CC - Item 3C - Acceptance of Bids and Award for Garvey Ave BridgeROSEMEAD CITY COUNCIL STAFF REPORT TO: THE HONORABLE MAYOR AND CITY COUNCIL FROM: ANDREW C. LAZZARETTO, CITY MANAGER DATE: NOVEMBER 28, 2006 SUBJECT: ACCEPTANCE OF BIDS AND AWARD OF CONTRACT FOR GARVEY AVENUE BRIDGE SUMMARY On November 14, 2006, bids were received for the subject project, which provides for the reconstruction of the Garvey Avenue Bridge over the Rio Hondo Channel. City Council will consider award of the contract to Reyes Construction, Inc. in the amount of $10,869,568.20. Staff Recommendation Staff recommends that the City Council accept all bids and award the project to Reyes Construction, Inc. in the amount of $10,869,568.20; waive the irregularities in the bids by Steve P. Rados, Inc. and Griffith Company; and authorize the Mayor to sign the contract on behalf of the City. ANALYSIS The following bids were received for the subject project on November 14, 2006: 1. Reyes Construction, Inc. $10,869,568.20 2. Sema Construction, Inc. $11,194,740.95 3. Steve P. Rados, Inc. $11,556,234.92 4. C.C. Meyers, Inc. $11,949,130.90 5. Griffith Company $12,727,017.10 6. MCM Construction, Inc. $12,970,049.95 7. Atkinson Contractors, LP $13,894,816.00 Attached are copies of the three lowest bids, a bid analysis, and Dun and Bradstreet reports for each of the three low bidders. The low bid was submitted by Reyes Construction, Inc., a responsible contractor, in the amount of $10,869,568.20, which is less than one percent above the Engineer's estimate of $10,774,631.25. The average bid was $12,165,936.86. Irregularities in the bid amounts by Steve P. Rados, Inc. and Griffith Company were due to addition errors that did not affect the order of the bids. APPROVED FOR CITY COUNCIL AGENDA: • i 1 City Council Meeting November 28, 2006 Page 2 of 2 FINANCIAL REVIEW Funding for the Garvey Bridge Reconstruction is included in the FY 06-07 Budget utilizing Federal Highway Bridge Rehabilitation and Replacement (HBRR) Program and Proposition C funds. PUBLIC NOTICE PROCESS This item has been noticed through the regular agenda notification process. Submitted by: Ken Rukavina, P.E. City Engineer Attachment A: Three Lowest Bid Proposals Attachment B: Bid Analysis Attachment C: Dun and Bradstreet Reports CITY OF ROSEMEAD PROPOSAL FOR TTA e'111yE1V7- .A f ES' CJit/. j, a,Cr14iv, ; NC . RECONSTRUCTION OF GARVEY AVENUE BRIDGE OVER RIO HONDO CHANNEL IN THE CITY OF ROSEMEAD FEDERAL PROJECT NO. BRLS-5358(006) TO THE CITY OF ROSEMEAD, as AGENCY In accordance with AGENCY's NOTICE INVITING SEALED BIDS, the undersigned BIDDER hereby proposes to furnish all materials, equipment, tools, labor, and incidentals required for the above-stated project as set forth in the Plans, Specifications, and Contract Documents therefore, and to perform all work in the manner and time prescribed therein. BIDDER declares that this proposal is based upon careful examination of the work site, Plans, Specifications, INSTRUCTIONS TO BIDDERS, and all other contract documents. If this proposal is accepted for award, BIDDER agrees to enter into a contract with AGENCY at the unit and/or lump-sum prices set forth in the following BID SCHEDULE. BIDDER understands that failure to enter into a contract in the manner and time prescribed will result in forfeiture to AGENCY of the proposal guarantee accompanying this proposal. BIDDER understands that a bid is required for the entire work, that the estimated quantities set forth in the BID SCHEDULE are solely for the purpose of comparing bids, and that final compensation under the contract will be based upon the actual quantities of work satisfactorily completed. THE AGENCY RESERVES THE RIGHT TO INCREASE OR DECREASE THE AMOUNT OF ANY QUANTITY SHOWN AND TO DELETE ANY ITEM FROM THE CONTRACT. It is agreed that the unit and/or lump-sum prices bid include all appurtenant expenses, taxes, royalties, and fees. In the case of discrepancies in the amounts bid, unit prices shall govern over extended amounts, and words shall govern over figures. If awarded the Contract, the undersigned further agrees that in the event of the BIDDER's default in executing the required contract and filing the necessary bonds and insurance certificates within ten (10) working days after the date of the AGENCY's notice of award of contract to the BIDDER, the proceeds of the security accompanying this bid shall become the property of the AGENCY and this bid and the acceptance hereof may, at the AGENCY'S option, be considered null and void. SPC03-66 C-1 • • BID SCHEDULE FOR RECONSTRUCTION OF GARVEY AVENUE BRIDGE OVER RIO HONDO CHANNEL IN THE CITY OF ROSEMEAD FEDERAL PROJECT NO. BRLS-5358(006) ITEM DESCRIPTION UNIT ESTIMATED UNIT EXTENDED NO. QUANTITY PRICES AMOUNT GENERAL 1. Mobilization. L.S. 1 050,tou $ 55c c , 2 Progress schedule. (Critical path L.S. 1 $IL' 60( $ I U 000 method). , 3 Prepare storm water pollution L.S. 1 $ 5 00U $ 15 pDU prevention plan SWPPP . , 4. Implementation of SWPPP. L.S. 1 $150, 00U - $ 1 5C , G 00 Regulatory permit compliance and implementation: L S 1 $ 15,000- 15, 000 a. US Army Corps of Engineers - . . 404 Permit. 5. b. California Regional Water Quality Control Board - 401 L.S. 1 $ 5) 00U $ 5o i UOcJ Permit. C. DFG - Stream Bed Alteration L.S. 1 $ 15 0GU $ 1,510 U U Agreement - 1601 Permit. , 6 Project improvements sign, per detail EA 2 $ 2 GU U $ 9 0 00 in Appendix. , , STREET IMPROVEMENTS 7. Clearing and grubbing. L.S. 1 $51),00 $ 56" L Uv 8. Unclassified fill. C.Y. 1,550 $ 10 $ 4 01500 9. Unclassified excavation. C.Y. 1,750 $ 21) - $ ~j, OOU 10. Remove existing tree. EA 7 $ 159U - $ 3)-7I0 11. Construct 4" PCC sidewalk. S.F. 8,970 $ 5 ."5-2- $ 9 q, ~ 5S 12 Construct driveway, Std. Plan No. S. F. 680 $ 21) ' $ 13 (E' 0(,> 110-1, T e-A or T e-C. , 13 Construct curb and gutter per APWA L. F. 820 $ ~ $ 24 (1' GNU Std. Plan No. 120-1, Type A2-8. 14. Asphalt concrete. TON 1,900 $ /00 $ J yV) 000 15. Crushed aggregate base. TON 1,590 $ '50 J $ 7q, 501) SPC03-66 Addendum 2 C-2(a) revised • • ITEM NO. DESCRIPTION UNIT ESTIMATED QUANTITY UNIT EXTENDED PRICES AMOUNT 16. Adjust water meter to grade. EA 2 $ 2,400 $ 4 C U 17. Adjust water valves, frame and cover to grade. EA 3 $2,LICO $ -7, 2 C'U 1 18 Adjust manhole frame and cover to grade. EA 2 $ a 2~gGt; $ ' CU a. Metal fence per detail on Sheet 3. L. F. 195 $:j I $ UC C 19. b. Pilaster EA 13 $ 2 CCu ' $ 2 CCt) c. Steel picket railing. L. F. 322 $ 00 - $ 17 u ~uu BRIDGE 20. Retaining wall No. 1, 2, & 3. L. F. 481 F $ $ 21 (f 21. Bridge rail pilaster. EA 14 $ 5,000-- $ -70 00C 22. Bridge removal (includes bridge and ier noses). L.S. 1 $ 325000 $ 325, 000 23. Structure excavation (bridge). C.Y. 1,541 F $ q 0 ' $ 13E, , X10 I (.c 24. Structure backfill (bridge). C.Y. 558 F $ 1150 - $ 0 31 -700 25. Furnish piling (Class 70C). L.F. 10,628 P $ ~5 $ 371) 11 26. Drive pile (Class 70C). EA 218S $1)700 $370.006) 27. Furnish piling (Class 45C). L. F. 612 P $ -30- $ /U) 3Q00 28. Drive pile (Class 45C). EA 18S $ 50Q $ 27, 0 pU 29. Prestressing cast-in-place concrete. L. S. 1 P/S $1/0 loco $ 1 I Ui (,cd 30. Structural concrete bridge footing includes bridge and pier noses). C.Y. 499 F $ 37U $ 1 b4, 3 L' 31. Structural