 32 30 CLOSEST INCREMENT TO 85TH 2 DEL MAR AVENUE GRAVES AVENUE GARVEY AVENUE 35/25*• 38 35/25** 3 DEL MAR AVENUE GARVEY AVENUE HELLMAN AVENUE 40 42 40 CLOSEST INCREMENT TO 85TH 4 EARLSWOOD DRIVE IVAR AVENUE ROSEMEAD PLACE 30 30 30 CLOSEST INCREMENT TO 85TH 5 ELLIS LANE OLNEY STREET TEMPLE CITY BLVD 30 32 30 CLOSEST INCREMENT TO 85TH 6 EMERSON PLACE NEW AVENUE SAN GABRIEL BLVD 30/25** 32 30/25** CLOSEST INCREMENT TO 85TH 7 ENCINITA AVENUE MISSION ROAD LOWER AZUSA ROAD 30/25** 32 30125** CLOSEST INCREMENT TO 85TH 8 GARVEY AVENUE WEST CITY LIMIT DEL MAR AVENUE 35 38 35 ` 9 GARVEY AVENUE DEL MAR AVENUE SAN GABRIEL BLVD 35 39 35 10 GARVEY AVENUE SAN GABRIEL BLVD WALNUT GROVE 35 38 35 AVENUE 11 GARVEY AVENUE WALNUT GROVE EAST CITY LIMIT 35 39 35 AVENUE 12 GRAND AVENUE CHARLOTTE AVENUE ROSEMEAD BLVD 35 38 35 13 HELLMAN AVENUE NEW AVENUE WALNUT GROVE 30 33 30 • AVENUE 14 JACKSON AVENUE GRAVES AVENUE GARVEY AVENUE 30/25** 35 30/25*` • See -Segments With Special Conditions" Section for Comments " = 25 mph when children are present • • Engineering and Traffic Survey 8 City of Rosemead r • T rY'`~~ C. ~u5>LtrtSt 4t'v ¢ Y A 1, . L}J1 ~~SjY~I, ~T.3f a. of Rec ommend ations Posted Speed Critical Recommended • To Limit Speed Speed Limit Comments 15 LOFTUS STREET TEMPLE CITY BLVD EAST CITY LIMIT 35 39 35 ` 16 LOWER AZUSA ROAD ROSEMEAD BLVD ENCINITA AVENUE 40/25** 42 40125** CLOSEST INCREMENT TO 85TH 17 MARSHALL STREET DELTA AVENUE WALNUT GROVE 35 38 35 AVENUE 18 MARSHALL STREET WALNUT GROVE ROSEMEAD BLVD 30125** 34 30/25** ` AVENUE 19 MARSHALL STREET ROSEMEAD BLVD HART AVENUE 35 38 35 20 MARSHALL STREET HART AVENUE RIO HONDO AVENUE 35 37 35 CLOSEST INCREMENT TO 85TH 21 MISSION DRIVE WEST CITY LIMIT WALNUT GROVE 40 43 40 AVENUE 22 MISSION DRIVE WALNUT GROVE ROSEMEAD BLVD 40 44 40 AVENUE 23 MISSION DRIVE ROSEMEAD BLVD VALLEY BLVD 40/25** 44 40/25** ` 24 MUSCATEL AVENUE MARSHALL STREET GRAND AVENUE 30125** 32 30125** CLOSEST INCREMENT TO 85TH 25 NEW AVENUE GRAVES AVENUE GARVEY AVENUE 35 38 35 26 RAMONA BOULEVARD WALNUT GROVE IVAR AVENUE 30 32 30 CLOSEST INCREMENT TO 851-H AVENUE 27 RIO HONDO AVENUE OLNEY STREET VALLEY BLVD 30/25** 35 30/25** ` 28 ROSEMEAD PLACE GARVEY AVENUE EARLSWOOD DRIVE 35 37 35 CLOSEST INCREMENT TO 85 * See "Segments with Special Conditions" Section for Comments = 25 mph when children are present Engineering and Traffic Survey 9 City of Rosemead • I T able I Summary • Recommendat ions -Ali Posted • • C ritical Recommended No'. Street • TO Limit • • Speed Limit Comments 29 RUSH STREET SAN GABRIEL BLVD WALNUT GROVE AVENUE 40/25" 44 40125" " 30 SAN GABRIEL BLVD SOUTH CITY LIMIT DELTA STREET 45/25" 48 45/25" " 31 SAN GABRIEL BLVD RUSH STREET GARVEY AVENUE 40 44 40 " 32 SAN GABRIEL BLVD GARVEY AVENUE HELLMAN AVENUE 40 42 40 CLOSEST INCREMENT TO 85TH 33 TEMPLE CITY BLVD OLNEY STREET VALLEY BLVD 40 42 40 CLOSEST INCREMENT TO 85TH 34 TEMPLE CITY BLVD VALLEY BLVD NORTH CITY LIMITS 40 43 40 35 VALLEY BLVD CHARLOTTE AVENUE ROSEMEAD BLVD 35 40 35 36 VALLEY BLVD ROSEMEAD BLVD STRANG AVENUE 35 41 35 ` 37 WALNUT GROVE AVENUE SAN GABRIEL BLVD RUSH STREET 45 49 45 " 38 WALNUT GROVE RUSH STREET GARVEY AVENUE 40 43 40 ` AVENUE 39 WALNUT GROVE GARVEY AVENUE HELLMAN AVENUE 40 44 40125"` AVENUE 40 WALNUT GROVE HELLMAN AVENUE VALLEY BLVD 40 45 40 AVENUE 41 WALNUT GROVE VALLEY BLVD MISSION BLVD 40 44 40 ` AVENUE 42 WALNUT GROVE MISSION BLVD NORTH CITY LIMIT 40 45 40 ` AVENUE See "Segments with Special Conditions" Section for Comments = 25 mph when children are present Engineering and Traffic Survey 10 City of Rosemead ENGINEERING AND TRAFFIC SURVEY March 2006 II WNG AND SURVEY 11 11 11 I FOR THE CITY OF ROSEMEAD Prepared by: A WILLDAN Serving Public Agencies 1 1 1 1 N;~U W I LLDAN Sei vir a Piilihr AaenciBs March 7, 2006 Mr. Andy Lazarretto City Manager City of Rosemead 8838 Valley Boulevard Rosemead, CA 91770 I Subject: 2006 Engineering and Traffic Survey I i 1't 1 ( rossruads Parktaay North, Suite 405 Inrlusln California 91 746-149 7 ;61;9(Iti-6200 lax -361/695-111(1 t~tvw.taiIIthn.i i,nt ' Dear Mr. Lazarretto: As requested, Willdan has completed an Engineering and Traffic Survey to justify and ' update the posted speed limits along 42 street segments in the City of Rosemead. These segments were last surveyed in July 1999, and require an update to comply with the 7-year limitation set forth in the California Vehicle Code (CVC). We are pleased to submit the enclosed Report that describes the E&T survey procedures and contains recommendations for posted speed limits on the 42 selected street segments in the City. A summary of these recommendations is included in the Analysis. Supporting documentation for each speed zone recommendation is provided in the Appendices. The Report was conducted in accordance with applicable provisions of the CVC, following procedures outlined in the Manual on Uniform Traffic Control Devices (MUTCD) dated 2003, the MUTCD California Supplement dated May 2004 and as required by Section 627 of the California Vehicle Code. The Report is intended to satisfy the requirements of Section 40802 of the CVC to enable the continued use of radar for traffic speed enforcement. We appreciate the opportunity to serve the City of Rosemead and the assistance and cooperation afforded to us during the course of this study. Very truly yours, WILLDAN Q~OfESS~p~,_ Q~Oe~$SA "qll k F. ~c A A4 1a °c LL' I No. 67583 No. 234t Vaness Munoz P.E,T.E. * Exp. 6. 30 Exp•(.'30'06 A~ Traffic Engineer 1 s~q TRAFF\ OF CAI OF CA~~F EZ:jmk (06-160) 15707/0307/R01 WILLDAN I ;I`r uali ior l'<ul North. Suite lUi Industry, Californi a 91746-3497 Serving Public Agencies Sh2'O08-6200 fd\ 562'(, 15-2120 %\11H'IT1 C1111 March 7, 2006 Mr. Andy Lazarretto City Manager City of Rosemead 8838 Valley Boulevard Rosemead, CA 91770 Subject: 2006 Engineering and Traffic Survey Dear Mr. Lazarretto: As requested, Willdan has completed an Engineering and Traffic Survey to justify and update the posted speed limits along 42 street segments in the City of Rosemead. These segments were last surveyed in July 1999, and require an update to comply with the 7-year limitation set forth in the California Vehicle Code (CVC). We are pleased to submit the enclosed Report that describes the E&T survey Procedures and contains recommendations for posted speed limits on the 42 selected street segments in the City. A summary of these recommendations is included in the Analysis. Supporting documentation for each speed zone recommendation is provided in the Appendices. The Report was conducted in accordance with applicable provisions of the CVC, following procedures outlined in the Manual on Uniform Traffic Control Devices (MUTCD) dated 2003, the MUTCD California Supplement dated May 2004 and as required by Section 627 1 of the California Vehicle Code. The Report is intended to satisfy the requirements of Section 40802 of the CVC to enable the continued use of radar for traffic speed enforcement. We appreciate the opportunity to serve the City of Rosemead and the assistance and cooperation afforded to us during the course of this study. Very truly yours, I WILLDAN Vanessa Munoz P.E,T.E. Traffic Engineer EZ:jmk (06-160) 15707/0307/R01 1 TABLE OF CONTENTS Page INTRODUCTION 1-2 Elements of the Engineering and Traffic Survey 2-3 ' SURVEY CONDITIONS 4 Survey Locations 4 Data Collection 4 Speed Data 4 Collision Data 4 Field Review Data 5 I ANALYSIS 6 Criteria 6 Results and Recommendations 6-7 Table 1-Summary of Recommendations 8-10 Segments with Special Conditions 11-16 LEGISLATIVE REFERENCES 17 Applicable Sections of California Vehicle Code 17-22 APPENDIX A - Segment Data ' Street Segment Sheets Radar Speed Distribution Forms APPENDIX B - Collision Rates APPENDIX C - Survey Equipment Used w Engineering and Traffic Survey City of Rosemead INTRODUCTION This Engineering and Traffic Survey is intended to be the basis for the establishment, revision, and enforcement of speed limits for selected streets within the City of Rosemead. This Engineering and Traffic Survey presents recommended speed limits for 42 street segments in the City of Rosemead. Engineering and Traffic Surveys are required by the State of California to establish intermediate speed limits on local streets and to enforce those limits using radar or other speed measuring devices. These surveys must be updated every 5, 7 or 10 years to ensure the speeds reflect current conditions as dictated by the California Vehicle Code (CVC).The CVC also requires that the surveys be conducted based on the methodology required by the Manual on Uniform Traffic Control Devices (MUTCD) dated 2003 and the MUTCD California Supplement dated May 2004. The survey was requested by the City for the proper posting of speed limits and to enable the Sheriffs Department to utilize radar or other electronic speed measuring devices for speed enforcement. CVC Sections 40801 and 40802 require Engineering and Traffic Surveys that verify the prima facie speed limit before enforcement by such a device is legal. The law further specifies that these surveys be conducted every 5 years. The surveys can be extended to 7 years provided the City's police officer(s) have completed a 24-hour radar operator course [CVC 40802(c)(2)(B)(i)(1)]. Additionally, some surveys may be extended to 10 years if a traffic engineer certifies that no changes in roadway or traffic conditions have occurred [CVC 40802 (c)(2)(13)(i)(II)]. These provisions assure that posted speed limits are kept reasonably current. The Engineering and Traffic Surveys for the City were conducted in accordance with procedures outlined in the Manual on Uniform Traffic Control Devices (MUTCD) dated 2003, the MUTCD California Supplement dated May 2004 and as required by Section 627 of the California Vehicle Code. The Code further describes three elements of an engineering and traffic survey: 1. Measurement of prevailing speed; 2. Accident history; and 3. Roadway characteristics not readily apparent to the motorist. Posted speed limits are established primarily to protect the general public from the reckless and unpredictable behavior of dangerous drivers. They provide law enforcement with a clearly understood method to identify and apprehend violators of the basic speed law (CVC Section 22350). This law states "No person shall drive a vehicle on a highway at a speed greater than is reasonable or prudent having due regard for weather, visibility, the traffic on, and the surface and width of the highway, and in no event at a speed which endangers the safety of persons or property." The posted speed limit gives motorists a clear warning of the maximum speed that is reasonable and prudent under typical driving conditions. Engineering and Traffic Survey 1 City of Rosemead The basic fundamentals for establishing speed limits recognize that the majority of drivers behave in a safe and reasonable manner, and therefore, the normally careful and competent actions of a reasonable driver should be considered legal. Speed limits established on these fundamentals conform to the consensus that those who drive the highway determine what speed is reasonable and safe, not on the judgment of one or a few individuals. A radar speed study is usually used to record the prevailing speed of reasonable drivers. Speed limits are also established to advise drivers of conditions which may not be readily apparent to a reasonable driver. For this reason, accident history, roadway conditions, traffic characteristics, and land use must also be analyzed before determining speed limits. Speed limit changes are usually made in coordination with physical changes in roadway conditions or roadside developments. Unusually short zones of less than one-half mile in length should be avoided to reduce driver confusion. Additionally, it is generally accepted that speed limits cannot be successfully enforced without voluntary compliance by a majority of drivers. Consequently, only the driver whose behavior is clearly out of line with the normal flow of traffic is usually targeted for enforcement. ELEMENTS OF THE ENGINEERING AND TRAFFIC SURVEY The Manual on Uniform Traffic Control Devices (MUTCD) dated 2003 and the MUTCD California Supplement dated May 2004 specifies the methodology to be used for completing Engineering and Traffic Surveys. This methodology includes an evaluation of current vehicle speeds, accident history and conditions not readily apparent to motorists. The basic elements of the Engineering and Traffic Survey are discussed in more detail as follows: Speed Sampling Existing vehicle speeds are surveyed by a certified radar operator with a calibrated radar unit in an unmarked vehicle. Speed samples are taken for each segment representing a statistically significant sample of current traffic. This data is then evaluated to identify the distribution of speeds. A key element in the evaluation is the identification of the 85th percentile speed. The 85th percentile speed is the speed at or below which 85 percent of the traffic travels. This threshold represents what is historically found to be a safe and reasonable speed for most drivers based on common roadway conditions. Therefore, a "basic speed limit" is established at the nearest 5-mile per hour (mph) increment to the 85th percentile speed. For example, if the 85th percentile speed is 48 mph, the basic speed limit is 50 mph. If the 85th percentile speed is 47 mph, the basic speed limit is 45 mph. 1 Engineering and Traffic Survey 2 City of Rosemead Collision History Reported collisions are reviewed for each street segment to determine if there is a higher than average rate of collisions. A segment that has an above-average collision rate typically suggests conditions that are not readily apparent to motorists. A summa of the collision rates for the 42 surveyed street segments is provided in summary Appendix B. Conditions Not Readily Apparent To Motorists Each street segment is field inspected to identify roadway conditions that may not be readily apparent to motorists. A determination is made whether any conditions are significant and warrant the recommendation of the speed limit 5 mph or more below the basic speed limit. It is important to note that the Manual on Uniform Traffic Control Devices (MUTCD) dated 2003 and the MUTCD California Supplement dated May 2004 recommends exercising great care when establishing speed limits 5 mph or more below the basic speed limit. 1 1 1 ~I I 1 1 Engineering and Tragic Survey 3 City of Rosemead SURVEY CONDITIONS SURVEY LOCATIONS The procedures described below describe the criteria and methods used to survey selected streets within the City of Rosemead. The specific location of the radar speed survey for each street segment was selected after considering the following: 1. Minimum stop sign and traffic signal influence. 2. Minimum visibility restrictions. 3. Non-congested traffic flow away from intersections and driveways. 4. Minimum influence from curves or other roadway conditions that would affect the normal operation of a vehicle. DATA COLLECTION Data of existing conditions was obtained including prevailing speed of vehicles, traffic collisions, visibility restrictions, and roadway conditions within the community. Speed data and field reviews were conducted at 42 locations during the months of November and December 2005 Speed Data Radar speed measurements were conducted at 42 locations during November and December 2005. All surveys were conducted in good weather conditions, during off-peak hours on weekdays. The radar unit was operated from an unmarked vehicle to minimize any influence on driver behavior. Typically, a minimum sample size of 100 vehicles or the total samples during a maximum period of 2 hours were obtained for each segment. Traffic speeds in both directions were recorded for individual segments and separate surveys were made for divided roadways. Collision Data Collision data was obtained from the City's SWITRS electronic collision database obtained from the Temple City Sheriffs station (responsible for the City of Rosemead). For this study, collision data was used from the latest 3 years of reported accidents from September 1, 2002 to September 1, 2005. The collision rates for the 42 segments are expressed in accidents per million vehicle miles (A/MVM). To calculate these rates, 24- hour traffic volumes were collected for each street segment. This information was then entered into the following formula to determine the collision rate: Ax1,000,000 R= tx365 days xlxv year Engineering and Traffic Survey 4 City of Rosemead ' A = Number of midblock collisions over time period R = Collision Rate (accidents/million vehicle miles) t = Time Period Covered (in years) / = Length of Segment (miles) v = Traffic Volume (average daily traffic) The segment collision rate was then compared to the average statewide collision rate. The average statewide collision rate was obtained from the 2002 Collision Data on California State Highways. Field Review Data A fie ld review was conducted for each of the selected street segments in the City with cons ideration for the following factors: 1. Street width and alignment (design speed); 2. Pedestrian activity and traffic flow characteristics; 3. Number of lanes and other channelization and striping patterns; 4. Frequency of intersections, driveways, and on-street parking; 5. Location of stop signs and other regulatory traffic control devices; 6. Visibility obstructions; 7. Land use and proximity to schools; 8. Pedestrian and bicycle usage; 9. Uniformity with existing speed zones and those in adjacent jurisdictions; and 10. Any other unusual condition not readily apparent to the driver. A t Engineering and Traffic Survey 5 City of Rosemead ANALYSIS CRITERIA Survey data was compiled and analyzed to determine the recommended speed limit in accordance with several criteria contained in the Manual on Uniform Traffic Control 1 Devices (MUTCD) dated 2003 and the MUTCD California Supplement dated May 2004. Some of the criteria used are: A. The critical speed or 85th percentile speed is that speed at or below which 85 percent of the traffic is moving. This speed is the baseline value in determining what the majority of drivers believe is safe and reasonable. Speed limits set higher than the critical speed are not considered reasonable and safe. Speed limits set lower than the critical speed make a large number of reasonable drivers "unlawful," and do not facilitate the orderly flow of traffic. The "basic speed limit" is the nearest 5 mph increment to the 85th percentile speed. B. The 10 mile per hour (mph) pace speed is the 10 mph increment that contains the highest percentage of vehicles. It is a measure of the dispersion of speeds across the range of the samples surveyed. An accepted practice is to keep the speed limit within the 10 mph pace while considering the critical speed and other factors that might require a speed lower than the critical speed. C. The collision rate for each street segment is compared to average collision rates that can be reasonably expected to occur on streets and highways in other jurisdictions, in proportion to the volume of traffic per lane mile. These average collision rates have been developed by the State of California and are considered 1 reasonable for use in the City of Rosemead. RESULTS AND RECOMMENDATIONS The Engineering and Traffic Survey Forms, presented in Appendix A, illustrate results of a thorough evaluation of the available data and recommend a speed limit for each street segment surveyed. A complete summary of all recommendations is shown in Table 1. In each case, the recommended speed limit was consistent with the prevailing behavior as demonstrated by the radar speed measurements. Typically, a speed limit in the upper range of the 10-mile pace was selected unless an collision rate significantly higher than expected was discovered or roadway conditions not readily apparent to the driver were identified. Any segments with recommended speed limits 5 mph or more below the basic speed limit are fully explained later in this report. The Legislature, in adopting Section 22358.5 of the California Vehicle Code (CVC), has made it clear that physical conditions, such as width, curvature, grade and surface conditions, or any other condition readily apparent to a driver, in the absence of other Engineering and Traffic Survey 1 6 City of Rosemead factors, would not be the basis for special downward speed zoning. In these cases, the basic speed law (CVC Section 22350) is sufficient to regulate such conditions. The recommendations contained in this Report are intended to establish prima facie speed limits. They are not intended to be absolute for all prevailing conditions. All prima facie speed violations are actually violations of the basic speed law (Section 22350 of California Vehicle Code). This statute states that a person shall not drive a vehicle at a speed greater than is safe having regard for traffic, roadway, and weather conditions. A prima facie limit is intended to establish a maximum safe speed under normal conditions. Table 1 summarizes the recommendations for all surveyed segments. The posted speed limits on the 42 street segments surveyed are recommended to remain unchanged. w r r 1 1 Engineering and Traffic Survey 7 City of Rosemead 1 1 1 1 1 1 1 ~ t t i ~ LO Go to OD o 00 o 00 o co to 00 O O O O O O W m W 2 w m w 2 w 2 w 2 W # W Ir ~ w w i # # # # # f C) z z z z z U) ( U) U) U) W W w w w w O O O O O O J U J U J U J U J U J U to N v m M LO N LO N ~ M V7 CYi V) M i f LO N LO M O M O M M ■ N Cl) co M N Iq O M N M N M N M 00 M O M 00 M O M 00 M M M to M O M N O r O M O M N . N t f) o M U') M to M LO LO M O M ~ O ■ io M O M O M M z g m m ¢ a Z m J Z Z w a w > > w > ~ J m > z Z w Z > } a z 0 ~ U I~ a ¢ Fr (7 CD ¢ u J m (D w X m 0 ~w U ~w Z (n > < J w (n w z 0 w z Z Z Q> C/) w o Z a> > a w 0 F- (A ~ a cn ~ ¢ u~ w 3: ¢ c~ D w D > > > F- - w :D z > m > Z > w > z m z Z w w W w Q 7j W J W_ O x ¢ w w D Z Q W ¢ ¢ Z F- W Z > Z U ¢ m m F-w 0 > ¢ rn W > > ¢ w ¢ F- 2 Z Z ¢ > Cf) ¢ < Q Z w w w z Z w 0 w 0 0 > O Z o U) U Z C7 w w > > > w U w Z > j w w Z w Z Q Z Q Z Q ; ¢ W W W W Z > > ¢ > ¢ W w o z z a Q a a O w Q Q J (n O W F- Z w w w w Z ¢ Y w w w Q -1 2 z ¢ ¢ ¢ ¢ w U o w w w w C7 C7 C7 c7 C7 = N M U') (O I~ a0 0) r r r r E E O U 0 0 U 41 (n N C 0 w c v in c U O Q. m ~ ca 0. m~ 3 ~ aci s v~ s <Z E N N C II # i a~i m m ~ m U p cr- ~ O C ~ ~U 'C m m C W co 1 1 1 1 1 1 1 1 1 1 1 f r i ) co l(7 W O co O GO O 00 0 0 0 0 0 W W W W W Z Z Z Z Z U) w w w w O O O O O U U U U U . O c7 N _ U') M N ` O cn O M O O I N N ` O M O ch N . O M O O ce) O st O M O fh O ce) N co M IT ch 00 Cl) r- c7 C) IT N ce) 00 M N M O m I- C7 M Lc) to M U') M M 0 C) O Ul) O LO M c07 LO LO M s O It O Cf) O M O c7 e H w Z w > w w w j W w w > w > O m D Q O 1 L m j Iz w w o Q V Z O //1 w~ J m Q Z J m O U Z ~w Q p DD lCL W W Q W F- (!J _ U Z Z Q W w d' = O Z Z Q W W J J Z aQ, > Q Q J J J ate' w W Q E 2 Q > Ce) Ue > > w 0 > m D J w > O J W > 0 J w w w > w w Z 0 w ~ Z U a j O W Q w > a a W Q O H U) Q w W W Q Z) W Z W Q U H ~ w ZZ W Q U) to W Z W } > a. (n J Z J W Q U) O F- of U) W J w Q (n O w Q > Q W Z -j W Q Z J X Q W O W o > ~Q Q > m - o > ~o o d O W w w w Q > = Z w w N H F- > > > Q W w D Q U a D U) U) U) w Z C13 0 (n J J J J Z Z Z Q Z W U) _ _ -r = O O O Q LL w cn U) (n U) (n (n _ 0 O w y O J O J rG Z Ln co r- - 00 r O Co N N N N CV) N q:r N O N W N r- N W N 2 d E 0 U c 0 U 0) c O c ~ N 0 U n m ~ U (C Q C U ~ CD C t (D 3 E ) L Q E N O ~ N ~ II • a m (ao m ~m U ~ C ~U .c m m c W Q 1 r t t 1 r 1 1 1 1 co ~ O O 1 Z Z W W f t i w w t i i t t i k • t Z Z w w U) U) O O U U 14 N O O O Iq O q' LO M O m LO O It k f N O qq O I' O qq Co ~ N ~ O ~ 00 N N M O r CA V O qT O • N k N O ;r O O 4 O sf O cn O M O V O q O O O O v • O O ' w > w W U) > 2 2 w Z F- w z > W Q J J J o W > W w W > w a J J O Z H Q a ~ z m W v W a Z F = a j z m w v 2 Z Z w • aj F- w X Q J w J Q w O ) O w Q 1- D w a U w 2 Q > (n f - O z Q C7 2 > z w J ~ w w Z:) w 13 J W D m J w J H w D z > w w 0 > Q > m co J w D w z W O co J co F 0 co w F- z a z J co m U F- 2 > CO W w o w W U 2 > a J O • Z Q D o (n w a z J J a a 2 (n o z a Cl) Z) w a J w J Q (n (n (n c9 O > U m 0 m > J J J m J J W W > W > w > w > W > w CD w co w w m ~ CO 0 J J > (n m Q ca Q in a J J m W co w c~ Z) ~ Z) 7) D~ DZ) = CO 0 Z CD z C9 z IL a J J Q J J Q Zz J W Q> Zz J I Q> Zz J W Q> Zz J w Q> zz J w a> Zz J W Q> cr- Q (n Q (n Q (n W W P > > ~a ~a ~a ~a ~a 3a (3) O M M N ce) Cl) M V M O m (O M I- M 00 C) O (7 O - N c 0) E E U o c O U (D c o~ c O U n m ~ nc co w U 3L w (D c L N ~ cI L Q v) E O04 ~ N U) II i ~ ~ m m ~ N U p ~ O cU +a m m C W O e- I SEGMENTS WITH SPECIAL CONDITIONS The following segments surveyed had recommended speed limits that were 5 miles per hour (mph) or more below the critical speed due to conditions not readily apparent to the driver. Each segment is discussed below. Segment #2 - Del Mar Avenue - Graves Avenue to Garvey Avenue This segment is currently posted at 35 mph and has 2 through lanes in each direction south of Wasola Street and 1 through lane in each direction north of Wasola Street with an ADT of 16,595 vehicles per day. The adjacent land use is residential and within the vicinity of a school. The critical speed is 38 mph and would normally justify a 40 mph posted speed limit. However, due to various hidden driveways, merging lanes, moderate pedestrian traffic, and an uncontrolled school crossing that may not be apparent to unfamiliar drivers, a lower speed limit is prudent. It is recommended that the speed limit remain at 35 mph for the above reasons. In addition, 25 mph school zones are recommended per Section 22352 of the California Vehicle Code. Segment #8 - Garvey Avenue - West City Limit to Del Mar Avenue This segment is currently posted at 35 mph and has 2 through lanes in each direction with an ADT of 26,874 vehicles per day. The adjacent land use is heavily commercial. The critical speed is 38 mph and would normally justify a 40 mph posted speed limit. However, due to the various hidden driveways, heavy curb parking, and moderate truck traffic that may not be apparent to unfamiliar drivers, a lower speed limit is prudent. It is recommended that the speed limit remain at 35 mph for the above reasons. 