CC - Item 3B - Adoption of New User Fee Schedule• •
ROSEMEAD CITY COUNCIL
r***~f STAFF REPORT
TO: THE HONORABLE MAYOR AND CITY COUN IL
FROM: ANDREW C. LAZZARETTO, CITY MANAGE
DATE: NOVEMBER 14, 2006
SUBJECT: ADOPTION OF A NEW USER FEE SCHEDULE
SUMMARY
On June 13, 2006, the City Council authorized staff to contract with MuniFinancial for the
purpose of examining and updating the City's existing user fee schedule. The intent of the
exercise was to examine the true cost of providing certain municipal services and has
resulted in the creation of an updated user fee schedule for the City Clerk's Office, the
Community Development Department, the Engineering Department, and the Finance
Department.
MuniFinancial has since completed their study and have provided an updated user fee
schedule for City Council consideration. The new schedule was created only after gaining
an understanding of the fully burdened cost for city personnel involved in providing certain
services. By taking the total salary and benefit costs for employees in each department and
then determining the amount of time it typically takes to provide a certain service,
MuniFinancial was able to determine the appropriate cost for certain user services.
Staff Recommendation
Staff recommends that the City Council approve Resolution No. 2006-36 (Attachment A)
establishing a new user fee schedule.
ANALYSIS
User Fee Background In Rosemead
On December 15, 1992, the Rosemead City Council enacted user fees for planning,
engineering, park & recreation, and development permitting services. Since that time, the
City had not conducted a comprehensive user fee study to determine if the current fee
structure was in alignment with the true cost of providing such services.
After reviewing the situation, the City Council approved a contract with MuniFinancial to
conduct a City-wide user fee study. The report was recently completed and provides an in-
depth analysis of the City's current fee schedule, the true cost of providing certain user
services, and the compilation of a new user fee schedule.
APPROVED FOR CITY COUNCIL AGENDA: v ~
0 0
City Council Meeting
September 26, 2006
Page 2 of 2
The attached study (Attachment B) contains detailed information regarding, including
justification for the new user fee rates.
Scope of Work
MuniFinancial reviewed and analyzed fees for the following departments:
Community Development
City Clerk
Finance
■ Engineering
■ Parks and Recreation
This work resulted in the development of a proposed new user fee schedule for Community
Development, the City Clerk's Office, Finance, and Engineering. Due to the nature of the
operations in Parks & Recreation, setting fee recovery levels at 100% would most likely lead
to a reduction in the number of participants. Therefore, MuniFinancial conducted an
analysis to identify the current cost recovery level for the entire department as an
informational item for the City Council's consideration. It appears that the department is
recovering around 5.8% of the cost attributable to services being provided in the
department.
User Fee Comparison
When the City Council authorized the user fee study, it was also requested that information
be produced to compare the proposed fees for the City and fees charged by surrounding
jurisdictions. MuniFinancial prepared such an analysis and collected the user fee schedule
from Pasadena, Downey, Montebello, Monterey Park, and South Pasadena for comparative
purposes. That information was extracted from the full report and has been included as a
separate attachment (Attachment C) for the City Council to review.
PUBLIC NOTICE PROCESS
This item has been noticed through the regular agenda notification process.
LEGAL REVIEW
This staff report and
Attorney.
Submitted by:
the attached resolution have been reviewed and approved by the City
Oliver Chi
Deputy City Manager
Attachment A: Resolution 2006-36
Attachment 6: MuniFinancial User Fee Study
Attachment C: User Fee Comparison
0 0
RESOLUTION NO. 2006-36
• A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF ROSEMEAD
ESTABLISHING A NEW USER FEE SCHEDULE FOR SERVICES
RENDERED IN THE CITY CLERK'S OFFICE, THE COMMUNITY
DEVELOPMENT DEPARTMENT, THE ENGINEERING DEPARTMENT,
THE FINANCE DEPARTMENT, AND THE PARKS & RECREATION
DEPARTMENT.
WHEREAS, the City Council engaged the services of MuniFinancial to conduct a
comprehensive user fee study and update on June 13, 2006; and
WHEREAS, the City is granted the authority under Section 66000 et. seq. of the California
Government Code to impose user fees for services rendered that primarily benefit an individual; and
WHEREAS, the User Fee Study conducted by MuniFinancial recommends the implementation
of a user fee schedule that will only allow the City to recover the amount it costs to provide specified
services; and
WHEREAS, the City Council published a notice of hearing on the potential user fee increases,
made the study available to the public, and held a public hearing in accordance with the requirements
of Government Code 66016 and 66018.
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF ROSEMEAD, CALIFORNIA,
DOES RESOLVE, DECLARE, DETERMINE AND ORDER AS FOLLOWS:
• SECTION 1. The Council finds and determines that the user fees set forth on the attached
user fee schedule (Appendix A) do not exceed the estimated reasonable cost of providing the service
for which the fee is charged.
SECTION 2. The attached user fee schedule (Appendixx A) for services rendered in the City
Clerk's Office, the Community Development Department, the Engineering Department, and the
Finance Department is adopted as the City's official user fee schedule.
SECTION 3. Each year in conjunction with the adoption of a new City budget, the City Council
shall have the authority to increase or decrease all user fees by resolution at a rate equal to the
Consumer Price Index (CPI) for the Los Angeles-Riverside-Orange County region.
PASSED, APPROVED and ADOPTED by the City Council of the City of Rosemead on this 14th
day of November, 2006.
Mayor, City of Rosemead
ATTEST:
•
City Clerk, City of Rosemead
APPENDIX A: SUMMARY OF FEE ANALYSIS
•
Full Cost Rao, Fee subsidy (full coal
Fully Burdened Rate urrent Fee recovery fee lose
(per Burdened
ed Rate Third Party/ Required Fee (kroludes 3rd party/ C
required fees) Current fee)
S-i-1AppI-fl n
_
-`---Fee- goi:i Frr F]oies ---T^c Farr
C4 Clerk
The City Clerks office Is responsible for conducting all elections, maintaining official city flies and performing necessary clerical work In ccaVanctionrwith the City Council. The City Clerk collects
data for Council agendas, takes and "nscribes Council minutes, conducts election procedures, updates the municipal code, and is responsible to and serves under the direction of Via City
Council.
-
-
F d,n9 o_l:irCVlat- 01 Jr-. IniLatrve - - -
3 34
3 - - -
54
- $
hew Fee
rva
Rosemead Muniu al Code Book
- Actual Cost
New Fee
Na
Subpoena for Records (Evidence Code Section 1583)
S6
56
New Fee
NO
Cdv Records Copies Slanderd or Lewd)
_ _
_
New Fee
Na
Color Copies (Standard)
56
56
New Fee
Na
Color Copies fLe"D
56
56
Information Re b
Documents not in existence requilring research 84 84 New Fee Ne
Audio Tape Copy
280
_ Plus Actual Cost of
Materiels
280
New Fee
We
Audio Tape Copy If tape provided by mqueslor
280
280
New Fee
We
CD. Floppy Disk, or Flash Drive Copy
56
Plus Actual Cost of
Material*
5e
New Fee
We
CD Co N or Disk Is provided the remmirlof
56
fib
New Fee
Na
OVD Copy
_
Plus Actual Cost of
New Fee
Ns
DVD Cop if DVD Is provided by the requeelor
98
se
Now Fee
We
G Council Agenda mailed
84
84
New Fee
We
City Council Minules mailed
188
lea
New Fe
Ns s
Certified Ca tes of On inal Documents
100
100
New Fee
We
Nola Fee
1M
144
New Fee
We
New Fee
No
Reproduction of Public Record
Black and While copies WS x 11
- Actual Cost
New Fee
No
8.5 x 11 Color copies, r ■
14
14
New Fee
Na
11.5 x 14 Color copies, r
14
U
New Fee
Na
11 x 17 Color copies, per s
14
14
New Fee
We
Custom Size copies
• Actual Cost
New Fee
rue
For records whom skctroNC format requested is the same as that used
. Actual Cost
-
New Fee
Na
For recortls where eNc4oNC krrrtat requested If for a retard which is
produced only at otherwise repulady schedule kderwb, or a'data
compaatlan. extraction. or progmmmkq' is required to produce the
. Actual Cost
-
-
New Fee
a
Bound records
190
198
New Fee
Na
Oiastal photographs On ~ paper
128
128
New Fee
Na
Photographs. slides. transparencies. blueprkds, maps and other pubic
- Actual Cost
-
New Fee
Na
Records Stored O6sbe. Adddi.W Retrieval. Re-Fee and Transportolim
Fee
185
185
New Fee
Na
Certification
For the ko peas, 29 29 New Fee Na
1 Per 10 pope 58 55 New Fee Na
Plans b Specs Distribution 260 260 New Fee Na
40
APPENDIX A: SUMMARY OF FEE ANALY1316
•
•
Fully Burdened Raft
(per occuraneehaso) Third Party/ Required Fee
ServiteiApplication
-
Full Cost Recovery Fee autmidy (full cost
(includes 3rd partyl Current Fee recovery fee less
required fees) current lee)
-
r N~i~z i Fee x:'oics
Community Development Planning Division
The Planning Division Is rosponsible for the supervfslon of land use in the City, development, updating, maintenance
assistance to the Rasemead Communlty Development Co
Copies
i - Fre ~ Fee rdot~a
i Foe
-
and Implementation of the City's General Plan, and provides technical
mmisslon.
Land Use Database
. Actual Cost
-
Actual Cost
35 Per Copy
n1a
General Plan (including background report)
107
107
25 Per Copy
82
General Plan Ma
85
65
5 Per Co
50
Reconstrudiuon Section Of Coda
107
107
107
Zonis At A Glance Chart
32
32
Per Co
32
Zoning Ma
107
107
5
102
Zoning Requirements
32
32
- Per copy
32
Zuni Ordinance
107
107
35
72
Public Hearin items
Conditional Use Pemits CUP
2,033
2,033
675 Per Transaction
m 5a
D" n Review DR Con.nercia9Resktendal
3,045
3,045
390 Per Transaction
2,655
General Plan Amendmertl GPA
2,657
2,657
950 Par Transaction
1,707
Mtadd al Code Amendment
2,657
2,657
925 Per Transaction
1,732
Planned Development Review (PD)
1,437
1,437
635 Per Tninsacton
802
Relief From Ordinance RFO - MoritorWms
948
948
300 Per Transaction
648
Relocation Impact Re on RIR - Mobile Horne Parks
3,234
3 234
1,500 Par TrsnucWn
1,734
Tenfalve Parcel I Trot Maps PM I TTM'
2,419
2 419
1,355 Per Transaction
1.034
Tentative Parcel I Trad Maps Per Lot
2,419
2,419
100 Per Transaction
2,319
Appeals
Flip Fee
1,144
1,144
300 Per Transaction
844
Public Haan Fee
720
720
38 Par Transacion
683
Other Mama
Occupwv-y Perms
1.385
1,385
225 Par Transaction
1.160
Site Plan Review
3 651
3,651
225 Par Transaction
3,426
Environmental Impact Assessment (WU Study)
8,146
B .m
300 Per Transaction
7,846
EIR - Plus Outside Consultant
9.683
8,683
2,9W Per Transaction
5,783
M Fxlentions
8,683
5,693
400 Per Transaction
6,253
Minor Lol Line Adusiment
13,910
13,910
290 Per Transaction
13,620
Geolo -I Re ors
1,228
1,228
325 Per Tmnswt*n
903
Oak Tree Perms
1.228
1,228
800 Par Transaction
428
Zonis Cam laince Leger
•
f
2065
2,065
2.065
r
4a1v wa.
General Services
,
Stormwaler pernul inspeWaMre.Napection, ummerciaplnduskfal, in
addib9n to Stale [a** (includes Gas Stallons and Auto Dealml
2,037
2,037
New Fee
We
Stommvatar pemit Inspectlonfre4nspection. restaurant. in addition to
Stale fees
2,037
-
-
2,037
- New Fee
We
Appeal of Public Nuisance Delenrdnabon to City Manager, payable in
sdv
2,863
2,W3
- N" Fee
We
Appeal of Public Nuisance Determination to City Counc . payable in
advance. hag of mhich Is refumdable if mmal Is uctield
3,962
3,962
- New Fee
We
New Filing ■nd Application Misca(laneous Parmft :
Laundry/Dry Clean: In-C
501
501
- New Fee
We
Adult Bus: Movie Book M113SJIM
501
501
- New Fee
n/a
Massage Parlor O eratin Pemiit
501
501
- New Fee
Na
Massa a Technician Permll
501
501
- New Fee
Na
Adult Bus Live Entertainment
501
501
New Fee
Na
Setf-Service Storage Facility _
501
501
- New Fee
n/a
APPENDIX A: SUMMARY OF FEE ANALYSIS
•
0
eMm/A llcatiorn
Fully Burdened Rate
(per occurence/CaN)
Third Party/ Rsqulred Fee
Full Cost Recovery Fee
(includes 3rd piulyl
required fees(
Current Fee
Subsidy (full cost
recovery foe lass
current fee)
N Notes
N
N
FN Notes
FN
Senior CA%en Housing
501
501
- New Fee
Na
Vehicle TwWri ration
501
501
- New Fee
Na
Dance & Entarakmment Perrill (Retall/M34
501
501
- New Fee
Na
Fortune Telling
501
501
- New Fee
Na
Mobile Home Parks
501
501
- New Fee
Na
Tatoo Pa r
SO
Na
Other Buskmas N
Bingo license appica im too. per PC326.5
CA Panel Code
Section 326.5(12)
1 332 inds; IN N 860
1,332
- New Fee
Na
Business and Animal Penrr/er
Tow Car Business Assistant Periit for Those Hired After Initial
Apphestion
464
464
- New Fee
Ns
Tow r Business Inspection F Incident to application permit
249
249
- New Fee
Na
Tow Car Business Pemdt Fee for Owner end ell assistants at t me of
applicAtion
249
249
- New Fee
We
Block Parry Permit (Includes Permit for Eroadxnenl Into Public Roo+
of-wgy)
249
249
- New Fee
Na
Pars Permit
1,373
1,373
- New Fee
We
Temporary Use Permit
2,295
2 295
- New Fee
We
Yard Sale ardt
231
231
- New Fee
Ne
Fireworks Pemnb
256
256
- New Fee
Na
Arlnsl Permit Koevinci Wild or Vicious Animal I
1
1
- New Fee
Na
Arterial Permit than Nose
1
1222
1 - New Fee
We
Production Fees
Motion Picture, Tele dston, Radio and Photographic Production Peril,
rd
Production om snies 2,431 2.431 New Fee Na
Student Production 602 602 - New Fee Na
Engineerfng
The Clfy of Rosemead has a contract with Wilidan to provide engineering smites. Those services Include administrative duties and development review, A rerainer of $800 Is collected monthly
for these services and Wllldan bills the publk on a time and materials basis.
Trail Map
Tenlalive 1 ract Ma
270 Full Cost
270
270
Record Ma Analysis
2,850 Full Cos[
2 B50
2. 1%
Additional Per Lot Cost
50 Full Cost
50
50
Monument Review
370 Full Cost
370
370
Defamed Momenerd Review
300 Full Cost
300
300
M Verification
255 Full Cost
255
255
Ma Clearance Review
300 Full Cost
300
300
Tract M Che6 Submittal
450 Full Cost
450
450
Parcel Map
TenutNe Parcel Ma
270 Full Cost
270
270
Record M• Analysis
2,000 Full Cost
2,000
2,000
Additonal Per Lot Cost
50 Full Cost
so
50
Dedications
750 Full Cost
750
750
Monument Review
370 Rd Cost
370
370
Ma Venfcation
225 Full Cost
225
225
Ma Clearance Review
300 Full Cost
300
300
Parcel Ma Check Submittal
450 Full Cost
450
450
Certificate of Compliance (Lot Line Adjustment)
42
APPENDIX A: SUMMARY OF FEE ANALYSIS
0
ervice/Ap Ilation
ed Rata
Fully (per Burdened Rate
Third Partyl Required Fee
Full Cost Recovery Fee
(includes 3rd partyl
squired teem)
Current Fee
Subsidy (full cost
recovery tee lose
currant fee)
ee Notes
w o s
w
Fee Note
Fee
Record Document Analysis
OW Full Cost
600
500
Additional Per Lot Cost
50 Full Cost
50
50
Varitcabon Of Compliance
225 Full Con
225
225
Review of Agreements
225 Full Con
225
225
Plan Checking
Initial Pion Check
$600 plus 4.5% of the
fist 5511.000. plus 3%
of the next 5100,ODD,
Plum 1.5% theraafter of
the estMnaled
- construction, cost
-
5500 plus 4.5% of the Ibst
550.000. plus 3% of the
- nest 5100.000. plus 1.5%
thereafter of the
tslYnated
construction cost
lan Chock Revision
5600 plus 4.5% of the
W $50.000, plus 3%
of the next $100,000,
plus 1.5% thereafter of
the estimated
- construction cost.
$500 plus 4.5% of the W
550,000, plus 3% of the
next 5700.000, plus 1.5%
thereafter of the estrrrled
anstnrcton coal
construction Permits
Issuance Fee
50
50
50
Initial Observation
f500, plus 6% of the
trai $700.000. plus 5%
of the next $100,000,
plus 4% thereafter of
the estimated
- construction cost
-
$500, plus 8% of the tint
$100,000, plus 5% of the
- next 3100.000, plus 4%
thereafter of the estimated
construction cost.
-
Modifications Observation
- Actual Cost
- Actual Cost
Drive
250 Per Driveway
250
250 Per Drfve~my
Close Existln DAvewa Opening
250 Per DrWawa
250
250 Per
Individual Sidewalk I Sidewak Fig4f
250 Per Location
250
250 Per Localion
Individual Curb / Gutter
200 Per Location
2D0
200 Per Location
Individual Alley Improvement
Per Sq. Fool I
3 Location
3
3 Per Sq. Fool ! Location
Street Trees
50 First Tree
50
50 Pest Tree
Additional Streit Trees
25 Every Tree Thereafter
-
25
25 Every Tree Thereafter
Curb Drain
150 Per Drain
150
150 Per Drain
Parkway Drain
300 Per Drain
300
300 Per Drain
Relocate Exis' Drainage Structure
1,000 Per Stuck"
1,000
I,DOO Per Structure
Excavation Permits
Service Out
$17.501 cut and $2 for each sq. R of
- exava0on
_
_ $17.50 I had and 52 for
vati
each sq. It. of excavation
vatlon
Main Lim
S2 per sq. It. for each
- s q. t. of excavation
$2 per sq. fl. for each sq.
of excavation
Sewer Gds Resident
250 Connection To Main
250
250 Connection To Main
Sewer Cuts (Commercial)
350 Connection To Main
350
350 Connection To Main
Encroaahnwnt Permha
Stockpile Material I Waste In Street R'
2W Par Stockpile
2001
200 Per Stockpile
Placing Container In Street Right-Of-Way
Par Corhlairhar
250 RefundabN
_
250
250 Par Container
Refundable
43
APPENDIX A: SUMMARY OF FEE ANALYSIS
•
is
ervice/Application
Rant
Fully (par eBurd Burdened ed Rae
Third Party/ Required Fee
Full Cost Recovery Fee
(Includes 3rd party!
required fees(
Current Fee
Subsidy (full coat
recovery fee less
currant fee(
w o
ee Notes
Fee
Fee Notes
Fee
Plan Tempormy Structure / E u' 1 In Stoat RighkX-Way
200 Per Structure
266
200 Per Structure
Pedeslnan Protection Reurad Budding Code
200 Par Location
200
200 Per Location
Street Closures
200 Per Location
200
200 Per Location
Commerrul Ftknin - Weekday
400 Per Day
400
400 Per D
Commerael Filming - Weekends, Nights. & Holidays
800 Per Day
ON
BW Per Day
Other Enaoarhments
P
Issuance Fee, Plus
50 Actual Coats
-
50
50 Issuance Fee, Plus Actual
Cos"
ropelled NW
Public Im mvemant Plan Review Fee
We
Major I mvernem Plan Review base fee
1,663
1.563
- New Foe
We
plus each lot
63
63
- New Fee
Na
Minor Improvement Plan Review ass lee
1,125
1,125
- New Fee
Ns
plus each lot
63
83
- New Fee
Na
Final Subdivision Ma Review Fee
Maw
Mom Final Ma Review lase lee
1,625
1,625
- New Fee
Ns
plus each lot
75
75
- Now Fee
Na
Major Subdivision Map Acceptance of Improvements and Dsdirallom
1,500
-
1800
- New Fee
Na
Motor ' Mw Aniendmord of Subdivision Aarearment
875
075
Now Fee
We
Minor
We
Minor Parcel Ma Review • f
1,250
1,250
- New Fee
N•
plus each lot
75
75
- New Fee
N•
Minor Subdivision Map Acceptance of ImpmvemeMs and Dedications
583
,
583
- New Fee
Na
Minor Subdivision of Subdivision A
300
300
New Fee
N•
New lot fee
- Actual Cost
-
Actual Cost
New Fee
Na
Base M Revision Fee
25
25
- Now Fee
No
Grease Trap Plan Review Fee
75
75
- New Fee
Na
Document Retrieval Fee
so
50
- New Foe
Na
St Si ns each intersection installed C'
375
375
- New Fee
Na
Street Lights, each intersection. installed by City
125
125
New Fee
Na
Speed Buffs each Installed C'
313
313
- New Fee
Na
Parade Penny
25
23
- New Fee
rVa
Parc=f m"
Thep Finance Dts'
NSF checks
300
1
-
300
1
New Fee
Per Chill Code 1719,
maximum allowable charge
for first NSF check Is $25
and for second and each
subsequent NSF check is
$35
rv.
e
St payment/check re•issuance
41
41
New Foe
Na
Yard Sale Permit
17
17
New Fee
Na
Bud eVCAFR/CIP Documents • Actual Cost
- Actual Cost
Actin Cost
New Fee
Na
Busmess License Lisli on CD 8
8
Now Fee
Na
Business License Processing Fees
Business Processing Fee/Permit Fee
184
184
New Fee
Na
Annual Renewal Processing Fee
97
97
New Fee
Na
Du IIC IC Cc 1111Ca10
54
54
Now Fee
Na
Change of Locution _
44
M
New Fee
Ne
APPENDIX A: SUMMARY OF FEE ANALYSIS
Fully Burdened Rate
Fun Cost Recovery Fee
Subsidy (full cost
(per oacummela"I
Third Fartyl Required Fee
(Includes 3rd party/
Current Fee
recovery fee less
required fees)
current fee)
Servi WA lication
Fee Notes
N Notes
Fee
Fes Notes
Fee
Parks 6 Recreation
Via Parks and RecreabOn Department administurs and coordinates all park, recreation, and related functions In the City, Specifically, the deparlmenf coordinates all recreation prams„classes,
'
aduiVyouthsporis leagues, special events, civic and cultural prvgrems, and volunteerservfces.' '
"Note:' See Report for the Macro Cost vs- Revenue Analysts of the Parks d Recreation i3epartmer t
0
17~
45
CITY OF ROSEMEAD
USER FEE STUDY
NOVEMBER 99 2006
FINAL REPORT
MuniFinancial
Corporate Office:
27368 Via Industria
Suite 110
Temecula, CA 92590
Tel: (951) 587-3500
Tel: (800) 755-MUNI (6864)
Fax: (951) 587-3510
Office Locations:
Anaheim, CA
Lancaster, CA
Oakland, CA
Phoenix, AZ
Sacramento, CA
Seattle, WA
www.muni.com
0 0
TABLE OF CONTENTS
TABLE OF CONTENTS ..............................................................................I
EXECUTIVE SUMMARY 3
Purpose of User Fee
INTRODUCTION
Policy Considerations
Methodology
Data Collection
Fees Comparison
4
5
6
6
CHAPTER 1. CITY CLERK 8
Description of Services
8
Analysis
8
City Clerk - FB Hourly Rates Summary
9
Table 1.1: City Clerk - FB Hourly Rates Summary
10
Time and Materials (T&M) Survey
11
Full Cost Recovery Fee Summary
11
Table 1.2: City Clerk - Fee Schedule
12
Table 1.2: City Clerk - Fee Schedule Summary
13
Summary
14
CHAPTER 2. COMMUNITY DEVELOPMENT/ PLANNING
15
Description of Services
15
Analysis
15
Community Development/Planning - FB Hourly Rates Summary
16
Table 2.1: Community Development/Planning - FB Hourly Rates Summary
17
Time and Materials (T&M) Survey
18
Full Cost Recovery Fee Summary
18
Table 2.2: Community Development/Planning - Fee Schedule
19
Table 2.2: Community Development/Planning - Fee Schedule
20
Table 2.2: Community Development/ Planning - Fee Schedule Summary
21
Summary
22
CHAPTER 3. ENGINEERING 23
Description of Services
23
Analysis
23
Engineering - FB Hourly Rates Summary
24
Table 3.1: Engineering - FB Hourly Rates Summary
25
Time and Materials (T&M) Survey
26
Full Cost Recovery Fee Summary
26
Table 3.2: Engineering - Fee Schedule
27
Table 32: Engineering - Fee Schedule
28
Table 32: Engineering - Fee Schedule Summary
29
Summary
30
CHAPTER 4. FINANCE
31
Description of Services
Analysis
Finance - FB Hourly Rates Summary
Table 4.1: Finance - FB Hourly Rates Summary
Time and Materials (T&M) Survey
Full Cost Recovery Fee Summary
Table 4.2: Finance - Fee ScheduleSummary
Summary
•
31
31
32
33
34
34
35
36
CHAPTER 5. PARKS & RECREATION 37
Description of Services
Analysis
37
37
APPENDIX A: SUMMARY OF FEE ANALYSIS 39
APPENDIX B: FULL-COST COST ALLOCATION PLAN 46
APPENDIX C: FEE COMPARISON 61
APPENDIX D: FEE COMPARISON CONT 69
11
• •
EXECUTIVE SUMMARY
As local governments deal with increased fiscal limitations in California, service fees, or user
fees have become an important source of revenue. This revenue source for the City of
Rosemead is detailed in this report.