concrete bridge (includes bridge and pier noses). C.Y. 3,175 F $ Op $ j 905, 32 Structural concrete, approach slab (Type N30). C.Y. 222 F $/,000 ` $ 2 2 21 0UU 33. coStructural ncrete). concrete (lightweight C.Y. 104 F $ 11 300 $ 19 20U 34. Apply anti-graffiti coating. S. F. 6,600 $ 2 $ 3 G1(f 35. Fractured rib texture. S.F. 3,080 $ - $ j 2 3 ZU " 36. Furnish precast PS, bulb-tee girder 90'-120' . EA 52 P $21 ,Coo - $I ~ 0 92 QOU 37. Erect precast PS bulb-tee girder. EA 52 S $ U1000-- s 31 2-1 00 38. Joint seal assembly (MR=4"). L. F. 210 $ f (Q L' - $ 3 3 , (f, 01 U 39. Bar reinforcing steel (bridge). LBS. 708,441 F/P/S $ 1 2U $ E'50, 12-q 40. Miscellaneous metal. LBS. 5,000 F/P/S $0.50 $ 3 rjQU 1 41. Steel bridge picket railing. L. F. 810S $ y ~5 " $ 352 35 42• Channel removal and reconstruction L. S. 1 $ 110e. 66, $ / 0 U / GUO ?v ' Revised as per Addendum 2 SPC03-66 Addendum 2 C-2(b) revised E E ITEM NO. DESCRIPTION UNIT ESTIMATED UNIT EXTENDED QUANTITY PRICES AMOUNT 43. Decorative columns. EA 4 1, cc(; $ (p C' CoU 1 44. Construct bathhouse per detail. See Appendix. EA 384 $ j / $ Z10 9 2 CHAN NEL 45. Clearing and grubbing. L. S. 1 $ $ /S,000 46. Diversion and control of water. L.S. 1 $ 10/000 $ 110, 000 47. Unclassified (Compacted fill). C.Y. 860 $ 5( $ !J 1 CCU 48. Unclassified (Excavation). C.Y. 7,297 `j - $ 49 Concrete channel lining (8" thick) and concrete channel invert. C.Y. 1,160 $ 4 2 5 $ Q q,? , oov Concrete parapet wall, Type 1: a. 2'-4' high L. F. 136 $ r0 $ b. 6' high L.F. 106 $ ((CU $ ~r 3 (X Q 50. C. 8' high L. F. 216 $ 510 - $ 10, 1 U c d. 10' high L.F. 117 $ Q 20 $ ~ 2 54C e. 12' high L. F. 27 $ 9zl C $ 215 3 51. Asphalt concrete - 2". TON 177 $ 2 u $ 4cp o 2v 52. Aggregate base coarse-6". TON 529 $ (pO - $ 3/ 7L/0 53. Chain link fence - 5'. L.F. 286 $ 3 7 r $ 1 5~ 2 54. Ornamental fence. L. F. 143 $400- $ 57,2-06 55. Ornamental gates - pedestrian. EA 2 2 o0o $ 24 OOU 56. Safety railing. L.F 590 $ 756 $ 1,17 50 57. Breakaway safety railing. L. F. 141 $ ' 7 $ 65 -217 58. Bicycle trail signing and striping. L. S. 1 $ / 21000 $ 12,000 59. Bicycle detour. L.S. 1 $ ,qc co" $ L40 O OD 60. Swift water rescue anchoring device. EA 5 C' C) $ COO 61. Utility relocation/ reconstruction: a. Drain extension 631+51 Garvey Avenue East Leve L. S. 1 $~0 DUU I $ 4~/ ~'CO b. Drain extension 629+47 Garvey Avenue East Leve L.S. 1 $~G CU% $ 140) ~'UU TRAFFIC AND STREET LIGHTING 62 Install 3" conduit with conductors L.F. 1,000 $ 75 $ -75 v(JU 63. Install s 3.5" conduit with conductors L.F. 300 $ 0 S25500 1 SPC03-66 Addendum 2 C-2(c) revised ITEM NO. DESCRIPTION UNIT ESTIMATED QUANTITY UNIT EXTENDED PRICES AMOUNT 64. Install 2 150 watt electroliers complete per Bridge Street Lighting Plan. EA 18 $ l C/CtU oo C C d(J G / 65. Install pullbox per Bridge Street Lighting Plan. EA 2 $ 300 J $ 66. Install Type III-BF service complete per Bridge Street Lighting Plan. EA 1 $ $ 30~ 67. Signing and striping per plan. L. S. 1 $ 3, ca U $ 3 coo 68. Traffic control per plan. L. S. 1 $12 U, 0&6 $ 12 01 COU 69. Temporary K railing. L. F. 4,800 $ 20 - $ q(o( 06U 70. Temporary traffic screens. L.F. 3,200 $ -7 ' $ 2,q Q()6 71. Temporary crash cushion modules. EACH 12 50U $ 15, 000 72. Inductive loops (Type E) EACH 2 $ 2~ ~0() $ yr 000 73. 2Y:-inch Type I conduit L. F. 1,000 $ $ / 3j Q 00 74. 4-inch Type I conduit L. F. 2,800 $ ~ j $ 3 (fIZ100 75. 5-inch Type I conduit. L.F. 2,800 $ 1 3 ' $ 3~ L{QG) TOTAL BID SCHEDULE IN FIGURES $ 1 f.~?(Ogr TOTAL ID SC DULE IN WARDS L r) 1.11 1 W Ft G M[0 f i C 1 G" U 15 Gt Y~ U iY -i Q 61 ~fe-u.j I c n r, v,tn '1 C(, n 4-,S * Revised as per Addendum 2 Note: F indicates Final Pay Quantities per Section 9-3.5 S indicates Specialty Item P indicates Partial Payment Item SPC03-66 Addendum 2 C-2(d) revised • CITY OF ROSEMEAD PROPOSAL GUARANTEE BID BOND FOR • BOND NO. 08030773 RECONSTRUCTION OF GARVEY AVENUE BRIDGE OVER RIO HONDO CHANNEL IN THE CITY OF ROSEMEAD FEDERAL PROJECT NO. BRLS-5358(008) KNOW ALL MEN BY THESE PRESENTS that REYES CONSTRUCTION, INC. as BIDDER, and FIDELITY AND DEPOSIT COMPANY OF MARYLAND a corporation organtzed and existing under the laws of the State of MARYLAND , and duly authorized to transact business under the laws of the State of Califomis, as SURETY, are held and firmly bound unto the Clty of Rosemead, ss AGENCY, In the penal surnof TFN PRRC:RNT nF TOTAT. RTI) PRTCR TN DOLLARS fINWORDS] dollars I n i f R; rl 1, which is 10 percent of the total amount bid by BIDDER to AGENCY for the above4tated project for the payment of which sum, BIDDER and SURETY agree to be bound, Jointly and severally, firmly by these presents. THE CONDITIONS OF THIS OBLIGATION ARE SUCH I* whereas BIDDER is about to submit a bid to AGENCY for the above. stated pm)ecL I said bid Is rejected, or N sell bid Is aocepted and a contract Is awarded and entered Into by BIDDER in the manner and time specified, !hen this obligation shall be null end void, otherwise it ahap remain in full force and effect In favor of AGENCY. IN WITNESS WHEREOF, three (3) identical counterparts of this Instrument, each of which shall for al purposes be deemed an original hereof, have been duly exemded by Bidder and Surety, on the dale set forth below, the name ofeach corporate party being hereto affixed and theas presents duly signed by Its undersigned representative(s) pursuant to authority of Its governing body. I Dated: OCTOBER 19th, 2006 J BIDDER Name: "YES CONSTRUCTION, INC. I Address:, "')*10NA, CA. 91766 SURETY: Note: BID DATE: This bond must be executed and dated, all signatures must be acknowledged before a Notary Public, and evidence of the authority of any person signing as ettorneyln•fact must be attached. OCTOBER 26, 2006 SPC03-66 C-8 Name: FIDELITY AND DEPOSIT COMPANY OF MARYLAND Address: 801 NO. BRAND BLVD, GLENDALE, CA. 91203 Type Name and Tltle: OWEN M. BROWN, ATTORNEY-IN-FACT 0 0 CAUFORMU► ALL4PUVWOSR a°'CKNO 'LE"Noff 3tdo d Lamm" County d OAIiGB On 10-19-06 betorr:me. r.~.rrwrros.rttis ~r.o..M+•rwun cum - Commission # 1494946 Votary PubUo - Cofifomia MY x= pmeonely loom b me 3rr OHM to be the pemor*o whose name(*) MW submtbed to the vA"M WNM ment and adawwbdpd 1D me the h&MWOMW emouNd em same in hbsAtIlMir mohort od ppodtyW, and due by hiss' sigrakroW an the kmbtX,m t w p8 or • or the upon boW at whidt the pwwnW seal. ar••- n.re DiPIYONAL on ti da .ni Ttnudr ow l0m, Ian bMor U not wgti~d by rR R witd0lr b s w/ltep bardlnw iwmoi and jw dl rl of Ili km b ANOW d=WMIL Deecrip*m of AttechM DOCUMOd EID BOND Tide or Ty" of Ooclxnenr Number d Pam ONE 1 Docr nwd D8iK 10-19-06 swor(s) Otlter Than Named Abom RE"S CONSTRUCTION INC. Capsd AMA) ChOned by Sim s Nwm Ovm x. Tbp d hab hew p IndMdUal Ctlt w-Thwor ❑ Parbnr - ❑ Lkrftd O Goneral 3RWd orrrW- vFmd O Trome O diumdian er Carwwvdor O Other: ~w is V pIDffi,ZTY ANP DEPOSIT COMPANY eve .r.9vr _.wn ejwMrrWAgAwmdW-.~awrAa.ran= 2=-Cho■.a C1pra 6w*wa ive FaLM0.sw * Amacarwn}oosaa 0 0 Power of Attorney FIDELITY AND DEPOSIT COMPANY OF MARYLAND KNOW ALL MEN BY THESE PRESENTS: That the FIDELITY AND DEPOSIT COMPANY OF MARYLAND, a corporation of the State of Maryland. by WILLIAM J. MILLS. Vice President. and ERIC D. BARNES. Assistant Secretan. in pursuance of authority Lrantcd by Article VI, Section 2. ol'the By-Laws of said Company. - ire set firth on the reverse side hercol and are hereby certified to he in full force and effect on the date hrre~~c dcfus,hL'rehy nontinatc, constitute and appoint Owen .