1 Segment #9 - Garvey Avenue - Del Mar Avenue to San Gabriel Boulevard This segment is currently posted at 35 mph and has 2 through lanes in each direction with an ADT of 26,980 vehicles per day. The adjacent land use is heavily commercial. The critical speed is 39 mph and would normally justify a 40 mph posted speed limit. However, due to the various hidden driveways, heavy curb parking, and moderate truck traffic that may not be apparent to unfamiliar drivers, a lower speed limit is prudent. It is recommended that the speed limit remain at 35 mph for the above reasons. Segment #10 - Garvey Avenue - San Gabriel Boulevard to Walnut Grove Avenue This segment is currently posted at 35 mph and has 2 through lanes in each direction with an ADT of 27,431 vehicles per day. The adjacent land use is heavily commercial. The critical speed is 38 mph and would normally justify a 40 mph posted speed limit. However, due to the various hidden driveways, heavy curb parking, moderate truck traffic, and moderate pedestrian traffic that may not be apparent to unfamiliar drivers, a lower speed limit is prudent. It is recommended that the speed limit remain at 35 mph for the above reasons. Segment #11 - Garvey Avenue - Walnut Grove Avenue to East City Limit This segment is currently posted at 35 mph and has 2 through lanes in each direction with an ADT of 28,277 vehicles per day. The adjacent land use is heavily commercial. The critical speed is 39 mph and would normally justify a 40 mph posted speed limit. However, due to the various hidden driveways, heavy curb parking, and moderate truck traffic that Engineering and Traffic Survey 71 City of Rosemead may not be apparent to unfamiliar drivers, and to maintain a consistent speed limit with the adjacent segments, a lower speed limit is prudent. It is recommended that the speed limit remain at 35 mph for the above reasons. Segment #12 - Grand Avenue - Charlotte Avenue to Rosemead Boulevard This segment is currently posted at 35 mph and has 1 through lane in each direction with an ADT of 3,487 vehicles per day. The adjacent land use is residential and commercial. The critical speed is 38 mph and would normally justify a 40 mph posted speed limit. However, due to the various hidden driveways, horizontal curve, and high left turn volumes without left turn lanes that may not be apparent to unfamiliar drivers, a lower speed limit is prudent. It is recommended that the speed limit remain at 35 mph for the above reasons. Segment #13 - Hellman Avenue - New Avenue to Walnut Grove Avenue This segment is currently posted at 30 mph and has 1 through lane in each direction with an ADT of 4,946 vehicles per day. The adjacent land use is residential and commercial. The critical speed is 33 mph and would normally justify a 35 mph posted speed limit. However, due to the various hidden driveways, high left turn volumes without left turn lanes, and a vertical curve that may not be apparent to unfamiliar drivers, a lower speed limit is prudent. It is recommended that the speed limit remain at 30 mph for the above reasons. Segment #14 - Jackson Avenue - Graves Avenue to Garvey Avenue This segment is currently posted at 30 mph and has 1 through lane in each direction with an ADT of 3,315 vehicles per day. The adjacent land use is residential and within the vicinity of a school. The critical speed is 35 mph and would normally justify a .35 mph posted speed limit. However, due to the various hidden driveways, moderate pedestrian traffic, and a vertical curve that may not be apparent to unfamiliar drivers, a lower speed limit is prudent. It is recommended that the speed limit remain at 30 mph for the above reasons. In addition, 25 mph school zones are recommended per Section 22352 of the California Vehicle Code. Segment #15 - Loftus Street - Temple City Boulevard to East City Limit This segment is currently posted at 35 mph and has 2 through lanes in each direction with an ADT of 14,283 vehicles per day. The adjacent land use is residential. The critical speed is 39 mph and would normally justify a 40 mph posted speed limit. However, due to the posted speed in the adjacent agency, various hidden driveways, and a vertical curve that may not be apparent to unfamiliar drivers and to maintain a consistent speed limit with the adjacent segments, a lower speed limit is prudent. It is recommended that the speed limit remain at 35 mph for the above reasons. Segment #17 - Marshall Street - Delta Avenue to Walnut Grove Avenue This segment is currently posted at 35 mph and has 1 through lane in each direction with an ADT of 6,030 vehicles per day. The adjacent land use is residential. The critical speed is 38 mph and would normally justify a 40 mph posted speed limit. However to maintain a consistent speed limit with the adjacent segments and due to various hidden driveways, and high left turn volumes without left turn lanes that may not be apparent to unfamiliar Engineering and Traffic Survey 12 City of Rosemead drivers, a lower speed limit is prudent. It is recommended that the speed limit remain at 35 mph for the above reasons. Segment #18 - Marshall Street - Walnut Grove Avenue to Rosemead Boulevard This segment is currently posted at 30 mph and has 1 through lane in each direction with an ADT of 9,337 vehicles per day. The adjacent land use is residential and within the vicinity of a school. The critical speed is 34 mph and would normally justify a 35 mph posted speed limit. However, due to the various hidden driveways, horizontal curve and high left turn volumes without left turn lanes that may not be apparent to unfamiliar drivers, a lower speed limit is prudent. It is recommended that the speed limit remain at 35 mph for the above reasons. In addition, 25 mph school zones are recommended per Section 22352 of the California Vehicle Code. Segment #19 - Marshall Street - Rosemead Boulevard to Hart Avenue This segment is currently posted at 35 mph and has 2 through lanes in each direction with an ADT of 11,515 vehicles per day. The adjacent land use is residential. The critical speed is 38 mph and would normally justify a 40 mph posted speed limit. However to maintain a consistent speed limit with the adjacent segments and due to various hidden driveways, high collision rate, and variation of street width that may not be apparent to unfamiliar drivers, a lower speed limit is prudent. It is recommended that the speed limit remain at 35 mph for the above reasons. Segment #21 - Mission Drive - West City Limit to Walnut Grove Avenue This segment is currently posted at 40 mph and has 2 through lanes in each direction with an ADT of 16,015 vehicles per day. The adjacent land use is residential. The critical speed is 43 mph and would normally justify a 45 mph posted speed limit. However to maintain a consistent speed limit with the adjacent segments and due to various hidden driveways, high left turn volumes without left turn lanes, and uncontrolled crosswalks that may not be apparent to unfamiliar drivers, a lower speed limit is prudent. It is recommended that the speed limit remain at 40 mph for the above reasons. Segment #22 - Mission Drive - Walnut Grove Avenue to Rosemead Boulevard This segment is currently posted at 40 mph and has 2 through lanes in each direction with an ADT of 17,175 vehicles per day. The adjacent land use is residential. The critical speed is 44 mph and would normally justify a 45 mph posted speed limit. However to maintain a consistent speed limit with the adjacent segments and due to various hidden driveways, high left turn volumes without left turn lanes, and an uncontrolled crosswalk that may not be apparent to unfamiliar drivers, a lower speed limit is prudent. It is recommended that the speed limit remain at 40 mph for the above reasons. Segment #23 - Mission Drive - Rosemead Boulevard to Valley Boulevard This segment is currently posted at 40 mph and has 2 through lanes in each direction with an ADT of 12,857 vehicles per day. The adjacent land use is residential, commercial, and 1 within the vicinity of a school. The critical speed is 44 mph and would normally justify a 45 mph posted speed limit. However, to maintain a consistent speed limit with the adjacent segments and due to various hidden driveways, horizontal curve, high left turn volumes without left turn lanes, and an uncontrolled crosswalk, that may not be apparent to Engineering and Tragic Survey 13 City of Rosemead unfamiliar drivers, a lower speed limit is prudent. It is recommended that the speed limit remain at 40 mph for the above reasons. In addition, 25 mph school zones are recommended per Section 22352 of the California Vehicle Code. Segment #25 - New Avenue - Graves Avenue to Garvey Avenue This segment is currently posted at 35 mph and has 1 through lane in each direction with an ADT of 8,725 vehicles per day. The adjacent land use is multi-family residential and some commercial. The critical speed is 38 mph and would normally justify a 40 mph posted speed limit. However, due to the various hidden driveways, heavy curb parking and a vertical curve that may not be apparent to unfamiliar drivers, a lower speed limit is prudent. It is recommended that the speed limit remain at 35 mph for the above reasons. Segment #27 - Rio Hondo Avenue - Olney Street to Valley Boulevard This segment is currently posted at 30 mph and has 1 through lanes in each direction with an ADT of 7,906 vehicles per day. The adjacent land use is residential and within the vicinity of a school. The critical speed is 35 mph and would normally justify a 35 mph posted speed limit. However, due to various hidden driveways and the occurrence of ' vertical and horizontal curves that may not be apparent to unfamiliar drivers, a lower speed limit is prudent. It is recommended that the speed limit remain at 30 mph for the above reasons. In addition, 25 mph school zones are recommended per Section 22352 of the California Vehicle Code. I Segment #29 - Rush Street - San Gabriel Boulevard to Walnut Grove Avenue This segment is currently posted at 40 mph and has 2 through lanes in each direction with an ADT of 8,929 vehicles per day. The adjacent land use is residential and within the vicinity of a school. The critical speed is 44 mph and would normally justify a 45 mph posted speed limit. However, due to various hidden driveways, a vertical curve, and moderate pedestrian traffic that may not be apparent to unfamiliar drivers, a lower speed limit is prudent. It is recommended that the speed limit remain at 40 mph for the above reasons. In addition, 25 mph school zones are recommended per Section 22352 of the California Vehicle Code. Segment #30 - San Gabriel Boulevard - South City Limit to Delta Street This segment is currently posted at 45 mph and has 2 through lanes in each direction with an ADT of 20,521 vehicles per day. The adjacent land use is residential and commercial. The critical speed is 48 mph and would normally justify a 50 mph posted speed limit. However to maintain a consistent speed limit with the adjacent segments and due to the moderate truck traffic and horizontal curve that may not be apparent to unfamiliar drivers, a lower speed limit is prudent. It is recommended that the speed limit remain at 45 mph for the above reasons. In addition, 25 mph school zones are recommended per Section 22352 of the California Vehicle Code. Segment #31 - San Gabriel Boulevard - Rush Street to Garvey Avenue This segment is currently posted at 40 mph and has 2 through lanes in each direction with an ADT of 24,022 vehicles per day. The adjacent land use is commercial. The critical speed is 44 mph and would normally justify a 45 mph posted speed limit. However to maintain a consistent speed limit with the adjacent segments and due to various hidden Engineering and Traffic Survey 14 City of Rosemead driveways, vertical curve, and heavy curb parking that may not be apparent to unfamiliar drivers, a lower speed limit is prudent. It is recommended that the speed limit remain at 40 mph for the above reasons. Segment #34 - Temple City Boulevard - Valley Boulevard to North City Limits This segment is currently posted at 40 mph and has 2 through lanes in each direction with an ADT of 19,880 vehicles per day. The adjacent land use is residential and commercial. The critical speed is 43 mph and would normally justify a 45 mph posted speed limit. ' However to maintain a consistent speed limit with the adjacent segments and due to various hidden driveways and moderate truck traffic that may not be apparent to unfamiliar drivers, a lower speed limit is prudent. It is recommended that the speed limit remain at 40 mph for the above reasons. Segment #35 - Valley Boulevard - Charlotte Avenue to Rosemead Boulevard ( This segment is currently posted at 35 mph and has 2 through lanes in each direction with an ADT of 29,289 vehicles per day. The adjacent land use is commercial. The critical 1 speed is 40 mph and would normally justify a 40 mph posted speed limit. However to maintain a consistent speed limit with the adjacent segments and due to moderate pedestrian activity and various hidden driveways that may not be apparent to unfamiliar drivers, a lower speed limit is prudent. It is recommended that the speed limit remain at 40 mph for the above reasons. Segment #36 - Valley Boulevard - Rosemead Boulevard to Strang Avenue This segment is currently posted at 35 mph and has 2 through lanes in each direction with an ADT of 26,357 vehicles per day. The adjacent land use is commercial. The critical speed is 41 mph and would normally justify a 40 mph posted speed limit. However, due to the adjacent segment posted speed limit, various hidden driveways, and moderate pedestrian traffic that may not be apparent to unfamiliar drivers, a lower speed limit is 1 prudent. It is recommended that the speed limit remain at 35 mph for the above reasons. Segment #37 - Walnut Grove Avenue - San Gabriel Boulevard to Rush Street This segment is currently posted at 45 mph and has 2 through lanes in each direction with an ADT of 17,241 vehicles per day. The adjacent land use is commercial and fronted by a golf course and university. The critical speed is 49 mph and would normally justify a 50 mph posted speed limit. However, due to the adjacent posted speed limit, steep vertical curve, and moderate pedestrian traffic that may not be apparent to unfamiliar drivers, a lower speed limit is prudent. It is recommended that the speed limit remain at 45 mph for the above reasons. Segment #38 - Walnut Grove Avenue - Rush Street to Garvey Avenue This segment is currently posted at 40 mph and has 2 through lanes in each direction with an ADT of 16,253 vehicles per day. The adjacent land use is residential. The critical speed is 43 mph and would normally justify a 45 mph posted speed limit. However, due to the various hidden driveways and heavy curb parking that may not be apparent to unfamiliar drivers, a lower speed limit is prudent. It is recommended that the speed limit remain at 40 mph for the above reasons. Engineering and Traffic Survey 15 City of Rosemead Segment #39 - Walnut Grove Avenue - Garvey Avenue to Hellman Avenue This segment is currently posted at 40 mph and has 2 through lanes in each direction with an ADT of 25,495 vehicles per day. The adjacent land use is residential and within the vicinity of a school. The critical speed is 44 mph and would normally justify a 45 mph posted speed limit. However to maintain a consistent speed limit with the adjacent ' segments and due to various hidden driveways, and moderate pedestrian traffic that may not be apparent to unfamiliar drivers, a lower speed limit is prudent. It is recommended that the speed limit remain at 40 mph for the above reasons. In addition, 25 mph school zones are recommended per Section 22352 of the California Vehicle Code. Segment #40 - Walnut Grove Avenue - Hellman Avenue to Valley Boulevard ' This segment is currently posted at 40 mph and has 2 through lanes in each direction with an ADT of 23,293 vehicles per day. The adjacent land use is residential and commercial. The critical speed is 45 mph and would normally justify a 45 mph posted speed limit. However to maintain a consistent speed limit with the adjacent segments and due to various hidden driveways, and both vertical and horizontal curves that may not be apparent 1 to unfamiliar drivers, a lower speed limit is prudent. It is recommended that the speed limit remain at 40 mph for the above reasons. Segment #41 - Walnut Grove Avenue - Valley Boulevard to Mission Boulevard This segment is currently posted at 40 mph and has 2 through lanes in each direction with an ADT of 18,561 vehicles per day. The adjacent land use is residential. The critical speed is 44 mph and would normally justify a 45 mph posted speed limit. However to maintain a consistent speed limit with the adjacent segments and due to various hidden driveways, and high left turn volumes without left turn lanes that may not be apparent to unfamiliar drivers, a lower speed limit is prudent. It is recommended that the speed limit remain at 40 mph for the above reasons. Segment #42 - Walnut Grove Avenue - Mission Boulevard to North City Limit This segment is currently posted at 40 mph and has 2 through lanes in each direction with an ADT of 14,061 vehicles per day. The adjacent land use is residential. The critical speed is 45 mph and would normally justify a 45 mph posted speed limit. However to maintain a consistent speed limit with the adjacent segments and due to various hidden driveways, and horizontal curves that may not be apparent to unfamiliar drivers, a lower speed limit is prudent. It is recommended that the speed limit remain at 40 mph for the above reasons. 1 Engineering and Traffic Survey 16 City of Rosemead LEGISLATIVE REFERENCES APPLICABLE SECTIONS OF CALIFORNIA VEHICLE CODE 1 SECTION 1. Section 627 of the Vehicle Code is amended to read: Section 627. (a) "Engineering and traffic survey,"as used in this code, means a survey of highway and traffic conditions in accordance with methods determined by the Department of Transportation for 1 use by state and local authorities. (b) An engineering and traffic survey shall include, among other requirements deemed necessary by the department, consideration of all of the following: (1) Prevailing speeds as determined by traffic engineering measurements. (2) Accident records. 