The City of Rosemead is located in the San Gabriel Valley. The City was incorporated in
1959 and spans 5.5 square miles. Today, the city boasts that its goals include the
improvement of quality of life offered in Rosemead in a business friendly atmosphere
conducive to economic growth and prosperity. The City offers a desirable and affordable
community in which to live and a dynamic and expanding business sector that is an
economic growth engine for West Coast commerce. Therefore, it is no surprise that the City
of Rosemead is home to over 57,000 residents.
PURPOSE OF USER FEE
A user fee is a payment made by an individual for a service provided by a jurisdiction that
primarily benefits that individual, or user. The primary objective of this User Fee Study
completed for the City of Rosemead, California, is to determine the full cost to the City for
providing administrative services.
The City requested that this report determine the full cost recovery fees that may be charged
to users for each service to:
1) Recover up to 100% of the actual cost of providing the service
2) Identify and recommend additions or deletions to the City's existing service fee
schedule
The City can impose fees under the authority granted by California Government Code
5§66000 et. seq. ("Code'} and is required by the Code to hold at least one public hearing as
part of a regularly scheduled City Council meeting to allow for public comment on its
proposed fees. The Code requires that the Council adopt approved fees by either ordinance
or resolution.
Costs included in this analysis are based on the fully burdened hourly rates ("FB Hourly
Rates") for city personnel involved in providing a service. FB Hourly Rates not only include
direct annual salaries and benefits but also indirect departmental overhead costs,
interdepartmental support costs, and central services overhead costs.
The services and fees for each department/division are addressed individually in chapters 1
through 5 of this report. The tables included in each chapter include a list of the services
provided by the department/ division, the FB Hourly Rates of all positions involved in
providing a service, and the results of the time and materials surveys conducted for each
department/division. A Full Cost Recovery Fee Summary Table shows the current fee being
charged for each service by the City, the total cost to the City in time and materials to
provide the service, any third party/required/penalty fees for each service, and the full cost
recovery fee for each service, which represents an amount sufficient to recover 100% of the
City's costs of providing a service.
MuniFinancial
0 0
INTRODUCTION
According to California Government Code §§66000 et. seq., public agencies can impose fees
for government services when: 1) the individual's decision to use the service is voluntary;
and 2) the fees charged to an individual user are reasonably related to the level of service
rendered to the cost of providing that service.
Fees in California are required to conform to the statutory requirements of the California
Constitution, the California Government Code, and the California Code of Regulations.
According to the California Government Code, fees may not exceed the reasonable cost of
providing the service for which they are collected unless the excess fee is approved by a two-
thirds (2/3) vote of the electorate.
The City believes that its General Fund may be subsidizing many services that benefit users,
and that current fees may not account for the support costs associated with the service
delivery.
To correct such possible deficiencies, the City has requested an update of its fee schedule.
As a part of the update, this report reviews current fees for services, the total cost associated
with delivering a service, and identifies the full cost recovery fee.
However, this report does not analyze fees where the total cost cannot be determined
through a time and materials survey. Such fees include rental charges for rooms and
facilities, penalty fees and late charges. We believe that there is no requirement to base rental
charges or penalty fees on actual costs, since the City is providing no "service" and no direct
or indirect costs are being borne by the City that go over and above normal maintenance to
City property. Typically, a city will rent or lease property for special uses and will charge
what is deemed a competitive market rate for such rent. The City of Rosemead can consider
this approach for fees that are considered rental charges or penalty fees. We would expect
that reasonableness and market comparables would be a good basis for determining the
appropriate level of these types of fees.
POLICY CONSIDERATIONS
Economists and government practitioners in California advocate the use of fees to finance
certain public services that primarily benefit users. Fees are imposed because they recover
costs associated with the provision of specific services benefiting the user, thereby reducing
the use of General Fund monies for such purposes.
Increasingly, jurisdictions not only want to collect the full cost of staff labor associated with
processing and administering services that benefit users, but also wish to recover support
costs-
Support costs are those costs relating to a jurisdiction's central services departments that are
properly allocable to the effective functioning of the jurisdiction's operating departments.
Appropriate support costs are generally derived from a jurisdiction's cost allocation plan.
For the purpose of this study, MuniFinancial prepared a Fully-Cost Cost Allocation Plan
using the City's operating budget for FY 2006/07 (Appendix B).
As labor effort and costs associated with the provision of services fluctuate over time, a
significant element in the development of any fee schedule is that it be adopted with the
flexibility to remain current. A fee schedule that is flexible and easy to use will assist the City
MuniFinancial
0 0
in its effort to ensure that fees are based on current and reasonable costs for providing
services. As a result, it is recommended that the City include an annual inflation factor in the
ordinance adopting the fee schedule that allows the City Council, either by ordinance or
resolution, to annually increase or decrease the fees based upon published information such
as the Consumer Price Index (CPI) or Employee Cost Index for State and Local Government Employees,
Total Compensation as released by the United States Department of Labor's Bureau of Labor
Statistics.
Annually, the City should consider determining the percentage change in the selected
adjustment factor and applying the resulting increase or decrease to the fee schedule by
adopting the change. Fees set by federal or state law are exempt from such adjustment.
METHODOLOGY
The method of analysis for calculating fees that has been used in this report is the:
Case Study Method- This approach estimates the actual labor and material costs
associated with providing a unit of service to a single user. Costs are estimated based
upon interviews with City staff regarding the time typically spent on tasks; a review
of available records; and
• Time and Materials (1 &M) Analysis. The T&M analysis involves charging a fee based
on actual costs, including staff time (at FB Hourly Rates), material costs, and outside
contractor costs, if applicable. Use of this T&M analysis is suitable when city staff
time requirements vary dramatically for a service, or for special projects where the
time and cost requirements are not easy to identify at the project's outset. Further,
the use of the T&M method is effective in instances when a staff member from one
department assists on an application, service or permit for another department on an
as-needed basis. To use the T&M method for any of the services provided, the City
may want to consider adopting the following policy or a similar one approved by the
City Attorney:
Concurrent with the submittal of an application, the project applicant shall pay deposit
amounts (when specified) and enter into an agreement to fully reimburse the City for
processing costs. The City shall not be required to perform any work on the application
prior to receipt of the deposit and execution of the agreement. The agreement shall also
include a provision for amendments to the agreement and scope of work to cover work
that was unforeseen or substantially exceeded time and materials estimates.
• Macro Cost vs. Revenue Method This "top-down" approach evaluates the
appropriateness of current fees by comparing the total cost of a service category (e.g.
Youth Sports & Programs) against total revenues received. Costs are estimated by
apportioning 100% of each staff member among the various service categories. This
type of analysis tells decision makers whether a category of fees is creating a revenue
surplus, deficit, or breaking even. This method was employed for the Parks and
Recreation analyses.
Under these methods, indirect costs are added to the direct cost of service to calculate the
fee. Indirect cost figures are obtained from the City's January 2006 Cost Allocation Plan.
MuniFinancial
0 0
DATA COLLECTION
This report identifies three (3) cost layers that, when combined, constitute the fully burdened
cost of a service. The cost layers are defined as: direct labor including salary and benefits,
departmental overhead, and the City's central services overhead. These layers are defined as
follows:
Direct Labor. Staff hours spent directly on fee-related services as shown on the Time
and Materials survey tables included in each
chapter.
• Departmental Overhears: Hours spent on staff
supervision by the Department director and
administrative activities including clerical support,
supplies and materials shown on the Time and
Materials survey tables included as departmental
overhead in each chapter.
• Cenlral Services Overheard These costs, detailed in
the City's Fully-Cost Cost Allocation Plan
prepared by MuniFinancial, represent services
provided by those Central Services Departments whose primary function is to
support other City departments.
Finally, data collection included a thorough review of relevant City documentation, such as
the City's General Fund budget, current City fee schedules, and correspondence related to
fee services.
FEES COMPARISON
The final data tool provided to the City in this report is a fee comparison matrix for each
department. Each matrix includes the City's current fees, the City's full cost recovery fees,
and the current fees of other jurisdictions that were deemed comparable to the City of
Huntington Park. The comparable jurisdictions were determined and chosen based on
locality, demographics, and staff recommendations.
The purpose of the comparison matrix is to show how the City's full cost recovery fees
compare to fees charged by the chosen jurisdictions for similar services. Although
comparison matrix is a useful tool for the City to have an overview of fees charged by other
jurisdictions, it is not recommended that the City sets its fees based on the fees charged by
other jurisdictions for the following reasons:
The notable challenge is the lack of background information was provided
despite research efforts and many inquiries.
The current fees charged by the chosen jurisdictions are not always comparable
to the City's full cost recovery fees. It is formidable to have an apple-to-apple
fee comparison. Services included in each fee vary from city to city. For
example, the plan check fee of a chosen jurisdiction may include permit issuance
fee while the plan check fee of Huntington Park City does not include permit
issuance fee.
MuniFinancial
•
• It is not always determinable when was the last time the chosen jurisdiction
updated its fees schedule. This is crucial since many cities continue charging fees
that were established years ago. Thus, these fees do not reflect the inflation over
the years like the full cost recovery fees were calculated in this study, and
consequently the full cost recovery fees are higher than fees of the chosen
jurisdiction.
Nonetheless, the comparison matrix is a useful tool to have an overview of what other cities
charge for similar services. Again, it is important for policy makers to understand that it is
not recommended to set fees based the fees charged by neighboring jurisdictions. The best
method for setting fees is to determine the actual costs of services based on time and
materials, which we have done in this report, and establish fees up to 100% recovery level
and based on policy and political consideration.
MuniFinancial 7
• •
CHAPTER 1 . CITY CLERK
DESCRIPTION OF SERVICES
The City Clerk's office is responsible for conducting all elections, maintaining official city
files and performing necessary clerical work in conjunction with the City Council. The City
Clerk collects data for Council agendas, takes and transcribes Council minutes, conducts
election procedures, updates the municipal code, and is responsible to and serves under the
direction of the City Council.
ANALYSIS
The City does not have an adopted fee schedule for services performed by the City Clerk's
office. Therefore, any fees currently collected are billed as the "actual cost" of materials with
no administrative overhead. As such, the current fee schedule is not 100% cost recoverable.
An analysis of fees adopted by other jurisdictions is used as a benchmark to set the City of
Rosemead's fee schedule for the following services performed by the City Clerk's
department:
• Information Request
0 Reproduction of Public Record
The purpose of this analysis is twofold: 1) to describe the components involved in
determining the total cost based on time and materials, and 2) to show the maximum
allowable fee the City can charge based on a 100% recovery level. While it is our intent to
show a full cost recovery fee based on full costs, the City administration will ultimately
decide which fees to adopt based on policy and political considerations.
MuniFinancial 8
CITY CLERK -,FE HOURLY RATES SUMMARY
Table 1.1 below shows the FB Hourly Rates Summary for the City Clerk's Department
positions involved in providing the public with information request and reproduction of
public document services. As described in the Data Collection section, this table illustrates
the following:
• Direct Labor: The total employee salary and benefits paid by the department as
illustrated in column E of Table 1.1. Personnel costs of $270,722 were determined
from the City's 2006/07 Budget.
Departmental Overhead: Includes the non-billable annual salary of $18,245 for the
position of City Clerk. This position is considered "non-billable" because a
percentage of its salary is not directly tied to the Time and Materials Survey.
However, since this salary is budgeted in this department, it is included in the
departmental overhead costs. Additionally, the 2006/07 operating budget for this
division of $593,038 is included as departmental overhead.
Central Services Overhead: A Full-Cost Allocation Plan completed by
MuniFinancial for the City of Rosemead in 2006 was used to determine the central
services allocation of $0 (Appendix B).
Appendix C, a fee comparison of neighboring jurisdictions shows that many of the
fees the City of Rosemead is proposing are similar to those charged by other
jurisdictions.
• Fully Burdened Hourly Rate: By using the methodology listed above, the Fully
Burdened Hourly Rate is listed under column "N" of Table 1.1.
Munihnancial
TABLE 1. II CITY CLERK -F@ HOURLY RATE'S SUMMARY
18,245
597.038
•
242.+1% w
Annual Salary a
Number of
Hourly Salary
% of Time
Employe. Salary d
x Nonbaable
Non-0h8able
%Annual Salary
Billable Amu
Total Dept
Central
Fully Burdens
Productive Hour 10
Fully Burdened
Ben.fit Rates by
Employees'
6 Benefit
Allocated W
Benefit paid by the
Annual Salary 8
Annual Salary
8 Benee4 to
Salary 8
Overhead
5-th;
Direct Labor'
Hourly Labor Raga "
Personnel CL.-'
Rates'
Department
Departhunt'
aenefih to
aBenaeh°
Department
So-so, I
Allocation'
Overhead
Department
Overhead
Penonnal Coats
AsooeYons
242.11%
0.00%
A
B
C
D
E
F
G
H
1
J
.
K
.
L
M
N
Job Claaaakaderna'
S.Lary-6
A/1:00
A•o
E
100x-
E-0
Di eot
0
Overhead %
1ndted
0
Overhead %
NN(
1,800'0 1
(LM)
Cdy Clerk
s 1:2,449
1.00
s 101
W
s 1:2,419
lox
s 18,245
Box
s 164,204
S 397.562
s
1
1 561.780
1620
s 347
Ncs Ito :the Cnv CW1
E9071
100
49
100".i:
a8.27..
0%
100°n.
BE.27a
13.721
:
301,994
1800
168
From City's 2006X1 Budget
From City's 2006X7 Budget Employee salary 8 benefits paid by the Department (column E Total) less Non4flable Annual Salary 8 Benefits (column G Total)
2 Average salaries and benefits provided by the City's 2006107 Budget for the respective job classification and multiplied by the number of employees (Column 8)
r1y ry per an employee to the Department, not including overhead costs
s Hourly Salary 8 Benefit costs
4 Employee salaries and benefits paid by Department determined by multiplying columns A and D
s Non,b4lable salary and benefits determined by multiplying columns E and F
° Billable salary and benefits determined by subtracting columns E and G
• ' Derived by multiplying Billable Salary 8 Benefits (column 1) by the Departmental Indirect Labor percentage, which is 242.11%
° Derived by multiplying the Billable Salary 8 Benefits (column 1) by the Central Services Overhead percentage, which is X00%
° Fully Burdened Direct Labor is the sum of &"a Annual Salary 6 Benefits (column 1). Total Dept Overhead Allocation (column J); Central Services Overhead Allocation (column K) divided by number of employees (column B)
10 Hours are derived by 2,080 annual working hours minus an estimated 250 vacation/holiday, hours (1.800 firs) and multiplied by % of time allocated to the Department less any Non-billable percent
" Derived by Fully Burdened Direct Labor divided by Productive Hours
12 Indirect Departmental personnel overhead costs not directly impacted by the user fees. Derived from column G "Non-Meade Annual Salary d Benefits"
13 Allocation determined from the City's Full-Cost Allocation Plan, completed August 2005 by MuniFinancial
14 Department Overhead Allocation Percent determined by dividing total Dept Direct Allocation of $611,283 by Personnel Costs of $262,477
1s Central Services Overhead Allocation Percent determined by dmding total Central Services Overhead Allocation of $0 by Personnel COS15 Of $262,477
10
0 0
TIME ANO MATERIALS (T&A4) SURVEY
Determining the amount of time each employee spends on assisting in the provision of the
services listed on the fee schedule is essential to identify the total cost of providing each
service.
Identification of these time elements relative to a particular service is most readily
determined through the completion of a Time and Materials Survey (T&M Survey). The
"time" portion of the survey reflects the average estimated time each department staff
position spends on a service. The "materials" portion of this survey refers to the costs of
materials spent by the department and is contained within the Departmental Overhead
allocation in the FB Hourly Rates. The result of multiplying the FB Hourly Rates by the
time spent by each position and adding any third party fees, reflects the actual costs, or total
costs of time and materials of providing a service. This is the full cost recovery to the City.
A T&M survey provides department management with an opportunity to assess the time
requirements for each service by position and record that information onto a spreadsheet.
Table 1.2 summarizes the amount of time, listed in five (5) minute intervals for each
employee used in providing a specific service to a user. The table also shows the total cost
of providing each service plus any third party, required or penalty fees to determine the Full
Cost Recovery Fee of providing each service.
FULL COST RECOVERY FEE SUMMARY
Table 1.2 summarizes the Full Cost Recovery Fees based upon the total cost of providing
each service as illustrated by the T&M survey.
An analysis of fees adopted by other jurisdictions is used as a benchmark to set the City of
Rosemead's fee schedule for the following services performed by the City Clerk's
Department.
MuniFinancial
11
TABLE 1.2: C/TY CLERK - FEE SCHEDULE
ServicelA Ilcatlon
City Clerk
Assistant to the
City Clerk
Third Partyl
Full Cost Recovery Fee
Footnote
1
(1)
Fully Burdened Rate z
Required/ Penalty
(includes 3rd
FB Hourly Rate
$347
$168
Fee
party/required fees) 2
FB Minute Rate FB Hourly Rate/60 Minutes
$5.78
$2.80
Average totel me to
complete a semce
Amount of Time Each Staff Member
Occurrence on Each Service in Minutes
Fee Notes
Fee Notes
Fee Notes
Filing of Circulators of an Initiative
30
30
84
$ 84
Rosemead Municipal Code Book
Actual Cost
- Actual Cost
- Actual Cos
Subpoena for Records Evidence Code Section 1563
20
20
56
56
City Records, Copies Standard or Legal)
Color Copies Standard
Actual Cost + 20
20
56
56
Color Copies (Legal)
Actual Cost + 20
20
56
56
Information Requests
Documents not in existence requiring research Actual Cost + 30 30 84 84
Audio Tape Copy
100 + Cost of Tape
100
280
Plus Actual
Cost of
Materials
Plus Actual
280 Cost of
Materials
Audio Tape Copy if tape provided by requestor
100
100
280
280
CD, Floppy Disk. or Flash Drive Copy
20 + Cost of CD
20
56
Plus Actual
Cost of
Materials
Pius Actual
56 Cost of
Materials
CD Co if CD or Disk is provided the r uestor
20
20
56
56
DVD Copy
5 + Cost of DVD
35
98
Plus Actual
Cost of
Materials
Plus Actual
Cost of
Materials
DVD Co if DVD is provided b the r uestor
35
35
98
98
City Council Agenda mailed
30
30
84
84
12
•
TABLE 7.2: C/Ty CLERK - F££ SCHEDULE
Service/Application
City Clerk
Assistant to the
City Clerk
Third Party/
Full Cost Recovery Fee
Footnote
(1)
1)
Fully Burdened Rate 2
Required/ Penalty
(includes 3rd
FB Hourly Rate
$347
$168
Fee
party/required fees) 2
FB Minute Rate F8 Hourly Rate160 Minutes
$5.78
$2.80
verage total time TO
complete a service
Amount of Time Each Staff Member
Occurrence on Each Service in Minutes
Fee Notes
Fee Notes
Fee Notes
City Council Minutes mailed
60
60
168
168
Certified Copies of Original Documents
25
10
15
100
100
Notary Fee
25
25
144
144
Reproduction of Public Record
Black and White copies 8.5 x 11
Actual Cost
Actual Cost
Actual Cost
8.5 x 11 Color copies, per page
5
5
14
14
8.5 x 14 Color copies, per page
5
5
14
14
11 x 17 Color copies, per page
5
5
14
14
Custom Size copies
Actual Cost
- Actual Cost
Actual Cos
For records where electronic format requested is the same
as that used by the City to create copies for its own use
Actual Cost
Actual Cost
Actual Cos
For records where electronic format requested is for a
record which is produced only at otherwise regularly
schedule intervals, or if "data compilation, extraction, or
programming" is required to produce the records
ctual Cost
Actual Cost
Actual Cos
Bound records
60
10
50
198
198
Digital photographs on lain paper
35
10
25
128
128
Photographs, slides, transparencies, blueprints, maps and
other public records
Actual Cost
- Actual Cost
Actual Cos
Records Stored Offsite, Additional Retrieval, Re-File and
Transportation Fees
45
20
25
1B5
185
Certification
For the first page
5
5
29
29
per 10 page
10
10
58
58
Plans 8 Specs Distribution
45
260
260
Fury BurdanW Hourly Rata delo conedhem Takla 1.1 CM Ct r Deparone.a - Fa Movly Raw annatNry
Fuy Burdened Houdy Rule MwW W to the nearest whole dollar and billed per a wvc&nff Dwr
13
•
•
0 0
SUMMARY
The City Clerk Department generally provides the public with copies of public records,
which includes all forms of communication related to public business. Based on the analysis
conducted in this chapter, we conclude the following:
• The City can charge a separate photocopy fee for materials not set at maximum
limits by State law.