\1. BROWN, of Anaheim, California, its true and ll'A lbl [U z1C T.,~tit)rtw},-itlTact, to make. execute, seal and deliver, for. and on its behalf as surely. and as its act ar k and all u04 piq d itat}ei takings, and the execution of such bonds or undertakings in pursuan~>Jr !"111:01X itti.sfl:tlliyt +t~iiie~W 4fpi'n said Company. as Dully and amply. to all intents and purposes, as it'giv ~o ~~n tLily xe Vw"Xliile~ 10%0 "cd by the regularly elected officers of the Company at its office i ~E3alt re; 1QI1:.~i► thctr uw r;urs"K_ This poucr of attorney revokes that issued on hehalf of Owcn M. BF,f MW, 4aw FrKru~uy 3,Tt~3f1Q~ The said Assistant Se, Section 2, of ft By-Lt+F IN WITNESS WA4 affixed the Corporate December, A.D. 2(X)4. ATTEST: qpot POs/i 0 4 ti. n. State of Maryland 1 s5: City of Baltimore j FIDELITY AND DEPOSIT COMPANY OF MARYLAND Eric D. Barnes Assistant Secretun' By: vVillian► J. Mills Vice President on this 27th day of December. A.D. 2004. before the subscriber, a Notary Public of the State of Maryland, duly commissioned and qualified, came WILLIAM J. MILLS, Vice President, and ERIC D. BARNES, Assistant Secretary of the FIDELITY AND DEPOSIT COMPANY OF MARYLAND, to me personally known to be the individuals and officers described in and who executed the preceding instrument, and they each acknowledged the execution of the same, and being by me duly sworn, severally and each for himself deposeth and saith, that they are the said of liccrs of the Company aforesaid, and that the seal affixed to the preceding instrument is the Corporate Seal of said Company, and that the said Corporate Seal and their signatures as such officers were duly al" ixcd and subscribed to the said instrument by the authority and direction of the said Corporation. IN TESTIMONY WHEREOF, I have hereunto set my hand and affixed my Official Seal the day and year first above written. Maria D. Aclamski Notun• Public My Commission Expires: July 8.'_(x)7 the extract set forth on the reverse side hereol' is a true copy of Article VI. and is now in fierce. 26)I-. the said Vice-President and Assistant Secretary have hereunto subscribed their names and Seal of the said FIDELITY AND DEPOSIT COMPANY OF MARYLAND, this 27th day of POA-F 012-4160 0 0 DESIGNATION OF SUBCONTRACTORS BIDDER proposes to subcontract certain portions of the work which are in excess of one- half of 1 percent of the total amount bid or $10,000, whichever is greater, as follows: NAME, ADDRESS, AND TELEPHONE NUMBER OF SUBCONTRACTORS Pn1hcr YW1 T-o. BOY 1110 ~~ctI~y, C~1 X237 Ali~l- 74-2213 to U O (IA bro T'l I e P.U - Lou oul ,fan 00 , ce 10-~5a-15M rtorw PruhiIr-Y-) , co 114 --7 ~2 - u450 Crao(Vt' l c✓ 751- U (i u;ov r~I , C r) 02 5 PORTION OF WORK 7-14) ^J CT ~izf Po K-h 6 Y-) D C L Prior to award of Contract, Contractor shall submit a list of suppliers and vendors in writing to the City Engineer. SPC03-66 C-3 c'~'t4{ 1 t , c f • The following are the names, addresses and telephone numbers for three public agencies for which BIDDER has performed similar work within the past 2 years: O1lYl G~~Y~ , 1. ~---N - NaW WW1 G vw (P'A1\VA0 SkTM Name and Addre of Owner 00 9DIA41 O2 66 , Nhm CA ail Name and telephone number Jv u(0 3 "1012.00- 2 Name and C 2-(y - 3r2'3 person familiar witl U CY Type of work lz~ 1-9 project Name and telephone number of person familiar with project 3. Type of work n Date completed wk 1(' JU CPr 4)'113'2- 521 - 953 'M(0 Date completed Soh !?1W61 of The following are the names, addresses, and telephone numbers for all brokers and sureties from whom BIDDER intends to procure insurance and bonds: TA.(~ tAY6k h&21 P~cm S . 0W6" BIDDER certifies that in all previous contracts or subcontracts, all reports which may have been due under the requirements of any AGENCY, State, or Federal equal employment opportunity orders have been satisfactorily filed, and that no such reports are currently outstanding. SPC03-66 C-4 Name and telephone number of person familiar with project AFFIRMATIVE ACTION CERTIFICATION BIDDER certifies that affirmative action has been taken to seek out and consider minority business enterprises for those portions of the work to be subcontracted, and that such affirmative actions have been fully documented, that said documentation is open to inspection, and that said affirmative action will remain in effect for the life of any contract awarded hereunder. Furthermore, BIDDER certifies that affirmative action will be taken to meet all equal employment opportunity requirements of the contract documents. NONCOLLUSION AFFIDAVIT BIDDER declares that the only persons or parties interested in this proposal as principals are those named herein; that no officer, agent, or employee of the AGENCY is personally interested, directly or indirectly, in this proposal; that this proposal is made without connection to any other individual, firm, or corporation making a bid for the same work, and that this proposal is in all respects fair and without collusion or fraud. SPC03-66 C-5 0 0 BIDDER'S INFORMATION BIDDER certifies that the following information is true and correct: Bidder's Name Business Address Telephone No. State Contractor's License No. and Class ~501 c~CO 1 \ P-~ , ~ C?-! . "f\z- ~ Original Date Issued 1b f ~ / ~ I I ~ q $ ~ Expiration Date a ~ l 01 The following are the names, titles, addresses, and telephone numbers of all individuals, firm members, partners, joint venturers, and/or corporate officers having a principal interest in this proposal: 030 The date of any voluntary or involuntary bankruptcy judgements against any principal having an interest in this proposal, or any firm, corporation, partnership or joint venturer of which any principal having an interest in this proposal was an owner, corporate officer, partner, or joint venturer are as follows: All current and prior DBA's alias, and/or fictitious business names for any principal having an interest in this proposal are as follows: SPC03-66 C-6 c e&I~ II gtxl ~~22~ ~~~~I 9 0 IN WITNESS WHEREOF, BIDDER executes and submits this proposal with the names, titles, hands, and seals of all aforenamed principals this 1~'h(I day of NOVM Zr , 200_. BIDDER: .