1 (3) Highway, traffic, and roadside conditions not readily apparent to the driver. (c) When conducting an engineering and traffic survey, local authorities, in addition to the factors set forth in paragraphs (1) to (3), inclusive, of subdivision (b) may consider all of the following: (1) Residential density. (2) Pedestrian and bicyclist safety. Basic Speed Law r 22350. No person shall drive a vehicle upon a highway at a speed greater than is reasonable or prudent having due regard for weather, visibility, the traffic on, and the surface and width of, the highway, and in no event at a speed which endangers the safety of persons or property. Speed Law Violations Section 22351. (a) The speed of any vehicle upon a highway not in excess of the limits specified in Section 22352 or established as authorized in this code is lawful unless clearly proved to be in violation of the basic speed law. (b) The speed of any vehicle upon a highway in excess of the prima facie speed limits in Section 22352 or established as authorized in this code is prima facie unlawful unless the defendant establishes by competent evidence that the speed in excess of said limits did not constitute a violation of the basic speed law at the time, place and under the conditions then existing. Prima Facie Speed Limits Section 22352. (a) The prima facie limits are as follows and shall be applicable unless changed as authorized in this code and, if so changed, only when signs have been erected giving notice thereof: Engineering and Traffic Survey 17 City of Rosemead (1) Fifteen mph A) When traversing a railway grade crossing, if during the last 100 feet of the approach to the crossing the driver does not have clear and unobstructed view of the crossing and of any traffic on the railway for a distance of 400 feet in both directions along such railway. This subdivision does not apply in the case of any railway grade crossing where a human flagman is on duty or a clearly visible electrical or mechanical railway crossing signal device is installed but does not then indicate the immediate approach of a railway train or car. B) When traversing any intersection of highways, if during the last 100 feet of his approach to the intersection, the driver does not have a clear and unobstructed view of the intersection and of any traffic upon all of the highways entering the intersection for a distance of 100 feet along all such highways, except at an intersection protected by stop signs or yield right-of-way signs or controlled by official traffic control signals. C) On any alley. (2) Twenty-five mph A) On any highway other than a state highway, in any business or residence district unless a different speed is determined by local authority under procedures set forth in this code. (B) When approaching or passing a school building or the grounds thereof, contiguous to a highway and posted with a standard "SCHOOL" warning sign, while children are going to or leaving the school either during school hours or during the noon recess period. The prima facie limit shall also apply when approaching or passing any school grounds which are not separated from the highway by a fence, gate or other physical barrier while the grounds are in use by children and the highway is posted with a standard "SCHOOL" warning sign. For purposes of this subparagraph, standard "SCHOOL" warning signs may be placed at any distance up to 500 feet away from school grounds. (C) When passing a senior center or other facility primarily used by senior citizens, contiguous to a street other than a state highway and posted with a standard "SENIOR" warning sign. A local authority is not required to erect any sign pursuant to this paragraph until donations from private sources covering those costs are received and the local agency makes a determination that the proposed signing should be implemented. A local authority may, however, utilize any other funds available to it to pay for the erection of those signs. (3) Thirty-five miles per hour on any highway, other than a state highway, in any moderate density residential district, as defined in subdivision (b) of Section 22352.1, when posted with a sign giving notice of that speed limit, unless a different speed is determined by local authority under procedures set forth in this code. (applies to Town of Apple Valley only) Increase of Local Limits Section 22357. (a) Whenever a local authority determines upon the basis of an engineering and traffic survey that a speed greater than 25 miles per hour (mph) would facilitate the orderly movement of Engineering and Traffic Survey 18 City of Rosemead ' vehicular traffic and would be reasonable and safe upon any street other than a state highway otherwise subject to a prima facie limit of 25 mph, the local authority may by ordinance determine and declare a prima facie speed limit of 30, 35, 40, 45, 50, 55 or 60 mph or a maximum speed limit of 65 mph, whichever is found most appropriate to facilitate the orderly movement of traffic and is reasonable and safe. The declared prima facie or maximum speed limit shall be effective when appropriate signs giving notice thereof are erected upon the street and shall not thereafter be revised except upon the basis of an engineering and traffic survey. This section does not apply to any 25 mph prima facie limit, which is applicable when passing a school building or the grounds thereof or when passing a senior center or other facility primarily used by senior citizens. (b) This section shall become operative on the date specified in subdivision (c) of Section 22366. If over 55 mph Maximum Speed for Designated Vehicles Section 22406. (a) No person may drive any of the following vehicles on a highway at a speed in excess of 55 ' mph: (1) A motortruck or truck tractor having three or more axles or any motortruck or truck tractor drawing any other vehicle. (2) A passenger vehicle or bus drawing any other vehicle. (3) A school bus transporting any school pupil. (4) A farm labor vehicle when transporting passengers. (5) A vehicle transporting explosives. (6) A trailer bus, as defined in Section 636. 1 (b) Any person who operates a commercial motor vehicle, as defined in Section 15210, upon a highway at a speed exceeding a maximum speed limit established under this code by 15 mph or more, is guilty of a misdemeanor. A violation of this subdivision shall be considered a "serious traffic violation," as defined in subdivision (i) of Section 15210, and shall be subject to the sanctions provided under Section 15306 or 15308, in addition to any other penalty provided by law. Downward Speed Zoning Section 22358.5. It is the intent of the Legislature that physical conditions such as width, curvature, grade and surface conditions, or any other condition readily apparent to a driver, in the absence of other factors, would ' not require special downward speed zoning, as the basic rule of Section 22350 is sufficient regulation as to such conditions. Boundary Line Streets Section 22359. With respect to boundary line streets and highways where portions thereof are within different jurisdictions, no ordinance adopted under Sections 22357 and 22358 shall be effective as to any such portion until all authorities having jurisdiction of the portions of the street concerned have Engineering and Traffic Survey 19 City of Rosemead approved the same. This section shall not apply in the case of boundary line streets consisting of separate roadways within different jurisdictions. Speedtrap Prohibition Section 40801. No peace officer or other person shall use a speedtrap in arresting, or participating or assisting in the arrest of, any person for any alleged violation of this code nor shall any speedtrap be used in securing evidence as to the speed of any vehicle for the purpose of an arrest or prosecution under this code. Speedtrap Section 40802. (a) A "speedtrap" is either of the following: (1) A particular section of a highway measured as to distance and with boundaries marked, designated, or otherwise determined in order that the speed of a vehicle may be calculated by securing the time it takes the vehicle to travel the known distance. (2) A particular section of a highway with a prima facie speed limit that is provided by this code or by local ordinance under subparagraph (A) of paragraph (2) of subdivision (a) of Section 22352, or established under Section 22354, 22357, 22358, or 22358.3, if that prima facie speed limit is not justified by an engineering and traffic survey conducted within 5 years prior to the date of the alleged violation, and enforcement of the speed limit involves the use of radar or any other electronic device that measures the speed of moving object. This paragraph does not apply to a local street, road, or school zone. (b)(1) For purposes of this section, a local street or road is defined by the latest functional usage and federal-aid system maps submitted to the federal Highway Administration, except that when these maps have not been submitted, or when the street or road is not shown on the maps, a "local street or road" means a street or road that primarily provides access to abutting residential property and meets the following three conditions: (A) Roadway width of not more than 40 feet. (B) Not more than one-half mile of a uninterrupted length. Interruptions shall include official traffic control devices as defined in Section 445. (C) Not more than one traffic lane in each direction. (2) For purposes of this section "School Zone" means that area of road contiguous to a school building or the grounds thereof, and on which is posted a standard "SCHOOL" warning sign, while children are going to or leaving the school wither during school hours or during the noon recess period. (c)(1) When all the following criteria are met, paragraph (2) of this subdivision shall be applicable and subdivision (a) shall not be applicable: Engineering and Traffic Survey 20 City of Rosemead 1 leted a ccessfull com i i th it ti h i ffi Wh d d th (A) y p ng on as su , cer ssu e c a ar s use e o en ra radar operator course of not less than 24 hours on the use of police traffic radar, and the course was approved and certified by the Commission on Peace Officer Standards and Training. (B) When laser or any other electronic device is used to measure the speed of moving h e objects, the officer issuing the notice to appear has successfully completed t training required in subparagraph (A) and an additional training course of not less than 2 hours approved and certified by the Commission on Peace Officer Standards and Training. (C)(i) The prosecution proved that the officer complied with subparagraphs (A) and (B) and that an engineering and traffic survey has been conducted in accordance with subparagraph (B) of paragraph (2). The prosecution proved that, prior to the officer issuing the notice to appear, the officer establish that the radar, laser, or other electronic device conformed to the requirements of subparagraph (D). (ii) The prosecution proved the speed of the accused was unsafe for the condition present at the time of alleged violation unless the citation was for a violation of Section 22349, 22356, or 22406. (D) The radar, laser, or other electronic device used to measure the speed of the accused meets or exceeds the minimal operational standards of the National Traffic Highway Safety Administration, and has been calibrated within the 3 years prior to the date of the alleged violation by an independent certified laser or radar repair and testing or calibration facility. " " speedtrap is either of the following: (2) A (A) A particular section of a highway measured as to distance and with boundaries marked, designated, or otherwise determined in order that the speed of a vehicle may be calculated by securing the time it takes the vehicle to travel the known distance. (B)(i) A particular section of a highway or state highway with a prima facie speed limit that is provided by this code or by local ordinance under subparagraph (A) of paragraph (2) of subdivision (a) of Section 22352, or established under Section 22354, 22357, 22358, or 22358.3, if that prima facie speed limit is not justified by an engineering and traffic survey conducted within one of the following time periods, prior to the date of the alleged violation, and enforcement of speed limit involves the use of radar or any other electronic device that measures the speed of moving objects: (1) Except as specified in subclause (II), 7 years. 1 (11) If an engineering and traffic survey was conducted more than 7 years prior to the date of the alleged violation, and a registered engineer evaluates the section of the highway and determines that no significant changes in roadway or traffic condition have occurred including, but not limited to, changes in adjoining property or land use, roadway width, or traffic volume, 10 years. (ii) This subparagraph does not apply to a local street, road, or school zone. Engineering and Traffic Survey 21 City of Rosemead Speedtrap Evidence Section 40803. (a) No evidence as to the speed of a vehicle upon a highway shall be admitted in any court upon the trial of any person in any prosecution under this code upon a charge involving the speed of a vehicle when the evidence is based upon or obtained from or by the maintenance or use of a speedtrap. (b) In any prosecution under this code of a charge involving the speed of a vehicle, where enforcement involves the use of radar or other electronic devices which measure the speed of moving objects, the prosecution shall establish, as part of its prima facie case, that the evidence or testimony presented is not based upon a speedtrap as defined in paragraph (2) of subdivision (a) of Section 40802. (c) When a traffic and engineering survey is required pursuant to paragraph (2) of subdivision (a) of Section 40802, evidence that a traffic and engineering survey has been conducted within 5 years of the date of the alleged violation or evidence that the offense was committed on a local street or road as defined in paragraph (2) of subdivision (a) of Section 40802 shall constitute a prima facie case that the evidence or testimony is not based upon a speedtrap as defined in paragraph (2) subdivision (a) of Section 40802. 1 1 1 Engineering and Traffic Survey 22 City of Rosemead CITY OF ROSEMEAD E~i ENGINEERING AND TRAFFIC SURVEY STREET DE ADELENA STREET CERTIFICATION DATE 3/7/2006 FROM ROSEMEAD BLVD TO ELLIS LANE SPEED FACTORS Date of Speed Survey 11/3/2005 Posted Speed Limit 30 mph Time of Speed Survey 1:OOPM Speed Justification 50th Percentile Speed (Mean Speed) 30 mph CLOSEST TO 85TH 85th Percentile Speed 32 mph 10 mph Pace Speed 26-35 Recommended Speed Limit 30 mph 1 Percentage of Vehicles in Pace 91 Number of Survey Samples 47 ' COLLISION HISTORY Number of Years Studied 3 years Total Collisions 4 1 Annual Collision Rate 1.333 accidents/year Collisions per Million Vehicle Miles 4.439 1 1 1 TRAFFIC FACTORS Average Daily Traffic 1,112 Date Counted 11/8/2005 Number of Lanes TWO LANES,UNSTRIPED Type of Traffic Control STOP @ ELLIS, ROSEMEAD BLVD, RIO HONDO Crosswalks? @ ALL STOPS Pedestrian Traffic LIGHT Truck Traffic LIGHT On-Street Parking YES, BOTH SIDES - RESTRICTED Sidewalks? YES, BOTH SIDES Driveways? YES, BOTH SIDES ROADWAY FACTORS Length of Segment 0.740 miles Width 40 feet Vertical Curve? NONE Horizontal Curve? NONE Visibility GOOD, EXCEPT AT DRIVEWAYS Roadway Conditions GOOD Lighting YES, MOST ON SOUTH SIDE Adjacent Land Use RESIDENTIAL Field Study By JA Checked By VM CERTIFICATION: I, Vanessa Munoz, do hereby certify that this Engineering and Traffic Survey within the City of Rosemead was performed under my supervision and is accurate and complete. I am duly registered in the State of California as a Professional Engineer (Traffic). Vanessa 3 Number 1 CITY OF ROSEMEAD F__2] ENGINEERING AND TRAFFIC SURVEY STREET DEL MAR AVENUE CERTIFICATION DATE 3/7/2006 FROM GRAVES AVENUE TO GARVEY AVENUE SPEED FACTORS Date of Speed Survey 11/3/2005 Posted Speed Limit 35/25" mph Time of Speed Survey 9:OOAM Speed Justification 50th Percentile Speed (Mean Speed) 35 mph HIDDEN DWYS.,CHG. IN LNS, PEDS, 85th Percentile Speed 38 mph SCHOOL XWALK 10 mph Pace Speed 30-39 Recommended Speed Limit 35/25" mph 1 Percentage of Vehicles in Pace 85 Number of Survey Samples 121 COLLISION HISTORY Number of Years Studied 3 years Total Collisions 5 Annual Collision Rate 1.667 accidents/year Collisions per Million Vehicle Miles 0.550 TRAFFIC FACTORS Average Daily Traffic 16,595 Date Counted 11/10/2005 Number of Lanes 4 LANES-UNDIV., 2 LANES UNDIV. N. OF WASOLA Type of Traffic Control T.S. @ GRAVES, GARVEY Crosswalks? @ ALL T.S.,HIGHCLIFF Pedestrian Traffic MODERATE Truck Traffic LIGHT On-Street Parking BOTH SIDES Sidewalks? YES, BOTH SIDES Driveways? YES, BOTH SIDES ROADWAY FACTORS Length of Segment 0.500 miles Width 64 feet Vertical Curve? SLIGHT Horizontal Curve? NONE Visibility GOOD, EXCEPT AT DRIVEWAYS ' Roadway Conditions FAIR Lighting YES, BOTH SIDES Adjacent Land Use RESIDENTIAL, SCHOOL Field Study By ST Checked By VM CERTIFICATION: 1, Vanessa Munoz, do hereby certify that this Engineering and Traffic Survey within the City of Rosemead was performed under my supervision and is accurate and complete. I am duly registered in the State of California as a Professional Engineer (Traffic). 7 TE 2341 Vanessa Munoz Date State Registration Number CITY OF ROSEMEAD ENGINEERING AND TRAFFIC SURVEY STREET DEL MAR AVENUE FROM GARVEY AVENUE CERTIFICATION DATE 3/7/2006 TO HELLMAN AVENUE SPEED FACTORS Date of Speed Survey 11/3/2005 Posted Speed Limit 40 mph Time of Speed Survey 10:OOAM Speed Justification 50th Percentile Speed (Mean Speed) 38 mph CLOSEST TO 85TH 85th Percentile Speed 42 mph 10 mph Pace Speed 33-42 Recommended Speed Limit 40 mph Percentage of Vehicles in Pace 78 Number of Survey Samples 209 COLLISION HISTORY Number of Years Studied 3 years Total Collisions 4 Annual Collision Rate 1.333 accidents/year Collisions per Million Vehicle Miles 0.320 1 J 1 TRAFFIC FACTORS Average Daily Traffic 22,803 Date Counted 11/10/2005 Number of Lanes 4 LANES - UNDIVIDED Type of Traffic Control T.S. @ GARVEY, EMERSON, HELLMAN Crosswalks? @ ALL T.S. Pedestrian Traffic LIGHT Truck Traffic LIGHT On-Street Parking YES, BOTH SIDES Sidewalks? YES, BOTH SIDES Driveways? YES, BOTH SIDES ROADWAY FACTORS Length of Segment 0.500 miles Width 64 feet Vertical Curve? YES Horizontal Curve? NONE Visibility GOOD, EXCEPT AT DRIVEWAYS Roadway Conditions FAIR Lighting SOME ON EAST SIDE Adjacent Land Use COMMERCIAL Field Study By ST Checked By VM CERTIFICATION: 1, Vanessa Munoz, do hereby certify that this Engineering and Traff ic Survey within the City of Rosemead was performed under my supervision and is accurate and complete. I am duly registered in the State of California as a Professional Engineer (Traffic). 3/~/0( Vanessa Munoz State Registration Number r"1 LJ 1 CITY OF ROSEMEAD ( g.ll ENGINEERING AND TRAFFIC SURVEY STREET EARLSWOOD DRIVE FROM IVAR AVENUE CERTIFICATION DATE 3/7/2006 TO ROSEMEAD PLACE SPEED FACTORS Date of Speed Survey 11/10/2005 Posted Speed Limit 30 mph Time of Speed Survey 10:OOAM Speed Justification 50th Percentile Speed (Mean Speed) 27 mph CLOSEST TO 85TH 85th Percentile Speed 30 mph 10 mph Pace Speed 23-32 Recommended Speed Limit 30 mph Percentage of Vehicles in Pace 89 Number of Survey Samples 72 COLLISION HISTORY Number of Years Studied 3 years Total Collisions 0 Annual Collision Rate 0 accidents/year Collisions per Million Vehicle Miles 0.000 TRAFFIC FACTORS Average Daily Traffic 2,372 Date Counted 11/10/2005 Number of Lanes 2 LANES - UNDIVIDED 1 Type of Traffic Control STOP @ IVAR Crosswalks? NONE ' Pedestrian Traffic Truck Traffic LIGHT LIGHT On-Street Parking YES, BOTH SIDES - RESTRICTED Sidewalks? NONE ' Driveways? YES, BOTH SIDES ROADWAY FACTORS Length of Segment Width 1 1 Vertical Curve? Horizontal Curve? Visibility Roadway Conditions Lighting Adjacent Land Use 0.260 miles 36 feet NONE YES, NORTH AND SOUTH END GOOD, EXCEPT AT DRIVEWAYS GOOD YES, BOTH SIDES RESIDENTIAL Field Study By JA Checked By VM CERTIFICATION: I, Vanessa Munoz, do hereby certify that this Engineering and Traffic Survey within the City of Rosemead was performed under my supervision and is accurate and complete. I am duly registered in the State of California as a Professional Engineer (Traffic). n / Munoz State Registration Number CITY OF ROSEMEAD 0 ENGINEERING AND TRAFFIC SURVEY STREET ELLIS LANE CERTIFICATION DATE 3/7/2006 FROM OLNEY STREET TO TEMPLE CITY BLVD SPEED FACTORS Date of Speed Survey 1/10/2006 Posted Speed Limit 30 mph Time of Speed Survey 2:OOPM Speed Justification 50th Percentile Speed (Mean Speed) 29 mph CLOSEST TO 85TH 85th Percentile Speed 32 mph 10 mph Pace Speed 23-32 Recommended Speed Limit 30 mph Percentage of Vehicles in Pace 83 Number of Survey Samples 131 COLLISION HISTORY Number of Years Studied 3 years Total Collisions 0 ' Annual Collision Rate 0 accidents/year Collisions per Million Vehicle Miles 0.000 TRAFFIC FACTORS Average Daily Traffic 1,814 Date Counted 11/17/2005 Number of Lanes 2 LANES - UNDIVIDED ' Type of Traff ic Control STOPS @ TEMPLE CITY, OLNEY, MARSHALL Crosswalks? @ MARSHALL ' Pedestrian Traffic Truck Traffic LIGHT LIGHT On-Street Parking YES, BOTH SIDES - RESTRICTED Sidewalks? YES, BOTH SIDES ' Driveways? YES, BOTH SIDES ROADWAY FACTORS Length of Segment 0.510 miles Width 40 feet 1 Vertical Curve? NONE Horizontal Curve? YES, AT RALPH AVE Visibility GOOD, EXCEPT AT DRIVEWAYS Roadway Conditions GOOD Lighting WEST SIDE ONLY Adjacent Land Use RESIDENTIAL Field Study By JA Checked By VM CERTIFICATION: I, Vanessa Munoz, do hereby certify that this Engineering and Traffic Survey within the City of Rosemead was performed under my supervision and is accurate and complete. I am duly registered in the State f California as a Professional Engineer (Traffic). 3 Q ' TE 2341 Vanes Munoz Date State Registration Number P 1 CITY OF ROSEMEAD ENGINEERING AND TRAFFIC SURVEY STREET EMERSON PLACE CERTIFICATION DATE 3/7/2006 FROM NEW AVENUE TO SAN GABRIEL BLVD SPEED FACTORS Date of Speed Survey 11/2/2005 Posted Speed Limit 30/25" mph Time of Speed Survey 9:OOAM Speed Justification 50th Percentile Speed (Mean Speed) 30 mph CLOSEST TO 85TH 85th Percentile Speed 32 mph 10 mph Pace Speed 25-34 Recommended Speed Limit 30/25"" mph Percentage of Vehicles in Pace 90 Number of Survey Samples 71 COLLISION HISTORY Number of Years Studied 3 years Total Collisions 0 Annual Collision Rate 0 accidents/year Collisions per Million Vehicle Miles 0.000 1 1 11 1 1 TRAFFIC FACTORS Average Daily Traffic 5,507 Date Counted 11/17/2005 Number of Lanes 2 LANES - UNDIVIDED Type of Traffic Control T.S. @ NEW AVE, DEL MAR, SAN GABRIEL Crosswalks? ALL T.S.,STOPS , PROSPECT,EVELYN Pedestrian Traffic MODERATE Truck Traffic LIGHT On-Street Parking YES, BOTH SIDES Sidewalks? YES, BOTH SIDES Driveways? BOTH SIDES, MANY ROADWAY FACTORS Length of Segment 1.000 miles Width 37 feet Vertical Curve? YES,BET DEL MAR,KELBURN Horizontal Curve? YES, SLIGHT AT JACKSON Visibility GOOD, EXCEPT AT DRIVEWAYS Roadway Conditions FAIR Lighting NORTH SIDE ONLY Adjacent Land Use RESIDENTIAL,SCHOOL,PARK i Field Study By ST Checked By VM CERTIFICATION: I, Vanessa Munoz, do hereby certify that this Engineering and Traffic Survey within the City of Rosemead was performed under my supervision and is accurate and complete. I am duly registered in the States of California as a Professional Engineer (Traffic). Vanessa Munoz State Registration Number 1 11 t 1 1 1 1 1 CITY OF ROSEMEAD 0 ENGINEERING AND TRAFFIC SURVEY STREET ENCINITA AVENUE CERTIFICATION DATE 3012006 FROM MISSION ROAD TO LOWER A7USA ROAD Date of Speed Survey 11/2/2005 Posted Speed Limit 30/25'" mph Time of Speed Survey 2:OOPM Speed Justification 50th Percentile Speed (Mean Speed) 29 mph CLOSEST TO 85TH 85th Percentile Speed 32 mph 10 mph Pace Speed 24-33 Recommended Speed Limit 30/25" mph Percentage of Vehicles In Pace 89 Number of Survey Samples 66 COLLISION HISTORY Number of Years Studied 3 years Total Collisions 3 Annual Collision Rate 1 accidents/year Collisions per Million Vehicle Miles 0.919 TRAFFIC FACTORS Average Daily Traffic 7,842 Date Counted 11/8/2005 Number of Lanes 2 LANES - UNDIVIDED Type of Traffic Control T.S. @ LOWER AZUSA, MISSION ; STOP 0 RIO DELL Crosswalks? @ ALL T.S.,STOPS, PITKIN, ROSE Pedestrian Traffic HEAVY Truck Traffic LIGHT On-Street Parking BOTH SIDES Sidewalks? YES, BOTH SIDES Driveways? YES, BOTH SIDES ROADWAY FACTORS Length of Segment 0.380 miles Width 45 feet Vertical Curve? NONE Horizontal Curve? NONE Visibility GOOD, EXCEPT AT DRIVEWAYS Roadway Conditions FAIR Lighting YES, BOTH SIDES Adjacent Land Use RESIDENTIAL, SCHOOL Field Study By ST Checked By VM CERTIFICATION: I, Vanessa Munoz, do hereby certify that this Engineering and Traffic Survey within the City of Rosemead was performed under my supervision and is accurate and complete. I am duly registered in the State of California as a Professional Engineer (Traffic). Munoz State Registration Number 1 CITY OF ROSEMEAD F ENGINEERING AND TRAFFIC SURVEY STREET GARVEY AVENUE CERTIFICATION DATE 317/2006 FROM WEST CITY LIMIT TO DEL MAR AVENUE SPEED FACTORS Date of Speed Survey 11/10/2005 Posted Speed Limit 35 mph Time of Speed Survey 3:OOPM Speed Justification 50th Percentile Speed (Mean Speed) 34 mph HIDDEN DWYS., CURB PKG., TRUCK ' 85th Percentile Speed 38 mph TRAFFIC 10 mph Pace Speed 30-39 Recommended Speed Limit 35 mph Percentage of Vehicles in Pace 72 ' Number of Survey Samples 204 COLLISION HISTORY Number of Years Studied 3 years Total Collisions 4 Annual Collision Rate 1.333 accidents/year Collisions per Million Vehicle Miles 0.277 TRAFFIC FACTORS Average Daily Traffic 26,874 Date Counted 11/10/2005 Number of Lanes 4 LANES - DIVIDED Type of Traffic Control T.S. @ DEL MAR, JACKSON Crosswalks? @ ALL T.S. Pedestrian Traffic LIGHT ' Truck Traffic MODERATE On-Street Parking BOTH SIDES - RESTRICTED Sidewalks? YES, BOTH SIDES Driveways? BOTH SIDES, MANY ROADWAY FACTORS Length of Segment 0.490 miles Width 76 feet ' Vertical Curve? YES Horizontal Curve? NONE Visibility GOOD, EXCEPT AT DRIVEWAYS Roadway Conditions BOTH SIDES Lighting YES, BOTH SIDES Adjacent Land Use HEAVY COMMERCIAL Field Study By ST Checked By VM CERTIFICATION: I, Vanessa Munoz, do hereby certify that this Engineering and Traffic Survey within the City of Rosemead was performed under my supervision and is accurate and complete. I am duly registered in the State of California as a Professional Engineer (Traffic). 