Photocopy fees are governed by the California Public Records Act, (the "CPRA'~
which limits the fee charged to "the actual direct cost of duplication" (Government
Code Section 6276). The CPRA prohibits incorporation of document retrieval costs
into the photocopy fee. Actual photocopy costs fluctuate according to the number
of copies requested, thus adversely affecting the validity of any cost/revenue
comparison. Currently, the City of Rosemead charges ten cents ($0.10) per page for
black and white, standard sized copies for such material. The Political Reform Act
requires that photocopying charges be set at $0.10 per page for those documents
related to election materials. Since this does not include most public records, it is
reasonable for the City to charge a separate photocopy fee for all other documents
not relating to that Act.
• The City Clerk's office is currently providing various services where it can potentially
be charging a new fee. These services included:
✓ Information Request
✓ Reproduction of Public Record
The fees that will be established for the City Clerk should be used citywide in order
to keep reproduction fees consistent.
MuniFinancial
14
ql~
CHAPTER 2. COMMUNITY DEVELOPMENT/
PLANNING
DESCRIPTION OF SERVICES
The Planning Division is responsible for the supervision of land use in the Citv,
development, updating, maintenance and implementation of the City's General Plan, and
provides technical assistance to the Rosemead Community Development Commission.
ANALYSIS
The Community Development Department asked that we analyze fees for the following
services:
• Special Map and Database Copies (not established in the City Clerk's fee schedule)
• Public Hearing Items
• Appeals
• Other General Services
The purpose of this analysis is twofold: 1) to describe the components involved in
determining the total cost based on time and materials; and 2) to show the maximum
allowable fee the City can charge based on a 100% recovery level. While it is our intent to
show a full cost recovery fee based on full costs, the Citv administration will ultimately
decide which fees to adopt based on policy and political considerations.
MuniFinancial
15
0 0
TIME ANO MATERIALS fT&MI SURVEY
Determining the amount of time each employee spends on assisting in the provision of the
services listed on the fee schedule is essential to identify the total cost of providing each
service.
Identification of these time elements relative to a particular service is most readily
determined through the completion of a Time and Materials Survey (T&M Survey). The
"time" portion of the survey reflects the average estimated time each department staff
position spends on a service. The "materials" portion of this survey refers to the costs of
materials spent by the department and is contained within the Departmental Overhead
allocation in the FB Hourly Rates. The result of multiplying the FB Hourly Rates by the
time spent by each position and adding any third party fees, reflects the actual costs, or total
costs of time and materials of providing a service. This is the full cost recovery to the City.
A T&M survey provides department management with an opportunity to assess the time
requirements for each service by position and record that information onto a spreadsheet.
Table 2.2 summarizes the amount of time, listed in five (5) minute intervals for each
employee used in providing a specific service to a user. The table also shows tine total cost
of providing each service plus any third party, required or penalty fees to determine the Full
Cost Recovery Fee of providing each service.
FULL COST RECOVERY FEE SUMMARY
Table 2.2 summarizes the Full Cost Recovery Fees based upon the total cost of providing
each service as illustrated by the T&M survey. Table 2.2 also lists the current fees and shows
the full cost recovery fees at 100% recovery level.
MuniFinancial 18
T-- S.Z. CowArunn-r OcvcLOraILN ~c~r+rvrNa - Few a---
Ph
E-
0
t
l
C..,.",
P a r
C.-Ay
R
l
t
Pam
Full Cost
Service/ kat{on
.
D-
-
op-
Mrapm
I~
p
Am-t
I.-
6op+r
e
e
a'a
6
'
Fully Burdened Rate
RsgWro4Y
Recovery FN
Current Fee
FeetnoY
11)
t1)
(1)
111
111
(11
11)
(1)
Penalty Fee
Pectlleaa
W- 3a d
F6 H-01 Rana
3416
1461
sm
FS
1103
so
14®
1>m
Fa1114
F11 Minutia Rea ! Hourly ROW00 Mlnvlaa
$683
97 79
4549
4430
6372
50.62
67.81
{3.47
total
a-i of Tad FArn taa6 M 0-a m Fie, Sn n tarsls
Fee alarm
Ha NMw
Fw
Fae rlalaa
cepie,
Land Use Database
Na
- Achlal Cost
Actual Cwt
35 P. Copy
General Plan .cludla back and r
30
to
20
107
5 107
25 P. Copy
General Plan M
10
15
20
65
65
5 par Copy
Reconstructuon Section Of Code
10
10
20
107
107
Zonis M A Glance Char)
5
10
32
32
Zonis Ma
10
10
20
107
107
5 Par Copy
Zml Re emenh
S
10
32
32
Zm Ordnance
5
10
20
107
107,
35 Pat Copy
Zoning
Condit-.1 Use Pwmlm CUP
435
120
240
45
30
2,033
2,033
675 Par T-6-
Design Review DR CommercialRa W end
600
120
240
180
30
30
3,045
3,045
390 Per Tmeact-
General Plan Amendm of GPA
4S0
ISO
90
60
60
30
30
2.657
2,657
950 Par Transact-
Mmici al Code Amendment MCA
450
ISO
90
60
60
30
30
2.657
2,657
925 Per Trausactm
Plamed D-.4 them Review PD
270
90
30
60
30
30
30
1,437
1,437
635 Par Transact-
Rebef From Ordinance RFO . MorBwiums
195
60
15
30
30
30
30
948
948
300 Par Transact-
Reloca0- I act Repon RIR -Mobla Home Pal.
600
too
120
90
90
30
90
3.234
3,234
1,500 Par Transact-
Tentatve Pared I Tract Ma a PM I TTM
435
120
90
90
60
30
45
2,419
2,419
1 385 Par Tranacton
Tenlzb- Parcel I Tract Mope Per Lot
435
120
90
90
60
30
45
2,419
2,419
100 Per Transact..
Appeal.
F4kn Fee
160
60
30
90
1,144
1,144
300 Per Transac9on
Pubic Hearf Fee
140
30
5
45
30
30
720
720
38 Par TmasNm
Other hams
Ocw an Permit
255
60
30
45
60
15
IS
15
15
1,385
1,385
5 P. TmsacBm
Site Plan Review
660
120
120
t 80
160
30
30
3,651
3.651
225 Pa Tranactlon
Envkonm-W 1 aN Assess-M Ontial 6
1500
240
180
480
540
30
30
9.146
8,146
300 Par Transaction
Negative Declaration - Irk -use (if oulaids -ult d is
required, lee equals 1o contract cost Plus ■ %of few coal for
atln-rskve cwt
1820
300
too
450
540
60
60
5.683
8,883
2,900 Per Tmsmftn
MifpNed Negative Declaration - In-house Of outside corautiant
is requiredX.=) als to co imcf mM pkn ■ 5b1 total coal 1w
adnnWstra
1620
300
180
480
540
60
60
6,683
-
6663
400 Par Tm44ct-
EIR - InMuaa (U ouulde consultant Ie required, Na equals to
contract coal tors a 5xof taw cwt fa adminYtrsMa cw
2520
600
300
720
720
90
90
13.910
-
13,910
290 Per Transacbon
Ma Extensions
240
60
30
45
60
t5
30
1228
1,226
325 Par Tmnctim
s2i~nr Lot Use Ad.m,, .t
240
60
30
45
60
15
30
122E
1226
800 Per Tmaachon
0
•
T ILL 2.2: Comm- CLVLLO~M£M%P(JwwrwO F£L Rem-
Pw
• saeree~
Owd
n
6
A
a
Ad
we
W
pM
1
eeneraew
ar
Cee+ateaT
R
t
Third Party/
Full Cost
5sm"A katlon
aq
Dr'°°r
ooeu
Mer' "
-
p1.-
raa
a
phew
nv
a
s
M.Wr.
^
eV
arm
m.
SP-Ad
a
oear
s^'°`W'
FuMy Burdened Rate'
RequlnN
Recovery Fee
Current Fee
Feelnere
p)
(U
19
(1)
(1)
(p
DI
(1)
Penalty Fee
Itnclrraea Ira
a
FS Hourly flab
$115
up
3330
Std
1193
M9
164Me
SAM
pewrwheo1 )
FB Midrib Rab a HWfIY RalaRO MMubs
3697
$772
ISM)
M,3M
$3.22
70.87
3721
L7 4T
ssrw+
x
brrma4 d 11 Eec
r 6bR Mw 0- m Fdi 6rw n Baia
Fr MMM
Fr Meba
Fee
Fee Mole
O al Rp.M
360
60
30 240
30
2.06s
2,OBs
O.a Tree Perm11
60
30 45
30
45 30 4S
45
1 707
1,703
ton Co LNtr
15
15
45
IS 5
432
432
P tad claw iNa
G-ref 9arvkas
St-wabr p.-W k""" 0o h.4..pec6.n,
meruelMduebial, n sddr6on to Stele bee (includes GM
Statbm and Auto Deakn
105
120
t0
120
30
45
30
1 S
15
2.037
2.037
New Fee
Stonnwetar p~ anpeceonea4napac9Mr, restawant. in
adddat to Sbb bee
105
120
10
120
30
45
30
15
15
2,037
-
2.037
New Fea
Appeal of Public Nufcanca Debrmn b City M-9..
payabb ti .dean.., he6 of nfadt is ref uMable it appeal Is
eW
345
120
90
60
45
45
45
60
45
2,683
2.663
New Fee
Appel of Pubic Nusence DetemlMatlm to CitT Counal.
payaale M advance, half of Wo h h re* Mabb if appeal it
ell
705
240
160
90
60
45
3,962
-
3,962
Naw Fee
New FIYn and A i ""m keaaanaoua Pa-Ift
Laun 7p C44W 1
265
60
80
60
501
501
New Fee
A" Bus More Book. Maass
115
60
60
60
501
501
New Fee
Msssa a valor O eratrn PermR
520
60
60
60
501
S0l
New Fee
Msasa a 7rchninan Pe1mR
e"A
520
60
60
60
Sol
Sol
New Fee
Adult Bus LN< Enlep
i
730
60
an
60
501
501
New Fee
SeILSennca Stara Fa
490
60
60
60
501
501
New Fee
Senior Citizen Meu
610
60
60
60
501
501
New Fee
Vehicle Town O on
170
60
60
60
501
501
New Fee
Dane. 6 Entarbinmenl Panne (RetWVVW%n
550
60
50
60
501
501
New Fee
Fort- TeMin
100
60
60
60
501
501
New Fee
Mob&e Nome Prim
90
60
80
60
501
501
New Fee
7.too Ped.
90
60
60
60
501
OMr Busim" Lkrbea
Bingo item. applf.6- fee, per PC326.5
]5
120
60
60
BO
32 Penal Code Secean
1,772 326.5(12) fates fee al
50
-
1,332
New Fe.
Buafnaaa rid Anem*f POrrnMa
To
w ur Business Assstmi Parmh tot Those Nked After Irdbal
Applt-
35
60
60
15
464
464
New Fee
Tow Cm Bu anew k%peceon Fee incident to permit appicali"
35
10
60
15
249
-
249
New Fee
6me o r Br7e tlMt Permit Fee Ir Ownr and so "t steno at
35
10
60
IS
249
242
New Fee
=O Parry Pem1X (htdudes Permi for Emoschm nt Mta Pubic
f-Wav}
45
10
60
15
M9
-
249
New Fee
P.-M Permit
100
120
60
90
1.373
1,373
New Fee
Tem o Use Permit
30
90
60
90
120
60
2295
2.295
_
N- Fzr
Y.rd Sal< P<rnNl
30
20
45
231
231
New Frr
E
•
r e4f 2.2: 0 ...Ntrr OLVt•LC~AIa'NT/PLANMINO • F7rl M.-.-
rvke! don
Pl.
O..o.
R.e.wYe..w.
+E-
Ow.ko-
~+er
6
PI.-
A..o..n
P-
A~
A-
Pl.
hrm
Cr^^.rny
R.Yb.
6pw,W
P.n-T-
+r
RdW
6psYr.1
ully Burdened Rata'
Third Party/
Raquirodl
Full Coat
Recovery Fee
urrent Fee
Feelneb
(1)
111
P)
nl
1+)
III
l1)
III
Penalty Fee
a
I'll Hourly
4416
1167
1170
1256
Sig]
W
S40
32n
FO MMWM ROO H"V RaftM Min YM
9611
17.72
$5.0
$430
LIM
SOA2
17.61
47.17
r.ra
•
An W
T.n. Er
n"M.nEw Om en Ew 5w
h Mk6m
Fr r1Pre.
Fr rm
Fw
Fw Ilo1n
Fireworks Pw111e
50
20
46
30
256
2S6
New Fee
Mind Prm6'. VAd w Ndous Ming
760
120
30
30
30
I
1
New FsP
Mimd Pernd: Kwlo rind oMw N.. 6waa .d.
760
120
30
30
30
1,222
1
New Fee
Production Fen
Melfon Pkaas, TsMridwr, Redo and PAalogrWhic Produce-
Pw 1W
Production C 163
120
90
30
120
60
30
2.431 2,4311 W. Fee
SWMM ProAwaon 165
10
to
30
45
30
602 602 New Fee
'Pwa.rrwwna.r.... w.teral tsrrw 0nrr..n.rw.wre w.w ne. r++r
• FW e....e rwre er errr. w. rW .uurr W M...'wrMm.
•
0
•
SUMMARY
CJ
This study of the Community Development Department's fee schedule examines fees for
community development services related to the Planning Division. These maximum
allowable fees are based on time and materials and represent 100% full cost recovery. Based
on our analysis, we have determined the following:
Much of the fees analyzed in this report are new fees for the City of Rosemead's
Community Development Department. These fees were calculated based on average
time estimations and are identified in the notes of the "current fee" column as a
"new fee."
Appendix C, a fee comparison of neighboring jurisdictions shows that many of the
fees the City of Rosemead is proposing are similar to those charged by other
jurisdictions.
Fees identified as "actual cost" are unique services and vary depending on the
complexity of the project. Therefore, it is more appropriate to charge a FB Hourly
Rate for each service.
Generally, we recommend that fees be set at 100% cost recovery levels.
MuniFinancial 22
• s
CHAPTER 3. ENGINEERING
DESCRIPTION OF SERVICES
The City of Rosemead has a contract with Willdan to provide engineering services. Those
services include administrative duties and development review. A retainer of $800 is
collected monthly for these services and Willdan bills the public on a time and materials
basis.
For development review services, Willdan bills the City for both development review and
inspection on a time and materials basis. For capital projects, Willdan collects eighteen
percent (18%) of the estimated construction cost to compensate for design and construction
management services, and then collects additional fees for extra services such as hydrology
studies, utility coordination, grant administration, labor compliance, etc. This Agreement
was established in July of 1981.
ANALYSIS
The City of Rosemead asked that we analyze fees for the following services:
• Track Map
• Parcel Map
• Certificate of Compliance (Lot Line Adjustment)
• Plan Checking
• Construction, Excavation, and Encroachment Permits
• Public Improvement Plan Review
• Final Subdivision Map Review
The purpose of this analysis is twofold: 1) to describe the components involved in
determining the total cost based on time and materials; and 2) to show the maximum
allowable fee the City can charge based on a 100% recovery level. While it is our intent to
show a full cost recovery fee based on full costs, the City administration will ultimately
decide which fees to adopt based on policy and political considerations.
MuniFinancial
23
0 0
ENGINEER/NO - FS HouRLY RATES SUMMARY
Table 3.1 below shows the FB Hourly Rates Summary for the City Engineer position
involved in providing the public with engineering services. As described in the Data
Collection section, this table illustrates the following:
• Direct Labor: The total contracted employee salary paid by the department as
illustrated in column E of Table 3.1. This cost of $9,600 is determined from the
City's 2006/07 Budget.
• Departmental Overhead: Includes the 2006/07 Operating Budget for this division
of $506,500 is included as Departmental Overhead.
• Central Services Overhead: A Full-Cost Allocation Plan completed by MuriFinancial
for the City of Rosemead in 2006 was used to determine the central services
allocation of $0. (Appendix B)
• Fully Burdened Hourly Rate: By using the methodology listed above, the Fully
Burdened Hourly Rate is listed under column "N" of Table 3.1.
MuniFinancial
24
TAOLE 3. 7: ENa/NEER/Na DivisiaN -FB HOURLY RATED SUMMARY
506.500
5276.04% "
AnmW Saary a
8-1111 Ralea b
Nurobar of
r
Hourly salary 6
'
% of Time Abated
to De
anrrrnt
Engbym Salary 6
8errefh
ad t
% Non-
bieNa
Non-billable
Amual Saar
l
% Annual
l
S
d
r
Bitable
A
nual
Total Dept
o
d
d
cordial
S
l
Fully
B
d
d
Productive
a
Fury
S
d
d
y
Peraannal Chao'
Employ-
Berea Ralw
P
p
ry
the oeparmrnl r
Annual
y
Benarda 1
a
a
y
Bereft to
n
Salary 6
m
ae
Abcnlion '
arv
raa
overbead
ur
ara
prod Labor r
Horaa
t r
a te
Hourly
Salary 8
Deperdnent
Ban.Its'
Abcstlon r
Labor
BenaMa to
Personnel
Rates "
Depar6rrM
arM
C
d
Gods
v
a
5278.04%
0.00%
A
B
C
D
E
F
G
H
I
J
K
L
M
N
O'Dked
0-Inbred
Jab ClassiicaNens'
sdws
'0
(100%-F) I
(E- G)
Overheed%
.J•K
15WO 1
Cm Env-Rewror
f 0.600
1.00
$ 5
100%
S 9,600
0%
6
100%
5 9.600
6 506.500
$
e 518.100
1,Boo
S 180
P-ri-Total
9600
IM
9.800
9.600
506.500
516,100
1,e00
0
' From City's 2006/07 Budget
" From City's 2006/07 Budget; Employee salary b benefits paid by the Department (column E Total) less Non-billable Annual Salary 6 Benefits (Column G Total)
2 Average salaries and benefits provided by the Ciry's 2006107 Budget for the respective lob classification and multiplied by the number of employees (Column B)
Hourly Salary & Benefit costs per an employee to the Department, not including overhead costs
' Employee salaries and benefits paid by Department determined by multiplying Columns A and D
a Non-billable salary and benefits determined by multiplying columns E and F
° Billable salary and benefits determined by subtracting columns E and G
7 Derived by multiplying Billable Salary b Benefits (column 1) by the Departmental Indirect Labor percentage, which is 6276.04%
° Derived by multiplying the Billable Salary 6 Benefits (Column 1) by the Central Services Overhead percentage, which is 0-00%
° Fully Burdened Direct Labor is Me sum of Billable Annual Salary 6 Benefits (column 1). Total Dept Overhead Allocation (column J); Central Services Overhead Allocation (column K) divided by number of employees (Column B)
Hours are derived by 2,080 annual working hours minus an estimated 280 vacation/holiday hours (1,800 hrs) and multiplied by % of time allocated to the Department less any Non-billable percent
" Derived by Fully Burdened Direct Labor divided by Productive Hours
12 Indirect Departmental personnel overhead costs not directly impacted by the user fees. Derived from column G "Non-billable Annual Salary & Benefits"
"Allocation determined from the City's Full-Coal Allocation Plan, completed August 2006 by MuniFinancial
" Department Overhead Allocation Percent determined by dividing total Dept Direct Allocation of=606,600 by Personnel Costs of =0
'a Central Services Overhead Allocation Percent detem fined by dividing total Central Services Overhead Allocation Df=0 by Personnel Costs of $8,600
25
• •
T/ME AND MATERIALS (7&A4) SURVEY
Determining the amount of time each employee spends on assisting in the provision of the
services listed on the fee schedule is essential to identify the total cost of providing each
service.
Identification of these time elements relative to a particular service is most readily
determined through the completion of a Time and Materials Survey (T&M Survey). The
"time" portion of the survey reflects the average estimated time each department staff
position spends on a service. The "materials" portion of this survey refers to the costs of
materials spent by the department and is contained within the Departmental Overhead
allocation in the FB Hourly Rates. The result of multiplying the FB Hourly Rates by the
time spent by each position and adding any third party fees, reflects the actual costs, or total
costs of time and materials of providing a service. This is the full cost recovery to the City.
A T&M survey provides department management with an opportunity to assess the time
requirements for each service by position and record that information onto a spreadsheet.
Table 3.2 summarizes the amount of time, listed in five (5) minute intervals for each
employee used in providing a specific service to a user. The table also shows the total cost
of providing each service plus any third party, required or penalty fees to determine the Full
Cost Recovery Fee of providing each service.
F'LiLL COST RECOVERY FEE SUMMARY
Table 3.2 summarizes the Full Cost Recovery Fees based upon the total cost of providing
each service as illustrated by the T&M survey. Table 3.2 also lists the current fees and shows
the full cost recovery fees at 100% recovery level. The table illustrates how much the City's
current fees rank to the full cost recovery fees determined by this report. However, since
the City of Rosemead contracts with Willdan for engineering services and Willdan bills the
City at 100% full cost recovery levels, there are no subsidies in this division.
MuniFinancial
TAILL 3.2: CmorimLER/NO - Fcr 6CMLOULL
Service/A Ilcation
City Engineer Retains
Third Part
/
Full Cost
Footnote
11)
Full
Burdened Rate2
y
Required/
Recovery
Current Fee
FB Hourly Rah
$ISO
y
P
lt
F
Fee
FB Minute Rah FS Hourly Ralaf80 Minutes
S2.50
ena
y
ee
Includes 7b
varspe WW bm to e a
wMCa
rrence on erv
Minutes
Fee Notes
Fe Nona
Fw
Fee Now.
Tract Ms
Tentative Tract Ma
S 270 Full Cost
$
S 270
S 270
Record Ma Analysis
2.850 Full Cost
-
2,850
2,850
Additional Per Lot Cost
50 Full Cost
50
50
Monument Review
370 Full Cost
-
370
370
Deterred Monument Review
300 Full Cost
-
300
300
Ma VerKca0on
255 Full Cost
255
255
Ma Clearance Review
300 FN Cost
300
300
-Tract Me Check Submittal
450 Full Cost
450
450
Parcel Ma
Tentative Parcel Ma
270 Full Cost
270
270
Record Ma Analysis
2,000 Full Cost
2,000
2,000
Additional Per Lot Cost
50 Full Cost
50
50
Dedications
750 Full Cost
750
750
Monument Review
370 Full Cost
370
370
Ma VerKCahon
225 Full Cost
225
225
Ma Clearance Review
300 Full Cost
300
300
Parcel Ma Check Submittal
450 Full Cost
450
450
Certificate of Compllanca Lot Une Adjustment)
Record Document Analysis
60D Full Cost
600
600
Additional Per Lot Cost
50 Full Cost
50
s0
Verification Of Compliance
225 Full Cost
225
225
Review of Agreements
225 Full Cost
225
225
•
•
27
TABLE 9.2: ENO/NEER/NQ - FEE SUMV42UI-C
Service/Application
Cxy Entim-R~er
Third Paul
"
Full Cost
Footnote
(1)
Full
Burdened Rate'
y
Required/
Recovery
Current Fee
FO Hourly Rau
$150
y
P
F
lt
Fee
F8 Minute Rate F8 Hourty Ra1d80 Minutes
$2.50
ena
y
ee
Includ.a 3rd
Average totell rrr to s a
service
rrenw on x e n
Minutes
Fea Noh■
Fas Notas
Faa
Fn Nobs
Plan Checking
Initial Plan Check
5800 plus 4.5% of the first 550,000,
_ plus 3% of the next $100,000, plus
1.5% thereafter of the estimated
construction cost
_
$800 plus 4.5% of the first $50,000,
plus 3% of the next $100,000, plus
1.5% thereafter of the estimated
construction cost.
lan Check Revision
$800 plus 4.5% of the first $50,000.