~1 ~Y1~01, C~ ~ll-1 ~dr~ OW- I ~ 2'1- 1 The undersigned declares under penalty of perjury under the laws of the State of California that the representatives made hereto are true and correct. .t-GO-vla Contra or's Sig ture QJ C gal U MeA)e Printed Name Note: All signatures must be acknowledged before a Notary Public, and evidence of the authority of any person signing as attorney-in-fact must be attached. SPC03-66 C-7 0 0 CALIFORNIA ALL-PURPOSE ACKNOWLEDGMENT State of California ss. County of On before me,11arl W~)~N Varna ana''~o :+wee g ' Ca'e acco personally appeared ~1V1ez Y 1 C. personally known to me proved to me on the basis of satisfactory evidence ALLISON 2NKERHOFF Commissbn N 1470150 @MY Notary Californio Lat County Comm. Expires Feb 13,2004 to be the personitj whose nameX isltrre- subscribed to the within instrument and acknowledged to me that heA*&- t+ey executed the same in hisAwf MTeefl' authorized capacity4ias), and that by his+eoA*,eio- signatureW on the instrument the personW"or the entity up behalf of which the person(' acted, exec ed he instrument. seal. EJJ ❑ ❑ OPTIONAL Though the information below is not required by law, it may prove valuable to persons relying on the document and could prevent fraudulent removal and reattachment of this form to another document. Description of Attached Document Title or Type of Document: Document Date: Signer(s) Other Than Named Above: Capacity(ies) Claimed by Signer Signer's Name: Individual Corporate Officer - Title(s): Partner - ` Limited ^ General Attorney-in-Fact Trustee Guardian or Conservator Other: Signer Is Number of Pages: t 1898 National Na1aryAssouahw - 9350 Oa Solo Ave . PO . Boa 2402 • Chatsworth. CA 91313.2402 • www.rkabon&Vctary.org Prod. No 5907 Reorder: Catl Toll-Free 1.806.876-6827 1 1 ■ 1 ■ L ■ 1 CCT."0'2006 09:17 ADDENDUM NO. 1 ;bob6 P.Uul/uu/- RECONSTRUCTION OF GARVEY AVENUE BRIDGE OVER RIO HONDO CHANNEL IN THE CITY OF ROSEMEAD FEDERAL PROJECT NO. BRLS-5358(006) This attached Addendum No. 1 forms a part of the Contract Documents for the above- identified project and modifies the original Specifications and Contract Documents as noted below. Portions of the Contract Documents not specifically mentioned in this Addendum remain in force. All trades affected shall be fully advised of these changes, deletions, and additions. I acknowledge receipt of this Addendum No. 1 and accept the aforementioned. Kenneth Date Attachment 41-1-~- /o- of kavina RCE No, 42866 Bidd Cah ~ c-~1~~, Ins. SPC03-66 Addendum No_ 1 0 0 ADDENDUM NO. 2 RECONSTRUCTION OF GARVEY AVENUE BRIDGE OVER RIO HONDO CHANNEL IN THE CITY OF ROSEMEAD FEDERAL PROJECT NO. BRLS-5358(006) Addendum No. 2 forms a part of the Contract Documents for the above-identified project and modifies the original Specifications and Contract Document as noted below. Portions of the Contract Documents not specifically mentioned in this Addendum remain in force. All trades affected shall be fully advised of these changes, deletions, and additions. The City of Rosemead has established a "ftp" (file transfer protocol) Internet website hosted by Willdan that allows bidders to review/print Addendum No. 2 and related documentation. Bidders may access this information by logging onto the website at ftp://ftp.wilidan.com. Username: "garveyavenuebridge" Password: "garveyavenuebridgen. The following information may be found in the "GarveyAvenueBridge" folder. Each file must be copied into a folder on your local hard drive. 1. Complete Addendum No. 2 (11 pages) 2. Revised Bid Schedule 3. Revised Final Report of Geotechnical Investigation 4. Lead Paint Inspection Report 5. Federal Wage Decision 6. Decorative Column Detail If a bidder does not have Internet capability or is having difficulty accessing the website, these documents are available for review at the City of Rosemead Public Works Department. Please contact the City of Rosemead Public Works Department at (626) 569- 50 to make arrangements. Alfonso RCE No. 50706 I acknowledge receipt of this Addendum No. 2 and accept the aforementioned. Date Attachment Spc03-66 Date Bidder mac, es C~vK~rrru~l o,~ , ln~ 9A LAVA 0 an) • CITY OF ROSEMEAD PROPOSAL FOR TTY//ME.VT 4fei~,4 RECONSTRUCTION OF GARVEY AVENUE BRIDGE OVER RIO HONDO CHANNEL IN THE CITY OF ROSEMEAD FEDERAL PROJECT NO. BRLS-5358(006) TO THE CITY OF ROSEMEAD, as AGENCY In accordance with AGENCY's NOTICE INVITING SEALED BIDS, the undersigned BIDDER hereby proposes to furnish all materials, equipment, tools, labor, and incidentals required for the above-stated project as set forth in the Plans, Specifications, and Contract Documents therefore, and to perform all work in the manner and time prescribed therein BIDDER declares that this proposal is based upon careful examination of the work site, Plans, Specifications, INSTRUCTIONS TO BIDDERS, and all other contract documents. If this proposal is accepted for award, BIDDER agrees to enter into a contract with AGENCY at the unit and/or lump-sum prices set forth in the following BID SCHEDULE. BIDDER understands that failure to enter into a contract in the manner and time prescribed will result in forfeiture to AGENCY of the proposal guarantee accompanying this proposal. BIDDER understands that a bid is required for the entire work, that the estimated quantities set forth in the BID SCHEDULE are solely for the purpose of comparing bids, and that final compensation under the contract will be based upon the actual quantities of work satisfactorily completed. THE AGENCY RESERVES THE RIGHT TO INCREASE OR DECREASE THE AMOUNT OF ANY QUANTITY SHOWN AND TO DELETE ANY ITEM FROM THE CONTRACT. It is agreed that the unit and/or lump-sum prices bid include all appurtenant expenses, taxes, royalties, and fees. In the case of discrepancies in the amounts bid, unit prices shall govern over extended amounts, and words shall govern over figures. If awarded the Contract, the undersigned further agrees that in the event of the BIDDER's default in executing the required contract and filing the necessary bonds and insurance certificates within ten (10) working days after the date of the AGENCY's notice of award of contract to the BIDDER, the proceeds of the security accompanying this bid shall become the property of the AGENCY and this bid and the acceptance hereof may, at the AGENCY'S option, be considered null and void. SPC03-66 C-1 • BID SCHEDULE FOR RECONSTRUCTION OF GARVEY AVENUE BRIDGE OVER RIO HONDO CHANNEL IN THE CITY OF ROSEMEAD FEDERAL PROJECT NO. BRLS-5358(006) ITEM NO DESCRIPTION UNIT ESTIMATED UNIT EXTENDED . QUANTITY PRICES AMOUNT GENERAL 1. Mobilization. L.S. 1 07SQ Q- /,0757 2. Progress schedule. (Critical path metho L S 1 3 ' Prepare storm water pollution prevention plan SWPPP . L.S. 1 600 $ ; J ODO 4. Implementation of SWPPP. L.S. 1 _$&61006 GO, (300 Regulatory permit compliance and implementation: a. US Army Corps of Engineers - L.S. 1 $76 QD , $ 7 0,06 404 Permit. 5. b. California Regional Water Quality Control Board - 401 L.S. 1 $/O~ 0 /D, 000 Permit. C. DFG - Stream Bed Alteration Agreement - 1601 Permit. L.S. 1 G $ 400 6' Project improvements sign, per detail i A di EA 2 666 $ 2 660 _ $ A1 n ppen x. , - ' STREET IMPROVEMENTS 7. Clearing and grubbing. L.S. 1 $~3p $-lso &)o 8. Unclassified fill. C.Y. 1,550 $ ~O $ 3/~ pOQ 9. Unclassified excavation. C.Y. 1,750 7~ 6 10. Remove existing tree. EA 7 $ j p~0 $7~ 000 11. Construct 4" PCC sidewalk. S.F. 8,970 $ Al. _1-8) $,V0 3G -5 12 Construct driveway, Std. Plan No. 110-1, T -A or Type-C. S.F. 680 $ S- $ s ~yd 13. Construct curb and gutter per APWA Std. Plan No. 120-1, Type A2-8. L.F. 820 $ yS ' $ 66- ,?L~ 9 14. Asphalt concrete. TON 1,900 $ 15. Crushed aggregate base. TON 1,590 $~/d 00 SPC03-66 Addendum 2 C-2(a) revised • ITEM DESCRIPTION UNIT ESTIMATED UNIT EXTENDED NO. QUANTITY PRICES AMOUNT 16. Adjust water meter to grade. EA 2 S $ .3,6640- 17. Adjust water valves, frame and cover EA 3 $ $ 1 9 ~O to grade. , 18 Adjust manhole frame and cover to d EA 2 $ J COO e. gra a. Metal fence per detail on Sheet 3. L.F. 195 $ - $ S 19. b. Pilaster - EA 13 $ $_7 !2 c. Steel picket railing. L.F. 322 $ 3 $ S BRIDGE 20. Retaining wall No. 1, 2, & 3. L.F. 481 F $ A/,s1S 21. Bridge rail pilaster. EA 14 $ 22 Bridge removal (includes bridge and i L.S. 1 $ 60 ~ 30 .536 p er noses). ) , . 