3 6 TE 2341 Vanessa Munoz Date State Registration Number CITY OF ROSEM EAD U ENGINEERING AND TRAFFIC SURVEY STREET GARVEY AVENUE CERTIFICATION DATE 3/7/2006 ' FROM DEL MAR AVENUE TO SAN GABRIEL BLVD SPEED FACTORS ' Date of Speed Survey 11/10/2005 Posted Speed Limit 35 mph Time of Speed Survey 2:00PM Speed Justification 50th Percentile Speed (Mean Speed) 35 mph HIDDEN DWYS., CURB PKG., TRUCK 85th Percentile Speed 39 mph TRAFFIC 10 mph Pace Speed 30-39 Recommended Speed Limit 35 mph Percentage of Vehicles in Pace 75 ' Number of Survey Samples 210 COLLISION HISTORY Number of Years Studied 3 years Total Collisions 10 Annual Collision Rate 3.333 accidents/year ' Collisions per Million Vehicle Miles 0.664 TRAFFIC FACTORS Average Daily Traffic 26,980 Date Counted 11/10/2005 Number of Lanes 4 LANES - DIVIDED ' Type of Traffic Control T.S. @ SAN GABRIEL, KELBURN, DEL MAR Crosswalks? @ ALL T.S. ' Pedestrian Traffic Truck Traffic LIGHT MODERATE On-Street Parking YES, BOTH SIDES- RESTRICTED Sidewalks? YES, BOTH SIDES Driveways? BOTH SIDES, MANY ROADWAY FACTORS ' Length of Segment 0.510 miles Width 76 feet Vertical Curve? YES Horizontal Curve? NONE Visibility GOOD, EXCEPT AT DRIVEWAYS ' Roadway Conditions GOOD Lighting YES, BOTH SIDES Adjacent Land Use HEAVY COMMERCIAL Field Study By ST Checked By VM CERTIFICATION: I, Vanessa Munoz, do hereby certify that this Engineering and Traffic Survey within ' the City of Rosemead was performed under my supervision and is accurate and complete. I am duly registered in the State of California as a Professional Engineer (Traffic). TE 2341 Vanes a Munoz Dat State Registration Number 1 1 CITY OF ROSEMEAD 10 ENGINEERING AND TRAFFIC SURVEY STREET GARVEY AVENUE CERTIFICATION DATE 3/7/2006 FROM SAN GABRIEL BLVD TO WALNUT GROVE AVENUE SPEED FACTORS Date of Speed Survey 11/10/2005 Posted Speed Limit 35 mph Time of Speed Survey 1:OOPM Speed Justification 50th Percentile Speed (Mean Speed) 34 mph HIDDEN DWYS., CURB PKG., TRUCK ' 85th Percentile Speed 38 mph TRAFFIC, PEDS. 10 mph Pace Speed 29-38 Recommended Speed Limit 35 mph Percentage of Vehicles in Pace Number of Surve les Sam 76 205 y p COLLISION HISTORY ' Number of Years Studied 3 years Total Collisions 12 Annual Collision Rate 4 accidents/year Collisions per Million Vehicle Miles 0.815 TRAFFIC FACTORS ' Average Daily Traff ic 27,431 Date Counted 11/17/2005 Number of Lanes 4 LANES - DIVIDED, 2WY LT LANES, LT POCKETS ' Type of Traffic Control T.S. @ WALNUT GROVE, DELTA, SAN GABRIEL Crosswalks? @ ALL T.S. Pedestrian Traffic MODERATE ' Truck Traffic MODERATE On-Street Parking BOTH SIDES - RESTRICTED Sidewalks? YES, BOTH SIDES ' Driveways? BOTH SIDES, MANY ROADWAY FACTORS ' Length of Segment 0.490 miles Width 76 feet ' Vertical Curve? NONE Horizontal Curve? NONE Visibility GOOD, EXCEPT AT DRIVEWAYS ' Roadway Conditions FAIR Lighting YES, BOTH SIDES ' Adjacent Land Use HEAVY COMMERCIAL Field Study By ST Checked By VM CERTIFICATION: 1, Vanessa Munoz, do hereby certify that this Engineering and Traffic Survey within ' the City of Rosemead was performed under my supervision and is accurate and complete. I am duly registered in the State of California as a Professional Engineer (Traffic). ' 2 .3 TE 2341 Vanedsa Murrdz Date State Registration Number CITY OF ROSEMEAD F-1 11 ENGINEERING AND TRAFFIC SURVEY STREET GARVEY AVENUE CERTIFICATION DATE 3/7/2006 ' FROM WALNUT GROVE AVENUE TO EAST CITY LIMIT SPEED FACTORS ' Date of Speed Survey 11/9/2005 Posted Speed Limit 35 mph Time of Speed Survey 3:OOPM Speed Justification ' 50th Percentile Speed (Mean Speed) 85th Percentile Speed 35 mph 39 mph HIDDEN DWYS., CURB PKG., TRUCK TRAFFIC,ADJ SEG SPEED 10 mph Pace Speed 29-38 Recommended Speed Limit 35 mph Percentage of Vehicles in Pace 71 ' Number of Survey Samples 204 ' COLLISION HISTORY Number of Years Studied 3 years Total Collisions 13 ' Annual Collision Rate 4.333 accidents/year Collisions per Million Vehicle Miles 0.712 1 1 1 1 TRAFFIC FACTORS Average Daily Traffic 28,277 Date Counted 11/10/2005 Number of Lanes 4 LANES - DIVIDED W/LT POCKETS Type of Traffic Control T.S. @ LEE,COMM. CTR,ROSEMEAD PL,MUSCATEL,WAL GRV Crosswalks? @ ALL T.S. Pedestrian Traffic LIGHT Truck Traffic MODERATE On-Street Parking BOTH SIDES - RESTRICTED Sidewalks? YES, BOTH SIDES Driveways? BOTH SIDES, MANY ROADWAY FACTORS Length of Segment 0.590 miles Width 76 feet Vertical Curve? NONE Horizontal Curve? NONE Visibility GOOD, EXCEPT AT DRIVEWAYS Roadway Conditions FAIR Lighting YES, BOTH SIDES Adjacent Land Use HEAVY COMMERCIAL Field Study By ST Checked By VM CERTIFICATION: I, Vanessa Munoz, do hereby certify that this Engineering and Traffic Survey within the City of Rosemead was performed under my supervision and is accurate and complete. I am duly registered in the State of California as a Professional Engineer (Traffic). CITY OF ROSEMEAD ENGINEERING AND TRAFFIC SURVEY STREET GRAND AVENUE CERTIFICATION DATE 3/7/2006 FROM CHARLOTTE AVENUE TO ROSEMEAD BLVD 12 Date of Speed Survey 11/9/2005 Posted Speed Limit 35 mph Time of Speed Survey 11:OOAM Speed Justification ' 50th Percentile Speed (Mean Speed) 85th Percentile Speed 34 mph 38 mph HIDDEN DWYS, HORIZ. CURVE, NO LT. LANES 10 mph Pace Speed 29-38 Recommended Speed Limit 35 mph Percentage of Vehicles in Pace 81 Number of Survey Samples 62 ' COLLISION HISTORY Number of Years Studied 3 years Total Collisions 2 Annual Collision Rate 0.667 accidents/year Collisions per Million Vehicle Mlles 0.519 TRAFFIC FACTORS Average Daily Traffic 3,487 Date Counted 11/8/2005 Number of Lanes 2 LANES - UNDIVIDED ' Type of Traffic Control STOP @ ROSEMEAD, WALNUT GROVE Crosswalks? @ ALL STOPS ' Pedestrian Traffic Truck Traffic LIGHT LIGHT On-Street Parking BOTH SIDES Sidewalks? YES, BOTH SIDES ' Driveways? MAINLY ON SOUTH SIDE ' ROADWAY FACTORS Length of Segment 1.010 miles Width 40 feet ' Vertical Curve? NONE Horizontal Curve? YES, AT MUSKATEL,ROSEMEAD Visibility GOOD, EXCEPT AT DRIVEWAYS t Roadway Conditions FAIR, NO LEFT TURN LANES Lighting YES, BOTH SIDES t Adjacent Land Use RESIDENTIAL, COMMERCIAL Field Study By ST Checked By VM CERTIFICATION: I, Vanessa Munoz, do hereby certify that this Engineering and Traffic Survey within ' the City of Rosemead was performed under my supervision and is accurate and complete. I am duly registered in the State of California as a Professional Engineer (Traffic). ' Q TE 2341 Vanessa unoz ate State Registration Number CITY OF ROSEMEAD F-1 3] ENGINEERING AND TRAFFIC SURVEY STREET HELLMAN AVENUE FROM NEW AVENUE CERTIFICATION DATE 3n/2006 TO WALNUT GROVE AVENUE SPEED FACTORS Date of Speed Survey 11/2/2005 Posted Speed Limit 30 mph Time of Speed Survey 1:OOPM Speed Justification 50th Percentile Speed (Mean Speed) 29 mph HIDDEN DWYS., NO LT. LANES, VERT. 85th Percentile Speed 33 mph CURVE 10 mph Pace Speed 25-34 Recommended Speed Limit 30 mph Percentage of Vehicles in Pace 86 Number of Survey Samples 102 COLLISION HISTORY Number of Years Studied 3 years Total Collisions 15 Annual Collision Rate 5 accidents/year Collisions per Million Vehicle Miles 1.846 TRAFFIC FACTORS ' Average Daily Traffic 4,946 Date Counted 11/10/2005 Number of Lanes 2 LANES - UNDIVIDED Type of Traffic Control T.S. @WALNUT GRV.,SAN GABRIEL,DEL MAR,JACKSON,NEW Crosswalks? @ ALL T.S. ' Pedestrian Traffic Truck Traffic LIGHT LIGHT On-Street Parking BOTH SIDES Sidewalks? YES, BOTH SIDES ' Driveways? YES, BOTH SIDES ROADWAY FACTORS Length of Segment 1.500 miles Width 38 feet ' Vertical Curve? YES,AT KELBURN Horizontal Curve? NONE Visibility GOOD, EXCEPT AT DRIVEWAYS ' Roadway Conditions FAIR, NO LEFT TURN LANES Lighting YES, BOTH SIDES ' Adjacent Land Use RESIDENTIAL, COMMERCIAL Field Study By ST Checked By VM CERTIFICATION: I, Vanessa Munoz, do hereby certify that this Engineering and Traffic Survey within ' the City of Rosemead was performed under my supervision and is accurate and complete. I am duly registered in the Stat of California as a Professional Engineer (Traffic). ' TE2341 Vanessa Munoz Date State Registration Number CITY OF ROSEMEAD 14 ENGINEERING AND TRAFFIC SURVEY STREET JACKSON AVENUE CERTIFICATION DATE 3/7/2006 FROM GRAVES AVENUE TO GARVEY AVENUE SPEED FACTORS Date of Speed Survey 11/2/2005 Posted Speed Limit 30/25"" mph Time of Speed Survey 3:OOPM Speed Justification 50th Percentile Speed (Mean Speed) 30 mph HIDDEN DWYS., PEDS., VERT. CURVE 85th Percentile Speed 35 mph 10 mph Pace Speed 26-35 Recommended Speed Limit 30/25" mph Percentage of Vehicles in Pace 79 Number of Survey Samples 72 COLLISION HISTORY Number of Years Studied 3 years Total Collisions 1 Annual Collision Rate 0.333 accidents/year Collisions per Million Vehicle Miles 0.551 ' TRAFFIC FACTORS Average Daily Traffic 3,315 Date Counted 11/10/2005 Number of Lanes 2 LANES - UNDIVIDED ' Type of Traffic Control T.S. @ GRAVES ; STOP @ FERN, GRAVES Crosswalks? @ ALL T.S.,STOPS, EGLEY Pedestrian Traffic Truck Traffic MODERATE NONE On-Street Parking BOTH SIDES - RESTRICTED Sidewalks? YES, BOTH SIDES Driveways? BOTH SIDES, MANY ' ROADWAY FACTORS Length of Segment 0.500 miles Width 36 feet ' Vertical Curve? YES,AT NORTH OF GRAVES AV Horizontal Curve? NONE t Visibility Roadway Conditions GOOD, EXCEPT AT DRIVEWAYS FAIR Lighting WEST SIDE ONLY ' Adjacent Land Use RESIDENTIAL, SCHOOL Field Study By ST Checked By VM CERTIFICATION: I, Vanessa Munoz, do hereby certify that this Engineering and Traffic Survey within the City of Rosemead was performed under my supervision and is accurate and complete. I am duly registered in the State of California as a Professional Engineer (Traffic). 1 i )6 3 X 1 ' ' 2~~ '4 4 TE 2341 Vanes unoz Date State Registration Number CITY OF ROSEMEAD 15 ENGINEERING AND TRAFFIC SURVEY STREET LOFTUS STREET CERTIFICATION DATE 3/7/2006 FROM TEMPLE CITY BLVD TO EAST CITY LIMIT Date of Speed Survey 11/2/2005 Posted Speed Limit 35 mph Time of Speed Survey 1:OOPM Speed Justification 50th Percentile Speed (Mean Speed) 35 mph ADJ. AGENCY SPEED, HIDDEN DWYS., 85th Percentile Speed 39 mph VERT. CURVE, 10 mph Pace Speed 30-39 Recommended Speed Limit 35 mph Percentage of Vehicles In Pace 75 Number of Survey Samples 138 COLLISION HISTORY Number of Years Studied 3 years Total Collisions 1 Annual Collision Rate 0.333 accidents/year Collisions per Million Vehicle Miles 0.492 TRAFFIC FACTORS ' Average Daily Traffic 14,283 Date Counted 11/8/2005 Number of Lanes 4 LANES - UNDIVIDED ' Type of Traffic Control T.S. 0 TEMPLE CITY BLVD Crosswalks? @ ALL T.S. ' Pedestrian Traffic Truck Traffic LIGHT LIGHT On-Street Parking BOTH SIDES-RESTRICTED Sidewalks? YES, BOTH SIDES ' Driveways? YES, BOTH SIDES ROADWAY FACTORS ' Length of Segment 0.130 miles Width 60 feet ' Vertical Curve? YES,AT EAST END Horizontal Curve? NONE Visibility GOOD, EXCEPT AT DRIVEWAYS ' Roadway Conditions GOOD Lighting YES, BOTH SIDES ' Adjacent Land Use RESIDENTIAL Field Study By JA Checked By VM CERTIFICATION: I, Vanessa Munoz, do hereby certify that this Engineering and Traffic Survey within ' the City of Rosemead was performed under my supervision and is accurate and complete. I am duly registered in the State of California as a Professional Engineer (Traffic). TE 2341 Vanessa Munoz Date State Registration Number CITY OF ROSEMEAD 16 ENGINEERING AND TRAFFIC SURVEY STREET LOWER AZUSA ROAD CERTIFICATION DATE 317/2006 FROM ROSEMEAD BLVD TO ENCINITA AVENUE SPEED FACTORS Date of Speed Survey 11/2/2005 Posted Speed Limit 40/25"' mph Time of Speed Survey 3:OOPM Speed Justification 50th Percentile Speed (Mean Speed) 39 mph CLOSEST TO 85TH 85th Percentile Speed 42 mph 10 mph Pace Speed 34-43 Recommended Speed Limit 40/25'" mph Percentage of Vehicles in Pace 79 Number of Survey Samples 145 COLLISION HISTORY Number of Years Studied 3 years Total Collisions 0 Annual Collision Rate 0 accidents/year Collisions per Million Vehicle Miles 0.000 TRAFFIC FACTORS Average Daily Traffic 14,542 Date Counted 11/8/2005 Number of Lanes 4 LANES - UNDIVIDED Type of Traffic Control T.S. @ ROSMEAD, ENCINITA Crosswalks? @ ALL T.S. Pedestrian Traffic LIGHT Truck Traffic LIGHT On-Street Parking NO PARKING Sidewalks? YES, BOTH SIDES Driveways? YES, NORTH SIDE MANY ROADWAY FACTORS Length of Segment Width Vertical Curve? Horizontal Curve? Visibility Roadway Conditions Lighting Adjacent Land Use 0.330 miles 56 feet NONE NONE GOOD, EXCEPT AT DRIVEWAYS GOOD YES, BOTH SIDES RESIDENTIAL, SCHOOL Field Study By JA Checked By VM CERTIFICATION: I, Vanessa Munoz, do hereby certify that this Engineering and Traffic Survey within the City of Rosemead was performed under my supervision and is accurate and complete. I am duly registered in the State of California as a Professional Engineer (Traffic). Vanessa Munoz 3A3~O& State Registration Number 1 CITY OF ROSEMEAD I 17 ENGINEERING AND TRAFFIC SURVEY STREET MARSHALL STREET CERTIFICATION DATE 3/7/2006 FROM DELTA AVENUE TO WALNUT GROVE AVENUE Date of Speed Survey 11/8/2005 Posted Speed Limit 35 mph Time of Speed Survey 10:OOAM Speed Justification 50th Percentile Speed (Mean Speed) 35 mph ADJ. SEG SPEED., HIDDEN DWYS., NO LT. 85th Percentile Speed 38 mph LANES 10 mph Pace Speed 29-38 Recommended Speed Limit 35 mph Percentage of Vehicles in Pace 88 Number of Survey Samples 89 COLLISION HISTORY Number of Years Studied 3 years Total Collisions 0 Annual Collision Rate 0 accidents/year Collisions per Million Vehicle Miles 0.000 TRAFFIC FACTORS Average Daily Traffic Number of Lanes Type of Traffic Control Crosswalks? Pedestrian Traffic Truck Traffic On-Street Parking Sidewalks? Driveways? 6,030 Date Counted 2 LANES - UNDIVIDED T.S. @ WALNUT GROVE ALL T.S. LIGHT LIGHT BOTH SIDES - RESTRICTED YES, BOTH SIDES YES, BOTH SIDES 11/8/2005 ' ROADWAY FACTORS Length of Segment 0.250 miles Width 40 feet ' Vertical Curve? NONE Horizontal Curve? NONE Visibility GOOD, EXCEPT AT DRIVEWAYS ' Roadway Conditions GOOD, NO LEFT TURN LANES Lighting NORTH SIDE ONLY ' Adjacent Land Use RESIDENTIAL Field Study By JA Checked By VM CERTIFICATION: I, Vanessa Munoz, do hereby certify that this Engineering and Traffic Survey within ' the City of Rosemead was performed under my supervision and is accurate and complete. I am duly registered in the Stpte of California as a Professional Engineer (Traffic). Number 1 CITY OF ROSEMEAD 18 ENGINEERING AND TRAFFIC SURVEY STREET MARSHALL STREET CERTIFICATION DATE 3/7/2006 ' FROM WALNUT GROVE AVENUE TO ROSEMEAD BLVD SPEED FACTORS Date of Speed Survey 11/8/2005 Posted Speed Limit 30/25** mph Time of Speed Survey 9:OOAM Speed Justification 50th Percentile Speed (Mean Speed) 30 mph HIDDEN DWYS., NO LT. LANES,HORIZ. 85th Percentile Speed 34 mph CURVE 10 mph Pace Speed 26-35 Recommended Speed Limit 30/25** mph ' Percentage of Vehicles in Pace 88 Number of Survey Samples 93 COLLISION HISTORY Number of Years Studied 3 years Total Collisions 2 Annual Collision Rate 0.667 accidents/year Collisions per Million Vehicle Miles 0.369 TRAFFIC FACTORS Average Daily Traffic 9,337 Date Counted 11/8/2005 ' Number of Lanes Type of Traff ic Control 2 LANES - UNDIVIDED T.S. @ ROSEMEAD, WALNUT GRV.;STOPOMUSCATEL,BARLET Crosswalks? @ ALL T.S. AND STOPS Pedestrian Traffic LIGHT Truck Traffic LIGHT On-Street Parking BOTH SIDES- RESTRICTED Sidewalks? YES, BOTH SIDES Driveways? YES, BOTH SIDES 1 ROADWAY FACTORS Length of Segment 0.530 miles Width 40 feet Vertical Curve? NONE Horizontal Curve? YES, EAST OF BARTLETT ' Visibility GOOD, EXCEPT AT DRIVEWAYS Roadway Conditions GOOD, NO LEFT TURN LANES Lighting NORTH SIDE ONLY Adjacent Land Use RESIDENTIAL, SCHOOL Field Study By JA Checked By VM CERTIFICATION: I, Vanessa Munoz, do hereby certify that this Engineering and Traffic Survey within the City of Rosemead was performed under my supervision and is accurate and complete. I am duly registered in the State of California as a Professional Engineer (Traffic). TE 2341 Vanessa Munoz Dat State Registration Number 1 t CITY OF ROSEMEAD 19 ENGINEERING AND TRAFFIC SURVEY STREET MARSHALL STREET FROM ROSEMEAD BLVD CERTIFICATION DATE 317/2006 TO HART AVENUE Date of Speed Survey 11/3/2005 Time of Speed Survey 3:OOPM 50th Percentile Speed (Mean Speed) 35 mph 85th Percentile Speed 38 mph 10 mph Pace Speed 30-39 Percentage of Vehicles in Pace 79 Number of Survey Samples 137 Posted Speed Limit 35 mph Speed Justification ADJ.SEG.SPEED,HIDDEN DWYS., COLLIS. RATE, CHG. IN ST. WIDTH Recommended Speed Limit 35 mph COLLISION HISTORY Number of Years Studied 3 years Total Collisions 14 Annual Collision Rate 4.667 accidents/year Collisions per Million Vehicle Miles 4.626 TRAFFIC FACTORS Average Daily Traffic Number of Lanes Type of Traffic Control Crosswalks? ' Pedestrian Traffic Truck Traffic On-Street Parking Sidewalks? Driveways? 11,515 Date Counted 4 LANES - DIVIDED T.S. @ ROSEMEAD ; STOP @ HART @ ALL T.S. LIGHT LIGHT NORTH SIDE ONLY -RESTRICTED YES, BOTH SIDES YES, MANY ON NORTHSIDE 111/8/2005 ROADWAY FACTORS Length of Segment 0.240 miles Width 71 feet Vertical Curve? NONE Horizontal Curve? NONE Visibility GOOD, EXCEPT AT DRIVEWAYS Roadway Conditions GOOD Lighting YES, BOTH SIDES Adjacent Land Use COMMERCIAL, RESIDENTIAL Field Study By JA Checked By VM CERTIFICATION: I, Vanessa Munoz, do hereby certify that this Engineering and Traffic Survey within the City of Rosemead was performed under my supervision and is accurate and complete. I am duly registered in the State of California as a Professional Engineer (Traffic). Munoz Number CITY OF ROSEMEAD 20 ENGINEERING AND TRAFFIC SURVEY STREET MARSHALL STREET CERTIFICATION DATE 3/7/2006 ' FROM HART AVENUE TO RIO HONDO AVENUE SPEED FACTORS Date of Speed Survey 11/3/2005 Posted Speed Limit 35 mph Time of Speed Survey 2:OOPM Speed Justification 50th Percentile Speed (Mean Speed) 34 mph CLOSEST TO 85TH 85th Percentile Speed 37 mph 10 mph Pace Speed 29-38 Recommended Speed Limit 35 mph Percentage of Vehicles in Pace 84 Number of Survey Samples 88 COLLISION HISTORY Number of Years Studied 3 years Total Collisions 1 Annual Collision Rate 0.333 accidents/year Collisions per Million Vehicle Miles 0.569 TRAFFIC FACTORS Average Daily Traff ic 6,418 Date Counted 11/8/2005 Number of Lanes Type of Traffic Control 2 LANES - UNDIVIDED STOP @ HART, RIO HONDO Crosswalks? @ RIO HONDO Pedestrian Traffic LIGHT ' Truck Traffic NONE On-Street Parking BOTH SIDES - RESTRICTED Sidewalks? YES, BOTH SIDES Driveways? YES, BOTH SIDES ROADWAY FACTORS Length of Segment Width Vertical Curve? Horizontal Curve? Visibility Roadway Conditions Lighting Adjacent Land Use 0.250 miles 40 feet NONE NONE GOOD, EXCEPT AT DRIVEWAYS GOOD SOUTH SIDES ONLY RESIDENTIAL Field Study By JA Checked By VM CERTIFICATION: I, Vanessa Munoz, do hereby certify that this Engineering and Traffic Survey within the City of Rosemead was performed under my supervision and is accurate and complete. I am duly registered in the State of C lifornia as a Professional Engineer (Traffic). .L~ Vanessa Munoz State Registration Number CITY OF ROSEM EAD 21 ' ENGINEERING AND TRAFFIC SURVEY STREET MISSION DRIVE CERTIFICATION DATE 3/7/2006 FROM WEST CITY LIMIT TO WALNUT GROVE AVENUE SPEED FACTORS Date of Speed Survey 11/9/2005 Posted Speed Limit 40 mph Time of Speed Survey 10:OOAM Speed Justification 50th Percentile Speed (Mean Speed) 39 mph ADJ. SEG SPEED,HIDDEN DWYS., NO LT. 85th Percentile Speed 43 mph LANES, UNC. XWALK 10 mph Pace Speed 34-43 Recommended Speed Limit 40 mph Percentage of Vehicles in Pace 74 Number of Survey Samples 169 COLLISION HISTORY Number of Years Studied 3 years Total Collisions 2 Annual Collision Rate 0.667 accidents/year Collisions per Million Vehicle Miles 0.407 TRAFFIC FACTORS Average Daily Traffic 16,015 Date Counted 11/17/2005 Number of Lanes 4 LANES - UNDIVIDED Type of Traffic Control T.S. @ WALNUT GROVE Crosswalks? @ ALL T.S., EARLE, DELTA Pedestrian Traffic LIGHT Truck Traffic LIGHT On-Street Parking BOTH SIDES- RESTRICTED Sidewalks? YES, BOTH SIDES Driveways? YES, BOTH SIDES ROADWAY FACTORS Length of Segment 0.280 miles Width 65 feet Vertical Curve? NONE Horizontal Curve? NONE Visibility GOOD, EXCEPT AT DRIVEWAYS Roadway Conditions FAIR, NO LEFT TURN LANES Lighting YES, BOTH SIDES Adjacent Land Use RESIDENTIAL Field Study By ST Checked By VM CERTIFICATION: I, Vanessa Munoz, do hereby certify that this Engineering and Traffic Survey within the City of Rosemead was performed under my supervision and is accurate and complete. I am duly registered in the State of California as a Professional Engineer (Traffic). ZJ ~ ~ /1 0 t:: 2 TE 2341 Vanessa Munoz to State Registration Number 1 CITY OF ROSEMEAD 22 ENGINEERING AND TRAFFIC SURVEY STREET MISSION DRIVE CERTIFICATION DATE 3/7/2006 FROM WALNUT GROVE AVENUE TO ROSEMEAD BLVD SPEED FACTORS Date of Speed Survey 11/8/2005 Posted Speed Limit 40 mph Time of Speed Survey 