_ plus 3% of the next $100,000, plus
1.5% nlereafter of the estimated
construction cosL
_
$800 plus 4.5% of the first $50.000.
plus 3% of the next $100,000, plus
1.5% thereafter of the estimated
construction coat.
Construction Permits
Issuance Fee
50 -
-
50
50
Initial Observation
- $500, plus 6% of the first $100,000,
-
5500, plus 6% of the first $100,055
plus 5% of the next $100,000, plus
4% thereafter of the estimated
construction cost.
Modifications Observation
- Actual Cost
Actual Cost
Driveway
250 Per Driveway
250
250 Per Driveway
Close Existing Driveway Opening
250 Per Driveway
250
250 Per Driveway
Individual Sidewalk I Sidewalk FYI-In
250 Per Location
-
250
250 Per Location
Individual Curb / Gutter
200 Per Locabon
200
200 Per Location
Individual Alley Improvement
3 Per S Foot/ Location
3
3 Per S q. Foot / Location
Street Trees
50 First Tree
50
So First Tree
Additional Street Trees
25 Every Tree Thereafter
25
25 Every Tree Thereafter
Curb Drain
150 Per Drain
150
150 Per Drain
Parkway Drain
300 Per Drain
-
300
300 Per Drain
Relocate Existing Drains Structure
1,000 Per Structure
1,000
1,000 Per Structure
Excavation Permits
Service Cut
$17.50 / cut and $2 for each sq. ft.
• of excavation
517.501 cut and 52 for each sq. ft.
of excavation
Main Line
_ $2 per sq. ft. for each sq. ft. of
excavation
-
_
$2 per sq. ft. for each sq. ft. of
excavation
Sewer Cuts Residential
250 Connection To Main
250
250 Connection To Main
Sewer Cu15 Commercial
350 Connection To Main
350
350 Connection To Main
•
•
TAILL 3.2: ENO/NEER/NO - FEL 5QNEOULL
Service/Application
Cay Engineer Rata er
Third Part
l
Full Cost
Footnote
(1)
Full
Burdened Rate'
y
Required/
Recovery
Current Fee
FB Hourty Rate
11150
y
P
l
F
Fee
FS Minute Rats FB Hourly Ratera0 Minutes
52.50
ena
ty
ee
includes 3rd
vetage total me to ERi;RW* s
sarWCe
mnce on Each erv ca n
Minutes
Fee Notes
Fee Not-
Fee
Fee Novas
Encroachment Permits
Stockpile Material I Waste In Street Ri t-Of-W
200 Per Stockpile
200
200 Per Stockpile
Pladn Container In Street Ri t-Of-We
250 Per Container (Refundable)
250
250 Per Container Refundable
Placing Temporary Structure / Equipment In Street Right-
Of-Way
200 Per Structure
200
200 Per Structure
Pedestrian Protection Reuired B Building Code
200 Per Location
200
200 Per Location
Street Closures
200 Per Location
200
200 Per Location
Commercial Filming -Weekday
400 Per Day
400
400 Per Day
Ccmmeraal Filming - Weekends Nights, 3 Holidays
SW Per Da
800,
800 Per Da
Olher Encroachments
N
f
50 Issuance Fee, Plus Actual Costs
50
50 Issuance Fee. Plus Actual Costs
ed
ew
wa
Public Improvement Plan Review Foe
Major Improvement Plan Review base fee
625
625
1,563
1,563
Now Fee
plus each lot
25
25
63
63
New Fee
Minor Improvement Plan Review base fee
450
450
1,125
1,125
New Fee
plus each lot
25
25
63
63
New Fee
Final Subdivislon Ma Review Fee
M& or
Major Final Ma Review base fee
650
650
1,625
1.6 25
New Fee
plus each lot
30
30
75
75
New Fee
Major Subdivision Map- Acceptance of Improvements and
Dedications
800
600
1.500
-
1,500
New Fee
Major Subdivision Map- Amendment of Subdivision
Agreement
350
350
875
-
875
New Fee
Minor
Minor Parcel Ma Review base fee
500
500
1,250
-
1,250
New Fee
us each lot
30
30
75
75
Now Fee
Minor Subdivision Map- Acceptance of Improvements and
Dedications
225
225
583
563
New Fee
Minor Subdivision Map- Amendment of Subdivision
Agreement
120
120
300
-
300
New Fee
New lot fee
Actual Cost
0
- Actual Cost
Actual Cost
New Fee
Base Ma Revision Fee
10
10
25
25
New Fee
Grease Trap Plan Review Fee
30
30
75
75
New Fee
Document Retrieval Fee
20
20
50
50
New Fee
Stop Signs, each intersection, installed b City
150
150
375
375
New Fee
Street Lights. each intersection, installed b City
50
50
125
125
New Fee
•
•
29
TAILL 3.2: Cmatm pima - FKw BQNCouLE
Service/Application
0ty Engineer Reta i
Third Part
/
Full Cost
Footnoa
(1)
Full
Burdened Rate2
y
Required/
Recovery
Current Fee
FS Hourly Rate
s+so
y
F
P
l
Fee
F8 Wim to Rita F8 Hourty Rat*M Minutes
f2.50
ena
ty
ee
imfudss 3rd
wWe WW &m W e s
servke
snw on m
Minutes
Fse Notes
Fw Not"
Fes
Fes Motes
Speed Bums each installed b C'
125
125
313
313
New Fee
Parade Permit
10
10
25
25
New Fee
Parcel Mere
120
120
300
300
New Fee
~ FWr eueaama 1W/r 0.W eMwmYwl aem Taeh 11. F yYrefYa • fe 11aF1/ Rahn 6umrry
FWr Owdw Hwtj RW rauridadber nrr rs aWr bps Cab pe•-ppf m
w.. am.t Cee r e.rrr a. sr sdr wdwrd na.N 41. p~b.sr nasebr a pppw sr aae.a. w oe+....a.w r m. naaae dapr
•
•
30
0 0
CHAPTER 4. FINANCE
DESCRIPTION OF SERVICES
'I'he Finance Department provides for the administration of payroll, accounting, purchasing,
preparation of the City's budget and reports to regulatory agencies.
ANALYSIS
The City does not have an adopted fee schedule for services performed by the Finance
Department. Therefore, any fees currently collected are billed as the "actual cost" of
materials with no administrative overhead. As such, the current fee schedule is not 100%
cost recoverable.
An analysis of fees adopted by other jurisdictions is used as a benchmark to set the City of
Rosemead's fee schedule for the following services performed by the Finance Department:
• Permit Applications
• Business License Processing Fees
The purpose of this analysis is twofold: 1) to describe the components involved in
determining the total cost based on time and materials; and 2) to show the maximum
allowable fee the City can charge based on a 100% recovery level. While it is our intent to
show a full cost recovery fee based on full costs, the City administration will ultimately
decide which fees to adopt based on policy and political considerations.
MuniFinancial 31
0 0
F/NAmcE - FS HOURLY RATES SLIMMARY
Table 4.1 below shows the FB Hourly Rates Summary for the Finance Department positions
involved in providing the publics with permit applications and business licensing services.
As described in the Data Collection section, this table illustrates the following:
• Direct Labor: The total employee salary and benefits paid by the department as
illustrated in column E of Table 4.1. Personnel costs of $461,800 were determined
from the City's 2006/07 Budget.
• Departmental Overhead: Includes the non-billable annual salary of $110,906 for the
positions of Director of Finances/MIS, Finance Assistant, Receptionist/Cashier,
Account Technician, and Office Assistant. These positions are considered "non-
billable" because a percentage of their salary is not directly tied to the Time and
Materials Survey. However, since these salaries are budgeted in this department, it is
included in the Departmental Overhead Costs. Additionally, the 2006/07 Operating
Budget for this division of $584,900 is included as Departmental Overhead.
• Central Services Overhead: A Full-Cost Allocation Plan completed by MuniFinancial
for the City of Rosemead in 2006 was used to determine the central services
allocation of $0. (Appendix B)
• Fully Burdened Hourly Rate: By using the methodology listed above, the Fully
Burdened Hourly Rate is listed under column "N" of Table 4.1.
MuniFinancial
32
TARLL 4. 1-' F-NCL -FB HOURLY RATES SUMMARY
Mnud Salary s
Numoer of
Hourly Salary l
%d Time Allocadwo
Employee Salary d
% Non-dMabb
Nor 4AaW Am"
% Maud
Bill"
Total Dept
G.,*W
Flay Burde
Productive
Fully
Beneat Rat by
EmploY-,
848401 Rat. ,
m Departs w"
BaneOrt paid by the
Maraud Saary J.
Salary a Beneeb'
Sean, a
Mnud
0-head
Samrwe
Deb Labor'
Haura w
Burdened
,_nd C1aaa r
paparvanru'
a-bli, b
DaP.Ir-r,1
O
t3aMab to
Dem.rbn it
P
l
Salary S
Be-ft.
Aso_5_ I
Overhead
Abcason'
Hourly Labor
Rai„
verhead
ersonne
Coen
196.30%
0,00%
A
B
C
0
E
F
G
H
1
J
K
L
M
N
(
Job ClauMkird-
Sala
(A1180018
Aro
E'F
too%- F
%11
Orarhe %
I.J•K
ISMS 1f
LILI
M Firs./415
S 176,545
1.00
S N
5518
8 87.100
50%
S ""So
50%
f 46,550
S 86.272
S -
S 1",622
4115
t 293
Yarn AaaYa
105,643
t.
1
0
S9
too%
105,943
10%
10,584
90%
0 So
188.691
284,152
1
1620
ITS
IcA
68208
1,
0
0
38
60%
51.566
20%
10.913
60%
..3
3
3
Be Set
130.21..
1.152
113
Teom-
181.256
3
00
34
100%
181.250
20%
36.257
eox
1as
,005
,
2a7.s38
1".181
1,140
100
Oft. Aarda4
23.035
1.00
13
100%
23.035
217%
4,607
60%
1a X78
36.541
54,969
1,600
71
Poeadon Tatar
554,887
7.00
481 800
110 906
350 694
895.806
Ise 338
6507
From City's 200SM7 Budget
„ From City's 2008107 Budget. Employee salary 6 benefits paid by the Department (Golan E Totem less Non billable Annual Salary & Benefits (column G Total)
' Average salaries and benefits provided by the Ceys 2006107 Budget for the respective (ob classification and multiplied by the number of employees (Column B)
s Hourly Salary 6 Simarfil costs per an employee to the Department: not irlduding overhead costs
' Employee salaries and berlafms paid by Depawnent determined by multiplying col r ns A and D
s Non-billable salary and benefits detemllned by multiplying columns E and F
s Billable salary and benefits determined by subtracting columns E and G
T Derived by multiplying Billable Salary 6 Benefits (column 1) by the Departmental Indirect Labor percentage, which is 196.30%
s Derived by multiplying the Billable Salary 6 Benefits (column p by the Central Services Overhead percentage, which is 0,00%
a Fully Burdened Direct Labor is the sum of Billable Annual Salary 6 Benefits (column 1); Total Dept Overhead Allocation (column J); Central Services Overhead Allocation (column K) divided by number of employees (column B)
to Hours are derived by 2,080 annual waking hours menus r estmlaled 250 vaulon/hoWry hours (1,600 hms) and mWOpbed by % of time allocated to the Department lass arty Non-billable percent
11 Derived by Fully Burdened Dared Labor divided by Productive Hours
1t Indirect Departmental personnel overhead costs not directly impacted by Me user fees. Derived from column G'Non-bi6able Annual Salary E Benefits'
1s Allocation determined from the City's Full-Cost Allocation Plan, completed August 2006 by MuniFinancial
14 Department Overhead A6ocabon Percent determined by dividing total Dept Direct Allocation of $696,806 by Personnel Costs of X350,694
is Canbal Services Overhead Allocation Percent datennlrod by dividing total Central Services Overhead Allocation of 60 by Personnel Costs of 6350,694
14 Took average salary and benefits of the job classifioelions with those positions with more than one employee
E
33
0 0
T/ME ANO MATERIALS (T&A4) SURVEY
Determining the amount of time each employee spends on assisting in the provision of the
services listed on the fee schedule is essential to identify the total cost of providing each
service.
Identification of these time elements relative to a particular service is most readily
determined through the completion of a Time and Materials Survey (T&M Survey). The
"time" portion of the survey reflects the average estimated time each department staff
position spends on a service. The "materials" portion of this survey refers to the costs of
materials spent by the department and is contained within the Departmental Overhead
allocation in the FB Hourly Rates. The result of multiplying the FB Hourly Rates by the
time spent by each position and adding any third party fees, reflects the actual costs, or total
costs of time and materials of providing a service. This is the full cost recovery to the City.
A T&M survey provides department management with an opportunity to assess the time
requirements for each service by position and record that information onto a spreadsheet.
Table 4.2 summarizes the amount of time, listed in five (5) minute intervals for each
employee used in providing a specific service to a user. The table also shows the total cost
of providing each service plus any third party, required or penalty fees to determine the Full
Cost Recovery Fee of providing each service.
FULL COST RECOVERY FEE SUMMARY
Table 4.2 summarizes the Full Cost Recovery Fees, based upon the total cost of providing
each service as illustrated by the T&M survey, for services that the City is currently providing
to the publics or will provide to the publics in the near future.
MuniFinancial
34
TABLE 4.2! FWANCE- FEE SCHEDULE
Service/A Ilcation
Dh.uel of F-
M.i.s.
Fnelge
A..iu.m
Reoepbo bm
Cwhfer
Account T..hnk".
A.i.1am
ON.-
Fully Burdened
=
Third Party/
Required/ Penalty
Full Cost
Recovery Fee
(meet,.. S d
Current Fee
Footnote
0)
(1)
(1)
(1)
(1)
Rate
Fee
p.rtyn.qui.d
FB Hourly Rate
$283
$175
$113
$100
$31
) 2
FB Minute Rate FB Hourly Ratel60 Minutes
$4.88
52.92
$1.6$
$1.67
$0.51
en9e me o
0off4do WV-
Alnaelt M Time Fxh St n Menleer doculrenca w Eudl eerrin to Minus.
Fw NoW
Fw Nose:
Fw
Fw Not.
SF checks
0
5
5
0
41
-
41
Per Civil Code 1719,
maximum allowable
charge for fiml NSF
check is S25 and for
second and each
subse"m NSF
check is $35
Stop payment/check re4ssuance
20
5
5
10
41
1
4
New F.
Yard Sale Permit
10
10
17
17
New F-
Coov of Bud eVCAFR/CIP Documents
Actual Cost
- Actual Cost
- Actual Cosl
Actual Cost
New F.
Business License Listl on CD
15
15
8
81
New F.
Business Ucense Processing Fees
Business Processing Fee/Pennit F
75
10
30
5
20
10
184
184
wwFee
Annual Renewal Processing Fee
40
5
15
5
10
5
97
97
New Fee
Duplicate ertifieate
15
5
10
54
54
New Fee
Chancie of Location
15
15
44
44
New Fee
FIr ev.w.e Mov1y ter. 4rrliW ew. T.eb 4.1. f>l.o - R Move Rate eolnlwf
NoY Fleei Cpl • re`ee r er eaY emenW enAr 1W site Mry w~W b mnMee em rlrte. er mo r loule.e m M relw eoev
0
SUMMARY
This study of the Finance Department's fee schedule examines fees for permit applications
and business license processing services. These maximum allowable fees are based on time
and materials and represent 100% full cost recovery. Based on our analysis, we have
determined the following:
• Many services are currently subsidized by the General Fund monies.
• Appendix C, a fee comparison of neighboring jurisdictions shows that many of the
fees the City of Rosemead is proposing are similar to those charged by other
jurisdictions.
• Fees identified as "actual cost" are unique services and vary depending on the
complexity of the project. Therefore, it is more appropriate to charge a FB Hourly
Rate for each service.
Generally, we recommend that fees be set at 100% cost recovery levels.
MuniFinancial 36
0 0
CHAPTER 5. PARKS & RECREATION
DESCRIPTION OF SERVICES
The Parks and Recreation Department administers and coordinates all park, recreation, and
related functions in the City. Specifically, the department coordinates all recreation
programs, classes, adult/youth sports leagues, special events, civic and cultural programs,
and volunteer services.
ANALYSIS
The Parks and Recreation department requested that we analyze fees for the following
divisions:
• Parks Admin
• Parks
• Recreation
• Aquatics
• Recreation Fee & Charge
• Aquatics Fee & Charge
• Dinsmoor Heritage House
Parks and Recreation Department is unlike other departments within the City because its
services are rental charges. Instead of using a T&M analysis to determine the full cost
recovery fee for this department, we conducted a Cost of Services Analysis, Table 5.1, using
the Macro Cost vs. Revenue method described on page 7.
The purpose of this analysis is to identify the current cost recovery level for the department
and for each program that the department oversees. Dividing the total revenue by the total
fully burdened expenses derives the cost recovery level for the department, and dividing the
expected revenue for each program by the fully burdened cost of each program derives the
cost recovery level for each program. The fully burdened expenditure includes personnel
cost, operating and capital outlay costs, and central services overhead from the Cost
Allocation Plan.
The analysis indicates that approximately 5.80% of General Fund costs attributable to Parks
and Recreation Department services are being recovered through fees. Generally, we
recommend that fees be set closer to 100% cost recovery level. However, some fees, if set
at that level, would preclude the participation of a number of residents, and possibly lead to
the termination of the service.
MuniFinancial 37
TABLE S. l: PARKS & RECREATION - COST OF SERVICES ANALYSIS
Total Revenues vs. Full Costs
otal Fully Burdened Cost
Personnel Expenses for FY 2006-07 $ 1,722,310
Operating & Capital Outlay for FY 2006-07 ' 3,384,520
Central Services Overhead 2 7" Iio
Fully Burdened Cost $ 5,828,949
Service/Application
Account
Numbers
Personnel'
Operating
&
Capital Outlay '
Total Program
Budget 1
Central
Services
Overhead 2
Fully Burdened
Cost 3
Expected
Revenue'
% of Cost
Recovery 4
Subs l /P rofit/Sufficient 5
A
B
C
A+B
D
E
C+D
F
G
F/E
Parks Admin
4800
$ 365,470
$ 13,900
$ 379,370
64,189
443,559
$ -
0.00%
Subsidize $ 443,559
Parks
4810
2,465,430
2,465,430
294,535
2,759,965
17,000
0.62%
Subsidize 2,742,965
Recreation
4820
1,059,910
141,040
1,200,950
201,337
1,402,287
68.000
4.85%
Subsidize 1,334,287
Aquatics
4830
178,410
483,650
662,060
94,544
756,604
0.00%
Subsidize 756,604
Recreation Fee & Charge
4840
99,470
263,000
362,470
61,330
423,800
220,400
52.01%
Subsidize 203,400
Aquatics Fee & Charge
4850
19,050
7,000
26,050
4,408
30,458
32.500
106.71%
Profit 2,042
Dinsmoor Heritage House
4870
10,500
10,500
1,777
12,277
-
0.00%
Subsidize 12,277
Total
$ 1,722,310
$ 3,384,520
$ 5,106,830
$ 722,119
$ 5,828,949
$ 337,900
' From the City FY 2006-07 Budget.
2 From Cost Allocation Plan prepared for the City of Rosemead by MunlFinanclal.
3 The Fully Burdened cost includes personnel, operating and capital outlay, and central services costs. The personnel cost includes salary and benefits.
` Percentage represents the cost recovery level of each program.
5 Indicates the performance of each program.
6 Parks & Recreation Department recovers 5.80% of the fully burdened cost.
10
•
38
0
APPENDIX A: SUMMARY OF FEE ANALYSIS
MuniFinancial 39
APPENDIX A: SUMMARY OF FEE ANALYSIS
Fully Burdened Rah
(per occurs,../case)
Servi-/Application
Third Party/ Required Fee
Full Cost Recovery Fee
(Includes 3rd party/
required fees)
Current Fee
Subsidy (full cost
recovery fee loss
current feel
Fee Notes
The City Clerk's office is responsible for conducting all elections, maintaining official etty
data for Council agendas, takes and transcribes Council minutes, conducts election pr
Fec -Notes ec Fee Notes I Fee
City Clerk
files and performing necessary cletleel work in conjunction with the City Council. The City Clerk collects
ocedures, updates the munlc/pal code, and Is responsible to and serves under the direction ofthe City
Council.
din of i:ecula;ors e! an nmairve
5 Ba
S
S 8a
New Fee I
-
Rosemead Municipal Code Book
- Actual Cost
-
New Fee
rVa
Subpoena for Records (Evidence Code Section 1563)
56
_
56
New Fee
Na
City Records Copies Standard or
New Fee
Na
Color Copies Standard
56
Se
New Fee
Na
Color s 11-agal)
56
56
Inforritation Requests
Documents not in exist enee rewilina research 84 New Fee Na
Audio Tape Copy
280
Plus Actual goal of
- Materiels
280
New Fee
Na
Audio Tape Co if tape provided b re uestor
280
280
New Fee
Na
CD, Floppy Disk, or Flash Dnve Copy
56
- Plus Actual Cost of
Materials
56
New Fee
We
CD Co If C or Disk is provided b tie reaussw
56
56
New Fee
Na
DVD Copy
98
Plus Actual Cost of
- Materials
New Fee
Na
DVD Co if DVD is provided the reaussicir
98
oa
t New Fee
Na
City Council Agenda mailed
e4
84
New Fee
We
City Council Minutes mailed
168
168
New Fee
We
Certified Copies of Original Documents
100
100
New Fee
Na
Note Fee
144
144
New Fee
Na
New Fee
Na
Reproduction of Public Record
Black and While copies 8.5 x 11
- Actual Cost
New Fee
Na
8.5 x 11 Color coies r
14
14
New Fee
No
8.5 x 14 Color copies,
14
14
New Fee
Na
11 x 17 Color copies, per a
14
14
New Fee
Na
Custom Sue copies
- Actual Cost
Now Fee
No
F
by the City to create copies or records where electron; fonrtal requested is the sterns, as that used
- Actual Cost
-
New Fee
Na
For records where electronic formal requested is for a record which is
produced only at otherwise regularly schedule intervals, or d'dats
compilation. extraction, or programming' Is required to produce the
. Actual Cost
New Fee
s
Bound records
i98
198
New Fee
Na
Digital ographs on paper plain
128
126
New Fee
Ns
Photographs, slides, transparencies. blueprints, maps and other pubic
records
- Actual Cost
-
New Fee
Ne
R
Feet ecords Stored Off lte. Additional Retrieval. Re-File and Transportation
185
185
Now Fee
Certification
For the first a e 29 29 New Fee Na
per 10 page 58 58 New Fee Na
Plans 8 Specs Distribution 260 260 New Fee No
40
APPENDIx A: SUMMARY OF FEE ANALYSIS
Full Cast Recovery Fee
Fully (per Burd Burr nened Wwse Rate ) Third Partyl Required Fee (includes 3rd party/ Current Fee
required fees)
Service/Application
-
Subsidy Ifull cost
recovery tee less
current feel
e~ elates 1
Notes ice Fer 1Jates Fe<
Community DevelopmenWienning Division
The Planning Division Is responsible for the supervision of land use In the City, development updating, maintenance and Implementation of the City's General Plan, and provides technical
assistance to lyle Rosemead Communhy Development Commission.
Cap-
land Use Ualabase
- Actual Coal
-
Actual Cos!