1 23. Structure excavation (bridge). C.Y. 1,541 F $ O r 24. Structure backfill (bridge). C.Y. 558 F $ 100 - $ 78' /Zp 25. Furnish piling (Class 70C). L.F. 10,628 P $ ,34q 26. Drive pile (Class 70C). EA 218S $ ~SQ $IfS 3 Q ' 27. Furnish piling (Class 45C). L.F. 612 P $ 3S-7;-- $ 28. Drive pile (Class 45C). EA 18S $gSQ - $7s,- .766 29. Prestressing cast-in-place concrete. L.S. 1 P/S $?ir'666 2.5',_660 30. Structural concrete bridge footing C.Y. 499 F $ ba ' Q6 $1991 includes bridge and pier noses). , 0 31 Structural concrete bridge (includes C.Y. 3,175 F $[O37- 12 0 2;ZAl bridge and pier noses). , 32' Structural concrete, approach slab C.Y. 222 F $ ~s(} 70 33. Structural concrete (lightweight C.Y. 104 F $ Q~ d $/`SGT concrete). 34. Apply anti-graffiti coating. S.F. 6,600 $ /Q $ Z,G 666 35. Fractured rib texture. S.F. 3,080 $3S~ $1D7 36. Furnish precast PS, bulb-tee girder ' ' EA 52 P $.u jo (90 -120 37. Erect precast PS bulb-tee girder. EA 52S $.y 704 $2zly 4160 38. Joint seal assembly (MR=4"). L.F. 210 $ 39. Bar reinforcing steel (bridge). LBS. 708,441 F/P/S $ 9~ 730~~• ~ 40. Miscellaneous metal. LBS. 5,000 F/P/S $ $3dJ $dd 41. Steel bridge picket railing. L.F. 810S $J1,6 r $ ~d 42 Channel removal and reconstruction ti L.S. 1 $(~d $ (a0~ (por on). " Revised as per Addendum 2 S SPC03-66 Addendum 2 C-2(b) revised • ITEM NO. DESCRIPTION UNIT ESTIMATED QUANTITY UNIT PRICES EXTENDED AMOUNT 43. Decorative columns. EA 4 $/D, DW $ J46, 606 44 Construct bathhouse per detail. See Appendix. EA 384 $ .3 d $ CHANNEL 45. Clearing and grubbing. L.S. 1 $/&t; 66 6r 1601 46. Diversion and control of water. L.S. 1 47. Unclassified (Compacted fill). C.Y. 860 $ = $17-, 960 48. Unclassified (Excavation). C.Y. 7,297 $ 2 S $/F.2 49 Concrete channel lining (8" thick) and concrete channel invert. C.Y. 1,160 $?'d $~l~/~ S i Concrete parapet wall, Type 1: a. 2'-4' hi h L.F. 136 $G~f ddd b. 6' high L.F. 106 $'~8~ $sd Sr~ 50. c. 8' high L.F. 216 $/D,3 G8 d. 10' high L.F. 117 $ t(6 $ ?p) e. 12' high L.F. 27 $j ' $aa a7.5 51. Asphalt concrete - 2". TON 177 $ f/r j $aQ~3, 52. Aggregate base coarse - 6". TON 529 53. Chain link fence - 5'. L.F. 286 $ $/Q 9 54. Ornamental fence. L.F. 143 $ /~40 $~Q~ d 2D 55. Omamental gates - pedestrian. EA 2 2~ $ f~~.b 56. Safety railing. L.F 590 $W/j/ 301 57. Breakaway safety railing. L.F. 141 /D6 58. Bicycle trail signing and striping. L.S. 1 $/g, 666 /2,pQQ 59. Bicycle detour. L.S. 1 $/F,0,00 -$/F OQQ 60. Swift water rescue anchoring device. EA 5 $ d~Q $ ~Q OQQ 61. Utility relocation/ reconstruction: a. Drain extension 631+51 Garvey Avenue East Leve L.S. 1 $,Z~Q7d $Zj~ b. Drain extension 629+47 Garvey Avenue East Leve L.S. 1 TRAFFIC AND STREET LIGHTING 62 Install 3" conduit with conductors (push). L.F. 1,000 $3: l $ 3.2~a0~ 63 Install 3.5" conduit with conductors (push). - L. F. 300 S37- S f f / i SPC03-66 Addendum 2 C-2(c) revised 171 ITEM NO. DESCRIPTION UNIT ESTIMATED QUANTITY UNIT PRICES EXTENDED AMOUNT 64. Install 2 150 watt electroliers complete per Bridge Street Lighting Plan. EA 18 bd ~~a~ QO 65. Install pullbox per Bridge Street Lighting Plan. - EA 2 / $ $ qbb' 66. Install Type III-BF service complete per Bridge Street Lighting Plan. 1 67. Signing and striping per plan. L.S. 1 $9 bO6 OQa 68. Traffic control per plan. L.S. 1 d G 69. Temporary K railing. L.F. 4,800 $ $ 70. Temporary traffic screens. L.F. 3,200 $ $ 71. Temporary crash cushion modules. EACH 12 $ 1 $ 72. Inductive loops (Type E) EACH 2 $,2Qr~ $ '7r d~a 73. 2'Yvinch Type I conduit L.F. 1,000 $o ..:2- $,;2 ,2 QQa 74. 4-inch Type I conduit L.F. 2,800 $7,6`1 75. 5-inch Type I conduit. L.F. 2,800 $ j TOTAL BID SCHEDULE IN FIGURES - f 9'f', TOTAL BI SCHE ULE IN W DS s * Revised as per Addendum 2 Note: F indicates Final Pay Quantities per Section 9-3.5 S indicates Specialty Item P indicates Partial Payment Item r SPC03-66 Addendum 2 C-2(d) revised Y DESIGNATION OF SUBCONTRACTORS BIDDER proposes to subcontract certain portions of the work which are in excess of one- half of 1 percent of the total amount bid or $10,000, whichever is greater, as follows: NAME, ADDRESS, AND TELEPHONE NUMBER OF SUBCONTRACTORS PORTION OF WORK Iri -f~ C'Vm/"Iql--' J--" v LD A r 1 l,~ fay '~~/cn2 .S'~~,J "Ile Prior to award of Contract, Contractor shall submit a list of suppliers and vendors in writing to the City Engineer. SPC03-66 C-3 0 0 DESIGNATION OF SUBCONTRACTORS BIDDER proposes to subcontract certain portions of the work which are in excess of one- half of 1 percent of the total amount bid or $10,000, whichever is greater, as follows: NAME, ADDRESS, AND TELEPHONE NUMBER OF SUBCONTRACTORS I)J r I'U.9F'A . PORTION OF WORK Prior to award of Contract, Contractor shall submit a list of suppliers and vendors in writing to the City Engineer. SPC03-66 C-3 0 0 DESIGNATION OF SUBCONTRACTORS BIDDER proposes to subcontract certain portions of the work which are in excess of one- half of 1 percent of the total amount bid or $10,000, whichever is greater, as follows: NAME, ADDRESS, AND TELEPHONE NUMBER OF SUBCONTRACTORS PORTION OF WORK Prior to award of Contract, Contractor shall submit a list of suppliers and vendors in writing to the City Engineer. SPC03-66 C-3 9 9 DESIGNATION OF SUBCONTRACTORS BIDDER proposes to subcontract certain portions of the work which are in excess of one- half of 1 percent of the total amount bid or $10,000, whichever is greater, as follows: NAME, ADDRESS, AND TELEPHONE NUMBER OF SUBCONTRACTORS PORTION OF WORK Prior to award of Contract, Contractor shall submit a list of suppliers and vendors in writing to the City Engineer. SPC03-66 C-3 • • r REFERENCES The following are the names, addresses and telephone numbers for three public agencies for which BIDDER has performed similar work within the past 2 years: Please see attached. Name and Address of Owner 2. 3. Name and telephone number of person familiar with project Contract amount Type of work Date completed Name and Address of Owner Name and telephone number of person familiar with project Contract amount Type of work Date completed Name and Address of Owner Name and telephone number of person familiar with project Contract amount Type of work Date completed The following are the names, addresses, and telephone numbers for all brokers and sureties from whom BIDDER intends to procure insurance and bonds: 800-688-5744 HRH of Colorado, 720 S_ Colorado Blvd-, stt-600-n. nenyar.,-CC 303-765-1531 Marsh USA, Inc., 600 Renaissance Center, Ste. 2100, Detroit, MI EQUAL EMPLOYMENT OPPORTUNITY COMPLIANCE BIDDER certifies that in all previous contracts or subcontracts, all reports which may have been due under the requirements of any AGENCY, State, or Federal equal employment opportunity orders have been satisfactorily filed, and that no such reports are currently outstanding. S PC03-66 C-4 A& r 1 yQ~' -j CL y 02 L~{ QNQQ4Q O Q Ot. -1 ~ ~O l 75 `.'O 6 -L M :3 ~mm C Q q p L U H d' ° : 2 p ri U F a c E a E a a a a E a € a IL