CC - Item 4D - Asphalt Concrete Overlay Acceptance of Work• ROSEMEAD CITY COUNCIL STAFF REPORT TO: THE HONORABLE MAYOR AND CITY COUN IL FROM: ANDREW C. LAZZARETTO, CITY MANAGER DATE: OCTOBER 10, 2006 SUBJECT: ACCEPTANCE OF WORK FOR ASPHALT CONCRETE OVERLAY ON VARIOUS CITY STREETS SUMMARY The referenced project has been constructed in conformance with the approved plans and specifications. Staff Recommendation Staff recommends that the City Council accept the referenced project; authorize recordation of the Notice of Completion by the City Clerk; and authorize release of the 10 percent retention payment 35 days after the recorded date of the Notice of Completion. ANALYSIS Attached is the final report of project cost. The original contract (base bid) amount was $316,344.20. The total amount to be paid to the contractor including quantity adjustments and retention is $441,447.16. The increase in cost was due to the addition of several streets to the project, made possible by the favorable base bid and available budget. FINANCIAL REVIEW Funding for the asphalt concrete overlay was included in the FY 06-07 Budget utilizing Gas Tax funds. PUBLIC NOTICE PROCESS This item has been noticed through the regular agenda notification process. Submitted by: Kell, ~4c"J; -A Ken Rukavina, P. City Engineer Attachment A: Final Progress Paymen Report APPROVED FOR CITY COUNCIL AGENDA: CITY OF ROSEMEAD CONTRACT PROGRESS REPORT Im- ~ Description: Street Resurfacing on Various Streets From: 6/27/2006 Report Number: Final To: 7/27/2006 Start Date: 05/03/06 Contractor: All American Asphalt Contract No. Complete Date: Not Complete Address: P.O. Box 2229, Corona, CA 9278767-2229 Job No. 15274/0802/06-150 Contract Price: $ 316,344.20 ITEM DESCRIPTION UNIT CONTRACT QUANTITY QUANTITY THIS EST. PREVIOUS ESTIMATE QUANTITY TO DATE UNIT PRICE TOTAL CONTRACT PRICE 1 Cold mill AC pavement uniform depth 0.75-inch. S. F. 11,400.00 11,225.00 11,225.00 $0.28 3,143. 2 Cold mill AC pavement uniform depth 1.75-inches. S. F. 4,830.00 4,860.00 4,860.00 $0.28 1,360.80 3 Cold mill AC pavement uniform depth 2.5-inches. SF 2,420.00 2,450.00 2,450.00 $0.28 686.00 4 Cold mill AC pavement variable depth 0-inch to 1.5-inches. S. F. 55,720.00 105,410.00 105,410.00 $0.28 29,514.80 5 Cold mill existing pavement variable depth .75-inch to 1.75-inches. S. F. 8,070.00 7,800.00 7,800.00 $0.28 2,184.00 6 Asphalt rubber hot mix (ARHM). TON 1,700.00 2,398.12 2,398.12 $103.00 247,006.36 7 Remove and construct 4-inch thick asphalt concrete over compacted native. S. F. 470.00 694.00 694.00 $8.90 6,176.60 8 Remove and construct 8-inch thick AC pavement over compacted sub grade. S. F. 4,270.00 4,939.00 4,939.00 $9.40 46,426.60 9 Remove and construct curb and gutter per APWA Standard Plan No. 120-1 and to match existing. L. F. 100.00 689.00 689.00 $36.00 24,804.00 10 Remove and construct curb only per APWA Standard Plan No. 120 1 and to match existing. L. F. 230.00 301.00 301.00 $21.00 6,321.00 11 Remove and construct cross gutter per APWA Standard Plan No. 122-1. S.F. 1,670.00 1,662.00 1,662.00 $15.60 25,927 20 12 Remove and construct curb ramp per APWA Standard Plan No. 111-2. EA 1.00 1.00 1.00 $1,600.00 1,600.00 13 Remove and construct 4-inch thick PCC driveway approach per APWA Standard Plan No. 110-1. S.F. 2,380.00 2,548.00 2,548.00 $6.60 16,816.80 14 Remove and construct 4-inch thick asphalt concrete area behind R/W or driveway. S.F. 690.00 1,006.00 1,006.00 $5.00 5,030.00 15 Adjust manhole frame and cover to grade. EA 19.00 28.00 28.00 $450.00 12,600.00 16 Adjust water valve frame and cover to grade. EA 7.00 19.00 19.00 $150.00 2,850.00 17 Striping L.S. 1.00 1.00 1.00 $4,000.00 4,000.00 18 Traffic loops, Type E EA 8.00 8.00 8.00 $400.00 3,200.00 19 Project Sign. EA 1.00 1.00 1.00 $1,800.00 1,800.00 TOTAL SCHEDULE $ 441,447.16 PAGE 1 s CITY OF ROSEMEAD CONTRACT PROGRESS REPORT ~a..M Description: Street Resurfacing on Various Streets From: &27/2006 Report Number: Final To: 7/27/2006 Start Date: 05/03/06 Contractor: All American Asphalt Contract No. Complete Date: Not Complete Address: P.O. Box 2229, Corona, CA 9278767-2229 Job No. 15274/0802/06-150 Contract Price: $ 316,344.20 ITEM DESCRIPTION UNIT CONTRACT QUANTITY QUANTITY THIS EST. PREVIOUS ESTIMATE QUANTITY TO DATE UNIT PRICE TOTAL CONTRACT PRICE Total Construction To Date $ 441,447.16 Prepared By: Date: -S-7-0 O Less 0% Retention $ - Total Due To Date $ 441,447.16 Check By: Date: Previous Payment $ 397,302.44 7 1 ! / Balance Due $ 44,144.72 Approved By: 1✓ 1 IV[ L- ALL ALL AMERICAN ASPHALT Approved By: A./" fNf/A!s/ BY:jmk 811106 Date: -A / r Approved By: PAGE2