35 Per Copy
Iva
General Plan (including background report)
107
107
25 Per CA
82
General Plan Ms
65
65
5 Per Co
60
Reconstructwon Section Of Code
107
107
107
Zoning At A Glance Chan
32
32
- Per Co
32
ZOmn M
107
107
5
102
Zonis Requirements
32
32
- Per Co
32
Zoning Ordinance
107
107
35
72
Public Hearin Items
Conditional Use Perfnds CLIP
2033
2.D33
875 Per Transaction
1,158
Design Review DR Commaroal/Residential
3,045
3,045
390 Per Transacbon
2,655
General Plan Amendment OPA
2,657
2,657
950 Per Transaction
1,707
Muniu a! Code Amendment MCA
2.657
2,657
925 Per Transaction
1,732
Planned Development Review PD
1,437
1,437
635 Per Transaction
802
Relief From Ordinance RFO - Montanums
940
948
300 Per Transaction
648
Relocation Impact Re n RIR - Mobile Homo Parks
3,234
3,234
1,500 Per Transaction
1.734
Tentative Parcel / Tract Maps PM i TTM
2.419
2 419
1,385 Per Transaction
1,034
Tentative Parcel / Tract Ma s Per Lot
2,419
2 419
100 Par Transaction
2,319
Appeals
Filing Fee
1.144
1 1M
300 Per Transaction
844
Public Hearing Fee
720
720
38 Per Transaction
683
Other Mons
Occu an Pemvl
1,385
1 385
225 Par Transaction
1,160
Site Plan Review
3,651
3,651
225 Per Transaction
3,426
Enwmnmental Impact Assessment initial Shidy)
8,146
8 148
300 Per Transaction
7,846
EIR - Plus Outside Conwitant
8,683
8,683
2,900 Per Transaction
5,783
Me Extensions
9,683
8,683
400 Per Transaction
8.283
Minor Lot Line Aduslment
13,910
13.910
290 Per Transaction
13,620
Geological Report
1 228
1,228
325 Per Transaction
903
Oak Tree Perms
1,228 -
- -
1228
800 Per Transaction
428
Zomn Com laince Leber
Nawfsar
11111111111
7
2065 .
12
2065
1 -
2.065
.
11
General Services
,
Stormwaler pent inspecLONre-inspection, mmrorcial/indushul, m
adds - n to Stale fees lindudes as Startions and Auto Dtaltri)
2,037
2.037
- New Fee
Na
Stormwater permit inspadionfre-inspection, restaurant, in addition to
Slate fees
2,037
2,037
- New Fee
Na
Appeal of Pubk Nuisance Determination to City Manspar, payable m
advance. haff of mfich is refundable if appeal Is upheld
2,863
2,563
- New Fee
Na
Appeal of Public Nuisance Determination to City Council, payable m
advance,
3.962
3,962
- New Fee
Na
Now Filing ■nd Application Miscallensoua Permits:
Laundry/Dry Clean. In-Citv
501
501
- New Fee
Na
Adult Bus Movie Book Massalls
501
501
New Fee
Ne
Massage Parlor Operating Pennit
501
501
- New Fee
Na
Massa a Technician Permit
501
501
- Now Fee
Na
Adult Bus Lwe Entertammen!
501
501
- New Fee
Na
Self-Service Storage Facility
501
501
New Fee
Na
0
0
APPENDIX A: SUMMARY OF FEE ANALYSIS
ervice/Application ication
Fully Burdened Rate
(per occurencdcase)
Third Party/ RequiqF"
Full Cost Recovery Fee
(includes 3M party!
required fees)
Current Fw
Subsidy (h9 cost
recovery fee leas
current fes)
N o
oe
Fee
Fee Notes
Fw
Senior Citizen n Housino
501
501
New Fee
Na
Vehide Timiria ration
501
501
- New Fee
Na
Dance d Entertainment Pemtil RetaiNM
501
501
- Naw Fee
Na
Fortune TeRM M
501
501
- New Fee
Na
Mobile Home Parks
501
501
- New Fee
Na
Tatoo Parbr
501
Na
Odw Business Lkemsa
Bingo license application fee. per PC326.5
CA Penal Code
Section 326.5(12)
1332 its he at SW
t 332
- New Fee
Na
Bua/nasa and AnIm&f Permits
Tow Car Business Assistant Perrot for These Hired Alter Indial
Aookstion
464
464
- New Fee
No
Tow Car Business Inspection Fee ind 1 to rrrt' application
249
249
New I'm
Na
Tow Car Business Permit Fee for 0vmer and at assistants at lime of
acclimation
249
- -
249
- New Fee
Na
Bock Parry Peffnd (atdudes Pamtit for Ersoachmard into Public Right-
249
249
- New Fee
No
Parade Permit
1,373
1,373
- New Fee
Na
Temorary Use PermN
2,295
2,295
- New Fee
rile
Yard Sale Permit
231
231
- New Fee
Na
Fireworks Perms
258
256
New Fee
rve
Animal Permit Kee i VVgd or Vicious Animal
1222
1,222
- New Fee
Na
Animist Pemut Keeping animal other than Those specified
1,222
1 222
- New Fee
Na
Production Fees
Motion Picture, Television, Radio and Pholographic Production Pamta,
per e
Production Cam nies 2,431 52:431 New Fas We
Student Production 602 602 New Fee Na
Engineering
The City of Rosemead has a contract with Wlildan to provide engineering services. Those services Include administratlyo duties and development review. A retainer of $800 Is collected monthly
for these services and Wiildan bills the public on a time and materials basis.
Trace M.tp
Tertative Tract Ma 270 Full Cost
- -
270
270
Rewrd Ma Analysis 2,850 Full Cost
2,850
2,850
Addilional Per Lot Cost 50 Full Cost
50
50
Monument Review 370 Full Cost
370
370
Deferred Monument Review 300 Full Cost
300
300
Ma Venfi"bon 255 Full Cost
255
255
Ma Clearance Review 300 Fug Cost
300
300
Tract Ma Check Submittal 450 Full Cost
450
450
Parcel Map
Tentative Parcel Ma
270 Full Cost
270
270
Rewrd Ma Analysis
2,000 Full Cost
2,000
2 000
Additional Per Lot Cost
50 Full Cost
50
50
Dedir bcns
750 Full Cost
750
750
Monument Review
370 Fug Cost
370
370
Ma Verification
225 Full Cost
225
225
M¢ Clearance Review
300 Full Cost
300
300
Parcel Ma Check Submittal
450 Full Cost
450
450
Grtifiate of Compliance (Lot Lim Adjustment)
APPENDIX A: SUMMARY OF FEE ANALYSIS
ervicalA lic,tlon
Fully Burdened Rate
(per occurancelcase(
Third Partyl Required Fee
Full Cost Recovery Fee
(Include, 3rd party/
required fees)
Cumerd Fee
Subsidy (full cost
recovery fee less
current feel
Fee Notes
ee Notes
Fee
Fee Note,
Fee
Record D-rit Analysis
600 Full Cost
600
600
Additional Per Lot Cost
50 Full Cost
so
50
Verification Of Coco fiance
225 Full Cost
225
225
Review of A urems
225 Full Cost
225
225
Plan Chacldn
Initial Plan Check
$800 plus 4.5% of the
first 650,000, plus 3%
of the next 5700,000,
plus 1.5% thereafter of
the estimated
- construction cost
sow plus 4.5% of the first
550,000, plus 3% of the
next 6100,000, plus 1.5%
thereafter of the estimated
construction cost.
lan Chack Revision
3800 plus 4.5% of He
fast $50.000, plus 3%
of the next 6100.000.
plus 1.5% thereafter of
the estimated
- construction cost
$800 plus 4.5% of the fast
550,000. plus 3% of the
next $100,000, plus 1.5%
thereafter of the estimated
construction cost
Construction Permits
Issuance Fee
50
50
50
Initial Observalion
$50D, plus 6% of the
fast $100,000, plus S%
of the next 57 D0,000,
plus 4% thereafter of
the estimated
- construction cost
$500, plus 6% of the first
$100,D00, plus 5% of the
next 11100,000. plus 4%
thereafter of the estimated
construction cost.
Modifications Observation
- Actual Cost
- Actual Cosl
Driveway
250 Par Drivevvay
250
250 Per Onvewa
Close Existi Driveway O ni
250 Par Driv
250
250 Per Dfrvewa
Individual Sidewalk I Sidewalk Fill-ir
250 Par Location
250
250 Per Location
Individual Curb I Gutter
200 Par Location
200
200 Per Localion
Individual Allay Improvement
Per Sq. Foot I
Location
3
-
3
3 Per Sq. FOOT / Location
-
Street Trees
50 Fist Tree
50
50 First Tree
Additional Street Trees
25 Every Tree Thereafter
- -
25
25 Every Tree Thereafter
Curb Drain
150 Per Drain
150
150 Per Drain
Parkway Drain
300 Par Drain
300
300 Par Drain
Relocate Existing Drainage Structure
1,000 Per Structure
1,0D0
1,00D Per Structure
Excavation Permits
Service Cut
$17.501 Gut and 2 tot
each sq. ft. of
• excavation
317.50 I Cut and $2 for
each sq, R. of excavation
Main line
2 per sq, fL or each
. ft. of excavation
-
_ $2 per sq. h. for each sq.
ft. of excavation
Sewer Cuts Residenlia
250 Gonnedwn To Main
250
250 Connection To Main
Sewer Cuts 00rrarterCJal
350 Connection To Main
350
350 Connection To Main
Encroachment Permits
Stockpile Material I Waste In Street Right-Cif-Way
200 Per Stockpile
200
2D0 Per Stockpile
Placing Container In Street Right-01-We
Per Container
250 Refundable
_
_ _ _250
Per Container
250 (Refundable).
•
•
APPENDIX A: SUMMARY OF FEE ANALYSIS
ervicelApplicetlon
Fully Burdened Rate
(per Burr ne d Raft
Third Parted Required Fee
Full Cost Recovery Fee
(includes 3rd party/
required lees)
Cunvnt Fee
Subsidy (full cost
recovery tea less
current M)
w o es
es Notes
se
Fee Notes
Fee
Placing Tam rs Structure I E ui men/ In Street Ri hl-Of-Wa
200 Per Structure
200
200 Per Structure
Pedestrian Protection Reuired Building Code
200 Per Location
200
200 Per Location
Street Closures
200 Per Location
200
200 Per Location
Comnerud Filming - Weekday
400 Per D
400
400 Per D
Commerual Filming _ Weekends, Nights, d
g00 Per Day
goo
900 Per D
Other Enuoachmems
Pop
aimed NewFem
Issuance Fee, Plu
50 Actual Costs
_
50
issuance Fee, Plus Actual
50 Costs
_
p
Public Improvement Plan Review Fee
Na
Maio( Im rovement Plan Review base fog]
1,563
1,563
- New Fee
Na
plus each lot
63
63
- New Fes
Na
Minor Im rovemenl Plan Review base fool
1,125
1 125
- New Fee
n/a
us each lot
63
63
- New Fee
We
Final Subdivision Ma Review Fee
Major
Millar Final M Review (base fee
1,525
1,525
- New Fee
We
plus each lot
75
75
- New Fee
No
Major Subdivision Map. Acceptance of Improvements and Dedications
1 500
_
1,500
- New Fee
Na
Mati Subdivision Ms AmerMmem of Su ion A reament
975
975
- New Fee
We
Minor
Na
Minor Parcel Ma Review base tee
1,250
1,250
- New Fee
Na
plus each lot
75
75
New Fee
n/a
Minor Subdivision Map- Acceptance of Improvements and Dedications
563
-
563
_ New Fee
Ma
Mmor Subdivision Ma AmerMment of Subdivision A reemem
300
S.
New Fee
Na
New lot fee
. Actual Coo
-
Actual Cost
- New Fee
Na
Base Ma Revision Fee
25
25
- New Fee
We
Grease Trap Plan Raview Fee
75
75
- New Fee
We
Docurnent Retneval Fee
50
so
- New Fee
Na
Stop Signs, each intersection installed CI
375
375
- New Fee
Na
Street Lights, each intersection installed C
125
125
- New Fee
n/a
Seed Bums each installed b City
313
313
- New Fee
Na
Parade Perim
75
25
- New Fee
N
a
Parch Mer e
300
300
New F-ee
_
nru
The Finance Ueparttnant tfor th
Finance
e administrstlon of psyrDR
accounting
purchasl ration of the Clly s budget and reports to regulatory agencies
SF checks
,
41
,
-
1
.
Pe, Cora code 1. 1
maorcwm ally waole cnar2e
for first NSF check is $25
and for second and each
subsequenl NSF check is
$35
a
Slot, amenVCheck re-issuance
41
41
New Fee
Na
Yard Sale Permit
17
17
Now Fee
Na
Bud et/CAFR/CIP Documents
- Actual Coo
- Actual Cosl
Actual Cost
New Fee
Na
Business License Listing on CO
8-
9
New Fee
Na
Business License Processing Fees
Business Processin Fee/Pennit Fee
184
ibl
New Fss
rua
Annual Renewal Processing Fee
97
97
New Fes
Na
Duplicate Certificate
54
54
New Fee
Na
Change of Location
44
44
New Fee
No
44
•
APPENDIX A: SUMMARY OF FEE ANALYSIS
Fully Burdened Rate
Full Cost Recovery Fee
Subsidy (full cost
(per occurancdcase(
Third Party/ Required Fee
(Includes 3rd partyl
Current Fee
recovery fee less
required fees(
current feel
ServlcelA llcation
Fee Notes
w o
se
Fee Notes
Fee
Parks 6 Recreation
The Parks and Recreation Department administers and coordinates all park, recreation, and related functions In the City. Specifically, the department coordinates all recreation programs, classes,
adultrouth sports leagues, special events, civic and cultural programs, and volunteer services.
'Note: See Report for the Macro Cost vs. Revenue Analysis of the Parks d Recreation Department
45
r:
9
0 0
APPENDIX B: FULL-COST COST ALLOCATION
PLAN
MuniFinancial 46
17-1
MMuniFinancial
•
Memorandum
DATE August 4, 2006
TO: Oliver Chi, Director of Administrative Services
FROM: Toyasha Black, Senior Analyst
CC: Marshall Eyerman, Principal-in-Charge
SUBJECT: City of Rosemead Full-Cost Allocation Plan
The City of Rosemead asked that we conduct a Full-Cost Allocation Plan to be used strictly
in conjunction with the City's User Fee Study. As such, this Plan is not Office of
Management and Budget compliant and can therefore not be used for the purposes of being
reimbursed for grant funds.
Instead, this cost allocation plan summarizes an analysis to determine the appropriate
allocation of costs from the City's central services departments to all other operating
departments. Central service department funds are allocable because they provide services and
support to operating departments. In addition, these cost centers conduct operations
necessary to serve the community.
To ensure that all costs associated within the provision of central services are appropriately
allocated to the respective operating departments, we analyzed and identified all central
services expenditures to determine which are allocable to operating departments as indirect
costs, otherwise known as overhead costs. With the exception of fifteen percent (15%) of the
City Council's budget of $52,106, which is unallocable, all other central services department
budgets are one hundred percent (1009/6) allocated to operating departments. Depreciation
expenses incurred by the central services departments are not included in this plan.
The table and chart below presents the total indirect cost of $3,345,745 to be allocated to the
operating programs.
Total Indirect Cost Summary, -
Central Service Departments Total Allocable Budget
City Council S 295,265
Administration 1,437,570
460. "~aw
City Clerk 863,760 all"
Finance 584,900
City Treasurer 300
City Attornev 163,940
Total Indirect Cost
$ 3,345,735
MMuni inancial 1
•
•
As mentioned, the above allocations will be used in conjunction with the City's User Fee
Study to ensure that the City's General Fund is not subsidizing user type services. Attached is
a detailed summary of how the central services fees were allocated by each line item in the
City's FY 2006/07 Operating Budget. The Tables are summarized as follows:
• Table Al: Budget Summary. Summarizes the City's FY 2006/07 Budget by
department. Each budget is broken down into three categories: personnel, operating,
and capital costs. Fifteen percent (15%) of the City Council's budget is considered
unallocable because it is for ceremonial related duties.
• Table A2: Distribution Bases. This Table is used to allocate the central services
department costs. Unlike Table Al, it omits capital improvement costs.
• Table 1 City Council Cost Allocation Summary. Allocates 85% of the City
Council's budget of $295,265 to both central services and operating departments.
Fifteen percent (15%) of the City Council's budget of $52,106 is reserved for
ceremonial duties and is thus unallocable.
• Table 2 Administration
Cost Allocation
Summary.
Allocates 100% of the
Administration's budget
of $1,437,570 to
both central
services and operating
departments.
• Table 3 City Clerk Cost Allocation Summary. Allocates 100% of the City Clerks'
budget of $863,760 to both central services and operating departments.
• Table 4 Finance Cost Allocation Summary. Allocates 100% of the Finance's budget
of $584,900 to both central services and operating departments.
• Table 5 City Treasure Cost Allocation Summary. Allocates 100% of the City
Treasure's budget of $300 to both central services and operating departments.
• Table 6 City Attorney Cost Allocation Summary. Allocates 100% of the City
Attorney's budget of $163,940 to both central services and operating departments.
• Table 7 Total Indirect Cost Summary. The first step of this table summarizes all
central services costs allocated to both central and operating departments. The second
step allocates the indirect costs from the central service departments to operating
departments only. This process is accomplished by calculating the indirect costs for
the central service departments (after the first step is complete), subtracting them out,
and then allocating them to the operating departments. Therefore, all central service
departments' costs are passed on to operating departments.
Should you have any questions, please feel free to contact Toyasha Black by telephone at (951)
587-3530 or e-mail at toyashab(i~nuni.com.
Table A1: Budget Summary
A
B
C
D
F
F
G
0 r
City Council
4100
f 1-1,870
f 4S,S00
S
f 347,370
15.00".
f 52.106
%-i-d IS°•. of the mul departinmrtl
f 293,263
hndga a mt +.rrnnnmal rrl4rrd dun!<.
Adno-t, nr,n
41 I-
I,'-24,7M0
212,780
-
1.437.570
O.Oir.
-
1.437.370
C0r Clerk
4120
267.11-
596,650
863,760
O.OIr.
HO 7611
F-rsee
4130
4'_8.710
1i6.190
581,9(X)
011(r•.
SS4.von
(atv- Truaurer
4140
.100
1110
0.W1.
-
w0
(:rtr.lttorne
41511
161940
163940
0.(X)°'.
In1,a4n
Huddmg
4190
670.400
129,000
799,44X1
C,,mtnun,ty Prtunnnn0
4200
WOO
U3,600
City Garage
4240
17.100
3-,100
67,400
1a F-( rcemu,t
4.1011
6,020,440
50,(X6)
6.0-11,440
P.krng Connol
4310
215.810
114,200
610,010
C rnrsrng Guard
4320
139,570
1,000
140,570
Annnal Requlannna
4330
75,011()
75,0311
Street Lghnng
•110)
137,000
117,16X1
Emerge- y Sk-ct,t
41W
6,000
OHM
Narconcs Forferturei k-ure
4360
9,410
62,500
71,910
Construction -Street, 8r H,gha'acs
4500
10,1147,840
10,1147,8441
Traffic.Admmittnnon
4510
6.40
61,%0
67.960
Construcnon -TrJfBc Srg-6
45.10
8,000
N,0(Nl
Alaintcnanm Streets dt High-y,
46-0
410,000
410,0(X1
h1ainte-ance -Triffic Ngnals
461(1
220,000
220,000
MAi ntenanae - Tre"&Park warn
Wit
298,80(1
2914,6011
M-Tenancc -Signk Srnrping
465(.
2()(),(6X)
200,IXXI
Puhlfc Transit
4660
6N eV0
494,500
264,01)
1.2_17,3.10
Planning
47W
03,130
284,430
9,3(X1
994X8(1
Building Rcgsdanona
4710
1. 110.450
1,110,450
h-1nneenng
4720
321,600
521,600
Cntn.u ry lmrn•rcmruts
4744,
246,560
198,980
445,$40
CDBG
475,E
1071140
1,658,771
1042,179
2,807,990
Solid Wasre
1780
70, iO(t
70,5111
Parks _ldm.... v nnn
4800
165,470
13,90()
179,370
Parks
4810
I (,92,280
624,X6(1
748,27()
2,463430
Recreanon
4820
1.039.910
129.670
11,370
1,2001!950
A quancs
46311
178,410
377,(X10
106,6i0
662,060
Rccmation F-& ('hzrg,.
4840
99.470
263,000
362,470
.18uancs Pee R Ch.,rgr
4X50
19,051)
7.(X)1)
26,050
Din-- HrnraSc
4876
10,5(11
10500
Park Prule is
1x80
17J
•
f 6,533,900 1 16,220,081 $ 13,246,909 $ 36,000,X90 S 52,106 f 3,14S,73S
Table A2: Distribution Bases
E
Departments
Personnel
Budget
Operating
Budget
Total Personnel
&
Operating Buduets
City Council
5 301,870
$ 45,500
S 347,370
Administration
1,224,790
212,780
1,437,570
City Clerk
267,110
596,650
863,760
Finance
428,710
156,190
584,900
c 'itN Treasurer
-
300
300
it\ :\ttornc,
163,940
163,940
toil I nK
670,400
670,400
Community Promotion
343,600
343,600
City Garage
37,100
37,100
Law Enforcement
-
6,020,440
6,020,440
Parking C ontrol
215,810
114,200
330,010
C rossing Guard
139,570
1,000
140,570
Animal Regulations
-
75,000
75,000
Street Lighting
337,000
337,000
Emergency Services
-
6,000
6,000
Narcotics Forfeiture & Seizure
9,410
62,500
71,910
Construction - Streets & Highways
-
-
-
Traffic Administration
6,460
61,500
67,960
Construction -Traffic Signals
Maintenance - Streets& Highways
410,000
410,0010
Maintenance -Traffic Signals
220,000
220,000
Maintenance -Trees& Parkways
298,800
298,800
Maintenance -Sign & Stripping
-
200,000
200,000
Public Transit
68,830
894,500
963,330
Planning
703,150
284,430
987,580
Building Regulations
1,130,450
1,130,450
Engineering
-
523,600
523,600
Community Improvements
246,560
198,980
445,540
DBG
107,040
1,658,771
1,765,811
Solid Waste
70,500
70,500
Parks Administration
365,470
13,900
379,370
Parks
1,092, 280
624,880
[,717,160
Recreation
1,059,910
129,670
1,189,580
Aquatics
178,410
377,000
555,410
Recreation Fee & Charge
99,470
263,000
362,470
Aquatics Fee & Charge
19,050
7,000
26,050
Dinsmoor 11 eritage
-
10,500
10,500
Park Projects
-
5 6,3 33,900 S 16,220,08 S 22,753,981
0 0
Table 1: City Council Cost Allocation Summary
Allocable
Distribution Basis/Bases % Budget
Allocable Budget 100.00"+, $ 295,265
Total 100.00% $ 295,265
Dist. Base Dept. % t Allocation
$ 295,265
City Council
4100
$ 347,3711 1.53% $ 4,508
$ 4,508
Administration
4110
1,437,570 6.32"' 18,654
18,654
City Clerk
4120
863,760 3.801% 11,208
11,208
Finance
4130
584,900 2.57"5, 7,590
7,590
City Treasurer
4140
300 0.00".'" 4
4
City Attorney
4150
163,940 0.72% 2,127
2,127
Building
4180
670,400 2.95% 8,699
8,699
Cummunitt Promotion
4200
343,600 1.514'" 4,459
4,459
City Garage
4240
31,100 0.16". 481
481
Law Enforcement
4300
6,020,440 26.46"4, 78,124
78,124
Parking Control
4310
330,010 1.45"4, 4,282
4,282
Crossing Guard
4320
140,570 0.62/., 1,824
1,824
Animal Regulations
4330
75,000 0.33"4, 973
973
Street Lighting
4340
337,000 1.48"'" 4,373
4,373
limergeney Services
4350
6,000 0.03% 78
78
Narcotics Forfeiture & Seizure
4360
71,910 0.32". 933
933
Construction -Streets & Highways
4500
-
-
Traffic Administration
4511)
67,960 0.30% 882
882
Construction - Traffic Signals
4530
Maintenance-Streets& Highways
4600
410,000 1.80"'„ 5,320
5,320
111aintenancc -Traffic Signals
4630
220,000 0.97'" 2,855
2,855
Maintenance-Trees& Parkways
46411
298,800 1.31"., 3,877
3,877
Maintenance - Sign & Stripping
4650
200,000 0.88°". 2,595
2,595
Public Transit
4660
963,3311 4.23"'b 12,501
12,501
Planning
4700
987,580 4.344'" 12,815
12,815
Building Regulations
4710
1,130,450 4.97" 14,669
14,669
Engineering
4720
523,600 2.30"S, 6,794
6,794
Cnmmunity Improvements
4740
445,541) 1.96"4, 5,782
5,782
CDBG
4750
1,765,811 7.76% 22,914
22,914
Solid Waste
4780
70,500 0.314'0 915
915
Parks Administration
4800
379,370 1.67i" 4,923
4,923
Parks
4810
1,717,160 7.55% 22,283
22,283
Recreation
4820
1,189,580 5.23"'. 15,436
15,436
Aquatics
4830
555,410 2.444., 7,207
7,207
Recreation Fcc & Charge
4840
362,470 1.59"4, 4,704
4,704
Aquatics Fee & Charge
4850
26,050 0.11% 338
338
Dinsmoor Heritage
4870
10,500 0.05"5, 136
136
Park Projects
4880
-
Total
$ 295,265
Per., i.~,,F;o- dcn,~d b. Jreidiug drpiamuv.l pet cannel & uperanog budgeuby the told personnel & opennr.g h~dg-
li „able L"qe, .,r the C- i. A Jur ,b-d to -1, dq-t-m
Table 2: Administration Cost Allocation Summary
Allocable Basis/Bases % Budget
fatal Pccsonncl & Operating Budgets 10u.1x1 $ 1,437,570
Total 100.00% $ 1,437,570
LI
Departmerim,
Dept. No.