cc N U z o1 03 (y N er/ pa ~i O m m M cn a; t7 n N N M N w W W LL J a O Vr F- V w O j ~ g $ p r LL m~ LL C ' 7 {aOp O' p 1 m ~ g~ m .w Z5 ~ N ~ W0 a m U C Y O C fC m ~ `m r a Fm C N ~ > tm~0 $ > Gj t~/ A m m~ m ° g gg ~ O 16 Z J 6C1 ~ m r ° C ggCll Ol C g I 1i Z d ig N a p LL LL > E ~C N J m° N ' m m m y 3 E~°g°°~ C . _ _ D ~D m¢a~ O Q E U O a t m `oE D 3 O C p 4 T C U p C_ mDpO p. A m m p g pg m C m J3 7E ~V ~y3 pp F ~O m 1¢0 L YDo ~D a N g r 111009 Q ` N C U m ' m 1 • b Q - N 3o°m m 3 m ,D m `a Y! 3 gc~ 01 .2 a nc 2 n B c p g m ~~m L, C. L. m ' H °E 6 , o~ _ g~ N Q N U W a d C C $ ~ a ~ - N D a. .S c9i U s g M m p > m o a`~czSE m 3 m m O vi 2 A E .6 w n l0 ~p 8 a L L o n m m ~~D 'o ~'~my E m g m 3 mj >0 a `S x mm r 9 g ° Ivpi c m 7 p .C s Z ° joy m °o~ v~ g ~_~i a b 3 9 m 8 m > m vi F E m > vim' _ N; ~0 ° r °vv iS C 9 °aao ~ g 3 n v~m > W = NN a N Y g N `o g'o~cJcgg U `mm c "0 ~o Urya m lj N ~m go ~ cn a ~Hg m C @ m "pE E m b bbb> V `>0 0Sc_ Em uj~ g m~ ~marn v c m m L c E ~l~~ m' Bi m m w> L rn`o m ov mrn~a~ oD m ~y5lmx ~L°- c3 w TS Q rn W m .C oc8mci } ~cUmLL ~m3 3 EL 'E w-m p cS coo c c c~~m o m c_ ~w m m g m `p S2 pa2e5 i 7S m g of o¢ ~m'pp !Q Q CL f7i 2N~p , ~ m~ a aL amEa ~ o p 29 o 3 ° Wp~ i ° ~U~tp N H 6- Jl i v U C x -e T c ~ c ~ G = W 0 OZ W Q p 0~ C w Son Qom- a0- a p ry Y LO Tnn ° aOO dt -1 cos p ~ h OIm ~ O NwfnN 'C U ~ c d 0 O M N a N O E~ O m Q ~ TmU C cU L p V 14 y m c In O a ~ 00 00 1A ~C w40f O C ~q m j u N P ~ 7U V $~U' 1 (D C O n a _p Q--NV O N f V ~i v U yy Co Q QC _ N m~ON m~A p,N ~O C~ v~ N m pXom U a t~f •m p $cl CL c$ Og V 0~6 gg n S=V v° m wmU ~Ig. >L@ ~ _ 7i O °U~N~o o V S U co~~ W U > ~vx~ C m E~mJ U ~Z ~z t i momv~m ~ ~x ° vp DC mmamm b~ n 3N E U0 a D a y m~0''mZ a U c o L - o Co ~ a°rn °N a ma g 'a w a~ z~iU'g U ID D vi > _~sm °0~ C co aw v c c ~oaavQjm 3 U °m O UQ'O= ' U 3 0 E mUm " ° >wn m N c d o0~ ° V O ~a E a c iJ c3 3 ~ i NC N U v a Y w ~Y W 0 K a mo U C? 3 o 04 0 m u c mo0 c~U C O }~$Co m~ cQ Q~ L) 121 3 ~ OV ~ r- 290§ y c m J O om~' . Z d g' Q 0 U Ua~ 0 0 z Q ~m c m ¢f o 0U fr {b< ~ iEO o a z(r d Y 4, :3 m ~i En7(1) m. 4M m dJi E ad z E W m" 0. Una ' ° _ ~U ) In rn wIn n £ a Ah Ah ~LU ~ 48 a° $8 ~4 'n a 1 4 =6, a0 o 00 $m ao S 0 ~z o 1 1 o "9 > >e ,a U U 0 LU a ~ E a E a E a E E E a E a E a E a N Q F V z p 00 41 -4 ~ m h w ^ w w ~ N w - x ~ cq o O w pm f 7 ~p w O M m W I - w U. J CL ~ Q VI V W = 0 V C C m C C bC U 7` O C 8 r 3 O p N Lm ry O C C N b N coo d f: Cp N O L ` {QN. ,2 + 2 ¢ E O C O O= c 9j e x Q d J O c a $zo c o E ° o-D c o e N a m m °v & m.E E rn m n m c C °c n an c U' O O m m f3 c Z Q W p E ~~v oooj O B N> nn OC c C S. ~ E ca cCgC°gm~ m N m N m 2 mm ` m m m ' mrn m c o ,7 E^o ~~Uc' E O 10 B ~m~>~ O 4 a 3 V > t O iC D O _ G cdo N C > p qq m m C y sm m m m pQ ;i -6 III a$r T m m I _L 'C i § 1 V ? U) tp O f`0 V 7 C F V S O cE c, , ~ t m C .L~ m 10 C 'K 'o m Qi° c Z . C U 2 O ~1 `o c m ~n0 S o ° Q n m -o m~ o c y Oi O IC - m mom _ w C m .10 c - 5'- ` c- p~ F O U an _b Q C C~ O m N m'E r Z Q ' OTC a X`m mu~ o F u i cwt omacn 3 m m ooTEm i m z 5 cam? 3u~- w£m g u1 N m ~o a n c_cE j T mm C N 8m nm - 0 U mmma s o D`°° o 10 ~ C E` n~c m~ m.° cNmDH aD cm D A o m o B D - o n~~ ° m 01 A m~ 3 m m om8i7i 8 U c u m _r m D m m 1 __a 03 ~~yy ~i m e m 'w co m § m m g o fe co D u 43 8 a g 70 m c b i m a C c 2 m 8 ~~a7 ~19 G y c T++ a) E N - 8 1 D~ W E m- F a c y 3 0 SrGar~ m t$ t4 8 c~ C n° 3 ~2.2 e c c8oam @ 0: of E s Z S' o m L > o3E y o? nnm m0. tL81 ~a~ ~H> grL roga Dm-- c fi ~ 8 s 3~~ ~c a g cc n o a W zZ 0 , pp o ~ D 8 pp > c o n 8 pp Of m ` y r- O w ~u ~ C c T pp~~ O co °oQ a ~ N$ Y N c~ =1yF 12 0 oNo c y~~ In ` N~'^' p~ C a . a 0= w 7 ~ a o c tV p O !n mN o m O O g U .N Um Od ° ``g c m o ou': Uo O D^ e 1 c ' V N if1 mom r~ °cco V O C g N m 01 m5^~ ~ CY wQ~O w -D•+ U N m m ~ N ° ~0 ~A U o co ) O m T 1p~ V 3 6T c~ ~oc4i D y m j cc8 E U m o E 8N ID Nboar L°c U c ° x m O C c Oo^w U m o B m m U D o -mrn~ c 7 O N C m SOUS D x'08 aU8 EpU L' in L m Uor ' m r m j5 m Ym~f3~a ~p'c EQD `rn C ~p m m V Y c3 N m mom. ~o c 'U o ~ E O L E iJOr> m o z a° N Y~ oo~D~ x O E O- m C y m~ m o 0 NU,2 DC>j~ oo m> - N r o Q m U maa12 Z EbYp o O C o zaMm~ p m D-o E _ m O O c c m ucawU LL _c~ Z'Z (DYpZ$ 8 .'Y VVV /3 CCJJ y 3 ~ of ro m~ mO o o U m m 0a3ov W O d 0 a 0 m c v n o 3 0 3 E O _ U c 3,Q a 0 x ov L° u a m g a m 8 O O U 8 c o o 2 0 U a (mg 0 c c c D U 6 c N a m 0 0 w ~ Dm 3T ~cJ 3g ins mm =Sam E 00o (n W Ir cr m a Dm D ao c m ko 8 -o m cnsm` u-) wo oo ~ a~ 9mu=i`- mod N m a A& Ah Z IQ- 002 gQ rn¢' 4 ~i~ ~4 g ~4 M ¢ gg Q LL 4 gg QH O F :E O Fe U CL ca a a a a a`. a N H ~ 2 0 V 00 n ~D N W N ~O` QOp~~~ Of cl) Obi ~Vp 0 W p Of y Op O OO~~ Vf Op~~ Qi pq V N N i O W H W LL N W N J CL O r U D L~~~ m {7p COU ° " O p° N rm~C 91 it m ~O p pp C TAO ~ J ~C W O p F LL m C D EDQ~ T~L~ m` s E c o~mc_5 U$_~pp3$ Y U ~ wSE E~Q~ m O. V 3o 3 Z3 C 'rl nU E m 'O .5 LL S m m m A Z o U ° :E pm O t p g O £pN N N m -C° 15 O x U (N m D a m pq 7 0.~m O C O ~c C LC $ m CC~ m y j L O T m } C a C ~s V,sa~ w m ; U ] tll U C CC O C Q b L m T m m O¢C is 2 p ° O m ~ y QQ C Z D S -gyp m Cm O~ } m b S CN L_ ~C m ~p a 7 OO V U .y m E ~p nm Q Z Q d P_ T U m 0 2 _ y[ 8 O S m m C q q 01 0 C L Cq 6 c~ VJ N 3 C m m a O it ' O '0 E /0 U 2 5 O N 3 ~ ~mm b y U D A O 97 f8 to 8 O N z m 0 U O R Gm °1g a pg SN~ E a-'3 mYC pDNa s, L _L J t0 ~ ' O Ni°m 3 m CF ~m U ~S 3ag 2S~maQg g SQ C t~- m~° D A 3 c c~ 0 2 ~~mm O N 3~ mp' pG~ ; ~ yo. ~ N yo. O J m C p rn G F L F: an d L r c vo o I~ t L F C m N m F= d° 0 ~ 3 a c m Kx C 0 W W Z 02 W 7•t i U N 0 p rn Opf N m n > (n p Y'] N ' 4 m 8 m 7 -a u5 o) 0 Va Oi 65 J ^ fnN d N $ Q m C CD N E 9 5 uhi V G7f M N D N U A N ~p 9 `p D 00 R <n N p ~ o Q U m Dj w d if m T $ l_7 ` !Q R 8 t Ot5 Tl7 3 h Ua yUrn m h ~ ry h D p m c ~ ¢r p O S~ U O a Q~ m N C C p~N¢ U U ~ O M C C O VOs vUmC Y cif O .O O Q N a l`~ 4 TCt"~ O~Um°iLOa 7 O mO~ ~ h N0 NO C. C mfnm9OC~i; ~00$ywom V UC7 m N c~a0 Q, h ~n 'p m N C E Q m D bUO m $ p E Ux _ Oi m> N pi ¢ p ^ CLCO N .mN02`~ U ~yL M .m N N'3 ~ ..C > Ol O p~ ¢ CG a C Q C h Q V N m p . U V) Q1 g V O N O OV C_ E mn d DU mDD ~ Y] i m j m g m C Jl ~U ° m 5 YiE O xo C . m Y OYpV m~ Ol m T m m Y 5~ C O =3'z_>Ximm m m y m ~m m 9Om mm C> > ~c C D m g C m m L GCN C 3 O D U m O m g C Y Z 2 EWm O~ ~?j ~Y Y > C g$ c m fn Y y CC (A O aa C a p ? _O ~m+ L. D 9 D¢ N U.