3:OOPM Speed Justification 50th Percentile Speed (Mean Speed) 39 mph ADJ. SEG SPEED., HIDDEN DWYS., NO LT. ' 85th Percentile Speed 44 mph LANES, UNC. XWALK, 10 mph Pace Speed 36-45 Recommended Speed Limit 40 mph Percentage of Vehicles in Pace 68 Number of Survey Samples 179 ' COLLISION HISTORY Number of Years Studied 3 years Total Collisions 6 Annual Collision Rate 2 accidents/year Collisions per Million Vehicle Miles 0.570 TRAFFIC FACTORS Average Daily Traffic 17,175 Date Counted 11/8/2005 Number of Lanes Type of Traffic Control 4 LANES - UNDIVIDED T.S. @ ROSEMEAD, MUSKATEL, WALNUT GROVE Crosswalks? @ ALL T.S., IVAR Pedestrian Traffic LIGHT Truck Traffic LIGHT On-Street Parking BOTH SIDES 1 Sidewalks? YES, BOTH SIDES Driveways? YES, BOTH SIDES ROADWAY FACTORS Length of Segment 0.560 miles Width 65 feet Vertical Curve? NONE Horizontal Curve? NONE Visibility GOOD, EXCEPT AT DRIVEWAYS Roadway Conditions FAIR, NO LEFT TURN LANES Lighting YES, BOTH SIDES Adjacent Land Use RESIDENTIAL Field Study By ST Checked By VM CERTIFICATION: I, Vanessa Munoz, do hereby certify that this Engineering and Traffic Survey within the City of Rosemead was performed under my supervision and is accurate and complete. I am duly registered in the Stat of California as a Professional Engineer (Traffic). -31--) Lav TE 2341 Vanessa Munoz Date State Registration Number f. 1 Date of Speed Survey 11/3/2005 Time of Speed Survey 9:OOAM 50th Percentile Speed (Mean Speed) 85th Percentile Speed 40 mph 44 mph 10 mph Pace Speed 35-44 Percentage of Vehicles in Pace 73 Number of Survey Samples 176 CITY OF ROSEMEAD ENGINEERING AND TRAFFIC SURVEY STREET MISSION DRIVE CERTIFICATION DATE 317/2006 FROM ROSEMEAD BOULEVARD TO VALLEY BLVD 23 Posted Speed Limit 40/25" mph Speed Justification ADJ. SEG SPEED, HIDDEN DWYS., HORIZ. CURVE, UNC. XWALK, NO LT. LANE Recommended Speed Limit 40/25" mph COLLISION HISTORY Number of Years Studied 3 years Total Collisions 7 1 Annual Collision Rate 2.333 accidents/year Collisions per Million Vehicle Miles 0.956 e 1 TRAFFIC FACTORS Average Daily Traffic 12,857 Date Counted 11/17/2005 Number of Lanes 4 LANES - UNDIVIDED Type of Traffic Control T.S. @ VALLEY, ROSEMEAD, ENCINITA Crosswalks? @ ALL T.S., NEWBY Pedestrian Traffic MODERATE Truck Traffic LIGHT On-Street Parking BOTH SIDES Sidewalks? YES, BOTH SIDES Driveways? YES, BOTH SIDES ROADWAY FACTORS Length of Segment 0.520 miles Width 65 feet Vertical Curve? NONE Horizontal Curve? YES, EAST OF ENCINITA Visibility GOOD, EXCEPT AT DRIVEWAYS Roadway Conditions FAIR, NO LEFT TURN LANES Lighting YES, BOTH SIDES Adjacent Land Use COMMERCIAL, RESIDENTIAL,SCHOOL Field Study By ST Checked By VM CERTIFICATION: I, Vanessa Munoz, do hereby certify that this Engineering and Traffic Survey within the City of Rosemead was performed under my supervision and is accurate and complete. I am duly registered in the State of California as a Professional Engineer (Traffic). State Registration Number Vanessa Munoz CITY OF ROSEMEAD 24 ENGINEERING AND TRAFFIC SURVEY STREET MUSCATEL AVENUE CERTIFICATION DATE 3/7/2006 ' FROM MARSHALL STREET TO GRAND AVENUE SPEED FACTORS Date of Speed Survey 11/8/2005 Posted Speed Limit 30/25'" mph Time of Speed Survey 2:OOPM Speed Justification 50th Percentile Speed (Mean Speed) 30 mph CLOSEST TO 85TH 85th Percentile Speed 32 mph 10 mph Pace Speed 25-34 Recommended Speed Limit 30/25`" mph Percentage of Vehicles in Pace 95 Number of Survey Samples 63 COLLISION HISTORY Number of Years Studied 3 years Total Collisions 5 1 Annual Collision Rate 1.667 accidents/year Collisions per Million Vehicle Miles 0.567 TRAFFIC FACTORS Average Daily Traffic Number of Lanes Type of Traffic Control Crosswalks? Pedestrian Traffic Truck Traffic On-Street Parking Sidewalks? Driveways? I 5,754 Date Counted 2/8/2006 2 LANES - UNDIVIDED T.S. @ MISSION, VALLEY; STOP @ MARSHALL, GRAND ALL T.S., AND STOPS,SCOTT LIGHT LIGHT BOTH SIDES-RESTRICTED YES, BOTH SIDES YES, BOTH SIDES ROADWAY FACTORS Length of Segment Width Vertical Curve? Horizontal Curve? Visibility Roadway Conditions Lighting Adjacent Land Use 1.400 miles 40 feet NONE NONE GOOD, EXCEPT AT DRIVEWAYS GOOD YES, BOTH SIDES RESIDENTIAL,CIVIC CENTER, PARK, SCHOOL Field Study By JA Checked By VM CERTIFICATION: I, Vanessa Munoz, do hereby certify that this Engineering and Traffic Survey within the City of Rosemead was performed under my supervision and is accurate and complete. I am duly registered in the State of California as a Professional Engineer (Traffic). State Registration Number J F CITY OF ROSEMEAD 25 ENGINEERING AND TRAFFIC SURVEY STREET NEW AVENUE CERTIFICATION DATE 317/2006 r FROM GRAVES AVENUE TO GARVEY AVENUE SPEED FACTORS ' Date of Speed Survey 11/2/2005 Posted Speed Limit 35 mph Time of Speed Survey 2:OOPM Speed Justification 50th Percentile Speed (Mean Speed) 35 mph HIDDEN DWYS., CURB PARKING,VERT. 85th Percentile Speed 38 mph CURVE 10 mph Pace Speed 31-40 Recommended Speed Limit 35 mph Percentage of Vehicles in Pace 79 Number of Survey Samples 104 COLLISION HISTORY Number of Years Studied 3 years Total Collisions 2 ' Annual Collision Rate 0.667 accidents/year Collisions per Million Vehicle Miles 0.419 TRAFFIC FACTORS Average Daily Traff ic 8,725 Date Counted 11/10/2005 ' Number of Lanes Type of Traffic Control 2 LANES - UNDIVIDED T.S. @ GARVEY, NEWMARK ; STOP@ GRAVES Crosswalks? @ ALL T.S. AND STOPS Pedestrian Traffic LIGHT Truck Traffic LIGHT On-Street Parking BOTH SIDES-RESTRICTED Sidewalks? YES, BOTH SIDES Driveways? YES, BOTH SIDES ROADWAY FACTORS Length of Segment 0.500 miles Width Vertical Curve? 56 feet YES,AT NORTH OF GRAVES AV Horizontal Curve? NONE Visibility GOOD, EXCEPT AT DRIVEWAYS Roadway Conditions FAIR Lighting YES, BOTH SIDES Adjacent Land Use MULTI FAMILY RESIDENTIAL,COMMERCIAL AT GARVEY Field Study By ST Checked By VM 1 CERTIFICATION: I, Vanessa Munoz, do hereby certify that this Engineering and Traffic Survey within the City of Rosemead was performed under my supervision and is accurate and complete. I am duly registered in the State of California as a Professional Engineer (Traffic). r L TE 2341 Vanessa Munoz D e State Registration Number I CITY OF ROSEMEAD ENGINEERING AND TRAFFIC SURVEY STREET RAMONA BOULEVARD CERTIFICATION DATE 3/7/2006 FROM WALNUT GROVE AVENUE TO IVAR AVENUE 26 SPEED FACTORS Date of Speed Survey 11/10/2005 Posted Speed Limit 30 mph Time of Speed Survey 11:OOAM Speed Justification 50th Percentile Speed (Mean Speed) 30 mph CLOSEST TO 85TH 85th Percentile Speed 32 mph 10 mph Pace Speed 25-34 Recommended Speed Limit 30 mph Percentage of Vehicles in Pace 93 Number of Survey Samples 73 COLLISION HISTORY Number of Years Studied 3 years Total Collisions 4 ' Annual Collision Rate 1.333 accidents/year Collisions per Million Vehicle Miles 1.662 TRAFFIC FACTORS Average Daily Traffic 4,777 Date Counted 11/10/2005 ' Number of Lanes Type of Traffic Control 2 LANES - UNDIVIDED T.S. @ WALNUT GROVE; STOP@BURTON Crosswalks? @ ALL T.S. AND STOPS Pedestrian Traffic LIGHT Truck Traffic LIGHT On-Street Parking EAST SIDE ONLY-RESTRICTED Sidewalks? SOUTH SIDE ONLY Driveways? SOUTH SIDE ONLY 1 ROADWAY FACTORS Length of Segment 0.460 miles Width 33 feet Vertical Curve? NONE Horizontal Curve? YES, WEST OF BURTON Visibility GOOD, EXCEPT AT DRIVEWAYS Roadway Conditions GOOD Lighting SOUTH SIDE ONLY ' Adjacent Land Use RESIDENTIAL Field Study By JA Checked By VM CERTIFICATION: I, Vanessa Munoz, do hereby certify that this Engineering and Traffic Survey within I the City of Rosemead was performed under my supervision and Is accurate and complete. I am duly registered in the State of California as a Professional Engineer (Traffic). b TE 2341 /'q, Lo Vanessa Munoz Date State Registration Number CITY OF ROSEM EAD 27 ENGINEERING AND TRAFFIC SURVEY STREET RIO HONDO AVENUE FROM OLNEY STREET CERTIFICATION DATE 3/7/2006 TO VALLEY BLVD ' Date of Speed Survey 11/3/2005 Posted Speed Limit 30/25" mph Time of Speed Survey 11:OOAM Speed Justification 50th Percentile Speed (Mean Speed) 85th Percentile Speed 30 mph HIDDEN DWYS., VERT. & HORIZ. CURVES 35 mph 10 mph Pace Speed 24-33 Recommended Speed Limit 30/25" mph Percentage of Vehicles in Pace 78 Number of Survey Samples 82 COLLISION HISTORY Number of Years Studied 3 years Total Collisions 0 ' Annual Collision Rate 0 accidents/year Collisions per Million Vehicle Miles 0.000 TRAFFIC FACTORS Average Daily Traffic 7,906 Date Counted 11/8/2005 Number of Lanes 2 LANES - UNDIVIDED Type of Traffic Control T.S. @ VALLEY BLVD;STOP @ DE ADELANE, MARSHALL Crosswalks? @ ALL T.S. AND STOPS Pedestrian Traffic LIGHT Truck Traffic LIGHT On-Street Parking YES BOTH SIDES-RESTRICTED Sidewalks? YES, BOTH SIDES Driveways? YES, BOTH SIDES ROADWAY FACTORS Length of Segment 0.550 miles Width 40 feet Vertical Curve? YES, NORTH OF DE ADELENA Horizontal Curve? YES, NORTH OF DE ADELENA Visibility GOOD, EXCEPT AT DRIVEWAYS Roadway Conditions GOOD Lighting WEST SIDE ONLY ' Adjacent Land Use RESIDENTIAL, SCHOOL Field Study By JA Checked By VM 1 CERTIFICATION: I, Vanessa Munoz, do hereby certify that this Engineering and Traffic Survey within the City of Rosemead was performed under my supervision and is accurate and complete. I am duly registered in the State of California as a Professional Engineer (Traffic). IJ6 TE 2341 Vanessa Munoz ate State Registration Number CITY OF ROSEMEAD ENGINEERING AND TRAFFIC SURVEY STREET ROSEMEAD PLACE FROM GARVEY AVENUE CERTIFICATION DATE TO EARLSWOOD DRIVE 3/7/2006 28 ' Date of Speed Survey 11/10/2005 Posted Speed Limit 35 mph Time of Speed Survey 9:OOAM Speed Justification 50th Percentile Speed (Mean Speed) 85th Percentile Speed 34 mph CLOSEST TO 85TH 37 mph 10 mph Pace Speed 29-38 Recommended Speed Limit 35 mph ' Percentage of Vehicles in Pace 88 Number of Survey Samples 81 COLLISION HISTORY Number of Years Studied 3 years Total Collisions 1 Annual Collision Rate 0.333 accidents/year Collisions per Million Vehicle Miles 0.945 TRAFFIC FACTORS Average Daily Traffic 2,300 Date Counted 11/10/2005 Number of Lanes 2 LANES - UNDIVIDED ' Type of Traffic Control T.S @ GARVEY Crosswalks? @ ALL T.S. Pedestrian Traffic LIGHT Truck Traffic LIGHT On-Street Parking BOTH SIDES-RESTRICTED Sidewalks? NONE Driveways? YES, BOTH SIDES ' ROADWAY FACTORS Length of Segment 0.420 miles Width 55 feet Vertical Curve? NONE Horizontal Curve? NONE Visibility GOOD, EXCEPT AT DRIVEWAYS Roadway Conditions GOOD Lighting MAINLY ON EAST SIDE ' Adjacent Land Use RESIDENTIAL Field Study By JA Checked By VM ' CERTIFICATION: I, Vanessa Munoz, do hereby certify that this Engineering and Traffic Survey within the City of Rosemead was performed under my supervision and is accurate and complete. I am duly registered in the State of C alifornia as a Professional Engineer (Traffic). 3 Av A ~O TE 2341 Vanessa Munoz ate State Registration Number CITY OF ROSEMEAD 29 ' ENGINEERING AND TRAFFIC SURVEY STREET RUSH STREET CERTIFICATION DATE 3/7/2006 FROM SAN GABRIEL BLVD TO WALNUT GROVE AVENUE SPEED FACTORS ' Date of Speed Survey 11/3/2005 Posted Speed Limit 40/25" mph Time of Speed Survey 1:OOPM Speed Justification 50th Percentile Speed (Mean Speed) 39 mph HIDDEN DWYS., VERT. CURVE, PEDS. 85th Percentile Speed 44 mph 10 mph Pace Speed 35-44 Recommended Speed Limit 40/25"' mph Percentage of Vehicles in Pace 74 Number of Survey Samples 133 COLLISION HISTORY Number of Years Studied 3 years Total Collisions 1 Annual Collision Rate 0.333 accidents/year Collisions per Million Vehicle Miles 0.209 ' TRAFFIC FACTORS Average Daily Traffic 8,929 Date Counted 11/10/2005 Number of Lanes Type of Traffic Control 4 LANES - DIVIDED T.S. @ SAN GABRIEL, WALNUT GROVE Crosswalks? @ ALL T.S., ANGELUS Pedestrian Traffic MODERATE Truck Traffic LIGHT On-Street Parking BOTH SIDES Sidewalks? YES, BOTH SIDES Driveways? YES, BOTH SIDES ROADWAY FACTORS Length of Segment 0.490 miles Width Vertical Curve? 87 feet YES,WEST OF WALNUT GROVE Horizontal Curve? NONE Visibility GOOD, EXCEPT AT DRIVEWAYS Roadway Conditions FAIR Lighting YES, ON MEDIAN ' Adjacent Land Use RESIDENTIAL, SCHOOL Field Study By ST Checked By VM CERTIFICATION: 1, Vanessa Munoz, do hereby certify that this Engineering and Traffic Survey within the City of Rosemead was performed under my supervision and is accurate and complete. I am duly registered In the State of California as a Professional Engineer (Traffic). 3 Zo 4 TE 2341 Vanessa Munoz /Datfi State Registration Number ~l CITY OF ROSEMEAD 30 ' ENGINEERING AND TRAFFIC SURVEY STREET SAN GABRIEL BLVD CERTIFICATION DATE 3/7/2006 t FROM SOUTH CITY LIMIT TO DELTA STREET SPEED FACTORS ' Date of Speed Survey 11/3/2005 Posted Speed Limit 45/25'" mph Time of Speed Survey 3:OOPM Speed Justification 50th Percentile Speed (Mean Speed) 44 mph HORIZ. CURVE, ADJ SEG SPEED,TRUCK ' 85th Percentile Speed 48 mph TRAFFIC 10 mph Pace Speed 39-48 Recommended Speed Limit 45/25" mph ' Percentage of Vehicles in Pace 70 Number of Survey Samples 197 COLLISION HISTORY Number of Years Studied 3 years Total Collisions 5 ' Annual Collision Rate 1.667 accidents/year Collisions per Million Vehicle Miles 0.337 TRAFFIC FACTORS Average Daily Traffic 20,521 Date Counted 11/10/2005 Number of Lanes 4 LANES - DIVIDED WITH LT LANES Type of Traffic Control T.S. @TOWN CENTER, WALNUT GROVE, DELTA, 60 FWY Crosswalks? @ ALL T.S. Pedestrian Traffic LIGHT Truck Traffic MODERATE On-Street Parking YES, BOTH SIDES Sidewalks? SOME,BOTH SIDES Driveways? YES,BOTH SIDES ROADWAY FACTORS Length of Segment 0.660 miles Width 84 feet Vertical Curve? NONE Horizontal Curve? YES, NORTH OF 60 FWY Visibility GOOD, EXCEPT AT DRIVEWAYS Roadway Conditions GOOD Lighting YES, BOTH SIDES ' Adjacent Land Use MULTI FAMILY RESIDENTIAL, COMMERCIAL, SCHOOL Field Study By JA Checked By VM CERTIFICATION: I, Vanessa Munoz, do hereby certify that this Engineering and Traffic Survey within the City of Rosemead was performed under my supervision and is accurate and complete. I am duly registered in the State of California as a Professional Engineer (Traffic). ' 31?-10b TE 2341 Vanessa Munoz Da a State Registration Number I CITY OF ROSEMEAD 31 ' ENGINEERING AND TRAFFIC SURVEY STREET SAN GABRIEL BLVD CERTIFICATION DATE 3/7/2006 FROM RUSH STREET TO GARVEY AVENUE 1 Date of Speed Survey 11/3/2005 Posted Speed Limit 40 mph Time of Speed Survey 10:00AM Speed Justification 50th Percentile Speed (Mean Speed) 85th Percentile Speed 39 mph HIDDEN DWYS., VERT. CURVE, CURB 44 mph PKG.,ADJ SEG SPEED 10 mph Pace Speed 35-44 Recommended Speed Limit 40 mph Percentage of Vehicles In Pace 70 Number of Survey Samples 181 COLLISION HISTORY f Y St N b i d a 3 um er o ears ud e ye rs Total Collisions 11 Annual Collision Rate 3.667 accidents/year Collisions per Million Vehicle Miles 0.558 TRAFFIC FACTORS Average Daily Traffic 24,022 Date Counted 11/10/2005 Number of Lanes 4 LANES - UNDIVIDED WITH CENTER LT LANES ' Type of Traffic Control T.S. @ RUSH, GRAVES, GARVEY, KLINGERMAN Crosswalks? @ ALL T.S. Pedestrian Traffic LIGHT ' Truck Traffic LIGHT On-Street Parking BOTH SIDES Sidewalks? YES, BOTH SIDES Driveways? YES. BOTH SIDES ROADWAY FACTORS Length of Segment Width Vertical Curve? Horizontal Curve? Visibility Roadway Conditions Lighting Adjacent Land Use 0.750 miles 1 1 84 feet YES, N OF KLINGERMAN NONE GOOD, EXCEPT AT DRIVEWAYS GOOD YES, BOTH SIDES COMMERCIAL Field Study By JA Checked By VM CERTIFICATION: I, Vanessa Munoz, do hereby certify that this Engineering and Traffic Survey within the City of Rosemead was performed under my supervision and is accurate and complete. I am duly registered in the State of California as a Professional Engineer (Traffic). /.~[7 3/3'-/Qy TE 2341 State Registration Number CITY OF ROSEMEAD 32 i ENGINEERING AND TRAFFIC SURVEY STREET SAN GABRIEL BLVD CERTIFICATION DATE 3/7/2006 ' FROM GARVEY AVENUE TO HELLMAN AVENUE SPEEDFACTORS ' Date of Speed Survey 11/3/2005 Posted Speed Limit 40 mph Time of Speed Survey 11:OOAM Speed Justification 50th Percentile Speed (Mean Speed) 39 mph CLOSEST TO 85TH ' 85th Percentile Speed 42 mph 10 mph Pace Speed 34-43 Recommended Speed Limit 40 mph 1 Percentage of Vehicles in Pace 76 Number of Survey Samples 203 1 t COLLISION HISTORY Number of Years Studied 3 years Total Collisions 21 Annual Collision Rate 7 accidents/year Collisions per Million Vehicle Miles 1.170 TRAFFIC FACTORS Average Daily Traffic 32,793 Date Counted 11/10/2005 Number of Lanes 4 LANES - UNDIVIDED WITH LT LANES Type of Traffic Control T.S. @ GARVEY, EMERSON, HELLMAN Crosswalks? @ ALL T.S. Pedestrian Traffic LIGHT Truck Traffic MODERATE On-Street Parking BOTH SIDES-RESTRICTED Sidewalks? YES, BOTH SIDES Driveways? YES, BOTH SIDES ROADWAY FACTORS Length of Segment 0.500 miles Width 76 feet Vertical Curve? NONE Horizontal Curve? NONE Visibility GOOD, EXCEPT AT DRIVEWAYS Roadway Conditions GOOD Lighting YES, BOTH SIDES Adjacent Land Use MULTI FAMILY RESIDENTIAL,COMMERCIAL Field Study By JA Checked By VM CERTIFICATION: I, Vanessa Munoz, do hereby certify that this Engineering and Traffic Survey within the City of Rosemead was performed under my supervision and is accurate and complete. I am duly registered in the State oA California as a Professional Engineer (Traffic). 4 Vanessa Munoz State Registration Number t II t CITY OF ROSEMEAD U ENGINEERING AND TRAFFIC SURVEY STREET TEMPLE CITY BLVD CERTIFICATION DATE 3/7/2006 FROM OLNEY STREET TO VALLEY BLVD Date of Speed Survey 11/2/2005 Posted Speed Limit 40 mph Time of Speed Survey 10:OOAM Speed Justification 50th Percentile Speed (Mean Speed) 39 mph CLOSEST TO 85TH 85th Percentile Speed 42 mph 10 mph Pace Speed 35-44 Recommended Speed Limit 40 mph Percentage of Vehicles in Pace 81 Number of Survey Samples 205 COLLISION HISTORY Number of Years Studied 3 years Total Collisions 3 Annual Collision Rate 1 accidents/year Collisions per Million Vehicle Miles 0.276 TRAFFIC FACTORS Average Daily Traffic 17,711 Date Counted 11/8/2005 Number of Lanes 4 LANES - UNDIVIDED Type of Traffic Control T.S. @ LOFTUS, MARSHALL, VALLEY Crosswalks? ® ALL T.S. Pedestrian Traffic LIGHT Truck Traffic MODERATE YES, BOTH SIDES - RESTRICTED YES, BOTH SIDES YES, BOTH SIDES On-Street Parking Sidewalks? Driveways? 1 ROADWAY FACTORS Length of Segment Width Vertical Curve? Horizontal Curve? Visibility Roadway Conditions Lighting Adjacent Land Use 0.560 miles 64 feet NONE YES, AT ELLIS GOOD, EXCEPT AT DRIVEWAYS GOOD YES, BOTH SIDES RESIDENTIAL Field Study By JA Checked By VM CERTIFICATION: I, Vanessa Munoz, do hereby certify that this Engineering and Traffic Survey within the City of Rosemead was performed under my supervision and is accurate and complete. I am duly registered in the State of California as a Professional Engineer (Traffic). CITY OF ROSEMEAD i ENGINEERING AND TRAFFIC SURVEY STREET TEMPLE CITY BLVD CERTIFICATION DATE 3/7/2006 ' FROM VALLEY BLVD TO NORTH CITY LIMITS SPEED FACTORS ' Date of Speed Survey 11/2/2005 Posted Speed Limit 40 mph Time of Speed Survey 9:OOAM Speed Justification ' 50th Percentile Speed (Mean Speed) 85th Percentile Speed 39 mph HIDDEN DWYS., TRUCK TRAFFIC, ADJ SEG 43 mph SPEED 10 mph Pace Speed 35-44 Recommended Speed Limit 40 mph Percentage of Vehicles in Pace 74 ' Number of Survey Samples 204 COLLISION HISTORY ' Number of Years Studied 3 years Total Collisions 1 Annual Collision Rate 0.333 accidents/year Collisions per Million Vehicle Miles 0.418 fl I~ TRAFFIC FACTORS Average Daily Traffic 19,880 Date Counted 11/8/2005 Number of Lanes 4 LANES + 2WY LT LANE Type of Traffic Control T.S. @ VALLEY Crosswalks? @ ALL T.S. Pedestrian Traffic LIGHT Truck Traffic MODERATE On-Street Parking NO PARKING Sidewalks? YES, BOTH SIDES Driveways? YES, BOTH SDIES ROADWAY FACTORS Length of Segment 0.110 miles Width 64 feet Vertical Curve? NONE Horizontal Curve? NONE Visibility GOOD, EXCEPT AT DRIVEWAYS Roadway Conditions GOOD Lighting YES, BOTH SIDES Adjacent Land Use RESIDENTIAL, COMMERCIAL Field Study By JA Checked By VM CERTIFICATION: I, Vanessa Munoz, do hereby certify that this Engineering and Traffic Survey within the City of Rosemead was performed under my supervision and is accurate and complete. I am duly registered in the State of California as a Professional En~~giinyneer (Traffic). ~✓ii'///oi/,l~ 3 /4Z TF 2341 Vanessa Munoz State Registration Number 1 1 CITY OF ROSEMEAD ENGINEERING AND TRAFFIC SURVEY STREET VALLEY BLVD CERTIFICATION DATE 317/2006 FROM CHARLOTTE AVENUE TO ROSEMEAD BLVD 35 SPEED FACTORS 1 Date of Speed Survey 11/8/2005 Time of Speed Survey 1:OOPM 50th Percentile Speed (Mean Speed) 35 mph ' 85th Percentile Speed 40 mph 10 mph Pace Speed 29-38 ' Percentage of Vehicles in Pace 63 Number of Survey Samples 206 Posted Speed Limit 35 mph Speed Justification ADJ. SEG SPEED, HIDDEN DWYS,PEDS Recommended Speed Limit 35 mph COLLISION HISTORY Number of Years Studied Total Collisions ' Annual Collision Rate Collisions per Million Vehicle Miles 3 years 25 8.333 accidents/year 0.917 TRAFFIC FACTORS Average Daily Traff ic ' Number of Lanes Type of Traffic Control Crosswalks? Pedestrian Traffic Truck Traffic On-Street Parking ' Sidewalks? Driveways? 1 29,289 Date Counted 11/8/2005 4 LANES + 2WY LT LANE T.S. @ DELTA,WALNUT GROVE, MUSCATEL, IVAR,ROSEMEAD ALL T.S. MODERATE LIGHT BOTH SIDES-RESTRICTED YES, BOTH SIDES BOTH SIDES,MANY ROADWAY FACTORS Length of Segment Width Vertical Curve? Horizontal Curve? Visibility Roadway Conditions Lighting Adjacent Land Use 0.850 miles 77 feet NONE NONE FAIR, EXCEPT AT DRIVEWAYS FAIR YES, BOTH SIDES COMMERCIAL,CIVIC CENTER Field Study By ST Checked By VM CERTIFICATION: I, Vanessa Munoz, do hereby certify that this Engineering and Traffic Survey within the City of Rosemead was performed under my supervision and is accurate and complete. I am duly registered in the State of California as a Professional Engineer (Traffic). 1 I 1 CITY OF ROSEMEAD F 36] ENGINEERING AND TRAFFIC SURVEY STREET VALLEY BLVD FROM ROSEMEAD BLVD CERTIFICATION DATE 3/7/2006 TO STRANG AVENUE Date of Speed Survey 11/3/2005 Time of Speed Survey 10:OOAM 50th Percentile Speed (Mean Speed) 36 mph 85th Percentile Speed 41 mph 10 mph Pace Speed 33-42 Percentage of Vehicles in Pace 69 Number of Survey Samples 203 Posted Speed Limit 35 mph Speed Justification ADJ. SEG SPEED, HIDDEN DWYS., PEDS. Recommended Speed Limit 35 mph COLLISION HISTORY Number of Years Studied 3 years Total Collisions 13 Annual Collision Rate 4.333 accidents/year Collisions per Million Vehicle Miles 0.450 TRAFFIC FACTORS Average Daily Traffic 26,357 Date Counted 11/8/2005 Number of Lanes 4 LANES AND LT LANES Type of Traffic Control T.S.