Operating Budgets $ 1,437.570
Dist. Base De t.'/. r Alh-i.on
RM
.:n t_-ncil
4100
$ 347,370 1.53"'" $ =i,94f,
$
. l dm in lst ration
4110
1,437,570 6.32"S, 91x,8_4
9,1,824
Cirv Clerk
4120
861,760 3.80"54,571
54,571
I-xnanee
4130
584,9(x) 257'+'. 36,953
36,953
Cxtc I re-ref
4140
301 O.w/. 19
19
City AtturncZ
4150
161,9411 0.72% 10,358
10,358
Building
4180
670,4117 2.95% 42,355
42,355
Community Promotion
4200
343,6011 1.51% 21,708
21,708
City Garage
4240
37,1(X1 0.16% 2,344
2,344
Law Enforcement
4300
6,020,440 26.46% 380,364
380,364
Parking Control
4310
330,010 1.45"'. 20,850
20,850
Ctossing Guard
4320
140,570 0.62"'. 8,881
8,881
Animal Regulations
4330
75,1x10 0.33"- 4,738
4,738
Street Lighting
4340
337,00x7 1.48'°" 21,291
21,291
limergency Services
4350
!x,000 0.03"'. 379
379
N arcutics Forfeiture & Seizure
4360
71,91t1 0.32". 4,543
4,543
Construction - Streets& Highways
4500
hraffic Administration
4510
67,960 0.3(1".'. 4,294
4,294
Construction -Traffic Signals
4530
-
-
Maintenance - Streets& I ighways
4600
410,0(x) 1.80% 25,903
25,903
Maintenance -Traffic Signals
4630
220,000 0.97% 13,899
13,899
Maintenance -Trees& Packwavs
4640
298,8111 1.31% 18,878
18,878
Maintenance -Sign & Stripping
4650
200,0(1) 0.88% 12,636
12,636
Public Transit
4660
963,330 4.23% 60,862
60,862
Planning
4700
987,580 4.34'% 62,394
62,394
Building Regulations
4710
1,130,450 4.97"/ 71,421
71,421
Enpriccring
4720
523,6(x) 230% 33,080
33,080
Community Improvements
4740
445,540 1.96% 28,149
28,149
C DBG
4750
1,765,811 7.761s, 111,562
111,562
Solid A astc
4780
70,5(1) 0.31°'. 4,454
4,454
Parks Admrn,stration
4800
379,370 1.67"'. 23,968
23,968
Park.
4810
1,717,160 7.55"'. 108,488
108,488
Recreation
4820
1,189,590 5.23% 75,156
75,156
Aquatics
4831,
555,410 2.44% 35,090
35,090
Recreation Fee & Charge
4841)
362,470 1.59% 22,900
22,900
Aquatics Fee & Charge
4850
26,050 0.11". 1,646
1,646
Dinsmoor Heritage
4870
111, 5,x1 0.05% 663
663
Park Projects
4880
- -
Total $ 22,753,981 100.00% $ 1,437,570
$ 1,437,570
I'rr..ur ,g, he d,• d ng drp,r rnr<,r,.. I par.,,nn.I & openrrng budgcu hr xh. ,ut,l peesunn.l & opetanng badger..
Tor.! Jha,ble huget it the Ad nun..... dntn'-d'. -h drputment
Table 3: City Clerk Cost Allocation Summary
Allocable
Distribution Bases/Bases % Budget
Total personnel & Operating Budgets I()0.0o $ 863,760
Total 100.00% $ 863,760
•
D.
Dept. No.
Total Personnel &
Operating Budgets $ 863,760
Dist. Bate Dept. 9'o All-atn-n
$ 563,760
C tt1 Council
4100
S 347,370 1.53",, S I i. I na
$ I tie
Administration
4110
1,437,570 6.32"'" 51,5-1
i1,i71
Cetr Clerk
4120
863,760 3.80"s, 32,789
32,789
Finance
4130
584,900 2.57"0 22,203
22,203
City Treasurer
4140
300 0.00". II
I I
Cit Attornc
4150
163,940 0.72% 6,223
6,223
Building
4190
670,400 2.95% 25,449
25,449
Community Promotion
4200
343,600 1.51°'0 13,043
13,043
City Garage
4240
37,100 0.16% 1,408
1,408
Law Enforcement
4300
6,020,440 26.46". 228,541
228,541
Parking Control
4310
330,010 1.45"h, 12,527
12,527
Crossing Guard
4320
140,570 0.62% 5,336
5,336
Animal Regulations
4330
75,000 0.33% 2,847
2,847
Street Lighting
4340
337,000 1.48". 12,793
12,793
Emergency Services
4350
6,000 0.03"0 228
228
Narcotics Forfeiture & Seizure
4360
71,910 0.32". 2,730
2,730
Construction -Streets& Ilighways
4500
Traffic Administration
4510
67,960 0.301/6 2,580
2,580
Construction -Traffic Signals
4530
Maintenancc - Streets& Flighways
4600
410,000 1.80:. 15,564
15,564
Maintenance -Traffic Signals
4630
220,000 0.971. 8,351
8,351
Maintenance -Trees&Parkways
4640
298,800 1.316/ 11,343
11,343
Maintenance - Sign & Stripping
4650
200,000 0.88°. 7,592
7,592
Public"rransit
4660
963,330 4.23% 36,569
36,569
Planning
4700
987,580 4.34% 37,489
37,489
Building Regulations
4710
1,130,450 4.97"0 42,913
42,913
Fnginccring
4720
523,600 2.301'6 19,876
19,876
Community Improvements
4740
445,5411 1.96". 16,913
16,913
C DBG
4750
1,765,811 7.76". 67,032
67,032
Solid Waste
4780
70,500 (01°'6 2,676
2,676
Parks Administration
4800
379,370 1.67". 14,401
14,401
Parks
4810
1,717,160 7.551. 65,185
65,185
Recreation
4820
1,189,580 5.234. 45,157
45,157
Aquatics
4830
555,410 2.4440 21,084
21,084
Recreation Fee& Charge
4840
162,470 1.591". 13,760
13,760
Aquatics Fee & Charge
4850
26,050 0.11". 989
989
Dinsmoor I Icritagc
4870
10,5()() 0.05". 399
399
Park Pmlcct
4880
- -
-
Total
$ 863,760
' Percenrag, &--I h, d-,bng erp.u nnrnr,I p r_c w(I & ,per anng budgets by the totd personnel & opctsong budgets
2 Toni ill -!A, 1~„gor ,,i rhv (:m ('.Ink d-rd .nod:--h dTasneent.
0 0
Table 4: Finance Cost Allocation Summary
Allocable
Distribution Basis/Bases % Budget
Total Personnel & Operating Budgets US)AM. S 584,900
Total 100.00% $ 584,900
Departments
Dept.
Total Personnel &
Operating 1
Dist. Base Dept. % t Allocation
$ 584,900
City Council
4100
S 347,370 1.53% S 8,929
S
Administration
4110
1,437,570 6.32% 36,953
36,953
City Clerk
4120
863,760 3.80% 22,203
22,203
Finance
4130
584,9011 2.57% 15,035
15,035
City Treasurer
4140
300 0.00% 8
8
City Attorne y
4150
163,940 0.72% 4,214
4,214
Building
4180
670,400 2.95;0 17,233
17,233
Community Promotion
42(K)
343,600 L51% 8,832
8,832
('it)• Garage
4240
37,100 0.16". 954
954
Law Enforcement
4300
6,020,440 26.461ro 154,758
154,758
Parking Control
4310
330,010 1.45% 8,483
8,483
Crossing Guard
4320
1411,570 0.62 /0 3,613
3,613
Animal Regulations
4330
75,000 0.331,928
1,928
Street Lighting
4340
337,(X0 1.48°5, 8,663
8,663
Emergency Services
4350
6,000 0,03% 154
154
Narcotics Forfeiture & Seizure
4360
71,910 0.32% 1,848
1,848
Construction - Streets& H ighways
4500
Traffic Administration
4510
67,960 0.30% 1,747
1,747
Construction - Traffic Signals
4530
Maintenance - Streets& I lighway s
4600
410,00) 1.80% 10,539
111,539
Maintenance -Traffic Signals
4630
220,000 0.97% 5,655
5,655
Maintenance -Trces& Parkways
4640
298,8(X) 1.31". 7,681
7,681
Maintenance - Sign & Stripping
4650
200,000 0.88% 5,141
5,141
Public Transit
4660
963,330 4.23% 24,763
24,763
Planning
4700
987,580 4.34% 25,386
25,386
Building Regulations
4710
1,130,450 4.97% 29,059
29,059
Engineering
4720
52-3,600 230% 13,459
13,459
Community Improvements
4740
445,540 1.96% 11,453
11,453
CDBG
4750
1,765,811 7.76% 45,391
45,391
Solid Waste
4780
7(,500 0.31% 1,812
1,812
Parks Administration
4800
379,370 1.67% 9,752
9,752
Parks
4810
1,717,160 7.55% 44,140
44,140
Recreation
4820
1,189,580 5.23% 30,579
30,579
Aquatics
4830
555,410 2.44% 14,277
14,277
Recreation Fec & Charge
4840
362,470 1.59% 9,317
9,317
Aquatics Fee&Charge
4850
26,050 0.1t,, 670
670
Dinsmoor Heritage
4870
10,500 0.05% 270
270
Park- Projects
4880
-
Total $ 22,753,981 100.00% $ 584,900
$ 584,900
p<ncn i.i~r den.cd by d-dinq dcp.,rt-.1A p-onncl & operanng btidgero bl rhr -,l pcra~!nnel N ~gxten ng, bud~ri:
' 1 -1 dlr. aldr hugrt ut the Fins e d-rd, ced rn -ch department.
Table 5: City Treasurer Cost Allocation Summary
Allocable
Distribution Basis/Bases % Budget
I'wal Personnel & Operating Budgets 1111.(11"~ $ 3(H)
Total 100.00% $ 300
•
Departments
Dept.
Total Personnel &
11
Dist. Base Dept. % I Allocation
$ 300
Cin• Council
4100
$ 347,370 1.53% $ 5
$ 5
Administration
4110
1,437,570 6.32% 19
19
(:tty Clerk
4120
863,760 180'!5, 11
11
Finance
4130
584,900 2.5794, 8
8
City Treasurer
4140
Yo 0.000i0 0
0
Ci • Attorne,
4150
163,940 0.720/6 2
2
Building
4180
670,400 2.95% 9
9
Community Promotion
4201)
343,600 1.51% 5
5
City Garage
4240
37,100 0.16% 0
0
Law Enforcement
43(1)
6,020,440 26.46% 79
79
Parking Control
4311)
330,010 1.45"0 4
4
Grossing Guard
4320
1411,570 0.62'!5, 2
2
Animal Regulations
4330
75,000 0.33"/„ 1
1
Street Lighting
4344)
337,01H) 1.48% 4
4
Emergency Services
4350
6,(M 0,0301 0
11
Narcotics Forfeiture & Seizure
4360
71,910 0.32% 1
1
Construction - Streets & 1 f ighway s
4500
-
Traffic Administration
4510
67,960 0.30"5, l
1
Construction -Traffic Signals
4530
Maintenance - Streets & Highways
4600
410,000 1.80% 5
5
Maintenance -Traffic Signals
4630
220,000 0.97% 3
3
Maintenance -Trees & Parkways
4640
298,800 1.31% 4
4
Maintenance - Sign & Stripping
4650
200,000 0.88"0 3
3
Public Transit
4660
963,330 4.23% 13
13
Planning
47(X)
987,580 4.340.0 13
13
Building Regulations
4710
1,13u,450 4.97% 15
15
Engineering
4720
523,600 2.30° 7
7
Community Improvements
4740
445,540 1.96 io 6
6
C D BG
4750
1,765.811 7.760%0 23
23
Solid Waste
4780
7(j,500 0. 31",6 1
1
Parks Administration
4800
379,370 1.67% 5
5
Parks
4810
1,717,1 Gt 1 7.55% 23
23
Recreation
4820
1,189,584) 5.23°1 16
16
Aquatics
4830
555,410 2.44% 7
7
Recreation Fee & Charge
4840
362,470 1.5990 5
5
Aquatics Fee & Charge
4850
26,050 0.11" 0 0
u
Dtnsmoor I lcritage
4870
10.511) (1•(15"„ fl
0
Park Projects
4880
Total $ 22,753,981 100% $ 300 $ 300
' I'crcnnaga• denead br dn,.hng drpaomrnul 1--i eel & uperu-g budgets by the ton! personnel & operating budgets
' 7 uud alloable bugci of the t am I rearm dutrtbutcd to mch department.
•
Table 6: City Attorney Coat Allocation Summary
Allocable Basis/Bases % Budget
t
Total Personnel & Operating Budgets 100.001". 5 163;9411
Total 100.00% $ 163,940
•
Dgmuiments
Dep. No.
Operating I
Dist. Base Dept. % t Allocation
$ 163,940
City Council
4100
S 5ti'
S 347,370 0.9696
S
Administration
4110
1,437,570 199° 6,546
6,546
City Clerk
4120
863,760 2.40° 3,933
3,933
Finance
4130
584!Alll 1.62° 2,664
2,664
City Treasurer
4140
300 0.(Ni4i 1
1
City Attorney
4150
163,940 0.46% 747
747
Building
4180
799,400 2.22% 3,640
3,640
Community Promotion
4200
143,W) 0-9590 1,565
1,565
City Garage
4240
67,4011 0.19°0 307
307
Law Enforcement
4311(1
6,070,440 16.86% 27,643
27,643
Parking Control
4310
330,010 0.92% 1,503
1,503
Crossing Guard
4320
140,570 0.39% 640
640
Animal Regulations
4330
75,000 0.21% 342
342
Street Lighting
4340
337,000 0.94% 1,535
1,535
Emergency Services
4350
6,000 0.02% 27
27
Narcotics Forfeiture & Seizure
4360
71'910 0.20% 327
327
Construction - Streets& I Iighways
4500
10,847,840 30.13% 49,399
49,399
Traffic Administration
4510
67,960 0.19"/0 309
309
Construction -Traffic Signals
4530
8,0011 0.02% 36
36
Maintenance - Streets& I lighways
4600
410,001 1.140 1,867
1,867
NIatntenanec - Traffic Signals
4630
220,(x10 0.61% 1,002
1,002
Maintenance -Trces& Parkways
4040
298,800 0.83% 1,361
1,361
Maintenance - Sign & Stripping
4650
2(x),00(1 0.56% 911
911
Public Transit
4660
1,227,330 3.41% 5,589
5,589
Planning
4700
996,880 2.77% 4,540
4,540
Building Regulations
4710
1,130,450 3.14",% 5,148
5,148
Enbnnecring
4720
523,600 1.45% 2,384
2,384
Community Improvements
4740
445,540 1.241 2,029
2,029
CDBG
4750
2,8117,990 7.80% 12,787
12,787
Solid Waste
4780
70,500 0.20% 321
321
Parks Administration
481x)
370,370 1.05% 1,728
1,728
Parks
4810
2,465,430 6.85% 11,2.27
11,227
Recreation
4820
1,200,95U 3-34'0 5,469
5,469
Aquatics
4830
662,060 1.84% 3,015
3,015
Recreation Fee& Charge
4840
362,470 1.0M.t 1,651
1,651
Aquatics Fee & Charge
4850
26,050 0.07% 119
119
Dinsmoor Heritage
4870
111,5011 0.03% 48
48
Park Projects
4880
Total $ 36,000,890 100.00% $ 163,940 $ 163,940
I'cr cap. "p. Jcnced Lc do nling Jcpanmcnt At personnel & operating budgers by The rod personnel & operanny 1,uJkau
rd it cable hugci 4 rho Coe 1rnorney disrnbuted rn uch dn+artrnrnt.
Table 7: Total Indirect Cost Summary
ToW Indirect Cosa Sommur
Torsi Allocable Budget o1 r rnrral Sera Dcpes S 1,345,735
A6urAddi(ioval (.'ullu: uL7r ff.d(u.
M..o General Govermm~u Dcpt
Total liidirect Co.t ],315,735
From
Tabk I
From
Table 2
From
Table 3
FIRST STF1'
From
Table 4
From
Table 5
From
Tahle 6
SYm
We I tbro 6
S
SYbIrKt Ind1rM
Co.ta Allontcd ro
Crmtol S-ior
Dept.
OCOND STEP
Dept
S 490,609
PINAI. S'ITI
City Council
4100
1 4,508
S _1,146
1 13,1X6
1 8,924
S S
1 1,582
f 50,156
{ (514,156)
Ad-mrstranan
4110
18,654
9(1,824
54,571
36,953
19
6,546
207,568
(207,568)
City Clerk
4120
11,208
54.571
12.789
2'_203
II
3933
124,717
(124,717)
Finamce
4130
7,590
16,953
21_.203
15.035
8
2,664
84,453
(84,453)
City Treasurer
4140
4
19
11
8
0
1
43
(43)
Gt Art-
4150
2,127
10,3,X
0.223
4-114
21
747
23,671
23,671
Budding
4180
8,699
42,355
25.449
17,233
9
3,640
97,385
341'.
1 16,734
1 114,120
Community Promotion
4200
4,459
21708
13.043
8.832
1,565
49,612
1 74'.
8,525
58,137
City Garage
4240
481
2,344
1,408
954
0
307
5,495
0.lW1.
944
6,439
I- L farmnent
4300
78,124
390.364
228,541
154,758
79
77,643
869,509
3045%
149,412
1,018,921
Parking Control
4310
4,282
20,850
12.527
8,483
4
1,503
47,650
1.67.
8,188
55,837
C ro-rig Guard
4320
1.824
8.881
511h
3,613
(,40
20,297
0,71:
1.488
23,784
Animal Rcgulanans
4330
973
4,738
',X47
1,928
1
142
10,829
031M.
1,061
12.690
Srr-t Ltghtmg
4340
4,373
21,291
12,791
8.663
4
1.515
48,659
1 7(ri.
8,161
57,020
Emergency Seretcts
4350
78
379
228
154
U
27
866
0,03%
149
1,015
Narconcs Fork-, M Se¢ure
4360
933
4.541
2,710
1.848
1
127
10,383
0 36%
1,784
12,167
Construuurn- Srrcets dr fltghsray.
4500
44,3iY)
49,399
1731.
8,488
57,887
nffic Admmnrration
4510
982
4,294
2.SXb
1,747
1
3(X)
9,813
0 34'.
1,686
11,499
Construction -Traffic Signals
4530
36
36
0.00%
6
43
Maintenance- Sitters h highway.
46011
5,120
25,9111
IS_i64
IQ539
5
1,867
59,199
207'x.
10,172
69,172
M a,mena,ce-Tra ffic Signals
4630
2,855
11.899
8,351
5,655
-
1,(X)2
11,765
I Ill.,.
5,458
37,224
Alvntrnance Tressh Parkways
4640
1.977
IX-878
11,143
7,6X1
4
1,161
43,143
I Sl"
7,411
50,557
Maintenance -Sign & Stripping
4650
2,595
12.636
7,59?
5,141
3
911
28,878
101%
4,962
33.840
Public Tnnnt
4660
IZ501
6(1,862
16369
24,763
13
5,589
140,196
4911.
24.108
164,401
Planning
4700
12,815
62594
}7,489
25,386
13
4.540
142.637
5.00'/.
24,510
107,147
Budding Regulations
4710
14,669
71,421
42,913
29,054
15
5,149
163,224
5 72"4
28,047
191,271
Etgmeermg
4720
6,794
33080
19,876
13,459
7
2,184
75,602
2.65".
12,99]
88,593
ammuna~ Imp o-enrs
4740
5,782
28,149
16,913
11,453
6
2,0219
64,331
225'.
11,054
75,185
(:DB(:
4750
22,914
111.562
67,032
45591
23
1_1,787
259,708
9114/.
44,627
304,335
Sohd Waste
4780
915
4,454
2,676
1,812
1
321
10,179
0.36'/.
1.749
11,929
Parks Administration
4800
4,923
23,966
14,401
9,752
1.728
54,777
1 92"4
9,413
64,189
Park.
4010
22,283
1013.486
65,185
44,140
23
11.227
251,345
8811".,.