+ L w O N m~ W m C a N L C ~-a' D U 01H ~ ~ tDJ~ U NO J J Q m2 loU O ENO M Uh 2~ Mal in° LL W Q _ CL mm ¢ LNU 0 0 c 0 WU O V 3 v ° d an > ~¢O C m p O p L O S gUO S ?2 3i c ~ c 0 O > o g U O. $ O U O~ E ` = m03 m v I> ~N C E m t U Y m 2 mm C W U ~0 m JQ c V ¢ q C a. Fe x00P v 3a m~~ ¢ ¢a ~ n a Ah r 4 0 U 20 a g 1 ; V) C14 C, ~ 0 8 is ~ w Z U E a E O m CD a E a E E a~ N C N m Q F U 2 m 00 Z 4Q~ qq N m C.4 '~S 00 ^ ^ m i w LLJ W LL J a O U O OI co G L C S u 3 C 3 W r 9 g> S W L mF ° Of g a m F n C, O lL O U ee N U J m a d N GGDD N > k m O N m x ~LL:,~ 0 G m m c g3 W o CL Z It y W O (13 2 c 82L a mm V 3 z 50~ ~ : x ~mm CC qy1 o -d IF ° N= CC o ~L 00 c o N a @ m M K gDin m o ~j o U ~D O '✓~g✓~'g m c7 c>, 00 3-; aLoJ JLL CD Q 4) 'm ~ C7 . =o oa y Z O I""~ o U C m $ tea' a m ~ O m ~p L' n p mo a ymyy0 ° R~ = p a 18 C a N 00 C 3 y= C O N 9- N m LL L r to H U W C10 m m a y e ~NYJ O Cttmlll Yi p8p C .5 n fpm 2a 9 o U gmp> I C g C m a- m mfr ~ j 0 •p mQ E ~00p11p~m s m °C ~ LL E. 0 y N J S y m m m ^z b9 C83~a m C O g Q1°1 0 10 a Ql LL -j p t o' N^ = U D °m gj f'1 0 _ CD CL 3 ~ z Q d a om ° >i~~ m m pm 0),E t=07 t~7 2 f0 tll ~3 c ~~°~Q ° ~ ~O^ a a m m m9-'_o EIrm1>1 iL i v- 3 m ° m Ol o m_ y rn 0 g ° 2 mo C 9 m 0 a a m= g 8 a x e0 m O C m m y C Q -~gb g m m 3 S v p E b g m e a s 'a t _ m 3 N o U a U m ° m °0 3 a x~U ° y~ rn N m a C I+j LL C D. U LL J c c ° rn y^ J 8K.e ci 'n zrn 6 ° N 'PC S _ o Un m r Ua o > O ab m ~ ~a o 3 02 _ g aE~tzd > m CJ 0 5 ~ ~Q° ~c nm L* co 11 eq 3 m v aw R c m m 3 Z Z 0 0 W N co m w Z E p~ O ys~ V p ~A c on O S ~ ~ ~J m o Y~ c'f 0 lClj D 0O O c t.J, 9 N O 8 1 1+ y ~a N co 'q' oOU d° N G ^ j m r~ c oO p Ta e ry gc~ - 0 rnU 1 l7 W U~ ~L m a al m mmrn c U oom$T' D N O y ¢j > m m c o;Q 3 a ~u ~Epg' O m OI 4] CQ ( 7 c t0 ao cmp om i cq y u~ ~p~ E m O O C C IS I t: ° ON m`o x~ m O z m r N ~ pS O m N g°» N ; my_ o 3 ° 4g=sN J O M 9 S U a' 13- U° m cn C4~ emu' V 1~ x ^ J C-`~ C O y O F F' N O N c a 0a cn U- 2 y D J N L~ m y U) g E ~ EEa m E ~UC7gF0 „ >c`OV 9o a.(3Am N RR Q a" ~033~ n ~vLL g tu Z N =m L) B ^ Eg a'riam^ OO N$ ~ O°c ~ i~c°~ ~ m c ogcio W V p a m> Q 'L O m > ¢ g U 0 g U c ¢ y m y y k 3 LL U N S U mddmm ; C7 CM ~u'SUO o U U coU m rn O m N N L m r° O > a 0 t 3 m Oo ~ rn> fa' v i Fm 'o ~J o'o E m_t~ t ae~ M - cmm y m a c9aJ rng m to (D o m b aaU .22 m warn V m a 0 0 AFFIRMATIVE ACTION CERTIFICATION BIDDER certifies that affirmative action has been taken to seek out and consider minority business enterprises for those portions of the work to be subcontracted, and that such affirmative actions have been fully documented, that said documentation is open to inspection, and that said affirmative action will remain in effect for the life of any contract awarded hereunder. Furthermore, BIDDER certifies that affirmative action will be taken to meet all equal employment opportunity requirements of the contract documents. NONCOLLUSION AFFIDAVIT BIDDER declares that the only persons or parties interested in this proposal as principals are those named herein; that no officer, agent, or employee of the AGENCY is personally interested, directly or indirectly, in this proposal; that this proposal is made without connection to any other individual, firm, or corporation making a bid for the same work, and that this proposal is in all respects fair and without collusion or fraud. I SPC03-66 C-5 BIDDER'S INFORMATION BIDDER certifies that the following information is true and correct: Bidder's Name SEMA Construction Business Address 6 Orchard, Ste. 150 Lake Forest, CA 92630 Telephone No. 949-470-0500 State Contractor's License No. and Class 657770 A; xAz l.s Original Date Issued October 30, 1992 Expiration Date October 31 , 2008 The following are the names, titles, addresses, and telephone numbers of all individuals, firm members, partners, joint venturers, and/or corporate officers having a principal interest in this proposal: SEMA Construction, Inc Bradley J. Spies, President Centennial, CO 303-627-2600 Steven R. Graves, Secretary-President Centennial, CO 303-627-2600 Steven C. Mills, General Manager Lake Forest, CA 949-470-0500 The date of any voluntary or involuntary bankruptcy judgements against any principal having an interest in this proposal, or any firm, corporation, partnership or joint venturer of which any principal having an interest in this proposal was an owner, corporate officer, partner, or joint venturer are as follows: N/A All current and prior DBA's alias, and/or fictitious business names for any principal having an interest in this proposal are as follows: N/A SPC03-66 C-6 0 0 IN WITNESS WHEREOF, BIDDER executes and submits this proposal with the names, titles, hands, and seals of all aforenamed principals this 13th day of November , 20 06 BIDDER: SEMA Construction. Inc. 6 orchard, Ste. 150 Lake Forest, CA 92630 The undersigned declares under penalty of perjury under ws of the State California that the representatives made hereto are true an rrect. Contractor Signature Steven C. Mills, General Manager Y Printed Name Note: All signatures must be acknowledged before a Notary Public, and evidence of the authority of any person signing as attorney-in-fact must be attached. SPC03-66 C-7 • • CALIFORNIA ALL-PURPOSE ACKNOWLF-DGMENT State of California County of Orange On Ly&eAx, _)-'(~'befora me, Teresa Corso WML rumTnu04Q"V"-to.-fir!OOC Nar.LAYNmc, personally appeared Steven C. Mills ❑ personally known to me - OR - ❑ proved. to me on -the basis of satisfactory evidence to be. the person(s) whose name(s) Is/are subscribed to the within Instrument and ac- knowledged to me that he/shetthey executed the same in his/her/their authorized TERESACORSO capacity(ies), and that by his/her/their jog 08179 N signature(s) on the instrument the person(s), NOComm.#15 NMA or,vcow4 - or the entity upon behalf of which the Yrcdua Expn,AUgtttT,tooe person(s) acted, executed the Instrument, WTi,NESS my hand and offidal seal. 4 apnartl~Q OP Y C) PITl0 NAL T63qh tno dat¢ Wcwis not i,egriired by 1a;v;:it may prove;valuable to ptrsonc rNy1nq on the documQnt and mid pwant kaudu1ent.Itiattadvnent.a1 this form. CAPACITY CLAIMED. BY SIGNER ❑ mrviou& ❑ CORPORATE OFFICER rfrL&SI DESCRIPTION OF ATTACHED DOCt1MeNT. aid Documents TITLE OR TYPE OF DOCUMENT ❑ PAATNEA(S) ❑ uMrrED ❑ GENERAL C ATTORNEY-10-FACT ❑ TRUSTEE(S) ❑ GUAaD1AWCONSERVATOR (DOTHER: General Manager WGNER IS AEPRESeMNG: nN+c or Vmuomm oa cmMM631 SEMA Construction, Inc-_ NUMBER OF PAGES OAT'E OF DOCUMENT SiGNEA(S) OTHER THAN NAMED ABOVE Im Gr 1,16 CITY OF ROSEIAEAD PROPOSAL GUARANTEE . BID BOWD FOR RECONSTRUCT)ON OF GARVEY AVENUE BRIDGE OVER RIO HONDO CHANNEL W THE CRY OF ROSEMEAD FEDERAL PROJECT NO. BRLS_5358(006) *M ALL MEN BY TI Lake Forest, CA a corporafion organtted and eAft wrier he lags of the SI wider to taws of ft Stab of Caliornkk as SURETY. are held agree b be bored. jok* and sevwraly, timely by these p menbL THE CONDITIONS OF THIS OBLIGATION ARE SUCH MK rwtweas BIDDER is about to submit a bid b AGENCY for the *01W stated project. I said bid is rejected, or 13M bid is a mepled and a contrail is awarded and wbied irb by BIDDER in the manner and time specWsd, then thuis ob6gaiion shaft bend and void, otherwise I shat rennin in ful force soil gilled In bw of AGENCY. . IN WTr ESS WHEREOF, bw (3) Iderricel i.1 's of this kmbwr t each of iw"shat br d popes be deemed an original hereo( harebem duly owculed by Bidder and Surety, onto dais set tM beior, the now of eech aar01 Aim party being hereb aced and these pre Frio duly signed by is wrdersgned representa"s) pursuant b auMo* of Ib gownffig body Dew November 14. 2006 BIDDER Nave: SEMA Construction, Inc. SURETY: N M Liberty Mutual Insurance Company Address 175 Berkeley Street, Boston, CA 02117 Note: This bond must be executed and dated, al signatruns must be admuwMdged bebre a Notary Pablo, Bari evidenced the authority d any person sh*g ss attomey-in-fad must be att "at. GS Type Name ardTdk Steven C. Mills, General Manager Type Name K4 TIk Florietta Acosta, Attorney-in-Fact • • AL.i._V%Jnrvac NV C%Fl%j 7a..C{/VmGa% State of California County of Orange On I"?, ?CCV befora me, Teresa Corso a1Z euF4- TnU Oil Q"VM - CC. -ALme 00!