@ROSEMEAD,HART, MISSION, RIO HONDO,TEMPLE CITY Crosswalks? @ ALL T.S. Pedestrian Traffic MODERATE Truck Traffic LIGHT On-Street Parking BOTH SIDES-RESTRICTED Sidewalks? YES, BOTH SIDES Driveways? BOTH SIDES, MANY ROADWAY FACTORS Length of Segment Width Vertical Curve? Horizontal Curve? Visibility Roadway Conditions Lighting Adjacent Land Use 1.000 miles 77 feet NONE NONE FAIR, EXCEPT AT DRIVEWAYS FAIR YES, BOTH SIDES COMMERCIAL Field Study By ST Checked By VM CERTIFICATION: I, Vanessa Munoz, do hereby certify that this Engineering and Traffic Survey within the City of Rosemead was performed under my supervision and is accurate and complete. I am duly registered in the State of California as a Professional Engineer (Traffic). CITY OF ROSEMEAD ENGINEERING AND TRAFFIC SURVEY STREET WALNUT GROVE AVENUE CERTIFICATION DATE 3/7/2006 FROM SAN GABRIEL BLVD TO RUSH STREET 37 SPEED FACTORS ' Date of Speed Survey 11/3/2005 Posted Speed Limit 45 mph Time of Speed Survey 2:OOPM Speed Justification 50th Percentile Speed (Mean Speed) 44 mph ADJ. SEG SPEED, VERT. CURVE.,PEDS. ' 85th Percentile Speed 49 mph 10 mph Pace Speed 39-48 Recommended Speed Limit 45 mph ' Percentage of Vehicles in Pace 68 Number of Survey Samples 138 ' COLLISION HISTORY Number of Years Studied 3 years Total Collisions 4 Annual Collision Rate 1.333 accidents/year Collisions per Million Vehicle Mlles 0.286 TRAFFIC FACTORS Average Daily Traff ic 17,241 Date Counted 11/10/2005 ' Number of Lanes Type of Traffic Control 4 LANES + 2WY LT LANE T.S. @ SAN GABRIEL, RUSH Crosswalks? @ ALL T.S. Pedestrian Traffic MODERATE Truck Traffic LIGHT On-Street Parking NO PARKING (MOST OF SEGMENT) ' Sidewalks? YES, BOTH SIDES Driveways? BOTH SIDES, FEW ROADWAY FACTORS Length of Segment 0.740 miles ' Width Vertical Curve? 65 feet YES, UPHILL NORTHBOUND Horizontal Curve? SLIGHT, SOUTH OF VILLAGE Visibility FAIR, EXCEPT AT DRIVEWAYS Roadway Conditions FAIR Lighting YES, BOTH SIDES Adjacent Land Use UNIVERSITY, GOLF COURSE, COMMERCIAL Field Study By ST Checked By VM CERTIFICATION: I, Vanessa Munoz, do hereby certify that this Engineering and Traffic Survey within the City of Rosemead was performed under my supervision and is accurate and complete. I am duly registered in the State of California as a Professional Engineer (Traffic). TE 2341 Vanessa Munoz',.,/ ate State Registration Number CITY OF ROSEMEAD 38 ENGINEERING AND TRAFFIC SURVEY STREET WALNUT GROVE AVEN UE CERTIFICATION DATE 3/7/2006 ' FROM RUSH STREET TO GARVEY AVENUE SPEED FACTORS ' Date of Speed Survey 11/3/2005 Posted Speed Limit 40 mph Time of Speed Survey 11:OOAM Speed Justification 50th Percentile Speed (Mean Speed) 39 mph HIDDEN DWYS., CURB PKG. ' 85th Percentile Speed 43 mph 10 mph Pace Speed 36-45 Recommended Speed Limit 40 mph ' Percentage of Vehicles in Pace 75 Number of Survey Samples 187 COLLISION HISTORY Number of Years Studied 3 years Total Collisions 8 ' Annual Collision Rate 2.667 accidents/year Collisions per Million Vehicle Miles 0.591 ' TRAFFIC FACTORS Average Daily Traffic 16,253 Date Counted 11/10/2005 Number of Lanes Type of Traffic Control 4 LANES UNDIVIDED,DIVIDED S/O EDISON T.S.@ RUSH, EDISON,KLINGERMAN,FERN,GARVEY Crosswalks? @ ALL T.S. Pedestrian Traffic LIGHT ' Truck Traff ic LIGHT On-Street Parking BOTH SIDES-HEAVY-RESTRICTED ' Sidewalks? YES, BOTH SIDES Driveways? BOTH SIDES, FEW 1 ROADWAY FACTORS Length of Segment 0.760 miles Width 65 feet Vertical Curve? NONE Horizontal Curve? NONE Visibility GOOD, EXCEPT AT DRIVEWAYS Roadway Conditions FAIR Lighting YES, BOTH SIDES Adjacent Land Use RESIDENTIAL Field Study By ST Checked By VM CERTIFICATION: I, Vanessa Munoz, do hereby certify that this Engineering and Traffic Survey within the City of Rosemead was performed under my supervision and is accurate and complete. I am duly registered in the State Qf California as a Professional Engineer (Traffic). Number Vanessa Munoz I CITY OF ROSEMEAD 39 ' ENGINEERING AND TRAFFIC SURVEY STREET WALNUT GROVE AVEN UE CERTIFICATION DATE 3/7/2006 ' FROM GARVEY AVENUE TO HELLMAN AVENUE SPEED FACTORS ' Date of Speed Survey 11/9/2005 Posted Speed Limit 40 mph Time of Speed Survey 2:OOPM Speed Justification ' 50th Percentile Speed (Mean Speed) 85th Percentile Speed 39 mph ADJ. SEG SPEED, HIDDEN DWYS., PEDS. 44 mph 10 mph Pace Speed 35-44 Recommended Speed Limit 40125" mph ' Percentage of Vehicles in Pace 70 Number of Survey Samples 172 COLLISION HISTORY Number of Years Studied 3 years Total Collisions 17 ' Annual Collision Rate 5.667 accidents/year Collisions per Million Vehicle Miles 1.218 TRAFFIC FACTORS Average Daily Traffic 25,495 Date Counted 11/17/2005 Number of Lanes 4 LANES - UNDIVIDED ' Type of Traffic Control T.S. @ GARVEY, HELLMAN Crosswalks? @ ALL T.S. Pedestrian Traffic MODERATE ' Truck Traffic LIGHT On-Street Parking BOTH SIDES ' Sidewalks? YES, BOTH SIDES Driveways? YES, BOTH SIDES ROADWAY FACTORS Length of Segment Width Vertical Curve? Horizontal Curve? Visibility Roadway Conditions Lighting Adjacent Land Use 0.500 miles 65 feet NONE NONE GOOD, EXCEPT AT DRIVEWAYS FAIR YES, BOTH SIDES MULTI FAMILY RESIDENTIAL, SCHOOL 1 1 Field Study By ST Checked By VM CERTIFICATION: I, Vanessa Munoz, do hereby certify that this Engineering and Traffic Survey within the City of Rosemead was performed under my supervision and is accurate and complete. I am duly registered in the State of California as a Professional Engineer (Traffic). 324~,0-6 TE 2341 Vanessa State Registration Number CITY OF ROSEMEAD ENGINEERING AND TRAFFIC SURVEY STREET WALNUT GROVE AVENUE CERTIFICATION DATE FROM HELLMAN AVENUE TO VALLEY BLVD 3/7/2006 40 SPEED FACTORS ' Date of Speed Survey 11/8/2005 Time of Speed Survey 11:OOAM ' 50th Percentile Speed (Mean Speed) 85th Percentile Speed 40 mph 45 mph 10 mph Pace Speed 35-44 ' Percentage of Vehicles in Pace 69 Number of Survey Samples 207 Posted Speed Limit 40 mph Speed Justification ADJ. SEG SPEED, HIDDEN DWYS.,VERT. & HORIZ. CURVE Recommended Speed Limit 40 mph ' COLLISION HISTORY Number of Years Studied 3 years Total Collisions 9 ' Annual Collision Rate 3 accidents/year Collisions per Million Vehicle Miles 0.483 1 TRAFFIC FACTORS Average Daily Traffic 23,293 Date Counted 11/8/2005 Number of Lanes 4 LANES - UNDIVIDED, DIVIDED SOUTH OF MARSHALL Type of Traffic Control T.S., @ HELLMAN, MARSHALL, VALLEY Crosswalks? @ ALL T.S. Pedestrian Traffic LIGHT Truck Traffic LIGHT On-Street Parking NO PKG SOUTH 1/2, NORTH 1/2 OK Sidewalks? YES, BOTH SIDES Driveways? YES, BOTH SIDES ROADWAY FACTORS Length of Segment 0.730 miles Width 65 feet Vertical Curve? YES,AT 1-10 Horizontal Curve? YES, AT 1-10 Visibility GOOD, EXCEPT AT DRIVEWAYS Roadway Conditions FAIR Lighting YES, BOTH SIDES Adjacent Land Use RESIDENTIAL, COMMERCIAL Field Study By ST Checked By VM CERTIFICATION: I, Vanessa Munoz, do hereby certify that this Engineering and Traffic Survey within the City of Rosemead was performed under my supervision and is accurate and complete. I am duly registered in the State of California as a Professional Engineer (Traffic). CITY OF ROSEMEAD 41 ' ENGINEERING AND TRAFFIC SURVEY STREET WALNUT GROVE AVENUE CERTIFICATION DATE 30/2006 ' FROM VALLEY BLVD TO MISSION BLVD SPEED FACTORS Date of Speed Survey 11/9/2005 Posted Speed Limit 40 mph Time of Speed Survey 9:OOAM Speed Justification ' 50th Percentile Speed (Mean Speed) 85th Percentile Speed 39 mph ADJ. SEG SPEED, HIDDEN DWYS., NO LT. 44 mph LANES 10 mph Pace Speed 35-44 Recommended Speed Limit 40 mph Percentage of Vehicles in Pace 69 Number of Survey Samples 207 COLLISION HISTORY ' Number of Years Studied 3 years Total Collisions 5 ' Annual Collision Rate 1.667 accidents/year Collisions per Million Vehicle Miles 0.492 ' TRAFFIC FACTORS Average Daily Traffic 18,561 Date Counted 11/8/2005 Number of Lanes 4 LANES - UNDIVIDED ' Type of Traffic Control T.S.@ VALLEY, MISSION,WELLS/EDMOND Crosswalks? @ ALL T.S. Pedestrian Traffic LIGHT Truck Traffic LIGHT On-Street Parking BOTH SIDES Sidewalks? YES, BOTH SIDES Driveways? YES, BOTH SIDES I ROADWAY FACTORS Length of Segment Width Vertical Curve? Horizontal Curve? Visibility Roadway Conditions Lighting Adjacent Land Use 0.500 miles 65 feet NONE NONE GOOD, EXCEPT AT DRIVEWAYS FAIR, NO LEFT TURN LANES MAINLY ON WEST SIDE RESIDENTIAL fl Field Study By ST Checked By VM CERTIFICATION: I, Vanessa Munoz, do hereby certify that this Engineering and Traffic Survey within the City of Rosemead was performed under my supervision and is accurate and complete. I am duly registered in the State of CAlifornia as a Professional Engineer (Traffic). Vanessa Munoz State CITY OF ROSEMEAD ENGINEERING AND TRAFFIC SURVEY STREET WALNUT GROVE AVENUE CERTIFICATION DATE FROM MISSION BLVD TO NORTH CITY LIMIT 3/7/2006 42 Date of Speed Survey 11/9/2005 Posted Speed Limit 40 mph Time of Speed Survey 1:OOPM Speed Justification 50th Percentile Speed (Mean Speed) 40 mph ADJ. SEG SPEED, HIDDEN DWYS., HORIZ. 85th Percentile Speed 45 mph CURVE 10 mph Pace Speed 37-46 Recommended Speed Limit 40 mph ' Percentage of Vehicles in Pace 75 Number of Survey Samples 154 COLLISION HISTORY ' Number of Years Studied 3 years Total Collisions 0 ' Annual Collision Rate 0 accidents/year Collisions per Million Vehicle Miles 0.000 TRAFFIC FACTORS Average Daily Traffic 14,061 Date Counted 11/8/2005 Number of Lanes 4 LANES - UNDIVIDED ' Type of Traffic Control T.S.@ MISSION ; STOP @ GRAND Crosswalks? @ ALL T.S. AND STOPS Pedestrian Traffic LIGHT Truck Traffic LIGHT On-Street Parking BOTH SIDES ' Sidewalks? YES, BOTH SIDES Driveways? YES, BOTH SIDES ' ROADWAY FACTORS Length of Segment 0.290 miles Width 56 feet Vertical Curve? NONE Horizontal Curve? YES, N. AND S. OF HALKET Visibility GOOD, EXCEPT AT DRIVEWAYS Roadway Conditions FAIR Lighting WEST SIDE ONLY ' Adjacent Land Use RESIDENTIAL,COMMERCIAL NORTH OF GRAND Field Study By ST Checked By VM ' CERTIFICATION: I, Vanessa Munoz, do hereby certify that this Engineering and Traffic Survey within the City of Rosemead was performed under my supervision and is accurate and complete. I am duly registered in the State O 'California as a Professional Engineer (Traffic). J / /Q6 TE 2341 ' Vanessa Munoz Date State Registration Number Radar Speed Distribution Forms Engineering and Traffic Survey ' City of Rosemead 1 Street Location Direction Remarks DE ADELENA STREET E-W ROSEMEAD TO ELLIS CITY OF ROSEMEAD SPOT SPEED SURVEY Date 11/3/2005 Begin 1:00PM End 2:OOPM Weather CLEAR Recorded by TSI - K.W. 50th % 30 MPH 85th % 32 MPH 1OMPH 26 35 % in Pace 91% MPH NUMBER OF VEHICLES 5 10 15 20 25 30 Number of Vehicles Percent of Total Cumulative Percentane 65 0 0% 100.0'>., 0 0% 100.0,-, 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 60 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 55 0 0% 1000% 0 0% 100 C 0 0% 100.0 0 0% 100-C.'' 0 0% 100.0`,,, 50 0 0% 100.0°/0 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 45 0 0% 1000% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 40 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 1 2% 100.0% 0 0% 97.9% 35 x x 0 0 0 5 11% 97.9% 0 1 2% 87.2% 0 0% 85.1% x x x x x o 0 0 0 9 19% 85.1% x o 2 4% 66.0% 30 x x x x x x x o 01 0 0 0 0 13 28% 61.7% x x o 3 6% 34.0% x x o 0 0 5 11% 27.7% x x 2 4% 17.0% x x o 3 6% 12.8% 25 0 0 0 3 6% 6.4% 0 0% 0.0% 0 0% 0.0% 0 0% 0.0% 0 0% 0.0% 20 0 0% 0.0% 0 0% 0.0% 0 0% 0.0% 0 0% 0.0% 0 0% 0.0% 15 0 0% 0 0°e X - East/North bound 0 - West/South Bound Tot al Observed 47 100 Street Location Direction Remarks DEL MAR AVENUE GRAVES AVE TO GARVEY AVE CITY OF ROSEMEAD SPOT SPEED SURVEY Date 11/3/2005 Begin 9:OOAM End 10:OOAN Weather CLEAR Recorded by TSI -S.W. 50th % 35 MPH 85th % 38 MPH 1OMPH 30 39 % in Pace 85% MPH NUMBER OF VEHICLES 5 10 15 20 25 30 Number of Vehicles Percent of Total Cumulative Percentage 65 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 60 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 55 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 50 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 45 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% x o 2 2% 100.0% 0 0% 98.3% 40 x x o 0 4 3% 98.3% x x x x x 0 0 0 8 7% 95.0% x x x o 0 0 0 0 0 0 10 8% 88.4% x x x o 0 0 0 7 6% 80.2% x x x x x x x x x o 0 0 0 01 0 0 0 0 01 0 20 17% 74.4% 35 x x x x x x o 0 0 0 0 11 9% 57.9% x x x x x x o 0 0 0 0 11 9% 48.8% x x x x o 0 6 5% 39.7% x x x x x x x o 0 0 0 11 9% 34.7% x x x x o 0 0 0 8 7% 25.6% 30 x x x x x x o 0 0 0 0 11 9% 19.0% x x x x x x 0 0 8 7% 9.9% x x x 0 4 3% 3.3% 0 0% 0.0% 0 0% 0.0% 25 0 0% 0.0% 0 0% 0.0% 0 0% 0.0% 0 0% 0.0% 0 0% 0.0% 20 0 0% 0.0% 0 0% 0.0% 0 0% 0.0% 0 0% 0.0% 0 0% 0.0% 15 0 0% 00% X - East/N orth bound 0 - West/South Bound Total Observed 121 100 N 1 CITY OF ROSEMEAD SPOT SPEED SURVEY Street DEL MAR AVENUE Date 11/2/2005 50th % 38 MPH Location Begin 10:OOAN End 11:00AN 85th % 42 MPH Direction N-S Weather CLEAR 1OMPH 33 42 Remarks GARVEY TO HELLMAN Recorded by TSI - K.W. % in Pace 78% MPH NUMBER OF VEHICLES 5 10 15 20 25 30 Number of Vehicles Percent of Total Cumulative Percenta e 65 0 0% 100.0% 0 0% 100.0% 0 .00/0 100.0°i, 0 0% 100 0'', 0 0% 100.01"D 60 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 55 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 50 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% x o 0 3 1% 100.0% 45 x x x x x x 6 3% 98.6% x x x x x o 0 0 0 0 0 0 12 6% 95.7% x x x x o 0 6 3% 90.0% x x x x x x x x o 0 01 0 0 0 0 0 16 8% 87.1% x x x x x 0 0 0 0 9 4% 79.4% 40 x x x x x x x x x x x x x o 0 0 0 01 0 0 0 10 0 01 1 24 11% 75.1% x x x x x x x o 0 0 0 0 0 0 0 0 0 01 0 01 0 1 21 10% 63.6% x x x x x x x x x x o 0 0 0 0 0 0 0 18 9% 53.6% x x x x x x x o 01 0 0 0 0 01 0 0 0 0 18 9% 45.0% x x x x x x x o 01 0 0 0 12 6% 36.4% 35 x x x x x x x x 0 0 0 0 0 0 0 15 7% 30.6% x x x x x x x x x o 0 0 0 01 0 0 0 0 0 19 9% 23.4% x x x x x x o 0 0 0 10 5% 14.4% x x x x o 0 0 0 8 4% 9.6% x x o 3 1% 5.7% 30 x x o 0 0 5 2% 4.3% x x o 3 1% 1.9% x 1 0% 0.5% 0 0% 0.0% 0 0% 0.0% 25 0 0% 0.0% 0 0% 0.0% 0 0% 0.0% 0 0% 0.0% 0 0% 0.0% 20 0 0% 0.0% 0 0% 0.0% a o% o.0r 0 0% 0.0% 0 0% 0.0% 15 0 0% 0.0% X - East/N orth bound 0 - West/South Bound Total Observed 209 100 e r i Street Location Direction Remarks EARLSWOOD DRIVE N-S WAR AVE TO ROSEMEAD PL CITY OF ROSEMEAD SPOT SPEED SURVEY Date 11/10/2005 Begin 10:OOAIV End 1:OOAM Weather CLEAR Recorded by TSI - K.W. 50th % 27 MPH 85th % 30 MPH 1OMPH 23 32 % in Pace 89% MPH NUMBER OF VEHICLES 5 10 15 20 25 30 Number of Vehicles Percent of Total Cumulative Percents e 65 0 0% 100.0% 0 0% 100.0% 0 Oo/p 100.0% 0 0% 100.0% 0 0% 100.0% 60 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 55 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 50 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 45 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 40 0 0% 100.0% 0 0% 100.0% 0 0% 100011, 0 0% 100 l' 0 0% 100.6 35 0 0% 100.0 0 1 1% 100.0 - 0 1 1 % 98.6 x o 2 3% 97 2 x x o 3 4% 94.4 30 x x x x x x x 0 0 0 10 14% 903 x x x 0 0 0 6 8% 76 4`1.- x x 0 0 0 0 0 7 10% 68.1'% X x x x x 0 0 7 10% 58.3°,Io x x x x x o 0 7 10% 48.6% 25 x x x x x x x o 0 0 0 0 0 101 14 19% 38.9% x 0 o x 4 6% 19.4% x 0 0 0 4 6% 13.9% 0 1 1% 8.3% x X1 1 2 3% 6.9% 20 x o 0 3 4% 4.2% 0 0% 0.0% 0 0% 0.0% 0 0% 00% 0 0% 0.0% 15 0 00/ 0 n1 X - EastlNorth bound 0 - West/South Bound Tot al Observed 72 100 1 CITY OF ROSEMEAD SPOT SPEED SURVEY Street ELLIS LANE Date 1/10/2006 Location Begin 2:OOPM End 3:OOPM Direction N-S Weather CLEAR Remarks OLNEY ST TO TEMPLE CITY BLVD Recorded by TSI - K.W. 50th % 29 MPH 85th % 32 MPH 1OMPH 23 32 % in Pace 83% MPH NUMBER OF VEHICLES 5 10 15 20 25 30 Number of Vehicles Percent of Total Cumulative Percents e 65 0 0% 100.0-'', 0 0% 100 01% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 60 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0°% 100.0% 55 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 50 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 45 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100 U, 40 0 0% 100.0 0 0% 1000 0 0% 100.0 X 1 1% 100.0,%1, x O O 3 2% 99.2'/j 35 x x 0 0 0 5 4% 96-9t, x x x 0 4 3% 93.1 x x o 0 4 3% 901% x x x x x x 0 0 0 0 0 0 12 9% 87.044, x x x x o 0 0 0 8 6% 779% 30 x x x x x x x x x x x x o 0 0 0 0 0 0 0 0 .0 0 0 0 25 19% 71.8% x x x o 0 0 0 0 0 0 10 8% 52.7% x x x x x x o l o 0 0 0 11 8% 45.0% x x x x o 0 0 0 8 6% 36.6% x x x x x 0 0 0 0 0 0 11 8% 30.5% 25 x x x z x x o 0 0 0 0 0 12 9% 22.1% X X X 0 0 0 0 7 5% 13.0% X X 0 0 0 5 4% 7.6% 0 O 2 2% 3.8% X 0 2 2% 2.3% 20 X 1 1%1 0.8% 0 0% 0.0% 0 0% 0.0% 0 0% 0.0% 0 0% 0.0% 15 0 0% 0.0% X - East/North bound 0 - WesUSouth Bound Total Observed 131 100 1 n u 1 1 t CITY OF ROSEMEAD SPOT SPEED SURVEY Street EMERSON PLACE Date 11/2/2005 50th % 30 MPH Location Begin 9:OOAM End 10:OOAIV 85th % 32 MPH Direction E-W Weather CLEAR 1OMPH 25 34 Remarks NEW AVE TO SAN GABRIEL BLVD Recorded by TSI - S. W. % in Pace 90% MPH NUMBER OF VEHICLES 5 10 15 20 25 30 Number of Vehicles Percent of Total Cumulative: Percents 65 0 0% 100 C 0 0% 100-0%; 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 60 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 55 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 50 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 45 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 40 0 0% 100.0% 0 0% 100.0% x 1 1% 100.0% 0 0% 98.6% 0 1 1% 98.6% 35 0 0 0 3 4% 97.2% x x x 3 4% 93.0% x o 2 3% 88.7% x x x o 0 0 0 7 10% 85.9% x x x o 0 5 7% 76.1% 30 x x x x x x x x o 0 0 0 0 0 14 20% 69.0% x x x o 0 0 0 0 0 0 0 11 15% 49.3% x x x x 0 0 0 7 10% 33.8% x x 0 0 0 5 7% 23.9% X x o 0 0 5 7% 16.9% 25 x x x o 0 5 7% 9.9% 0 0 2 3% 2.8% 0 0% 0.0% 0 0% 0.0% 0 0% 0.0% 20 0 0% 0.0% 0 0% 0.0% 0 0% 0.0% 0 0% 0.0% 0 0% 0.0% 15 0 0% 0.0% X - North bound 0 - West/South Bound Tot al Observed 71, 100 CITY OF ROSEMEAD SPOT SPEED SURVEY Street ENCIN1TA AVENUE Date 11/2/2005 50th % 29 MPH Location Begin 2:OOPM End 3:OOPM 85th % 32 MPH Direction N-S Weather CLEAR 10MPH 24 33 Remarks MISSION RD TO LOWER AZUSA RD Recorded by TSI - K.W. % in Pace 89% MPH NUMBER OF VEHICLES 5 10 15 20 25 30 Number of Vehicles Percent of Total Cumulative Percents e 65 0 0% 1000-/1 0 0% 100.0'so 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 60 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 55 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 50 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 45 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 40 0 0% 1000% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 35 x 0 101 3 5% 100.0% 0 0% 95.5% x o 0 3 5% 95.5% x 0 0 0 0 5 8% 90.9% x x x o 0 0 0 7 11% 83.3% 30 x x x x x 0 0 0 8 12% 72.7% X x 0 0 0 0 0 01 0 9 14% 60.6% x x x x o 0 0 0 0 9 14% 47.0% x x x 0 0 5 8% 33.3% x x o 3 5% 25.8% 25 x x x x x o 0 0 8 12% 21.2% x 0 1 1 2 3% 9.1% 0 1 2% 6.1% 0 0% 4.5% x 1 2% 4.5% 20 0 0 2 3% 3.0% 0 0% 0.0% 0 0% 0.0% 0 0% 0.0% 0 0% 0.0% 15 0 0% 00% X - East/North bound 0 - West/South Bound Total Observed 66 100 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Street Location Direction Remarks GARVEY AVENUE E-W WEST CITY LIMIT TO DEL MAR AVE CITY OF ROSEMEAD SPOT SPEED SURVEY Date 11/10/2005 Begin 3:OOPM End 4:OOPM Weather CLEAR Recorded by TSI - K.W. 50th % 34 MPH 85th % 38 MPH 1OMPH 30 39 % in Pace 72% MPH NUMBER OF VEHICLES 5 10 15 20 25 30 Number of Vehicles Percent of Total Cumulative Percents e 65 0 0% 100.0% 0 0% 100,0'/0 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 60 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100 0 55 0 0% 1000 0 0% 1000 < 0 0% 100 0',' 0 0% too 0``~, 0 0% 100-01,~, 50 0 0% 100.01", 0 0% 1o0.o`- 0 0% 100.0 0 0% 1000% 0 1 0% 100.0% 45 0 1 0% 99.5% 0 0% 990% 0 0% 990% x x x x 0 0 6 3% 990% x 0 0 3 1% 961f-~ 40 x 0 0 0 0 0 0 7 3% 94 6"', x x x o 0 0 0 0 0 9 4% 91.2>' x x x x x x x o 0 0 0 0 0 0 0 0 16 8% 86.8 x x x 0 0 0 0 0 8 4% 78.9°%, x x x x x o 0 01 0 01 0 0 0 13 6% 75.0"%., 35 x x x x x x x x x x x x o 0 0 0 0 0 0 0 0 0 0 0 0 25 12% 68 6 x x x x x x x x x x x x x x o 0 0 0 0 0 0 21 10% 56 4°/: x x x x x x x x 0 0 0 0 0 0 0 15 7% 46.1 °1o x x x x x x x x o 0 0 0 0 0 01 01 16 8% 38.7% x x x x x 0 0 01 01 9 4% 30.9% 30 x x x x x x x x x O O O O 01 0 15 7% 26.5% x x x x x o 0 01 01 9 4% 191% x x x x x x o 0 0 0 0 11 5% 14.7% x x x 0 4 2% 9.3% X x x x x o 0 0 8 4% 7.4% 25 x x x x o 5 2% 3.4% 0 1 0% 1.0% 0 1 0% 0.5% 0 0% 0.0% 0 0% 0.0% 20 0 0% 0.0% 0 0% 0.0% 0 0% 0.0% 0 0% 0.0% 0 0% 0.0% 15 0 0% 0.0% X - East/North bound 0 - West/South Bound Tot al Observed 904 100 CITY OF ROSEMEAD SPOT SPEED SURVEY Street GARVEY AVENUE Date 11/10/2005 50th % 35 MPH Location Begin 2:00PM End 3:OOPM 85th % 39 MPH Direction E-W Weather CLEAR 10MPH 30 39 Remarks DEL MAR AVE TO SAN GABRIEL Recorded by TSI - K.W. % in Pace 75% MPH NUMBER OF VEHICLES 5 10 15 20 25 30 Number of Vehicles Percent of Total Cumulative Percents e 65 0 0% 100.0`4u 0 0% 100 0`.lo 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 60 0 0% 100.0% 0 0% 100-0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 55 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 1000% 50 0 0% 100.0% 0 0% 100 C 0 0% 100 C 0 0% 1000 0 0% 100 C 45 0 1 0% 100 C , x o 2 1% 995'. 0 0 2 1% 986 x x 0 0 0 0 0 7 3% 97.6-,- x x 0 0 0 0 0 7 3% ' 942 40 x x x o 0 0 6 3% 91.0 x x x x x x o 0 0 0 0 0 0 13 6% 88.1 x x x x 0 10 01 0 0 10 0 0 12 6% 81°° x x x x x x x x x , o 0 0 0 13 6% 76 2 x x x x x x x x x x x x x o 0 0 0 0 0 0 20 10% 70.0% 35 x x x x x x x x x x x x x o 0 0 0 0 0 0 0 0 0 0 24 11% 60.5% x x x x x x x x x x o 0 0 0 0 0 0 0 0 0 0 21 10% 49.0% x x x x x x x o 0 0 0 0 0 0 0 15 7% 39.0'!,, x x x x x x x x o 0 0 0 0 01 0 0 16 8% 31 Vii` x x x x x x x o 0 0 0 11 5% 24. . 30 x x x x x x x 0 10 1 0 0 0 12 6% 19.C x x x x x o 0 0 0 0 10 5% 13.) x x x o 0 0 6 3% 8.6` x o 2 1% 5.7;4: x x x 0 4 2% 4.8% 25 x x x 0 0 5 2% 2.9% x 1 0% 0.5% 0 0% 0.0% 0 0% 0.0% 0 0% 0.0% 20 0 0% 0.0% 0 0% 0.0% 0 0% 0.0% 0 0% 0.0% 0 0% 0.0% 15 0 0% 00%1 X - EasUNorth bound 0 - West/South Bound Total Observed 210 100 jEffM 1 1 CITY OF ROSEMEAD SPOT SPEED SURVEY Street GARVEYAVENUE Date 11/10/2005 50th % 34 MPH Location Begin 1:OOPM End 2:OOPM 85th % 38 MPH Direction E-W Weather CLEAR 1OMPH 29 38 Remarks SAN GABRIEL TO WALNUT GROVE Recorded by TSI - K.W. % in Pace 76% MPH NUMBER OF VEHICLES 5 10 15 20 25 30 Number of Vehicles Percent of Total Cumulative Percents e 65 0 0% 100.0° o 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 60 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 55 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 50 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 45 0 0% 100.0% 0 0% 100.0% x 1 0% 100.0% x x x 0 0 5 2% 99.5% x x o 0 4 2% 97.1% 40 x x x o 0 0 0 0 8 4% 95.1% x x x 0 0 0 6 3% 911% x x x x x x x x x o 0 0 0 01 0 0 16 8% 88.3% x x x x x 0 0 0 0 9 4% 80.5% x x x x x o 0 0 0 0 0 0 0 0 14 7% 76.1% 35 x x x x x x x x x x x o 0 0 0 0 0 0 0 0 01 0 0 0 0 0 26 13% 69.3% x x x x x x x x x x o 0 0 0 0 0 0 0 18 9% 56.6% x x x x x x o 0 0 0 0 0 0 13 6% 47.8% x x x x x x x x x x x x o 0 0 0 0 0 0 0 0 0 22 11% 41.5% x x x x 0 10 10 10 10 10 0 0 12 6% 30.7% 30 x x x x x x x 0 0 0 01 0 10 1 13 6% 24.9% x x x x x x x o 0 0 0 0 0 1 1 13 6% 18.5% x x x x 0 0 0 7 3% 12.2% x x x x 0 0 6 3% 8.8% X 0 0 0 4 2% 5.9% 25 x x x x x o 0 0 8 4% 3.9% 0 0% 0.0% 0 0% 0.0% 0 0% 0.0% 0 0% 0.0% 20 0 0% 0.0% 0 0% 0.0% 0 0% 0.0% 0 0% 0.0% 0 0% 0.0% 15 0 0% 0.0°10 X - North bound 0 - West/South Bound Total Observed 205 100 r~ 1 CITY OF ROSEMEAD SPOT SPEED SURVEY Street GARVEY AVENUE Date 11/9/2005 Location Begin 3:OOPM End 4:OOPM Direction E-W Weather CLEAR Remarks WALNUT GROVE TO EAST CITY LIM Recorded by TSI - K.W. 50th % 35 MPH 85th % 39 MPH 1OMPH 29 38 % in Pace 71% MPH NUMBER OF VEHICLES 5 10 15 20 25 30 Number of Vehicles Percent of Total Cumulative Percents e 65 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 60 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100,0-: 0 0% 100 0 55 0 0% 1000 " 0 0% 1000 0 0% 100-0ib 0 0% 100.0`/0 0 0% 100.0% 50 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 1 0% 100.0% 45 2 j 0 0 4 2% 99.5% . x . 