43,190
294,535
•
11
PLNAl. 5T0'
f. 1,53u
4,408
1,777
Total f 29S,26S 3 1,437,570 3 863,760 3 584,900 3 300 3 163,940 S 5,345,735 3 (190,6091 100.00'% 3 490,609 S 3,345,735 0
Suaua.a4 ibs dbara.o f-.a I -a - dsp-, w.bn -A - dep--,..e „pm'w dq a,mwn
' S.M.- b. u d... wa..O,,.ard w.mw unu dgr.e,nu r du F.ev Sup TI uad a 4 Mdtn
TI. pmaauyv a d -d b, d,.ubad dr mdur - db,wrd w e p --p dep.-, y ,6. u..l.aA-, - db.u d ...p.,uiad drp..u,,..,, d. F- pup
" Pu.,bauuw ,n -h tap -j dep.na.e. u dr..nd bT mu6plyvd dr pne. W b, w mW u A- - A--4. -.I d.pu.va„ m d. Fa,. 9.p
r~
L
Table 7: Total Indirect Cost Summary
•
Table A3: Detail Distribution of Total Indirect Cost
Operating Departments Indirect Cost
Building
Community Promotion
City Garage
Law Enforcement
Parking Control
Crossing Guard
Animal Regulations
Street Lighting
Emergency Services
Narcotics Forfeiture & Seizure
Construction - Streets & Highways
Traffic Administration
Construction -Traffic Signals
,Maintenance -Streets & Highways
Maintenance -Traffic Signals
Maintenance -Trees & Parkways
Maintenance - Sign & Stripping
Public Transit
Planning
Building Regulations
Engineering
Community Improvements
CDBG
Solid Waste
Parks Administration
Parks
Recreation
Aquatics
Recreation Fee & Charge
Aquatics Fee & Charge
Dinsmoor Heritage
Park Projects
Total Indirect Cost
5
$ 3,345,735
114,120
58,137
6,439
1,018,921
55,837
23,784
12,690
57,020
1,015
12,167
57,887
11,499
43
69,372
37,224
50,557
33,840
164,404
167,147
191,271
88,593
75,385
304,335
11,929
64,189
294,535
201,337
94,544
61,330
4,408
1,777
0
Sourcc: Tablc 7.
0 0
0
APPENDIX C: FEE COMPARISON
MuniFinancial 61
rANIK 1.71 G1rr Cl- rrf■ CLIaIPAAtIdON
City of Rosemead
City of Pasadena
City of Downey
City of Montebello
City of Monterey Park
Ctty of South Pasadena
Full Cost Recovery Fee 1
Current Fee )
Current Fee'
Current Fee'
Current Fee 6
Current Fee'
Service/Application
Faa Rob.
Fa. Reba
Fee N.ba
FN Nob.
F.. No%.
Fw Nob.
F&V V C..A. .1.n I--
f
M
f
70000 W MF"arM Wp
FIbap M-he.M
MOM
Cad I Mr.rdaY
fu
d C
d
a
Roa.nrad Mun.yd C. Bo.R
- A-W C..
a80.00 Cob fwh
a
►a
...s
618,50
146.00 M-OPM CCe
170100 -061 .10.
16500 W-. W Cad. b.aY
rJa
•
.r.baarpoon (h•
binhn t)1 MwKpJ
b+ d r. S52 dwr0..
rvw rdu... 1.. n
Cod..mrW r.MNar
ad.dd0ar roe rr
a wd ...d~arw)
S.4-- U, Raoord. (Eadam Cede Sa 1563)
C.py drrp w
55
M
nb
ria
"W Goa -m.*-k'~
N.
n..p.. egama, aM
R
C-V
Cd.r Cover 16brm.rd)
f.r p.p. al.adr
Pa 69 p.p., 90.10 W
55
0.15 d..-t 90.15 va
0.60 .ddb l p'p (..0..
Na
0.,0 Par 9090 .1 mpy d
0.05 2~9090
addr-l p•p
f dovrrr U ...W
W-J dooArrnb
s,dhe W-ft .rd
pok,
C--U, G
58
M
Id.
rd.
Na
ria
Mb
Oounw.Y rrt ar ad.brv r.rrrh
M
ria
Na
W.
Adrl Cwt
N.
Wrda T" copy
780 Pk. AcV.I Cwt d
AYbn
11.00 Pa Up. a arW p.6-
"'.0
rd.
11.50 Pa u.a.b bw
70 00 1. , . W Mho
w`
Arrdo Tapa Copy d bp• aaa.hd by r.Ru..br
280
rtb
ri.
N.
N.
CO. Fbppy Dr.r, a Fbah Oma Gopr
So PW Ac1W Cod of
Wavers,
N.
ri.
Na
nb
N.
CO d CO a Drs, r 1r
56
M
IV.
.rb
Na
N.
DVO Copy
Pk. Ak.J Cod0
rY.
.Y.
Na
rY.
rY.
DVD dOVOr or-Wd by V.
96
rrl.
rar
rrb
N.
r.1
P. CAy Cord
rr..&q.,p-. fib
Cdy Cored Ap.nd. m.hd
M
50.00 Aear.. My
N.
for mpra 0 CRy
200 C
d
N.
r✓a
o..
m..enp
.p.nd..+.er, orr
•
Crry Cord 8a..a.a n ."d
190
11800 onF/. 5150f.
200 Ead.
rA
Na
ria
.p.M...m nr..br
C .fUE d Ooo.rwrb
100
5.00 Ca110.d doc.mrrt
ria
N.
Na
10,00
Nobry Fw
1 M
10.00
.brbdpN
N.
Na
R "smMPubs, R-
86ck and wHb mpw (85 . 11)
AobW Cod
0.1 S Par o.p
0.80 Pa 0, r 90.10
N.
010 Par Pap.
0.35 Iy.O.d
P.P
a 5. 11 C.I.
14
Ns,
M
.is,
Na
M
0.5. 11 Cob. m P,
1a
rM i
M
rtla
Na
N.
11 . 17 Cobr
1.
N.
nr
r.b
Na
Na
C- Sri.
~
Acbrl CPd
N.
ria
Na
Na
ri.
For racwh a1r.r
bNOric 1am.lrpwaaW r dr em. n put
Acbrl Cad
N.
N.
N
.rwd b d.. Ci b ne.r m lar Ih o..n w
a
r
N.
62
TAAL! 7.71 C/rY CI.- - "Ke COwn.•wIIOM
Service/ ilcatlon
City of Rosemead
Full Cost Recovery Fee'
City of Pasadena
Current Fee'
City of Downey
Current Fee'
City of Montebello
Current Fee 4
City of Monterey Park
Current Fee f
City of South Pasadena
Current Fee 4
F-
N.".
F- Fr•b
F-
F-
F- U0.
Fa r•cpA rlsn sb 9onc bmrr<rspusbd w Mr • nmd wIW ~
prod•.e ^'FV r Derr.... r•e,fR1F srlydd• +,bN•1•. a F'J•Y
funr4•on, •avcson, a proar•marW np•rW b padres er
r•axd•
Aobal Car
N•
N•
N•
N•
N•
eo,•r r•rab
1N
N•
N•
N•
W.
W.
M
175
N•
rd•
N•
N•
Na
F•rbp•yr "a b•mp
& bkwpr m•ps •rr Derr
nms
A-W Car
NF
N•
N•
Sp-WL d m•r.rR
Ae•d C•r w maps. d•w- •ro
rr•
R-d• Shed Oe•b. AWO-M Rs•wal. R•ir r,d T
F•w
156
M
M
rY•
W.
M
C•rok~
Fnr e,• Frr
7e
nh
NO
rd•
Ns
M
_P'r to
ps~
se
rd•
,J•
r,!•
N•
N•
u^s • ``+ee~a Oabibrrbsn
Tae
nb
M
M
N•
rr•
'Irw,a wr sr mrw ev~~rser
' W r Prsdr~ss Jsrnl f. sr•a~r b Fsr ♦r ]o•F
' f:q J Oaw,N• •ara4 r fr. Nrlrw a a.A m•
' G` V 1Y•WbY FA 4yr. •d,•rC a An ]••l
'W r wsr•vp••• YW V bwY r Fw. w O~Y~ aA' 1. ]Obl
' or r•...o.rr.. rr wrr rc.r a r w• n >ax
63
•
•
T Ka l.ll CWeY OfKlCawrlMr - /1<ee COY/u1FIOr+
Service! Nutlon
Ctty of Rosairi
Fug Coat Recoaery Fw'
City of Pasadena
Cumnt Fee'
City of LA Mlrada
CumM Fee'
City of Mollballeft
Cumnt Fee'
City of Meruerey Park
Cumni Fee `
Ctty of SouM Pasadena
Cumnt Fee `
Fee Iloree
e.. a
i..
s«
Fr Ralee
Lard LAe Deteb-
! - ACUd Cod
Na
Ne
Ne
W.
Genanei Plan adudn bacM
107
Nor
W.
38.00 Gim" plan
Na
Gan" Ran Ma
as
IV.
Na
M
W.
RecaMrumuon Sadwn Of Gotla
107
Nor
We
W.
Na
Zoning Al A Glance Chan
32
Na
Na
^h
Capf w eppnal¢ed
A
l
W
Na
Z-" Map
107
Na
Nor
Each • map,
0 S14 Mr Nch Iwga
ctua
-1 maten
each r map..
dbWs- and report
Nor
Z,ling Rqmmanal
32
rife
Nor
Na
Nor
2 Ordl.
107
Ne
Ne
Na
Ne
Zon
Condainal Use Pamxt (CUP)
2,033
1,%7.00
2,7e5.00
1,074,00
Fw sirba+amly
352 00 rwdence. S 9371.
wmmwau
1,545.00
.66W R"-JDR) Cd+enerwelflteedermal
,045
Deeign Concapl Review
I. mmor PriMd lees
er.r 520.000 Mu~
for wee of a t- wort
51, ISO rw nWnrdat
358 00 W.Mcae Ibelvwen
520.000 and 9100,000
vuuebon rw wet w
.A--1k), 11,9031w
major po)act IS100.000
value w 100,000 e¢ R
.
a
rw mrsitrrtlon
F.
(10.000 ea R or 1-n .
SS821w was-:*.
771 1- 17*iin 10,000.¢
(t), SSS l la remade!
(eatlnd mffeate rn 11-
area mate men 10,000
ap R 13661 for ramadu
(vem -ase in sow
arda.F-*
755.00 Rsdenn. $980 *Jb
Family Dewgn Review
Ganwal Plan A-Wines (GPA)
2057
5,085,00
Aduel wW S7 000 deposit
2,792
N.
$4,000 depouL hIv
dodged howp rwae.
11he i 40 wet
M,nftd Code Am-&-ft
2057
Ne
Ne
Ne
Na
Na
Plwrnetl Oeveloprrlera Raww MD)
1 X37
Na
NO
Planned
1.355° b1
eacn adeon.l Id
Ne
Na
Reaw Fmre Ordnance RFO - Monalms re
945
M
Nor
Nor
Na
N•
Reloraaon Impad R RIR - Slohb Hoare Pwks
3,234
Ne
Na
Ne
Nor
TantaMa Pwcel I Tred
Map (TPIA I TIM)
2.418
Bra lea Iw Umaare
2,627 00 panel
. map, !2,870 Era
inlits lee lir IenlaWa Irad
n".
F. tblawha bad
map. 51034 1.,
1 385 tmaWe pw a
m
qua 555 psi bthina and
837.00 555 for each addaonM
bWM
T.M.W. Penal map,
1,085.00 51,790 Tedaeve bad
map
Teldetlve Parcel I Tract Maps Par Lit
2.418
Iva
Na
Na
Nor
Fang FN
1,1M
Appel to SWrZw"
711.00 Adrm~abNtmuq
0r
1.215
aApo" m d d°r"
Na
Aaped Ill Cay Corarc5
$51 $ill wpaww
Milm all nCindbe
Appeal to Planning
815.00
Ccecommewn w C(U'
Putlk MaMng FM
720
420 IcMan Conbuerrcend
r11a
Ne
Na
Clew Mma
Penn
1,385
Na
nA
nif.
N
Na
Sde Plan Revew
3.051
Nor
Retlevdipmant aill,
1.200 plWelavebn
ravtaw
SNplan,.A-
1,280 and CM. Carew
rsinaw
330 St pten rerinv
Nor
Eml-ini d Impad Aaese M llrA Stuoy)
6.1 M
1450.00 S Em'rOce1e~
Na
rue
Nor
435.00 Plu 5285 d Pu00c
Worlu review ne.ded
•
•
T:.- a.ar COrr.rurvrrr OrvraonrprwT - Frr1
City of Rosemead
Cky of Pasadena
Clry of La Mlmds
City of Montebello
City of Monterey Park
City of South Pasadena
Full Coat Recovery Fast
Cumnt Fee'
Cumne Foe `
Current Foe'
Cumnt Fee `
Current Fee `
SeMce/ kaUon
rr.+
r.. u.r..
r.. x.-..
w..
rm.
r.. rsvr..
N.gat- O.daneon - Inhwas IH Dowd- CWaL"I is
reaped. 1- aaala to m w Mal dw • %ot total coal
tar adMm9 Wva eat
0,683
Ne
1.280
IV.
275
55.00 P. eppicaaon
Mdpetad N.O.W. OadwW- - I-M- IH Dotarde
mraraaM a i.pa.d, fm walk to comad cat dl.. •
6.683
N.
Ne
N.
Ne
2211.00
%d total cal to ridt-W.M. cast
Pk. 1251.
np I.. ISumir
Inh01a.,-
14,000 deposit, h/y
OR • Ineoras (N oufa%
ost a ragsr.d la wp*
95,000 d•Ik-srt r
i3,000 d.pa8
drw). plus
Out— to -*AM
aeotead howdy
Uric
to
eontrea seat dot a %ot mIr cat for ednne.traev. cat
13.810
Ac W Cost
r.qulr.d
AMW cat
t.ger.d
1 216 12S for p-anp el
1.323 1... P k con.u8anr.
rat-
pl. euukl.
N.- at
oat dot 15%
,
a.b
P.W.t-(Slab
mandel.d
.drrxnWrsW./-
Map Fst-
1 226
N.
N•
N•
We
N.
116- t.a Line Adu.b-M
I Z25
1471 00 Ld Me nc
Na
1 034
441 Lot Yn.
290.00 Lr PM
cal Report
2065
Not
rW
Not
N.
Not
Oak Tr.s Port-
1,703
Not
We
N.
Ne
M
Zoning Co
mpe.no. Lae-
432
We
275 Zominp lrta
Zonrp-rol-ea
52 lever
185 CerMrab d wm bna
Na
Gans- Ber.4ae
StwwmMw p.rna inspN90M►4rMpeceon.
eenerarn.lnndamr, n edaeon to
Steblea prdWa
2017
rye
NO
Not
G. Sum. M Auo oerar.
We
W.
Smrmwebr p.mM impearoM.-InepKaon, nallurad, in
add*- Stets fa-
2.037
r"
Na
Na
Ne
Not
Appeal at Pubic Nulaerw. Oasrrd-eon Is City Manepn.
pryetl. m eaence. MN f oh b rNrdaW If appal a
2.863
N.
We
We
Ne
Ne
Appeal of Hrelle Hraorroa Or.rrMrWOn it, City Curd,
peye0h N edvena, haN of rdkrJr I. r.fundsre it apps- is
3.982
Not
M
We
M-
W.
Nw F" and Application (MModeneous fermis!:
; pea W.
Pa k-'
LeundrydOry Cl"n In-City
501
Ns
12D.00 per edfaorW
Not
We
Not
-
AdA Bus Mwi.. Soak Maus
501
We
We
Ne
Not
We
Maas Pedor O Permit
501
Not
ride
rye
N.
rye
Ma.a Ta<hnnen PamN
501
nb
300.00
Na
We
is
Ad .h Bus U- Entedalnmanl
501
We
Na
Nft
Na
We
S.N-Semp Slono, F
501
Not
Ne
Ne
Ne
Na
Sent/ Cagan ilnua
501
rye
Ns
We
We
is
Vebd.T
601
Ne
We
Not
We
Not
Oena a EMerta- P.nna IReta91iMwry
501
rye
1,810 EM.darimara
IM Public dente per
day
Ne
Fonun. Ti
501
Na
Me
Not
We
We
Mob!. Norm Pala
501
Na
N.
We
We
No
Trop P.A.
Ne
Na
We
Na
Od- Busetae Urenwa
& hoots- cation fair, PC326.5
1,332
W.
We
Not
Ne
N
01,0imes and Animal A.rnda
Tow Car B.pots AwebM Fianna for Those Wad Mar
Inr.r o on
4M
rVa
Ne
Ns
Tow Car BWn.a Inspection Fes, incident to p.rmd
talon
249
Ne
Ne
We
Taw Car Hu.ina. Perms FN br Owner ant all aeelebnb
249
N
st tlme ur a 11-agar
a
We
Ne
Na
Not
aartl F.- r.~ rc~.an P.metM FyraedrrleM rMe
2N
rye
Na
P.U
a~d,R~ r ,gno~
lye
nra
Na
•
•
r.-. Z.21 Qu•tMY - C-onrLM • i . CCr
Service! Yution
City of Rosemead
Full Coal Recovery Fee'
City of Pasadena
Current Feet
City of La Minds
Currant Feet
City of Montebello
Current Fae 4
City of Monterey Park
Curent Faa a
City of South Pasadena
Current Fee e
F..
tt.t..
w
r..
ww.F
~
F wet..
Pared. Perms
1,373
r"
We
N•
Ns
Ne
Tam • Use Print
2,295
We
215
rd.
220
IJa
Yard Sre Pe
231
Ne
We
We
Na
Fuerodw Pe-d
256
rd.
2,110
Rte 1.W rear
200 nNMebl.
lee
Na
We
ANmd Prank K NAd r V1dou Mml
1.272
Ne
Na
Na
We
N•
Ad-W P-Wt Ktrpttp -..1 o0tr ar ft- ep..r"
1.222
Na
We
We
M
M
PtpdttcWt Fe-
Mau- Pwty- TW- Rado rW Pltempapwa
Produmon P
Prediction Conq a
2.471
Ne
2,400 par pteason'
pNM 15.000 depart
for edur wad
Na
We
Setdem Pradr.11on
602
Ne
Na
Na
W.
' W r tert.rt o...wrr •.rr r Few r~ptc
' W w t. tar.'. to ws.Wr. m
' W r tt~erinsw a+rr rrr.n r. K m
'Wrw.r..t h..rr es.wr wstirM.~+r' atw
• W w r w..rr.ttr rerrrrr r aver . r te rr m
0
0
T- 3.3: CarsyNrM77vs - COaerv
Service/Application
City of Rosemead
Full Cost Recovery Fee'
City of Pasadena
Current Fee'
City of La Mirada
Current Fee °
City of Montebello
Current Fee'
City of Monterey Park
Current Fee F
City of South Pasadena
Current Fee'
Fee Ilotaa
Fe, rlerea
Fr .l.a.a
Fea Fl.raa
Fw Mora
F.. 71.b
Public Im vement Plan Review Fee
Maio, Improvement Plan R.-(bace 1-1
S 150.1 WwFw
M
P1 kY11prYr.maa
Pbn O dOkapec n
P d Ma laa
Pu1c 11wb
c++p~ M • Y.aaa an
NF
pka each bl
65 -Fr
M
M aaab I %a1
appa- p
Armor I and Plan Renew base lee
1.125 W F.
-a.- 0
M
pkm each lot
63 Ww F.
M
Na
Final SubdiVl.lon Map Review Fee
Maier
SaYOrebn Yp ma
.
Final M Resew bee fee
M,jor
1.615 ww Fx
puvaV rasa b H
pkA eachM
n -F.
,
a7o's .rim ap.b.
Major Subdh son Map Acceptance, 01
Im rhonta and Deckcsfi K
1
Epp Na. Fee
0poal pea acha1
TaKNW paloNb.q
F.W YM map. •
WrcN maps Maw (p
G-.* M amrs'14'
P.e %WS city
faW WW map hunt
Major $ubdiviab. l Map Ama,YlmeM of
SubdN1a1611 ApfewnsM
675 Wr F.
fa.xwae v.a as
Oh6
1 ~7~.00 ArO.I mp nvl.w,
12.07V *"p pea
~
6Aep map nvaw, 1700 4
Sew wparleap ea,
3.OW b Owe nwwl'
12.Opo br boor
F.en..l
St
sao kr
des ant b.a
S.eer.ram p.rd ray
pur lry
1317C
7,pp~p 11,050Iea ou110.
mb Pw ales Yap
M Mp,
anel P..-q v.a
.
,
.atn utvMM
r701 .f-Angb.
b
p
Mrnor ParWM Review bt.e lee
1.750 F.
. a
relF.
Gun
IW S]0 Cn
each lot
75 Wes F.
aeY bN
MIw Such-ion Map Acoeptance of
Im me114 end Dedcaeae
el W. F.
Moor Subdlvwon Map Amendment of
Subd~
app Ww F.
New lot he
amr Ca.r Ww Fr
M
M
Na
M
M
Baas Map R-i nFM
25 W. F.
M
M
M
M
M
(2- Trap Plan R-I.. Fee
75 W. Fr
M
M
M
M
M
Domerera RWWM Fee
so new Fr
M
025 Par Pea W
Ptacr.c.rh
Pa t44.rE wlala
o25 p-mW~ era r
a W F,gwapry
Pbra. re purp a bx
_5 pep.a 164.
5. F-
M
Slop S g- eadt m[enaGtipn Mtal d C
375 Ww F.
M
M
M
M
M
Sllaat L hts, each IN..acbon metaled C
125 Ww FM
M
M
M
Na
M
5 ved Bumps. each lrrtaled Grry
313 Na. F.
M
M
M
Na
M
Parade Pe-A
25 Ww F.
M
M
rte!
M
M
Parcel Merge
app -F.
M
M
M
40000 Pa trronrrdy
' y.a.zz w«w.......r.««.....v erv
'4VUlrnsi«a Vrar •~w~ wen
Q V neiWl it eater .saws w+rw ~ ~ Ap
.~Vwww~ssrt rr«.s«aesrsw .vl~ew r+~ 7xc
'fS VO..«1rn~r«r w.r ~s~wrr~~.~~.. na
•
•
Twig 4 3: Flrvwr 9 • r.- C.---
City of Rosemead
City of Pssedens
City of Le Mlreds
City of Montebello
City of Monterey Perk
City of South Pesedane
Servlce/A Italian
Full Coat Recovery Fee'
Current Fee'
Current Fee'
Current Fee
Current Fee F
Current Fee 6
F« Nm«
F« Nw«
F. Ne
F« Neb•
F« Nab
F« Web
P. fJN Cent 1719.
meNram •b-W
For Ua eel tlrd~, P6rr
dWq br 6rY NSF
E; •f rru vW of
For ti roneal6uaM
NSF 0h d.
S ♦1 drrA b 305 W b
f mm
6 15.00
3 25.00 dam' 375 •W
0
rl d d
f 1700
R" d.35 M
6 2500
4
IMYM
•emMW •aM
el
a•¢er
l
25%a/Nor vhe of
-
roni~
Ur Y
L w
WOwOvrr• NSF
dr•rA
Stop fd/C1Mfi1.4.-.-
al riref«
M
M
M
M
Pa copy of fp
pe-1 wxw
For mplNof
MlW9N po
MOa
Copy W BudpeVCAFRICIP Documenn
AoeW Cod Naar F«
19.00 SeMwr6. M Per
Om M p•q M mpw el
70.00 mP/: 370 oar amW
AdW CoY q.a.k•e nral.reN
CearOr•MreN•
f0A0 P.,
aopF of euEpat
WA, rrwwe'
ierrN4 Mpon
rrce w rrop.
rvael A,.-W It p
A GFR
BWIMat U IfW LIW MCD
eFYe F«
M
M
M
M
M
B-6 w Lk-" Process) F-
8uYneY Prora RV FeeF Fee
I04 N F«
]SAO
S5.00 MCMF. 616 t7rAO"
70.0
27.50 IYrrMVew
e5.00 Pw w'rM 4.%4 ft
eat
An-M ReMvd Prouu VFee
6rF F.
M
no:
15,00
2750 Arorel ~
SAO
DIrp6FAe C.."'r m.
Se -F-
M
M
M
1500 P. . •r
10.00 P. mnd•e Farr
Chanpe of Local o
N N•n F«
M
M
a~r Ne^0•a
15.00 Al b
Lbre•a
M
NF
'.ru rr ,.a.e•rr
' a Mhrran••O•wer~ MYV rW.r Sd
'fy lurrYaYra Mrnh~ 1. )JO<
' 4 r rru•vn rrmr r burr r r... wc>Ww r r led
•
•
• •
APPENDIX D: FEE COMPARISON CON'T.