0 0 3 1% 97.5% 0 0 2 1% 96.1% x 0 0 0 0 0 6 3% 95.1% x x 0 0 4 2% 92.2% 40 x x x x x x 0 0 101 9 4% 90.2% x x x x 0 0 0 0 1 1 8 4% 85.8% x x x x x x 0 0 0 0 0 0 0 0 14 7% 81.9% x x x x x x x o 0 0 0 11 5% 75.0% x x x x x x x x x o 0 0 0 01 0 0 0 0 0 0 20 10% 69.6% 35 x x x x x x x x x x x x x x 0 0 0 0 0 0 0 0 0 0 0 0 26 13% 59.8% x x x x x x x x 01 0 0 01 0 01 0 0 0 17 8% 47.1% x x x x x o 0 0 0 0 0 0 12 6% 38.7% x x x x x x x x x x 0 0 0 0 0 0 0 0 18 9% 32.8% x x x x 0 0 0 7 3% 24.0% 30 x x x x x x o 0 0 0 10 5% 20.6% x x x x x x 0 0 0 0 10 5% 153% x x x x 01 0 6 3% 10.8% x x o 0 0 5 2% 7.8% x x x 0 4 2% 54% 25 x x x x o 0 0 7 3% 3.4% 0 0% 0.0% 0 0% 0.0% 0 0% 0.0% 0 0% 0.0% 20 0 0% 0.0% 0 0% 0.0% 0 0% 0.0% 0 0% 0.0% 0 0% 0.0% 15 0 0% 0 0°/ X - East/North bound 0 - West/South Bound Total Observed 204 100 " . i 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Street Location Direction Remarks CITY OF SPOT SPEED SURVEY Date Begin End Weather Recorded by 50th % #DIV/0! MPH 85th % #DIV/0! MPH 1OMPH 56 65 % in Pace #DIV/0! MPH NUMBER OF VEHICLES 5 10 15 20 25 30 Number of Vehicles Percent of Total Cumulative Percentage 65 0 #DIV10! #DIV/O! o #DIV/0! #DIV/0! 0 #DIVlO! #DIV/0! 0 #DIV/0! #DIV/0! 0 #DIV/0! #DIV/0! 60 0 #DIV/O! #DIV/0! 0 #DIV/0! #DIV/0! 0 #DIV/0! #DIV/0! 0 #DIV/0! #DIV/0! 0 #DIV/0! #DIV/O! 55 0 #DIV/0! #DIV/O! 0 #DIV/0! #DIV/0! 0 #DIV/0! #DIV/0! 0 #DIV/0! #DIV/O! 0 #DIV/0! #DIV/0! 50 0 #DIV/O! #DIV/0! 0 #DIV/0! #DIV/O! 0 #DIV/0! #DIV/0! 0 #DIV/0! #DIV/0! 0 #DIV/O! #DIV/0! 45 0 #DIV/0! #DIV/0! 0 #DIV/0! #DIV/O! 0 #DIV/0! #DIV/O! 0 #DIV/O! #DIV/O! 0 #DIV/0! #DIV/O! 40 0 #DIV/0! #DIV/0! 0 #DIV/O! #DIV/0! 0 #DIV/O! #DIV/0! 0 #DIV/0! #DIV/0! 0 #DIV/0! #DIV/0! 35 0 #DIV/0! #DIV/0! 0 #DIV/0! #DIV/0! 0 #DIV/01 #DIV/01 0 #DIV/01. #DIV/0! 0 #DIV/O! #DIV/0! 30 0 #DIV/0! #DIV/0! 0 #DIV/0! #DIV10! 0 #DIV/0! #DIV/0! 0 #DIV/O! #DIV/0! o #DIV/01 #DIV/O! 25 0 #DIV/0! #DIV/0! 0 #DIV10! #DIV10! 0 #DIV/O! #DIV/0! 0 #DIV/O! #DIV/0! 0 #DIV/0! #DIV/0! 20 0 #DIV/O! #DIV/0! 0 #DIV/0! #DIV/O! 0 #DIV/O! #DIV/0! 0 #DIV/0! #DIV/0! 0 #DIV/O! #DIV/0! 15 0 #DIV/0! #DIV/01 X - East/North bound 0 - WestlSouth Bound Tot al Observed 0 100 I F 1 n 1 CITY OF ROSEMEAD SPOT SPEED SURVEY Street GRAND AVENUE Date 11/9/2005 50th % 34 MPH Location Begin 11:00AN End 12:OOPN 85th % 38 MPH Direction E-W Weather CLEAR 10MPH 29 38 Remarks CHARLOTTE TO ROSEMEAD Recorded by TSI - K.W. % in Pace 81% MPH NUMBER OF VEHICLES 5 10 15 20 25 30 Number of Vehicles Percent of Total Cumulative Percents e 65 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100 0°/ 0 0% 100.0 - 60 0 0% ' -1-00(l 0 0% 100. 0 0% 100 u 0 0% 100.0' 0 0% 100.0'/ 55 0 0% 100.011 0 0% 100.0 0 0% 100-0-/, 0 0% 100-0' 0 0% 100 0 50 0 0% 100.0 0 0% 100.0`:: 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 45 x 1 2% 100.0% 0 0% 98.4% x 1 2% 98.4% x x 2 3% 96.8% 0 0% 93.5% 40 0 1 2% 93.5% 0 0 2 3% 91.9% x x x o 4 6% 88.7% x 0 0 0 0 0 6 10% 82.3% x o 0 3 5% 72.6% 35 x x x x x o 0 0 0 9 15% 67.7% x 0 0 0 0 0 0 7 11% 53.2% x x x o 4 6% 41.9% x x x o 0 0 0 0 0 9 15% 35.5% x 1 2% 21.0% 30 x o 0 3 5% 19.4% X 0 0 0 4 6% 14.5% x o 2 3% 8.1% x 1 2% 4.8% x 1 2% 3.2% 25 x 1 2% 1.6% 0 0% 0.0% 0 0% 0.0% 0 0% 0.0% 0 0% 0.0% 20 0 0% 0.0% 0 0% 0.0% 0 0% 0.0% 0 0% 0.0% 0 0% 0.0% 15 0 0% 0.0% X - East/N ort h bound 0 - West/South Bound Tot al Observed 62 100 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Street Location Direction Remarks HELLMAN AVENUE E-W NEW TO WALNUT GROVE CITY OF ROSEMEAD SPOT SPEED SURVEY Date 11/2/2005 Begin 1:00PM End 2:OOPM Weather CLEAR Recorded by TSI -S.W. 50th % 29 MPH 85th % 33 MPH 1OMPH 25 34 % in Pace 86% MPH NUMBER OF VEHICLES 5 10 15 20 25 30 Number of Vehicles Percent of Total Cumulative Percentage 65 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 60 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 55 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0%a 100.0°/ 50 0 0% 100 C 0 0% 100 C 0 0% 1000 ' 0 0% 100 0°~ 0 0% 100.011,/~. 45 0 0% 100.01/, 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 40 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 1 1% 100.0% 35 x x o 0 0 10 6 6% 99.0% x x x x 0 10 0 7 7% 93.1% x x x x 0 0 0 7 7% 86.3% x x x x x x a o 0 0 0 0 12 12% 79.4% x x o 0 0 5 5% 67.6% 30 x x x x x o 0 0 0 0 0 11 11% 62.7% x x x x x x o 0 0 0 0 0 0 13 13% 52.0% x x x x x o 0 0 0 0 10 10% 39.2% x x o 0 0 0 6 6% 29.4% x x x x 0 0 0 0 8 8% 23.5% 25 x x x x x o 0 0 0 9 9% 15.7% x 01 1 2 2% 6.9% x 1 1 % 4.9% x 1 1% 3.9% x x 2 2% 2.9% 20 x 1 1% 1.0% 0 0% 0.0% 0 0% 0.0% 0 0% 0.0% 0 0% 0.0% 15 0 0% 0 ,0,,, X - East/N ort h bound 0 - West/South Bound Tot al Observed 102 100 CITY OF ROSEMEAD SPOT SPEED SURVEY Street JA CKSON A VENUE Date 11/2/2005 50th % 30 MPH Location Begin 3:OOPM End 4:OOPM 85th % 35 MPH Direction N-S Weather CLEAR 1OMPH 26 35 Remarks GRAVES TO GARVEY Recorded by TSI -S.W. % in Pace 79% MPH NUMBER OF VEHICLES 5 10 15 20 25 30 Number of Vehicles Percent of Total Cumulative Percents e 65 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 60 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 55 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 50 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 45 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 1 1% 100.0% 0 0% 98.6% 40 0 1 1% 98.6% 0 1 1% 97.2% x 0 0 0 4 6% 95.8% 0 0% 90.3% x o 0 3 4%a 90.3% 35 x x x o 0 0 0 0 8 11% 86.1% x o 0 3 4% 75.0% x o 2 3% 70.8% x x x x o 0 01 01 01 9 13% 68.1% x x 2 3% 55.6% 30 x x x x x x o 0 0 0 0 0 0 13 18% 52.8% x 0 0 0 4 6% 34.7% x x x x o 0 0 0 8 11% 29.2% x o 2 3% 18.1% x x o 0 0 0 6 8% 15.3% 25 x x x x 0 5 7% 6.9%a 0 0% 0.0% 0 0% 0.0% 0 0% 0.0% 0 0% 0.0%a 20 0 0% 0.0% 0 0% 0.0% 0 0% 0.0% 0 0% 0.0% 0 0% 0.0% 15 0 0% 0.0% X - Eas t/North bound 0 - West/South Bound Total Observed 72 100 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Street Location Direction Remarks LOFTUS STREET E-W TEMPLE CITY TO EAST CITY LIMIT CITY OF ROSEMEAD SPOT SPEED SURVEY Date 11/2/2005 50th % Begin 1:OOPM End 2:OOPM 85th % Weather CLEAR 1OMPH Recorded by TSI - K.W. % in Pace 35 MPH 39 MPH 30 39 MPH NUMBER OF VEHICLES 5 10 15 20 25 30 Number of Vehicles Percent of Total Cumulative Percentage 65 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 1000% 60 0 0% 1000"/", 0 0% 100 r 0 0% 100 G"', 0 0% 100 0 , 0 0% 100.0% 55 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0ro 0 0% 100.0ro 50 0 0% 100.0% 0 Ora 100.0ro 0 0io 100.0io 0 0% 100.0% 0 0% 100.0% 45 0 0 2 1 % 100.0% 0 0% 98.6% x 1 1% 98.6% x x x o 0 0 0 0 0 9 7% 97.8% x o 2 1% 91.3% 40 x x 0 0 0 0 6 4% - 89.9% x x x x 0 0 0 0 8 6% 85.5% x x x x x o 0 0 0 0 0 0 12 9% 79.7% x x x x o 0 0 0 0 0 10 7% 710% x x x x x o 0 0 0 0 0 0 12 9% 63.8% 35 x x x x x x x x x o 0 0 0 0 0 0 0 0 18 55.1 x x x x x x x o 0 0 0 0 0 0 14 42.0% x x x x x 0 6 14% 31.9% x x x x x 0 0 0 0 9 27.5% x x x x 0 5 21.0% 30 x x x x x 0 0 0 0 9 7% 17.4% x x o 0 0 0 0 0 8 6% 10.9% x x o 3 2% 5.1% x 1 1 % 2.9% x 1 1% 2.2% 25 x x 2 1% 1.4% 0 0% 0.0% 0 0% 0.0% 0 0% 0.0/a 0 0% 0.0% 20 0 0% 0.0% 0 0% 0.0% 0 0% 0.0% 0 0% 0.0% 0 0% 0.0% 15 0 0% 0.0% X - Eas t/N ort h bound 0 - West/South Bound Tot al Observed 138 100 fl CITY OF ROSEMEAD SPOT SPEED SURVEY Street LOWER AZUSA ROAD Date 11/2/2005 Location Begin 3:OOPM End 4:OOPM Direction E-W Weather CLEAR Remarks ROSEMEAD TO ENCINITA Recorded by TSI - K.W. 50th % 39 MPH 85th % 42 MPH 10MPH 34 43 % in Pace 79% MPH NUMBER OF VEHICLES 5 10 15 20 25 30 Number of Vehicles Percent of Total Cumulative Percentage 65 0 0% . 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 60 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 55 0 0% 100 C~ 0 0% 100 C ' 0 0% 100,C 0 0% 1006. 0 0% 100 6- 50 x 0 2 1% 100 C" x 1 1% 98.61- 0 0 0% 979``, 0 0% 97.9 : x o 2 1% 97.90' 45 x x x o 0 0 0 0 0 9 6% 96.6% 0 0 0 3 2% 90.3% x x x o 0 5 3% 88,3% x x x x x x o 0 01 0 0 0 0 0 14 10% 84,8°/,) x x x x x x 0 0 01 0 10 7% 75.2°4~ 40 x x x x x x x x x 0 0 0 0 0 0 0 0 0 0 0 0 0 22 15% 68.3% x x x x x x x x x x o 0 0 0 0 0 0 0 18 12% 53.1% x x x x x x x o 0 0 0 0 0 0 0 0 0 0 18 12% 40.7% x x x 0 0 0 6 4% 28.3% x 0 0 0 0 5 3% 24.1% 35 x x x x x x o 0 0 0 0 01 01 13 9% 20.7% x x o 0 4 3% 11.7% 0 1 1 % 9.0% x x o 0 0 5 3% 8.3% x o 2 1 % 4.8% 30 x x 0 0 4 3% 3.4% x 1 1%1 0.7% 0 0% 0.0% 0 0% 0.0% 0 0% 0.0% 25 0 0% 0.0% 0 0% 0.0% 0 0% 0.0% 0 0% 0.0% 0 0% 0.0% 20 0 0% 0.0% 0 0% 0.0% 0 0% 0.0% 0 0% 0.0% 0 0% 0.0% 15 0 0°i° 0.0°i° X - Eas t/North bound 0 - West/South Bound Total Observed 145 100 CITY OF ROSEMEAD SPOT SPEED SURVEY MARSHALL STREET Date 11/8/2005 50th % 35 MPH Begin 10:00AN End 11:00AN 85th % 38 MPH E-W Weather CLEAR 10MPH 29 38 DELTA TO WALNUT GROVE Recorded by TSI - K.W. % in Pace 88% MPH NUMBER OF VEHICLES 5 10 15 20 25 30 Number of Vehicles Percent of Total Cumulative Percenta e 65 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 60 0 0% 100 C'' 0 0% 100 C 0 0% 100 C,11 0 0% - 100 0` 0 0% 100 0 ;t: 55 0 0% 100 0`71 0 0% 100 01~% 0 0% 1000% 0 0% 100.0% 0 0% 100.0% 50 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 45 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% ° 1 1% 100.0% 0 0% 98.9% 40 x x x o 4 4% 98.9% x 0 0 0 4 4% 94.4% x x x x x x x o 01 0 10 11% 89.9% x x x o 0 0 0 0 0 9 10% 78.7% x x x x x x o 0 8 9% 68.5% 35 x x x x x x x 0 0 0 0 0 0 01 01 15 17% 59.6% x 0 01 0 0 0 6 7% 42.7% x x x x 0 0 0 0 0 9 10% 36.0% x x x o 0 0 0 0 0 9 10% 25.8% ° 1 1% 15.7% 30 x x o 0 0 0 6 7% 14.6% x x o 0 0 5 6% 7.9% X Of 1 2 2% 2.2% 0 0% 0.0% 0 0% 0.0% 25 0 0% 0.0% 0 0% 0.0% 0 0% 0.0% 0 0% 0.0% 0 0% 0.0% 20 0 0% 00%1 0 0% 0.0% 0 0% 0.0% 0 0% 0.0% 0 0% 0.0% 15 0 0% 0.0% X - East /North bound 0 - West/South Bound Total Observed 89 100 - I II= CITY OF ROSEMEAD SPOT SPEED SURVEY Street MARSHALL STREET Date 11/8/2005 50th % 30 MPH Location Begin 9:OOAM End 10:OOAN 85th % 34 MPH Direction E-W Weather CLEAR 10MPH 26 35 Remarks WALNUT GROVE TO ROSEMEAD Recorded by TSI - K.W. % in Pace 88% Number Vehicle 1 X x 2 2% 100.0% x x 2 2% 97.8% x x x x x 0 0 7 8% 95.7% x x 01 01 4 4% 88.2% x x x x o 0 6 6% 83.9% x x x x x x x 0 0 0 0 0 0 13 14% 77.4% x x x x o 0 0 7 8% 63.4% x x x x x x 0 0 0 0 01 0 0 13 14% 55.9% X x x x x x x o 0 0 10 11% 41.9% x x x x 0 0 0 0 01 01 10 11% 31.2% 0 0 0 3 3% 20.4% x x x o 0 0 0 0 0 9 10% 17.2%1 x x x o 0 0 6 6% 7.5% 0 1 1% 1.1% - East/North bound 0- CITY OF ROSEMEAD SPOT SPEED SURVEY Street MARSHALL STREET Date 1113/2005 50th % Location Begin 3:OOPM End 4:OOPM 85th % Direction E-W Weather CLEAR 1OMPH Remarks ROSEMEAD TO HART Recorded by TSI - K.W. % in Pace 35 MPH 38 MPH 30 39 MPH NUMBER OF VEHICLES 5 10 15 20 25 30 Number of Vehicles Percent of Total Cumulativo Percentao 65 0 0% 100 0 0 0% 100.c , 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 60 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 55 0 0% 100.0% 0 0% 100.0% 0 0% 100 C 0 0% 100 c 0 0% 100 0 50 0 0% 100 0',. 0 0% 100 0's 0 0% 100.0°L, 0 0% 100.0^.4: 0 0% 100.0% 45 x 1 1% 100.0% x 7 1 % 99.3% x 1 1 % 98.5% x x x o 0 x 6 4% 97.8% x 0 2 1% 93.4% 40 0 1 1% 92.0% x x x x 0 0 0 7 5% 91.2% x x x o 0 01 01 01 01 0 0 11 8% 86.1% x x x o 01 0 0 0 0 9 7% 78.1% x x x x x x -L .L o 0 0 0 0 0 0 15 11% 71.5% 35 x x x x x x x x x x x 0 0 0 0 01 0 0 0 01 0 21 15% 60.6% x x x x x o 0 0 0 0 10 7% 45.3% x x x x x o 0 0 0 0 10 7% 38,0% X x x x x x x x o 0 0 0 0 0 14 10% 30.7% X x o 0 0 5 4% 20.4% 30 x x x o 0 0 6 4% 16.8% x x x x 0 0 0 7 5% 12.4%1 x x x 0 0 0 6 4% 7.3% x 1 1% 2.9% x 1 1 % 2.2% 25 x x 2 1% 1.5% 0 0% 0.0% 0 0% 0.0% 0 0% 0.0% 0 0% 0.0% 20 0 0% 0.0% 0 0% 0.0% 0 0% 0.0% 0 0% 0.0% 0 0% 0.0% 15 0 0% 0.0% X - East/North bound 0 - West/South Bound Total Observed 137 1 00 mum I 1 CITY OF ROSEMEAD SPOT SPEED SURVEY Street MARSHALL STREET Date 11/3/2005 50th % Location Begin 2:OOPM End 3:OOPM 85th % Direction E-W Weather CLEAR 1OMPH Remarks HART TO RIO HONDO Recorded by TSI - K.W. % in Pace 34 MPH 37 MPH 29 38 84% MPH NUMBER OF VEHICLES 5 10 15 20 25 30 Number of Vehicles Percent of Total Cumulative Percenta e 65 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 60 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 55 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 50 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 45 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% x 1 1% 100.0% 0 0% 98.9% 40 x 0 2 2% 98.9% x x x 3 3% 96.6% x x x 0 0 0 0 7 8% 93.2% x x x x x x 0 0 8 9% 85.2% x 0 0 0 0 0 0 7 8% 76.1% 35 x x x x x x x x1 0 10 0 0 0 13 15% 68.2% X 0 0 0 0 0 0 01 01 9 10% 53.4% x x x 0 0 0 6 7% 43.2% x x x x o 0 0 0 0 0 0 0 0 13 15% 36.4% 0 0 2 2% 21.6% 30 x x o 3 3% 19.3% x x x 0 0 0 6 7% 15.9% 0 01 1 2 2% 9.1% 0 1 1% 6.8% x x 2 2% 5.7% 25 x x o 3 3% 3.4% 0 0% 0.0% 0 0% 0.0% 0 0% 0.0% 0 0% 0.0% 20 0 0% 0.0% 0 0% 0.0% 0 0% 0.0% 0 0% 0.0% 0 0% 0.0% 15 0 0% 00% X - East/N orth bound 0 - West/South Bound Tot al Observed 88 100 ;::i _ , I I CITY OF ROSEMEAD SPOT SPEED SURVEY Street MISSION DRIVE Date 11/912005 50th % 39 MPH Location Begin 10:OOAN End 11:00AN 85th % 43 MPH Direction E-W Weather CLEAR 1OMPH 34 43 Remarks WEST CITY LIM TO WALNUT GROVE Recorded by TSI - K.W. % in Pace 74% MPH NUMBER OF VEHICLES 5 10 15 20 25 30 Number of Vehicles Percent of Total Cumulative Percentage 65 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 60 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 55 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100 0°/ 50 0 0% 1000,111 0 0% 1000, x x 0 0 0 5 3% 100 0 x x 2 1% 97 0' x x x x o 0 0 7 4% 95.9 45 x x o 0 0 5 3% 91.7 x x x o 4 2% 88.8:% x x x x x x x o 8 5% 864"i x x x x x x x x x o 0 0 0 0 0 15 9% 81.7 x x x x x x 0 0 0 9 5% 72.8"% 40 x x x x x x x x x x o 0 0 0 0 0 0 0 0 0 20 12% 67.5', x x x x x x x 0 0 0 0 0 0 13 8% 55.6% x x x x x x x x o 0 0 0 0 0 0 0 0 0 01 0 0 21 12% 47.9% x x x 0 0 0 6 4% 35.5% x x x x x x x o 0 0 0 0 12 7% 32.0% 35 x x x x x x x x 01 0 0 0 12 7% 24.9% x 0 0 0 0 0 0 0 0 9 5% 17.8% 0 1 1% 12.4% x x o 0 0 0 0 0 8 5% 11,8% x x 0 0 4 2% 7.1% 30 x 0 0 0 0 5 3% 4.7% x x 01 1 3 2% 1.8% 0 0% 0.0% 0 0% 0.0% 0 0% 0.0% 25 0 0% 0.0% 0 0% 0.0% 0 0% 0.0% 0 0% 0.0% 0 0% 0.0% 20 0 0% 0.0% 0 0% 0.0% 0 0% 0.0% 0 0% 0.0% 0 0% 0.0% 15 0 00/ 0 0" X - East/North bound 0 - West/South Bound Tot al Observed 169 100 y„ 11 1 CITY OF ROSEMEAD SPOT SPEED SURVEY Street MISSION DRIVE Date 11/8/2005 Location Begin 3:OOPM End 4:OOPM Direction E-W Weather CLEAR Remarks WALNUT GROVE TO ROSEMEAD Recorded by TSI - K.W. 50th % 39 MPH 85th % 44 MPH 1OMPH 36 45 % in Pace 68% MPH NUMBER OF VEHICLES 5 10 15 20 25 30 Number of Vehicles Percent of Total Cumulative Percenta e 65 0 0% 100.0% 0 0% 100.0`/n 0 0% 100.0 0 0% 100.0` 0 0% 100.0'i 60 0 0% 100-01, 0 0% 1000 0 0% 100.0 0 0% 100 0 0 0% 100 0 55 0 0% 100-0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 50 0 0% 100.0% x 1 1% 100.0% x z x 3 2% 99.4% x o 2 1% 97.8% x x x 0 0 0 6 3% 96.6% 45 x x x x x x x x 01 0 0 0 0 0 14 8% 93.3% x x x x x x 0 0 0 0 10 6% 85.5% x x x 0 0 0 0 7 4% 79.9% x x x x x x x x x x x x o 0 0 0 0 0 18 10% 76.0% x x x x x 0 0 0 0 9 5% 65.9% 40 x x x x x x x x x x o 0 0 0 0 01 0 17 9% 60.9% x x x x o 0 0 0 01 01 0 0 0 0 14 8% 51.4% x x x x x x 0 0 0 0 0 0 0 0 14 Bola 43.6% x x x x x x 0 0 0 10111 10 6% 35.8% x x x o 0 0 0 0 0 9 5% 30.2% 35 x x x x x 0 0 0 0 0 0 0 12 7% 25.1% x x x 0 101 0 0 0 8 4% 18.4% x x 01 0 11 0 5 3% 14.0% x x x x 0 0 0 0 8 4% 11.2% x x 0 10 1 4 2% 6.7% 30 x 0 0 10 1 4 2% 4.5% 0 0 0 1 1 3 2% 2.2% 0 1 1% 0.6% 0 0% 0.0% 0 0% 0.0% 25 0 0% 0.0% 0 0% 0.0% 0 0% 0.0% 0 0% 0.0% 0 0% 0.0% 20 0 0% 0.0% 0 0% 0.0% 0 0% 0.0% 0 0% 0.0% 0 0% 0.0% 15 0 0% 0.0% X - East/N orth bound 0. West/South Bound To tal Observed 179 100 1 1 1 1 Street Location Direction Remarks MISSION DRIVE E-W ROSEMEAD TO VALLEY CITY OF ROSEMEAD SPOT SPEED SURVEY Date 11/3/2005 Begin 9:OOAM End 10:OOAN Weather CLEAR Recorded by TSI - K.W. 50th % 40 MPH 85th % 44 MPH 1OMPH 35 44 % in Pace 73% MPH NUMBER OF VEHICLES 5 10 15 20 25 30 Number of Vehicles Percent of Total Cumulative Percents e 65 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 60 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 55 0 0% 1000% 0 0% 100.0% 0 0% 100.0% 0 0% 100 01" 0 0% 10001 50 o 1 -1% 100 r'_ x o 2 1% 99.4 x x x 0 0 0 6 3% 98: IC o 2 1% 94.9 x x x x o 5 3% 93 E 45 x x x x x 0 0 o g 5% 90 P' x x x o 0 0 0 01 0 0 0 11 6% 86 4' x x x x x x x x o 0 0 0 12 7% 80.1 x x x x x x x x o 0 0 0 0 0 0 0 16 9% 73.°." x x x x x 0 0 0 0 0 10 6% 64.2" 40 x x x x x x x x o 0 0 0 0 0 0 0 0 0 0 19 11% 58.5 x x x x' x x x x x o 0 0 0 0 0 0 0 0 0 0 0 21 12% 47 t x x x x x x o 0 0 0 0 0 12 7% 35-8' x x x o 0 0 0 o B 5% 29.0 x x x x o 0 0 0 0 9 5% 24.4' 35 x x x x x o 0 0 0 0 10 6% 19-- x x x o 0 5 3% 13 6- x x x 0 0 5 3% 108 x x x o 0 0 6 3% 8.C 0 0% 4.5 30 x o 01 1 3 2% 4.5 x x x o 4 2% 2.8 x 1 1% 06- 0 0% 0.0 0 0% 0.0 25 0 0% 0 0 0 0% 00 0 0% 0.0"' 0 0% 0.0 0 0% 00 20 0 0% 001 0 0% 00, 0 0% 0.0,1- 0 0% 0 0 0 0% 0C" 15 0 0%.1 0.00 X - East/Nort h bound 0 - West/South Bound Total Observed 176 100 t 1 t 1 f e 1 t 1 CITY OF ROSEMEAD SPOT SPEED SURVEY Street MUSCATEL AVENUE Date 11/8/2005 Location Begin 2:OOPM End 3:OOPM Direction E-W Weather CLEAR Remarks MARSHALL TO GRAND Recorded by TSI - K.W. 50th % 30 MPH 85th % 32 MPH 1OMPH 25 34 % in Pace 95% MPH NUMBER OF VEHICLES 5 10 15 20 25 30 Number of Vehicles Percent of Total Cumulative Percents e 65 0 0% 100.0 0 0% 10001,11 0 0% 100 01-n 0 0% 1000 " 0 0% 100 0111- 60 0 0% 10&W4, 0 0% 100 0'., 0 0% 100 0` , 0 0% 100.0"I, 0 0% 100.0" 1 55 0 0% 100 014- 0 0% 100.0'-., 0 0% 100 0'' 0 0% 100 0"-' 0 0% 1000 50 0 0% 100 0 0 0% 100 0 0 0% ' - 1000 0 0% 1000 0 0% 100 0 45 0 0% 100 0 0 0% 100011, 0 0% 100 0 , 0 0% 100 G 0 0% 100 C 40 0 0% 100.0 o 0 0% 100.0% 0 0% 100.0% 0 0% 100 0'! 0 1 2% 100 0 35 x o 2 3% 984 x x x 0 4 6% 95. x o 2 3% 88.9` o x x o 0 0 0 6 10% 85.7% x x x x x 0 6 10% 76.2% 30 x x x x x x x x o 0 0 0 12 19% 66.7% x x x x x x o 0 0 0 0 0 12 19% 47.6% x x x o 0 0 0 7 11% 28.6% 0 0 0 3 5% 17.5% x o x 3 5% 12.7% 25 x x x 0 0 5 8% 7.9% 0 0% 0.0% 0 0% 0.0% 0 0% 0.0% 0 0% 0.0% 20 0 0% 0.0% 0 0% 0.0% 0 0% 0.0% 0 0% 0.0% 0 0% 0.0% 1$ 0 0% 0.0% X - East/North bound 0 - West/South Bound Total Observed 63 100 N[MMM CITY OF ROSEMEAD SPOT SPEED SURVEY Street NEW AVENUE Date 11/2/2005 50th % Location Begin 2:OOPM End 3:OOPM 85th % Direction N-S Weather CLEAR 1OMPH Remarks GRAVES TO GARVEY Recorded by TSI - K.W. % in Pace 35 MPH 38 MPH 31 40 79% MPH NUMBER OF VEHICLES 5 10 15 20 25 30 Number of Vehicles Percent of Total Cumulative Percentage 65 0 0% 10000/1, 0 0% 100 0 0% 100 0' 0 0% 100 C 0 0% 100.0'" 60 0 0% 100 0'" 0 0% 1000 0 0% 10001, 0 0% 100 0`;,, 0 0% 100.0% 55 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 50 0 0% 100.0% 0 0% 100 C" 0 0% 100 C 0 0% 100 0 0% 100(. 45 0 0% 100 0 0 0% 100 C 0 0% 100 C x 0 0 3 3% 100 C ° 1 1% 97 ' 40 x x x o 0 0 0 7 7% 96 x x 0 10 0 5 5% 89 - x x x x o 0 0 0 0 0 10 10% 84(- x x o 0 0 0 6 6% 75 0> x x x x o 0 0 0 0 0 0 11 11% 69.2'' 35 x x x x x x x x x x o 0 0 0 0 0 0 17 16% 58.7 x x x x 0 0 0 0 8 8% 42.3° x x x 0 0 0 6 6% 34.6% X x x x x x 0 0 0 0 10 10% 28.8% x o 2 2% 19.2% 30 x x x o 0 01 1 6 6% 17.3% x x 0 0 4 4% 11.5% x x x 0 4 4% 7.7% 0 0% 3.8% x 1 1% 3.8% 25 x x x 3 3% 2.9% 0 0% 0.0% 0 0% 0.0% 0 0% 0.0% 0 0% 0.0% 20 0 0% 0.0% 0 0% 0.0% 0 0% 0.0% 0 0% 0.0% 0 0% 0.0% 15 0 0% 0.0% X - East Morth bound 0 - West/South Bound Tot al Observed 104, 100 r 1 1 Street Location Direction Remarks RAMONA BOULEVARD E-W WALNUT GROVE TO IVAR CITY OF ROSEMEAD SPOT SPEED SURVEY Date 11/10/2005 50th % 30 MPH Begin 11:00AN End 12:OOPN 85th % 32 MPH Weather CLEAR 10MPH 25 34 Recorded by TSI - K.W. % in Pace 93% MPH NUMBER OF VEHICLES 5 10 15 20 25 30 Number of Vehicles Percent of Total Cumulative Percents e 65 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 60 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 55 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 50 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 45 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 40 0 0% 100.0% 0 0% 100.0% x 1 1% 100.0% x 1 1 % 98.6% 0 0% 97.3% 35 x 0 2 3% 97.3% x 0 0 0 4 5% 94.5% x 1 1 % 89.0% x x x o 0 0 6 8% 87.7% X x x o 0 0 0 0 0 9 12% 79.5% 30 x x x x x x o 0 0 0 0 0 0 0 14 19% 67-1% X x o 0 17 0 0 7 10% 47.9% x x x x x o 0 0 8 11% 38.4% x x 0 0 4 5% 27.4% x x o 0 0 0 6 8% 21.9% 25 x x x x x o 0 0 0 9 12% 13.7% 0 1 1% 1.4% 0 0% 0.0% 0 0% 0.0% 0 0% 0.0% 20 0 0% 0.0% 0 0% 00% 0 0% 0.0% 0 0% 0.0% 0 0% 0.0% 15 0 0% 0.0% X - East/North bound 0 - Wes USouth Bound Total Observed 73 100 CITY OF ROSEMEAD SPOT SPEED SURVEY Street RIO HONDO AVENUE Date 11/3/2005 50th % 30 MPH Location Begin 11:00AN End 12:OOPN 85th % 35 MPH Direction N-S Weather CLEAR 1OMPH 24 33 Remarks OLNEY TO VALLEY Recorded by TSI - K.W. % in Pace 78% MPH NUMBER OF VEHICLES 5 10 15 20 25 30 Number of Vehicles Percent of Total Cumulative Percenta e 65 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 60 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 55 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 50 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 45 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 40 0 0% 100.0% 0 0% 100.0% x x 0 0 0 5 6% 100.0% 0 1 1%1 93.9% x x x 3 4% 92.7% 35 o 01 01 01 4 5% 89.0% 0 1 1% 84.1% x x o 0 0 5 6% 82.9% 0 0 0 01 0 0 0 7 9% 76.8% x x x x 0 5 6% 68.3% 30 x x x x x x x x o 0 0 0 0 13 16% 62.2% x x x x x x x 0 0 0 0 0 12 15% 46.3% X x x o 0 0 6 7% 31.7% 0 0 2 2% 24.4% x 0 0 0 0 5 6% 22.0% 25 x x x o 0 0 0 7 9% 15.9% x o 2 2% 7.3% x 1 1% 4.9% 0 0% 3.7% x x 2 2% 3.7% 20 x 1 1% 1.2% 0 0% 0.0% 0 0% 0.0% 0 0% 0.0% 0 0% 0.0',x: 15 0 0% 0 o X East/North bound 0 - West/South Bound Total Observed 82 00 1 CITY OF ROSEMEAD SPOT SPEED SURVEY Street ROSEMEAD PLACE Date 11/10/2005 50th % 34 MPH Location Begin 9:OOAM End 10:OOAN 85th % 37 MPH Direction N-S Weather CLEAR 1OMPH 29 38 Remarks GARVEY TO EARLSWOOD Recorded by TSI - K.W. % in Pace 88% MPH NUMBER OF VEHICLES 5 10 15 20 25 30 Number of Vehicles Percent of Total Cumulative Percents e 65 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 60 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 55 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 50 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 45 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% x 1 1% 100.0 0 0% 98.8 40 x 0 2 2% 98 8 x o 2 2% 96.3'- L x x 0 0 0 6 7% 93 8'' - x x x x o 5 6% 864 x x x x o 5 6% 80.2 35 x x x x x x x x 0 0 0 0 0 0 0 15 19% 74.' , x x x x 0 0 6 7% 55.6' x x x x 0 0 6 7% 48.1 x x x x x o 0 0 01 0 0 11 14% 40.7;% x x 0 0 4 5% 27.2% 30 x x 0 0 0 0 0 0 8 10% 22.2% x x 0 0 0 5 6% 12.3% x o 0 3 4% 6.2% 0 0% 2.5°!. - 0 0% 2.5 25 0 0 2 2% 2.5 0 0% 0.0 0 0% 0 0' 0 0% 0.01s 20 0 0% 0.0% 0 0% 0.0% 0 0% 0.0% 0 0% 0.0% 0 0% 0.0% 15 0 0% 0.0% X - East/North bound 0 - West/South Bound Total Observed 81 100 CITY OF ROSEMEAD SPOT SPEED SURVEY Street RUSH STREET Date 11/3/2005 50th % 39 MPH Location Begin 1:OOPM End 2:OOPM 85th % 44 MPH Direction E-W Weather CLEAR 1OMPH 35 44 Remarks SAN GABRIEL TO WALNUT GROVE Recorded by TSI - K.W. % in Pace 74% MPH NUMBER OF VEHICLES 5 10 15 20 25 30 Number of Vehicles Percent of Total Cumulative Percents e 65 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% D -0% 100.0% 60 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 55 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 50 0 0 0 3 2% 100.0% x o 0 3 2% 97.7% 0 0 2 20/a 95.5% x o 2 2% 94.0% x o 2 2% 92.5% 45 x x x o 0 0 6 5% 91.0% X x x x x o 0 7 5% 86.5% 0 0 2 2% 81.2% x x x x o 0 0 7 5% 79.7% x x x x x x x o 0 9 7% 74.4% 40 x x x x x x x x x x o 0 0 0 0 0 0 0 01 01 20 15% 677% x x x x x o 0 0 0 0 0 11 8% 52.6% x x x x x x x x o 0 0 0 0 0 0 15 11% 44.4% x x x x x o 0 0 0 9 7% 33.1% x x x x x x o 0 0 0 0 11 8% 26.3% 35 x x x o 0 01 01 7 5% 18.0% 0 1 1% 12.8% x x 2 2% 12.0% x x x o 0 0 0 7 5% 10.5% x 1 1% 5.3% 30 x x o 0 0 5 4% 4.5% x 1 1% 0.8% 0 0% 0.0% 0 0% 0.0% 0 0% 0.0% 25 0 0% 0.0% 0 0% 0.0% D 0% 0.0% 0 0% 0.0% 0 0% 0.0% 20 0 0% 0.0% 0 0% 0.0% 0 0% 0.0% o 0% 0.0% o 0% 0.0% 15 0 0% 0.0% X - Eas t/Nort h bound 0 - West/South Bound Total Observed 133 100 CITY OF ROSEMEAD SPOT SPEED SURVEY Street SAN GABRIEL BOULEVARD Date 11/3/2005 50th % Location Begin 3:OOPM End 4:OOPM 85th % Direction E-W Weather CLEAR 1OMPH Remarks SOUTH CITY LIMIT TO DELTA Recorded by TSI -S.W. % in Pace 44 MPH 48 MPH 39 48 MPH NUMBER OF VEHICLES 5 10 15 20 25 30 Number of Vehicles Percent of Total Cumulative Percenta e 65 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 60 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 55 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% x x o 3 2% 100.0% x 0 0 0 4 2% 98.5% 50 x x x 0 0 0 0 0 0 1 1 9 5% 96.4% x x x x x x x x 0 0 - 10 5% 91.9% x x x x x x 0 0 0 0 10 5% 86.8% x x x x o 0 0 7 4% 81.7% x x x x x x x o 0 0 0 0 0 13 7% 78.2% 45 x x x x x x x x x x x o 0 101 0 0 0 0 0 10 0 0 0 23 12% 71.6% x x x x x x x x x x x o 0 0 0 0 0 0 0 0 0 0 22 11% 59.9% x x x x o 0 0 0 0 0 0 11 6% 48.7% x x x x x x x o 0 0 0 0 0 0 0 0 16 8% 43.1% x x x o 0 0 0 0 8 4% 35.0% 40 x x x x x x o 0 0 0 0 0 0 0 0 15 8% 31.0% x x x x x x o 0 0 0 0 0 12 6% 23.4% x x x x x x 0 0 0 9 5% 17.3% x x x 0 0 0 6 3% 12.7% x x x 0 01 0 0 7 4% 9.6% 35 x x x x x o 0 0 0 9 5% 6.1% x x o 3 2% 1.5% 0 0% 0.0% 0 0% 0.0% 0 0% 0.0% 30 0 0% 0.0% 0 0% 0.0% 0 0% 0.0% 0 0% 0.0% 0 0% 0.0% 25 0 0% 0.0% 0 0% 0.0% 0 0% 0.0% 0 0% 0.0% 0 0% 0.0% 20 0 0% 0.0% 0 0% 0.0% 0 0% 0.0% 0 0% 0.0% 0 0% 0.0% 15 0 0% 0.0% X - East/Nort h bound 0 - West/South Bound Total Observed 197 100 Street Location Direction Remarks SAN GABRIEL BOULEVARD RUSH TO GARVEY CITY OF ROSEMEAD SPOT SPEED SURVEY Date 11/3/2005 50th % Begin 10:OOAM End 11:00AM 85th % Weather CLEAR 1OMPH Recorded by TSI - S.W. % in Pace 39 MPH 44 MPH 35 44 MPH NUMBER OF VEHICLES 5 10 15 20 25 30 Number of Vehicles Percent of Total Cumulative Percentage. 