MnniFinancial
69
0 0
Table 1D: City of Monterey Park's
Public Works Improvement Plan Checking Fee
Fee
$ 166 minimum for a construction ocst $0 to $2,205 30% of Admin. Cost
$ 166 plus 7% of consturction cost over $2,205 but less than $82,688 30% of Admin. Cost
$ 5,397 plus 4.5% of construction cost over $82,688 but less than $165, 357 70% Consultant Cost
$ 9,118 plus 3.5% of construction cost over $165,375
This is a fixed fee and applies only to the first two (2) plan checks. Additional plan checksk shall be at cost
plus 20% if a consultant's plan check services are required, the fee will be cost plus 20% for City
administrative services and may be required to be paid in lieu of a fixed fee. A minimum of $3,000 shall be
deposited with the City when a consultant's plan check is deemed necessary by the City Engineer and it shall
be increased from time to time, if necessary.
Source: City of Monterey Park.
Table 213: City of Montebello's
Map Analysis - Plan Check
Number of lots/parcels
1 to 5
6 to 10
11 to 25
26 to 50
51 to 100
101 to 150
151 or more lots/parcels
Plus
Fee
1,000
1,300
1,750
2,800
4,350
6,500
6,500
35 per lot in excess of 50 lots
Source: City of Montebello.
70
LVLL 1.31 CITY CL6NM - FTLe CompA jIOM
City of Rosenwald
City of Pasadena
City of Downey
City of Montebello
City of Monterey Park
City of South Pasadena
Full Cost Recovery Fee'
Current Fee °
Current Fee'
Current Fee
Current Fee'
Current Fee'
Service/ Application
Fr N.N.
F. NOM
Fr N.Y•
Fr Na .
F.a N.Y.
Fr Wft.
F&V d C.."-.1- Iola-
S 84
S 200.00 M - P -n arq
N.
N.
M
a 700.00 =k 1- 11-
~OpT
m. W cd.N
Rarnr.d SA,nred Ced. Sad
Aead C-1
V
[oe. f777 Yr
.50, C- e~
..c.wr
115.00 L%-. .1 C.&
U.-VW lrsrtr-e..ry.1
c° 0-
176.01) ~
156,00 MN. "C.& Ymk
M
~
331 Me..epM
6-%.
S
r.vb ngrr M b
,
rl r
Wrr
cad.
.s
rW dd- 9w r.w
b. MW
.r
.
Sub,-- br R-m (ErW.nc. Cod. S.c... 15611
C." clrr0. o.
50
M
M
M
A.W. C.M ~ A-i NYruY h
M
rrr . d.pr.nr..M
C,V R GYnd.rd w
C.I. C.P.. (pro)
Fer.1 pop M..ci.
P.r 5.1 pp. KIDW
58
0.15 des..sK 50.15 r
DOD »
M
0.10 P. pp W
035 2~ P.p.
WOO-- p.p
r.AdnP p.rpdY .ete
CNr CV,. L 1
Se
M
M
M
M
M
ntam.tl.n R ..Y
Doomrnr rrl In KL~M -.h
04
M
M
M
AeOrl Cad
M
A~o T.p C.py
760 Il.Pr ~p1
M
ICAO sent' psbn
M
1t30 P.r..rY Yp
70.00 alp. S30 pr.+de.
Wp,
T.p C. d bP p-.Ud by H',I,-
2e0
M
M
M
N.
M
CO Fbpy DW w Fl.. D- C.py
56 PY ` C'"d
M
M
M
M
M
CDC 0CD.r D1.kr ovd.d alts
50
M
M
M
N.
M
DVD C.P1
tsl. Cant el
N.
M
N.
N.
M
DVD C"V 0DVDa b
M
M
M
M
N.
M
Pw City Curd
n- .y.adp.3.6
CM Cana Aw.rrd. nrd.d
M
50.00 Ae.ndr sir
M
2,00 1 vi a
.autd...Nrt.rr
M
N.
Cat' C.und M-m Id
lea
11600 M..h..Ny. 5150br
100 EWt
M
N.
M
.wrtd...ml Mr.M
C.roS.d C- W DwnrrrY
100
6.00 O.r.e.d docum.N
M
M
M
10.00
N." F-
IY
10.00 N.Yry rs°'-~
M
M
M
lteprodYeOe. of PmbBc R..as
BLKk W war mgrs 18.5 a 11)
Aft W Cpl
0.15 P. pap
Oa0 Pw 0rY PW.', 70.10
r.616-1
N.
0.10 P.
Pap
0.35 2-l page
6.5. ll Cdwm .
1.
M
M
M
M
M
SS v 11 Call, mrr p.r pap
11
M
M
M
M
M
11 . 17 f..bi mp.e
11
M
nle
nH
C--
A-I Coe
_
•
TAILL 2.31 Ci" CLKNK - FWK& CONPA MDN
Service/ leatlon
City of Rosemead
Full Cost Recovery Fee'
Ctty of Pasadena
Current Fee'
Cety of Downey
Current Fee F
Clty of Montebello
Current Fee 4
City of Monterey Park
Current Fee F
City of South Pasadena
Current Fee'
Fee ke .
FN Nevi
FM Mete.
Fee Ne.e.
Fee Nob
r« Mob
Fa rec.N. wlwre ebceonc boner npwF.w w br • rwnrA.I.N w
peerAd udr.1 oerrww. nPF.NY rlra4.rMVel. a rt"Q.Y
Oerreasbn, erR.00r1 p pop.ww+p" Y r.eured b poMrw a
wort
Ackw Cer
rW
rJ.
Na
Ne
rrN
B.W wme.
i88
M
rel.
rd.
N.
rJ.
oe
128
N.
nh
rW
rd.
N.
RaleOeplA e8del Ierr.p.r r.de., bb.pw.. rneF..r.d ed..r
nmd.
Arnrl Cor
k•
rd.
N.
6p.ubad rr-"
Act W Cow N nwq. drer- rd
rd.
Reeord. Sbred 08rr, Adearl e0-4 WFae .r.e T
Few
185
nh
M
N.
N.
N.
CA n
Far 8w br
m
rN
rib
M.
Ne
Ne
P.
58
N.
M
M1
N.
N.
~Mrw a ti wc. Ll--
2W
rN
N.
M
rd.
rJ.
'T.yyl} 1pw v.rrY rerwio.o iu ew nrir eie
• aPr.O•w\O.rd Fr tlrOY 4 [d Yr'AU}
• Dy aee+..r. W...b a FFr .dFane r a AA r ww
• v; a r.wa,+,. F... s..er mre F~ r. r. }.m
• ca r r=w.m o.K..r..r sower a F.r..rr ore.. ,w r .y..
•
•
rw.cr >r-3r, eowwuw,rr orvr. oewrr.r - azrs cu.fw.wrso,v
City of Rosemead
City of Pasadena
City of V Mlmda
City of Montowic
City of Monterey Park
City of South Pasadena
Full Cost Recovery Fee'
Current Fee'
Current Fee'
Current Fee'
Current Fee'
Current Fee '
Service/ ilw1on
r..
a.
r.. tsd..
r.. h4,ba
re. ahdr
FN atd..
Land Us. Dntat-
- Aca,d Cat
Na
rJe
Na
Ne
General Ron ,ndudn arw ound r
107
N.
N.
38.00 0 r.1 plan
rd.
G-W Plan Ma
65
N.
Na
We
Ma
Recd ,'.u uon 5ecaon a Coda
107
Na
M
Na
N.
Zw.n Al A Glance (:Mn
B
M
Na
Na
COw of a d
l
A
i
n
We
Zonrlp Map
107
M
N.
E.en amp map.
9 S14 br each tarp
m
. r maps,
ctua
orl mbn
-o
dyams, and Pb
nor
rY.
Zmin Re menb
32
N.
N.
N.
rd.
zonn,A Ordnance
107
We
Na
N.
N.
Z-Wo
FN ands-famly
C-011-al Use Pamela ICU%
2033
1.967.00
2.785.00
1.03400
35200 rwarre: 3 9371.
1.545.00
-rn-d
DW9n Concept Renew
for miar pr pa lath
M S20,000.duason
F. rrrmr.&WOn
fat oat of ww" a w
110.000.4 M1 N I-).
$1.160 fN aarmadete
5882 for mrrV d-
Sngla-F.-Ov
D-9n R.n.w IDRI C-,..Affl..S bd
3.045
358.00 pralecla lo-dwean
Na
ni.
771 (more than, 10,000 M
765.00 Re.raac.. $980 M
$20.000 and 5100,000
a.), 5551 IN remodel
Famey Dedgn Renew
.aluNwn fw mat W
( What musts m Oaf
.not cork), 111,993 ter
NK me. man 10,000
malt/ Voted (5700,000
W RI. 3681 Vw remodel
.akw N 700900 M R
I.rm iricr.aa m sow
$4.000 span. fuey
GenNd Plan AmenAam (GPA)
7,657
5.695.00
Adud cat 17
000 a
e
2.792
Na
.1-trd h..Iy rd..
.
ps
r
pre evbra coa»
ML4wVW Code Amand-W MCA
2,657
NB
Na
Na
N.
N.
Ram.d
Plannad Devdoprlamt Rtnaw(PDI
1437
Wit
rW
355 d-lop11 M
1
19.
H.
.
ddcb, S30 to,
own stational lot
R.bd From OldnNrea RFO - MNtl.rnra
But
Ma
Na
N.
We
Na
Rdoueon knood R RIR • Moea. /bra Pane
3~rm
N.
Na
N.
No
TenWN. P
r
Ma
s
" I TTM
l/ Tr
419
2
Sae M for bntr.e
7
00
7
map. $1031 f.,
F. ""'j". 4.d
Rr 555 DN bllurN and
Tafda0v. Wrul map
a
ce
p
act
(
I
,
.
map: $2.9
iwW
2.42
0 bass
fa far bnt.W. hraQ
M.
1.385 bre90ve Odcel
837.00 555 tor each add6orW
b4una
1,885.00 $1.790 T.reave au
o-
map
Tantaava Parcel / Tnd Mapa Pat Ld
2 4t9
Id.
Wit
Na
N.
Flktp F.
1
144
Appal to Sa42aNlg
711
00 AAHraatrerorfRanran
1
215
N
Appeal to Cdy Covrd.
551
al
l t
Appel to Rannnp
1
,
.
p
.
Appeal of planning
.
appa
$
o
8
5.00 mmrn.don or City
Dlr.dw
atom
MadBaean Commie...
Cmncd
Prtle naanng F.a
720
420 = X d
N.
N.
Na
O4w hms
Om pt, l
1365
Na
1Va
Na
Na
Ne
RedevW.J-ta
Sde pan -
Sd. Ran Rawaw
1,851
Na
1,200 paNdweeon
tlYlew
1.280 as Cmc cam.
fM.w
330 SU plan tanaw
N.
Erwuw ntal impact Arrsment flf.ad S.4y)
8.146
1.450.00 SInsal Ermmnrnmal
nl.
Na
Na
.35 00 Rua 3785 r Puekc
VJOika re,ew needed
64
T..- 9.3, craa.a.rrnryr. vrvrcn erc..>• • rr.. cnwrr -c-,
Servlul ileatlon
City of Rosemead
Full Cast Rauwry Fee'
City of Pasadena
Current Fee'
City of La Mlnda
Current Fee'
City of Montebello
Current Fee'
City of Monterey Park
Currant Fee'
City of South Pasadena
Current Fee '
r« ww«
e« worn
1w w...
e«
Npaove Dad.r.oon - IM.oaa (If nu WA. cor.Ii.N Y
requneo le. pu.4 to Wl .d oWt pk. a %o! tdd -0
tat d--u-. r.n
0,093
M
1200
Na
275
55.00 Pr appecmbc n
MMpabd Neg.W. D.".*- • k.-h-111 dead.
cor..Abd . req-d, Ia..quab W WAnd Con Pk. a
1fa11clal coal la adnarYatraN.
01.003
Ne
Na
nla
Na
230 DO
FIR - In-P- (0 o,4.4. caMr4. I".ad I"
to coal -t pi- ■ led total am N, eft.W W .cod
13,910
lS Oo0 depWd .
Ac0u1 CWt r-.d
$3.000 dwoM
Acted coat
Pk. 5251.
Iandtrg Iw(Stab
mr.0.bd), PDA
1 240 US M pa"" or
Nao. Of
Pr.P.rm-(Stab
1.6 r.vbr,
OWOV W I. oonWhnt
1,323 M aglW aorr6rfa
Wa1 pk. 15%
.dn..nf.h.lw
WOO
~ t* O.Wd
rm.. a- orbrd.
W.b
Ma EA-arw
1220
Na
Na
rJ.
Na
Na
W- Lol Un. Aduaam.d
1220
1471 00 Ld bn. dpadrriimI
M
1 034
441 Lot fm.
290.00 UA fro
Gedo cal R
"
2,065
rue
Na
N.
Na
Na
Oak TL
'M
1,703
rv.
Na
Na
N.
N.
Z-ng Compl-1.~
432
Na
275 Zoning WW
52 2d.n0 Wraersaon
bar
105
CraOcab of mm .nW
N.
o.naral S-i a
Stc-iter WrrM IWpeleoM-padw,
mrgadAn LW. In .dd0on b Stab few (Mclud..
Gw SIeOOW and ArAO Dwler.
2.037
rw
N.
N.
Na
Na
addrom m r6nt. few oM►map.cpon. raafaurrrL In
2,037
Na
IV.
i.
rib
N.
Appel of Pubes Nu.anW Dnarrnina.on W Cap MW"m,
pryatle m ad,-, I..e of aadr h r.nmd•tl. N appeal •
2AW
Na
M
Na
IV.
ru.
Appal d PrMYc Nwrrc Odwrdrra0pr to City Counck
pryad. in ed+ano., tall of which Ia ranrrrdabe d.pp.al a
LTh,Ad
3.962
W.
N.
Ya
Ne
Na
New Faep and App4coO t (7N.wYwee. Prwaa):
L.undyrDry CS.. In-G1y
501
M
Na
N.
rim
P. ec«r., pea l9.
12000 O.r addbr.e
W
Ad LAB- Movra Book Maaaa
sot
N.
No
N•
N•
Na
Mw Panor Op.,arg Parmn
501
nft
rim
Na
roe
No
Mew Tecnna.n Perms
501
N.
300.00
Na
N.
N.
AM Bua Live Edert.nment
$01
No
%
rya
N.
Na
Sea.5ernce Sta Faoli
501
N.
N•
hill
Mfg
ft
Servo, Cozen Now
501
Na
Na
N.
N.
rW
Vet11d1 Towt O noon
sot
N.
N.
N.
N.
Na
Dan- 0 EM.nat mnd P.rmn (R.W WIhn)
501
Na
Iota =...d
123 Pubic WnW pr
N.
I~. Tehn
Sol
N.
Na
N.
N•
Na
Mob" Hach Par,.
501
Na
N.
Na
Ne
N.
Tab. P.dd
Na
Na
IV.
Na
Odra Su.k1Wa l./cnaa.
BAn2a acsr.a Wilicallon PC3Mm5
1,332
N.
Na
Na
N.
N
Buakt.a. end A W" PamlMa
T w Car BI.Inew Aaarebnt Pnrrn for T71W. HM MM
Irked Appbcaao~
484
rft
Na
N.
r"
:w Cr 6u.urW. Impaction Fw IncidarR to pe.VI
249
rMa
Na
Taw C. Bu.rn«e Permrl FN Iw Owar and M W odaw,
n ems
al aP¢cat_c
2W
Na
rYa
Ne
Bock Party F`ern,t ,r.~iuow Prrdl /or Iirro.darler41rdo
PuHrc Rr: yr.V':o
249
N.
r"
Na
0
•
rw.ar a'.er Cow--- orvrr.o►..ra.r • iirr. Coa.
S-WAI Mellon
Ctty of Rosemead
Full Coat Recovery Fes'
Ctty of Pasadena
CumM Fee'
Ctty of La Mirada
Current Fee
Ctty of Montebello
Cumnt Fee'
City of Monterey Park
Cumrd Foe'
City of South Pasadena
Cumnt Fee '
w am.
sr
e.. e1.r..
e.
a«
^
PMad. Parn.i
1,373
Na
We
M•
n/a
N•
Tem • L)" P-W
2,295
Ma
215
M•
220
rim
Yrd SA. P.-
231
we
Ne
W.
5
Ne
F-rks Penh
254
Na
2,110
P1u $70 m .
200 ialundabl.
oceeu lea
Ne
We
A si Perme Keepng NMd or Vwlout Anmd
1,222
We
nb
nfa
We
Ne
Arwnd Pem Ke ne anmd oa1•r Imn Ogee toeall•d
1.712
rye
np
rye
nh
NA
PreOtllen Faso
Mean f+lcerte. TeWamr, R-% and Plnbpaphc
Proirctlm P
Pradua C-".-
2,421
We
2.400 P. ePplrro -
91. 15,00D dep..
far a w.t wan
N.
Ma
swd.m Pr.doww
am
ry.
rya
We
we
•qru rr.v r_..r. an
• A w.w.r~. r~ ar...ar rr r. m
•ctir•.ww~..,,,,. u... ~n.arrr.~r r..~~r... rasa.
0
9
T..ear 3.3: Cwsrwraarrwo - Fire C--
ServieelA ication
City of Rosemead
Full Cost Recovery Fee'
City of Pasadena
Current Fee 2
City of La Mirada
Current Fee'
City of Montebello
Current Fee `
City of Monterey Park
Current Fee `
City of South Pasadena
Current Fee'
Fee More.
Fw 1101..
Fw .1st..
itw Maw.
Fw M.w,
Fw Ilab.
P13MIC I evalnant Pi.. Review Fee
Meld Improvemtan Pian Reveal (base fKj
3 t Sa3 11.w Fw
M
P~ a~lOro..rrwra
Pan CfwdAn.p.eal
Pt.n rh..a bu 6..
PJc wiOrW
anOrw.nre. P~
Ch.d M e ewe sn
M
-h W
N N.w F.
M
M ..Iel. l { el
App-dw p_
Minor Im ent Plan Ra Ii W bpsa im
1.125 N.w F.
M
oanenlCBOn rMw
S« ~rW D
N
pkm each lot
e3 ft. F.
M
M
Final Subdivision Map R.4- Fee
Maly
n
s
bs
W
t
M Fain RswW base fee
1.626 Ilwr F.
l
~
on
r.
m.p
d,,olye b..b 34
pka each la
7S /M F.
x M% or l Ar g.
Malmo Subd - Map Arxegancw of
I o9efnana and D"cabons
I Aye N- iw
D"- Pee IaaW
7.Itl.IN.
.ro.W W
F1W asd nup. a
roN nu
r.v1.V Il
C.." M ra11.n+.
0. %515 CRY
Fein petal m.
rwe
MsJor Subdivision Map A3nwW-m w
SubdNialon AW"-*
176 N.r Fw
proolrap.0 W
1.7m m P. aI.P nwwr,
32J)" a.pow p1e
p
S,~ my r.ww. 37m W
FnM O.rta1'a.ot m.p
r1.ew
p
p
q
3.Om b ev.. mM.ai,
12.000 Mr Was,
uMIW; 11 lm w
obminaa.IM M...
StAdvl.on prwl ItaP
dwdae 1... b 03.9
p
i.p➢0 S1.050 pYaoa.loe
ran. pr eel art m.
mrw
Mrt,or
.del Ploww.e a,e
.Whntrrle•I
a lw
Minor Parcel M Ravaw base 1N
1,260 M.w Fw
tdi.
C
G,.Vr M wA
p5e 75]0 Cq
pk, each b1
76 M.w F.
ppbyp~ bw
Mm, Sub6O4*- Map ACoeptanoa of
I v n-ft ad Dedca
563 molw
Minor Subdivaion Map Amerldranf of
Subd- Agtoment
766 Wwiw
New le fee
AoW Co. Nvw Fw
N.
M
N.
M
M
Baas Ma Revhbn Fee
25 Now F.
M
M
M
M
M
Cxea.e T Plan Revaw Fee
75 New Fw
M
M
M
M
M
Daa .M Raw-[ Fee
50 New Fw
M
oa P. p`p` of.." of
pwk pops.
Par 11.N old wh..
02s plwlo oo" .IW
wOm of EnpY rv
Pbn. no dory. abw
awns p.p.. bal.
S. F.Mwa
N.
SIP each nI.rsectwn mstaaed C
775 N Fw
M
M
M
M
M
SI-I L hh each iMeM1ecllOn Irablkd City
126 4- F.
M
M
M
M
M
Spe ed Bum each Ina46ad C
313 N.w Fw
M
M
M
M
M
Panic Permll
25 mow F.
M
M
rrr
M
M
Parcel Merge
3m W. Fw
M
M
M
assw P`r sensn.r4N
r.r u
•
•
' gatrwl.en rw r..w. aaww.~ r .a m
'rsraew.. ro..I..re awes, a,w. raw.~..w. m
ctaww..w,,. twr sr~..r r..r w.~.w. ~ rr.. ,r 7oao
r-L. S. 3. FINANCe • Fla. COMIAeIION
City of Rosemead
City of Pasadena
City of La Mirada
City of Montebello
City of Monterey Park
City of South Pasadena
ServldlA leation
Fug Cost Rewwry Fee'
Current Fee'
Current Fee'
Current Fee
Current Fee'
Current Fee'
FM Mrrea
Fw M.N
Fw MaM1•
Fw Mont
Fee Nwn
Fr Ilar•a
Pw C A CMa 1710
.awwer
For M eY wu 1. PLA
wWpa b ew NSF
Eft w b +•fr or
For Mw ron-Wb•rl
NSF dleda
3 at warA~375wr
S 3040
3 tam
s me,
1)40
{ 75.00
wr w ra
wieaae+ra HaF elate
xsa o1 W +afA o1
~
Ma d.a
w1a4
Stop PVPT*nUd*& f0-IaaWnp
41 N Fw
M
M
M
M
_
Far oaetn N
Pw auaPw nFOe r
Coq of Budg trAFRACIP Doe-ft
le40 Stets,-LID P.
0.35
a
mem
00.00 oaq: $30 pr W
Adel Caw ~
°11~
1040
A
r F
ya
aaP/ w Wdew
w
t
rwvl neon
~
ft-
wa
•lar
FR
BuarneN Llutea LbM on CO
A r F«
M
M
M
M
M
Dust-Lt.-Pro i Fans
Business Ploca3sM Fe.PerfM Fee
1N IMwrw
]S.W
SW k.c ..{la worcry
3000
77.30 t*,. FS
eS.W P. p•rrNh-h-V
Annual Renmuel Procefeblg Fee
07 W. F••
M
20.00
15.00
7150 Annul --I
sm
Dup". Certftete
6a N•e FN
M
M
M
1540 vw def~+M a~1
10.00 Pre unYNtl peer
Charlpe 01 Ln0anon
N Nee Fw
M
M
IS 00 Wwr
Braaleu tlo.rr•
Na
M
'..a`.a raw .....rr
'q r•..r.•. ~r r. ew..A.r ••d rw~ 401
' or r 1. nn..>, v A,w.1 340
'grwaan.a.~ I. f•~wr awwa~ Aw rA ]FOl
'q rrr.rwn e.~r.wrrhw..o.Fw Ay1 tmt
•wrar.r.. rr. awe rFw rw~a w w r u aas.
•