65 0 0% 10&C 0 0% 100.04.• 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 60 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 55 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 50 0 0% 100.0% 0 0% 100.0% x o 0 3 2% 100.0% x 1 1% 98.3% x 0 0 0 0 5 3% 97.8% 45 x x x x x o 0 7 4% 95.0% x x x x x x o 0 0 0 0 o a o 14 8% 91.2% x x x x o 0 0 0 0 9 5% 814% x x x x x x x x x x x x o 01 0 0 0 0 0 0 0 21 12% 78.5% x x x x x x x o 0 0 0 0 12 7% 66.9% 40 x x x x x x x x o 0 0 0 0 01 0 15 8% 60.2% x x x x x x x x x x 0 0 .0 0 0 0 0 0 18 10% 51.9% x x x x o 0 0 0 0 0 10 6% 42.0% x x 0 0 0 5 3% 36.5% x x x x x o 0 0 0 0 0 11 6% 33.7% 35 x x x x x x 0 0 0 0 a 0 12 7% 27.6% x x x o 0 0 6 3% 21.0% X x x 0 0 5 3% 17.7% x x x x x x 0 0 8 4% 14.9% x x x o 0 5 3% 10.5% 30 x x x x 0 0 0 0 8 4% 7.7% x 0 0 0 4 2% 3.3% x o 2 1% 1.1% 0 0% 0.0% 0 0% 0.0% 25 0 0% 0.0% 0 0% 0.0% 0 0% 0.0% 0 0% 0.0% 0 0% 0.0% 20 0 0% 0.0% 0 0% 0.0% 0 0% 0.0% 0 0% 0.0% 0 0% 0.0% 15 0 0% 0 0% X East/Norlh bound 0 - West/South Bound Total Observed 181 100 1 1 1 1 1 1 1 Street Location Direction Remarks SAN GABRIEL BOULEVARD CITY OF ROSEMEAD SPOT SPEED SURVEY Date 11/3/2005 50th % 39 MPH Begin 11:00AN End 12:00PN 85th % 42 MPH Weather CLEAR 10MPH 34 43 GARVEY TO HELLMAN Recorded by TSI - S.W. % in Pace 76% MPH NUMBER OF VEHICLES 5 10 15 20 25 30 Number of Vehicles Percent of Total Cumulative Percenta e 65 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 60 0 0% 100.0% 0 0%a 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 55 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 50 0 0% 100.0% 0 0% 100.0% I 0 0% 100.0% 0 0% 100.0% x x o 01 1 3 1% 100.0% 45 x x x o 0 0 0 0 8 4% 98.5% x x x x x o 0 7 3% 94.6% x x x o 0 0 0 0 8 4% 91.1% x x x x x x x x x o 0 0 0 0 0 0 0 0 0 19 9% 87.2% x x x x x x o 0 0 9 4% 77.8% 40 x x x x x x x x x x x x x x x o 0 0 0 0 0 0 22 11% 73.4% x x x x x x x z x x x x o 0 10 0 0 0 0 10 0 0 0 0 0 0 0 27 13% 62.6% x x x x x x o 0 0 10 0 0 0 0 10 0 0 0 0 0 20 10% 49.3% x x x x x x x o 0 10 0 0 0 0 10 15 7% 39.4% x x x x o 0 0 0 0 0 10 5% 32.0% 35 x x x x o 0 0 0 0 0 0 0 0 0 14 7% 27.1% x x x x x x x o 0 0 10 5% 20.2% x x x x 0 0 6 3% 15.3% x x x x x o 0 7 3% 12.3% x x x x x o 0 10 1 8 4% 8.9% 30 x x x o 0 0 6 3% 4.9% x o 2 1% 2.0% x x 2 1% 1.0% 0 0% 0.0% 0 0% 0.0% 25 0 0% 0.0% 0 0% 0.0% 0 0% 0.0% 0 0% 0.0% 0 0% 0.0% 20 0 0% 0.0% 0 0% 0.0% 0 0% 0.0% 0 0% 0.0% 0 0% 0.0% 15 0 0% 0.0% X - East/North bound 0 - WesUSouth Bound Total Observed 203 1 00 SEEM 1 1 1 Street Location Direction Remarks TEMPLE CITY BOULEVARD N-S OLNEY TO VALLEY CITY OF ROSEMEAD SPOT SPEED SURVEY Date 11/2/2005 50th % 39 MPH Begin 10:00AN End 11:00AN 85th % 42 MPH Weather CLEAR 10MPH 35 44 Recorded by TSI - K.W. % in Pace 81% MPH NUMBER OF VEHICLES 5 10 15 20 25 30 Number of Vehicles Percent of Total Cumulative Percentage. 65 0 0% 100.0 0 0% 100 O~Y, 0 0% 100.0°x° 0 0% 100.0% 0 0% 100.0% 60 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 55 0 0% 100.0°x° 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 50 0 0% 100-0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% x 0 0 0 4 2% 100.0% 45 x x x x x 0 0 0 8 4% 98.0% x x x x x o 0 0 0 0 0 11 50 94.1% x x x 0 0 01 0 0 8 4% 88.8% x x x x x x x x x x x o 0 0 0 0 0 0 0 0 0 1 1 21 10% 84.9% x x x x x x x x 0 0 0 0 0 0 0 01 0 17 8% 74.6% 40 x x x x x x x x x x x o 0 0 0 01 0 0 0 0 0 21 10% 66.3% x x x x x x x x x x x o 0 0 0 01 0 0 0 0 0 0 0 0 0 25 12% 56.1% x x x x x x x x x o 0 0 0 0 0 0 0 0 0 0 20 100 43.90 x x x x x x x 0 0 0 0 0 0 13 6% 34.1% x x x x x x x x o 0 0 0 0 0 14 7% 27.8% 35 x x x x x x x x x x o 0 0 0 0 0 0 17 8% 21.0% x x x x 0 0 0 7 3% 12.7% X x 0 0 01 0 0 7 3% 9.3% x x x x x 0 0 7 3% 5.9% x x x 3 1% 2.4% 30 x x 2 1% 1.0% 0 0% 0.0% 0 0% 0.0% 0 0% 0.0% 0 0% 0.0% 25 0 0% 00% 0 0% 0.0% 0 0% 0.0% 0 0% 0.0% 0 0% 0.0% 20 0 0% 0.0% 0 0% 0.0% 0 0% 0.0% 0 0% 0.0% 0 0% 00% 15 0 0% 0.0% X East/North bound 0 - West/South Bound Total Observed 205 100 1 1 1 1 Street Location Direction Remarks TEMPLE CITY BOULEVARD N-S VALLEY TO NORTH CITY LIMITS CITY OF ROSEMEAD SPOT SPEED SURVEY Date 11/2/2005 50th % Begin 9:00AM End 10:00AN 85th % Weather CLEAR 10MPH Recorded by TSI - K.W. % in Pace 39 MPH 43 MPH 35 44 74% MPH NUMBER OF VEHICLES 5 10 15 20 25 30 Number of Vehicles Percent of Total Cumulative Percenta e 65 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 60 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 55 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 50 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% x o 2 1% 100.0% x x x x 0 0 0 7 3% 99.0% 45 x x x x x o 0 0 0 0 0 11 5% 95.6% x x x x o 0 0 0 8 4% 901% x x x x x x x 01 01 01 0 11 5% 86.3% x x x x o 0 0 0 0 0 0 0 0 13 6% 80.9% x x x x x x x x o 0 0 0 0 0 0 15 7% 74.5% 40 x x x x x x x x x x x o 0 0 10 0 10 0 0 0 0 0 0 0 0 25 12% 67.2% x x x x x x x x x x x x x o 0 0 0 0 0 01 01 21 10% 54.9% x x x x x x x x x x o 0 0 0 0 0 10 0 18 9% 44.6% x x x x x x o 0 0 0 0 0 0 0 0 0 16 8% 35.8% x x x x x 0 10 0 0 9 4% 27.9% 35 x x x x x x x x x o 0 0 0 0 14 7% 23.5% x x x o 0 0 0 0 8 4% 16.7% x x o 0 4 2% 12.7% x x x x x 0 0 0 0 0 10 5% 10.8% x x x o 0 0 6 3% 5.9% 30 x 0 0 0 4 2% 2.9% x x 2 1% 1.0% 0 0% 0.0% 0 0% 0.0% 0 0% 0.0% 25 0 0% 0.0% 0 0% 0.0% 0 0% 0.0% 0 0% 0.0% 0 0% 0.0% 20 0 0% 0.0% 0 0% 0.0% 0 0% 0.0% 0 0% 0.0% 0 0% 0.0`x', 15 0 0% 00- X - East/Nort h bound 0 WesUSouth Bound Tot al Observed 204 100 1 CITY OF ROSEMEAD SPOT SPEED SURVEY Street VALLEY BOULEVARD Date 11/8/2005 Location Begin 1:OOPM End 2:OOPM Direction E-W Weather CLEAR Remarks CHARLOTTE TO ROSEMEAD Recorded by TSI - K.W. 50th % 35 MPH 85th % 40 MPH 1OMPH 29 38 % in Pace 63% MPH NUMBER OF VEHICLES 5 10 15 20 25 30 Number of Vehicles Percent of Total Cumulative Percents e 65 0 0% 100.0°/1, 0 0% 100.0`% 0 0% 100.0% 0 0% 100.0% O 0% 100.0% 60 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0°x° 55 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 50 0 0% 100 0 0 0% 100 C 0 0% 100 C 0 0% 1000 0 0% 100 0 45 x x x x x o 6 3% 100.0°.6 x x x 0 4 2% 97 1% x x o 0 4 2% 95.1'i x x x x x x 0 0 0 0 10 5% 93.21; x x x 0 0 5 2% 88.3';,' 40 x x x x 0 0 10 0 0 9 4% 85.9% x x x x o 0 10 0 0 9 4% 81.6% x x x x x x 0 0 0 0 0 0 0 0 0 0 16 8% 77.2% x x x x 0 10 0 0 0 9 4% 69.4% x x x x x x x 0 0 0 01 0 0 0 101 0 1 16 8% 65.0% 35 x x x x x x x x x x o 0 0 0 0 0 0 0 18 9 0 57.3 0 X x x x x x x 0 0 0 0 0 0 1- 1 14 7% 48.5% x x x x x o 0 0 8 4% 41.7% x x x x x x x x x x 0 0 0 0 101 0 16 8% 37.9% x x x 0 0 0 6 3% 30.1% 30 x x x x x x x 0 0 0 0 0 0 13 6% 27.2% x x x x x x x x 0 0 0 0 0 13 6% 20.9% x x x 0 10 0 0 0 0 0 10 5% 14.6% 0 0 0 0 4 2% 9.7% x x 0 0 0 0 0 7 3% 7.8% 25 x x 0 0 0 0 0 7 3% 4.4% 0 0 2 1% 1.0% 0 0% 0.0% 0 0% 0.0% 0 0% 0.0% 20 0 0% 0.0% 0 0% 0.0% 0 0% 0.0% 0 0 0 0.0°!° 0 0% 0.0% 15 0 0% 0.0% X - East/North bound 0 - West/South Bound Total Observed 206 100 II 1 u 1 CITY OF ROSEMEAD SPOT SPEED SURVEY Street VALLEY BOULEVARD Date 11/3/2005 50th % 36 MPH Location Begin 10:OOAN End 11:00AIV 85th % 41 MPH Direction E-W Weather CLEAR 10MPH 33 42 Remarks ROSEMEAD TO STRANG Recorded by TSI - K.W. % in Pace 69% MPH NUMBER OF VEHICLES 5 10 15 20 25 30 Number of Vehicles Percent of Total Cumulative Percentage 65 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 60 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 55 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 50 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% x 1 0% 100.0% 45 x x x x o 0 6 3% 99.5% x x O 0 1 1 4 2% 96.6% x x o 0 1 1 4 2% 94.6% x x x x x x x x 0 10 1 0 0 0 0 14 7% 92.6% x x x x x o 0 0 8 4% 85.7% 40 x x x x x x o 0 0 0 0 0 0 0 1a 70 81.8% x x x x x x x x x o 0 0 o O o 0 0 10 0 0 0 10 22 11% 74.9% x x x x x x x x o 0 01 0 0 0 0 0 0 10 18 9% 64.0% x x x o 0 0 10 0 0 9 4% 55.2% x x x x o 0 0 0 0 0 0 0 0 13 6% 50.7% 35 x x x x x x x x x x x x o 0 0 0 0 0 0 0 0 0 0 0 0 25 12% 44.3% x x x x x x o 0 0 0 1 1 10 5% 32.0°k x x x x x 0 0 0 8 4% 27 1 x x x x x x x x x x 10 5% 23 2' x x 01 0 101 0 6 3% 182 30 x x x x o 0 0 0 0 9 4% 153 x x x x x o 0 0 8 4% 108 x x 01 01 4 2% 69 x 1 0% 49 5 2% 44 25 x x x 01 1 4 2% 2.0 t: 0 0% 0.05,3 0 0% 0.0% 0 0% 0.0% 0 0% 0.0% 20 0 0% 0.0% 0 0% 0.0% 0 0% 0.0% 0 0% 0.0% 0 0% 0.0% 15 0 0% 0.0% X - EasUN orth bound 0 - West/South Bound Tot al Observed 203 100 1 1 CITY OF ROSEMEAD SPOT SPEED SURVEY Street WALNUT GROVE AVENUE Date 11/3/2005 50th % 44 MPH Location Begin 2:OOPM End 3:OOPM 85th % 49 MPH Direction N-S Weather CLEAR 1OMPH 39 48 Remarks SAN GABRIEL TO RUSH Recorded by TSI - K.W. % in Pace 68% MPH NUMBER OF VEHICLES 5 10 15 20 25 30 Number of Vehicles Percent of Total Cumulative Percentage 65 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 60 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 1 1% 100.0% 55 0 0 0 3 2% 99.3`%_ 0 0% 97 0 1 1% 971 x 0 0 0 0 0 0 7 50 964 x 0 2 1% 91 "1 50 x x x o 0 5 4% 89 9 x x x x x 0 0 0 8 6% 86 x x 0 0 0 01 0 7 5% 80A x x 01 0 4 3% 75 4"/,, x x x x 0 0 0 7 50 72 5°'a 45 x x x x x x x x x o 0 0 0 0 0 15 11% 674% x x x x x x x o 0 0 0 0 0 0 0 0 16 12% 56 5% x x x 01 0 0 0 7 5% 44.9% x x x x x x x 0 0 0 0 0 12 9% 39.9% x 0 01 0 0 5 4% 31.2% 40 x x x x x 0 0 0 0 0 10 7% 27.5% x x x x x o 0 0 0 0 0 11 8% 20.3% x x x o 0 0 0 7 5% 12.3% 0 1 1% 7.2% x x x 3 2% 6.5% 35 x x x o 0 5 4% 4.3% 0 0% 0.7% 0 0% 0.7% x 1 1% 07% 0 0% 0.0% 30 0 0% 0.0% 0 0% 0.0% 0 0% 00% 0 0% 0.0% 0 0% 0.0% 25 0 0% 0.0% 0 0% 0.0% 0 0% 0.0% 0 0% 0.0% 0 0% 0.0% 20 0 0% 0.0% 0 0% 0.0% 0 0% 0.0% 0 0% 00% 0 0% 0.0% 15 0 0% 0.0% X - East/North bound 0 - West/South Bound Total Observed 138 100 I u CITY OF ROSEMEAD SPOT SPEED SURVEY Street WALNUT GROVE AVENUE Date 11/3/2005 50th % 39 MPH Location Begin 11:00AN End 12.-OOPN 85th % 43 MPH Direction N-S Weather CLEAR 1OMPH 36 45 Remarks RUSH TO GARVEY Recorded by TSI - K.W_ % in Pace 75% MPH NUMBER OF VEHICLES 5 10 15 20 25 30 Number of Vehicles Percent of Total Cumulative Percents e 65 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 60 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 55 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0%a 100.0% 0 0% 100.0% 50 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 1000% 0 0 2 1% 100.0 . 45 x x x x x x o 0 0 0 0 0 0 0 14 7%0 98 c, x x x x x x 0 0 0 0 10 5% 914 x x x x 0 0 0 0 0 0 0 11 6% 86 x x x x x x x x o 0 0 0 0 10 0 0 0 0 0 0 0 21 11% 802 " x x x x x 0 01 0 0 0 0 0 12 6% 69.0 40 x x x x x x x x x x x x x 0 0 0 0 0 0 0 0 0 0 23 12% 62.6 X x x x x x x x o 0 0 0 0 0 0 0 16 9% 501- x x x x x x x x x x 0 0 0 0 0 14 7% 41 T- x X x x O O O 0 O O 0 0 12 6% 34.2 x x x x x x 0 0 8 4%p 27 8`4, 35 x x 0 0 0 5 3% 23 5/0 x 0 0 0 4 2% 20.9`!' X x x x x o 0 0 0 0 10 5% 187% x x x x x x 0 7 4% 13,4°%, x x x x x x o 0 0 9 5% 96°1 30 x x x x o 0 0 7 4% 4,8% x x 2 1% 1.1% 0 0% 0.0% 0 0% 0.0% 0 0% 0.0% 25 0 0% 0.0% 0 0% 0.0% 0 0% 0.0% 0 0% 0.0% 0 0% 0.0% 20 0 0% 0.0% 0 0% 0.0% 0 0% 00% 0 0% 00% # # f 0 0% 0.0% 15 1 1 1 0 0% 0 0°/ X - East/North bound 0 - West/South Bound Tot al Observed 187 100 11 1 CITY OF ROSEMEAD SPOT SPEED SURVEY Street WALNUT GROVE AVENUE Date 11/9/2005 Location Begin 2:OOPM End 3:OOPM Direction N-S Weather CLEAR Remarks GARVEY TO HELLMAN Recorded by TSI - K.W. 50th % 39 MPH 85th % 44 MPH 10MPH 35 44 % in Pace 70% MPH NUMBER OF VEHICLES 5 10 15 20 25 30 Number of Vehicles Percent of Total Cumulative Percentage 65 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 60 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 55 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0%, 0 0% 100.0% 5( 0 0%, 100.0% 4E 4( 3: 3( x 1 1% 0.6% 0 0% 0.0% 0 0% 0.0%1 2E 0 0% 0.0% 0 0% 0.0% 0 0% 0.0% 0 0% 0.0% 0 0% 0.0% 2( 0 0% 0.0%1 0 0% 0.0% 0 0% 0.0% 0 0% 0.0% 01 0% 0.0% 15 000/1 t CITY OF ROSEMEAD SPOT SPEED SURVEY Street WALNUT GROVE AVENUE Date 11/8/2005 Location Begin 11:00AN End 12:00PN Direction N-S Weather CLEAR Remarks HELLMAN TO VALLEY Recorded by TSI - K.W. 50th % 40 MPH 85th % 45 MPH 10MPH 35 44 % in Pace 69% MPH NUMBER OF VEHICLES 5 10 15 20 25 30 Number of Vehicles Percent of Total Cumulative Percentage 65 0 0% 1000% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 60 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 55 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% x 1 0% 100.0% 0 0% 99.5% 50 x x x 3 1% 99.5% x x x x o 5 2% 98-1% x x x x x x x x 0 9 4% 95.7% x x x 3 1% 91.3% x x x x 0 0 6 3% 89.9% 45 x x x x x o 0 0 0 9 4% 87.0% x x x o 0 0 0 0 0 9 4% 82.6% x x x x o 0 0 0 0 9 4% 78.3% x x x x x x x x o 0 0 0 10 0 0 0 0 0 0 0 20 10% 73.9% x x x x x a o 0 0 0 0 0 12 6% 64.3% 40 x x x x x x x x x x x x x o 0 0 0 0 0 0 0 0 0 0 24 12% 58.5% x x x x x x x x x o 0 0 10 0 0 0 16 8% 46.9% x x x x x x x x x x o 0 10 0 0 0 0 0 0 0 0 21 10% 39.1% x x x o 0 0 0 0 8 4% 29.0% x x x x x x x x o 0 01 01 0 13 6% 25.1% 35 x x x x 0 0 0 0 0 0 01 1 11 5% 18.8% x x o 01 0 0 6 3% 13.5% x x 0 10 0 5 2% 10.6% x x 0 0 01 0 0 0 8 4% 8.2% 0 0 0 3 1% 4.3% 30 x 0 0 0 4 2% 2.9% 0 1 0% 1.0% 0 1 0% 0.5% 0 0% 0.0% 0 0% 0.0% 25 0 0% 0.0% 0 0% 0.0% 0 0% 0.0% 0 0% 0.0% 0 0% 0.0% 20 0 0% 0.0% 0 0% 0.0% 0 0% 0.0% 0 0% 0.0% 0 0% 00% 15 0 0% 0.0% X - East/North bound 0 - West/South Bound Tot al Observed 207 100 CITY OF ROSEMEAD SPOT SPEED SURVEY Street WALNUT GROVE AVENUE Date 11/9/2005 50th % Location Begin 9:OOAM End 10:00AN 85th % Direction N-S Weather CLEAR 1OMPH Remarks VALLEY TO MISSION Recorded by TSI - K.W. % in Pace 39 MPH 44 MPH 35 44 69% MPH NUMBER OF VEHICLES 5 10 15 20 25 30 Number of Vehicles Percent of Total Cumulative Percentage 65 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 60 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 55 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% x 1 0% 100.0% 0 0% 99.5% 50 x 1 0% 99.5% x x x 3 1% 99.0% x x x 0 4 2% 97.6% 0 0 0 3 1% 95.7% x x o 0 0 5 2% 94.2% 45 x x x x x x o 0 0 0 0 11 50 91.8% x x x o 0 0 0 0 0 0 0 0 12 6% 86.5% x x x o 0 0 0 0 0 9 4% 80.7% x x x x x x o 0 01 0 0 0 0 13 6% 76.3% x x o 0 0 01 0 0 0 0 0 12 6% 70.0% 40 x x x x x x x x x o 0 0 0 0 0 0 0 0 0 20 10% 64.3% x x x x x x x o I 0 0 0 12 60 54.60 x x x x x x x x x x x x 0 0 0 0 0 0 0 0 0 0 22 11% 48.8% x x x x x x x o 0 0 0 0 13 6% 38.2% x x x x x x o 0 0 0 0 0 0 13 6% 31.9% 35 x x x x x x x x o 0 0 0 0 0 0 0 0 17 8% 25.6% X x x x x 0 0 0 0 0 10 5% 17.4% x x x x x x 0 0 0 9 4% 12.6% X x x o 0 0 0 7 3% 8.2% 0 1 0% 4.8% 30 x x x o 0 5 2% 4.3% x x o 3 1% 1.9% x 1 0% 0.5% 0 0% 0.0% 0 0% 0.0% 25 0 0% 0.0% 0 0% 0.0% 0 0% 0.0% 0 0% 0.0% 0 0% 00% 20 0 0% 0.0% 0 0% 0.0% 0 0% 0.0% 0 0% 0.0% L 0 0% 0.0% 15 0 0% 0.0% X - EastlNorth bound 0 - West/South Bound Total Observed 207 100 CITY OF ROSEMEAD SPOT SPEED SURVEY Street WALNUT GROVE AVENUE Date 11/9/2005 50th % 40 MPH Location Begin 1:OOPM End 2:OOPM 85th % 45 MPH Direction N-S Weather CLEAR 1OMPH 37 46 Remarks MISSION TO NORTH CITY LIMIT Recorded by TSI - K.W. % in Pace 75% MPH NUMBER OF VEHICLES 5 10 15 20 25 30 Number of Vehicles Percent of Total Cumulative Percenta e 65 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 60 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 0 0% 100.0% 55 0 0% 100.0% 0 0% 100.0% 0 0% 100-0% 0 0% 100.0% 0 0% 100.0% 50 x 1 1% 100.0% x 1 1% 99.4% x o 2 1 % 98.7% 0 1 1% . 97,4% x x x o 0 0 0 0 01 0 0 11 7% 96.8% 45 x x x x x 0 0 0 8 5% 89.6% x x x x O o 0 0 0 9 6% 84.4`% x x x x x x x x o 0 0 0 12 8% 78 6°/', x x x x x x x x x 0 0 0 0 0 0 15 10% 70 8`' x x x x x 0 0 01 01 9 6% 61 O'. 40 x x x x x x x o 0 0 0 0 0 0 0 15 10% 55 x x x x x x x x x 0 0 0 0 0 0 0 0 0 0 19 12% 45 x x x x x o 0 0 0 0 10 6% 33 x x x x x a 0 01 1 8 5% 26 5 x x x o 0 0 0 0 0 9 6% 21 4 35 x 0 0 0 0 5 3% 15 E"- x x x 0 0 5 3% 12 x x x o 4 3% 91'x': x x 0 10 0 0 6 4% 6.5°o x o 2 1 % 2.6% 30 x o 2 1% 13% 0 0% 0.0% 0 0% 0.0% 0 0% 0.0% 0 0% 0.0% 25 0 0% 0.0% 0 0% 0.0% 0 0% 0.0% 0 0% 0.0% 0 0% 0.0% 20 0 0% 0.0% 0 0% 0.0% 0 0% 0.0% 0 0% 0.0% 0 0% 0.0% 15 0 0% 0.0% X - East/N orth bound 0 - West /South Bound Total Observed 154 100 1 t 1 APPENDIX B ' Collision Rates 1 r Engineering and Traffic Survey r City of Rosemead Ll I I Ln O to O LO O U') O LO O O O to O LO M LO M U') M LO M U-) O O O LO O U) O to O M M M M M M M M CO M M M O co O In O N O O O O Cl O to r I~ O r N r O) r to r cn N O Cl O v: to M O O O O N t0 c0 I~ to u? V: O v o 0 0 0 0 0 0 0 0 o c 0 0 0 ti ~ LO N r O O O 00 M 0) v r cn O ~t O cn r O O to O 1n M r M M 0 0 0 6 0 0 0 0 0 0 0 0 0 N rn O N r- CD CD N v ti co c0 CF) M Iq F-- N ~ co O V- O r (Y) O CN . r LO trD 00 N ce) N Co LO to r- N co N r-- N N CIO M IT M IT r V r U-) It O O O CV) Nr C) C14 CY) N LO r r O I ~ Q • w g m m Z m > > > z z w z , w d w > w m z W J W z a ¢ ° C) ~ ¢ } °a Q J aU' W U' U Z U Z U) > w w a Z Z J z W Z Z J w > x i- 0) L) w 0 z w v¢i o U) ¢ Q w x ¢ Q u~ w w 0 W ° W ° F- w J m w > z w > W = > m m z w z w w w w ° ¢O z > w ¢ w w Z w m ¢ ¢ ¢ w ~ w x m r w ¢ U W w m w r Q 0 V ¢ ¢ ° Z) J O Q w -1 2 U) Q x ¢ z `n to ~ w -j z Jw ¢ Q S W Q 2 U) 0 C7 C7 ? J O w z w ° ¢ U) > ¢ U z (7 W H w w ~ Z Z) z w U ~1 ¢ z QU J w D z w :3 W _ W _ W ~ Z Z z j wQ' U) Q Q z ¢ a a a a > ¢ ¢ w 0 z co ~ w Q Q g ° Z w w w w o < 0 ` ¢ J W U x ~ x x ¢ J U LL W W W J w 2 w z w ¢ C7 ¢ C~ ¢ C7 ¢ C7 W S O O r . N M v LO (0 f- co 0) O r r r N r M r q r In r tD r a~ Q) U C co N Q1 t; W 70 co a~ E Q 0 U 1 1 1 ' Ln O U') O LO M LO O (n O to O Ln O LO O Ln O u) O U') O Un O LO M O r un O LO a) M M M M V M st M M M M M M N ~t „ t O Cl O to (D N O) (D ti O O I~ (D u,) 1l- (D O) r N (D O O to qqr O) O h M 00 LO O r- O M co U? co O cn V (D O O N M In r Cl O IT O O O O O O r O O O O O r LO N M (n qcr N cn N 0o N co cn N cn O v O cn (D v U') cn (N v 0) I; (D (D in 1l- O LO 0 0 0 0 0 0 o r o 0 0 o O O o 0 CY) M LO o O LO r- co V Lf) r- (D C) O 0) r 04 N C14 M CD r O O O r (D r 1~ r N r O O ~ ) C N O 00 O N V N N M O N r N (D f- 1n N V O r r u) r N • W > w > W W > Z w Q w > w ❑ > F- D Z O • m ❑ D Z O O m ° ❑ 1 Z > w Q w z ❑ J ❑ O 0 w cr w Q > a ?w > °z ~w W } w > a p ~ ~w (n w ZZ W m ZZ w w z > J J ZZ > aw a 0 m i O Qw ~a 0 Of J > ~ Q a > J > m Qw ~a w ❑ a (D W m ~ o c~ _ w ❑ w ❑ W w w w J 2 ❑ m z O of m w ❑ J O w co w F- z W p w w w z w w w z > > a ? zz w Q Q F- ZS ZZ w = U) w > jW ZZ U) W ~ > m 0 U Fm- Fes- Z } > _ J w un m (n J W (n I a J w 3: z 0~ 6 Z ❑ (n w O ~a 2 ~a w O a O (A (A m CD W W W W ❑ a > = z W U ❑ > ❑ > ❑ > w > w > w > w > W J ❑ > g m J m J m J J F- F J J ❑ ❑ ° W w p m a O ❑ a ° w R w W R W R a J a a a z z z F- > z z W w m a co _ = m = o o o a a o ' U) a (n w a (1) w a (1) w a Fn (n Fn (n V5 (n 0 U) ° w g = o U) O 0 ° C7 z a U z a C7 z a g z (n w m 1l- r 00 r O r O N r N N N M N N (n N CD N I~ N M N O N O M r M N M Z U b C ca O m C Oi W 07 N 0) O O U 1 I Ln 0~ to 17~ LO O~ Ln O to CO Ul) O LO O LO O LO O to O N co r I,- O C) to co w N m U co r N cP1o ~ m ll~ °O O O O O O O O r O O O r Lo c o O (D a co C) m N 0 0 0 ~ 0 0 0 0 0 0 co co co m L w v ti co 0 w Ln rn m M co c co r r N N r r N N r r co r N m V' co I- O In O • • U) F- > ❑ ❑ W Z 1- J J m Z W a W Lij Z W a W Q J ❑ m J z CIO J LU Q 2 > J !A N F- > Z w 0 x C~ 2 > Z 1- W > > 0] :D Z W U) ❑ Q m J W W F W > ❑ m > m U) m w p L co co F- Q w z w z0 W Z • J Z W O Z 2 U) > M Q J W J Q U) (A O > U w U) w C7 2 > m m > > > > > > U U >0 0> J J m W m } W Z Z CL w a w -j > -j > ZZ ~Q ZZ ZZ ZZ Z Z M M c~ co Cr- V) Go ce) M ~ I Z 3 U a c co m m c W a co m E m 0 0 U 1 1 1 APPENDIX C Survey Equipment 1 Engineering and Traffic Survey City of Rosemead 1 1 SURVEY EQUIPMENT USED The radar equipment used to collect speed measurements for this survey include two Model K1 5-K Hand-Held Traffic Radar manufactured by MPH Industries, Inc., of Chanute, Kansas. The calibration of the unit was checked before each series of measurements were taken. Tests of the unit were conducted in accordance with the manufacturer's specifications. The Model K1 5-K Hand-Held Traffic Radar's were last calibrated on July 29, 2005 and July 31, 2005 by R.H.F, Inc. Engineering and Traffic Survey t City of Rosemead