- IQTW ►tJtt personally appeared Steven C. Mills f" borsmmawm ❑ personally known to me_ - OR • ❑ proved. to me on -the basis of satisfactory evidence to be. the person(s) whose name(s) [stare subscribed to the within Instrument and ac- knowledged to me that he/she/they executed the same in his/her/their authorized capacity(ios), and that by his/her/their signature(s) on the instrument the person(s), TERESAC0RS0 or the entity upon behalf of which the ~Comm. 1508179 N person(s) acted, executed the instrument) oW coaoq 91tt Cantu Eqm A*9 11.200A S my hand a d offlclej seal. 3K3HA ne oR MM AT ,OP-TlO NAL Tirou9h the data Wcwfia•nct required:by (aiir:tit may p'nrrt .valuable to pgrW4 r*"g on the document and p u(d prevent fraudulent reattachment.d this form. CAPACITY CLAIMED. BY SIGNER J INONVUAt. ❑ CORPORATE OFFICER rMa.31 DESCRIFT 0H OF ATTACHED DOCUM51-T Bidder's Bond TITLE OR rYPE OF DOCUMENT ❑ PARTNEFI(S) ❑ UMR'ED ❑ GENERAL C ATCORNEYAN-FACT ❑ TAUSTEE(S) ❑ GUARDIANICONSERVATOR ® OTHER: nee ral Manager SIGNER IS REPRESENTING: tw+e ce 0lf1 0192 OR LhTrr > G:p SEMA Construction. Inc. NUMBER OF PAGES DATE OF DOCUMENT SIGNER(S) OTHER THAN NAMED AeOVE ICW GF A 16 0 0 ADDENDUM NO. 1 RECONSTRUCTION OF GARVEY AVENUE BRIDGE OVER RIO HONDO CHANNEL IN THE CITY OF ROSEMEAD FEDERAL PROJECT NO. BRLS-5358(006) This attached Addendum No. 1 forms a part of the Contract Documents for the above- identified project and modifies the original Specifications and Contract Documents as noted below. Portions of the Contract Documents not specifically mentioned in this Addendum remain in force. All trades affected shall be fully advised of these changes, deletions, and additions. Kenneth J. Rukavina RCE No, 42866 Date I acknowledge receipt of this Addendum No. 1 and accept the aforementioned. November 14, 2006 Date Attachment Bid r SEMA Construction, Inc. Steven C. Mills, General Manager SPC03-66 Addendum No. 1 0 0 ADDENDUM NO. 2 RECONSTRUCTION OF GARVEY AVENUE BRIDGE OVER RIO HONDO CHANNEL IN THE CITY OF ROSEMEAD FEDERAL PROJECT NO. BRLS-5358(006) Addendum No. 2 forms a part of the Contract Documents for the above-identified project and modifies the original Specifications and Contract Document as noted below. Portions of the Contract Documents not specifically mentioned in this Addendum remain in force. All trades affected shall be fully advised of these changes, deletions, and additions. The City of Rosemead has established a "ftp° (file transfer protocol) Internet website hosted by Willdan that allows bidders to review/print Addendum No. 2 and related documentation. Bidders may access this information by logging onto the website at ftp://ftp.wilidan.com. Username: "garveyave n u eb ridge" Password: "garveyavenuebridge°. The following information may be found in the "GarveyAvenueBridge" folder. Each file must be copied into a folder on your local hard drive. 1. Complete Addendum No. 2 (11 pages) 2. Revised Bid Schedule 3. Revised Final Report of Geotechnical Investigation 4. Lead Paint Inspection Report 5. Federal Wage Decision 6. Decorative Column Detail If a bidder does not have Internet capability or is having difficulty accessing the website, these documents are available for review at the City of Rosemead Public Works Department. Please contact the City of Rosemead Public Works Department at (626) 56f 0 to make arrangements. 1441.1e._ 2 -1-16 e old . Alfonso RCE No. 50706 Date I acknowledge receipt of this Addendum No. 2 and accept the aforementioned. November 14, 2006 ~9~ ~.Cn aA Date Bid er Steven C. Mills, General Manager Attachment Spc03-66 0 0 CITY OF ROSEMEAD BIDDER INFORMATION SHEET Project/Contract No.: BRLS-5358 ( 006 949-470-0500 Project Title: Reconstruction of Garvey Ave Bridge over Rio Hondo Channel DBE Goal for Contract (if any): 2% The following information is requested for all contractors who provide a bid, proposal, or quote, or who are contacted by the proposed prime contractor. This information should be submitted with your bid, proposal, or quote. If you are the apparent low bidder (or the second or third low bidder), the information should be submitted within four business days of the bid opening date. Information provided will be held in confidence. Firm Name: SEMA Construction, Inc Address: 6 orchard, Ste. 150, Lake Forest, CA 92630 Contractor's License Number and Class: Telephone: Bid Opening Date: November 14, 2006 657770 A; HAZ Facsimile: 949-829-01 00 Years in Business: 15 Is the firm currently certified as a DBE? If yes, DBE Certification No.: NAICS or WCC code(s), if known: ❑ Yes R] No Services/products in bid (contract items and/or description): Earthwork /excavation, pipe installation hr;dQp rnnctruCti-oa_ Dollar Amount of items bid on (this contract): Gross Annual Receipts (last year):* ❑ Less than $1 million ❑ $1 million - $5 million ❑ $5 million - $10 million ❑ $10 million-$15 million ® Over $15 million (Please duplicate this form and provide information on all bidders.) THE CITY OF ROSEMEAD THANKS YOU FOR YOUR ASSISTANCE. *This information is requested pursuant to Federal law. F-33 11 CITY OF ROSEMEAD PROPOSAL FOR /4 rrA c11,WE,v7- A <s of,re-jle- j ICAAvr ,Vc. RECONSTRUCTION OF GARVEY AVENUE BRIDGE OVER RIO HONDO CHANNEL IN THE CITY OF ROSEMEAD FEDERAL PROJECT NO. BRLS-5358(006) TO THE CITY OF ROSEMEAD, as AGENCY In accordance with AGENCY's NOTICE INVITING SEALED BIDS, the undersigned BIDDER hereby proposes to furnish all materials, equipment, tools, labor, and incidentals required for the above-stated project as set forth in the Plans, Specifications, and Contract Documents therefore, and to perform all work in the manner and time prescribed therein. BIDDER declares that this proposal is based upon careful examination of the work site, Plans, Specifications, INSTRUCTIONS TO BIDDERS, and all other contract documents. If this proposal is accepted for award, BIDDER agrees to enter into a contract with AGENCY at the unit and/or lump-sum prices set forth in the following BID SCHEDULE. BIDDER understands that failure to enter into a contract in the manner and time prescribed will result in forfeiture to AGENCY of the proposal guarantee accompanying this proposal. BIDDER understands that a bid is required forthe_entire work, that the estimated quantities set forth in the BID SCHEDULE are solely for the purpose of comparing bids, and that final compensation under the contract will be based upon the actual quantities of work satisfactorily completed. THE AGENCY RESERVES THE RIGHT TO INCREASE OR DECREASE THE AMOUNT OF ANY QUANTITY SHOWN AND TO DELETE ANY ITEM FROM THE CONTRACT. It is agreed that the unit and/or lump-sum prices bid include all appurtenant expenses, taxes, royalties, and fees. In the case of discrepancies in the amounts bid, unit prices shall govern over extended amounts, and words shall govern over figures. If awarded the Contract, the undersigned further agrees that in the event of the BIDDER's default in executing the required contract and filing the necessary bonds and insurance certificates within ten (10) working days after the date of the AGENCY's notice of award of contract to the BIDDER, the proceeds of the security accompanying this bid shall become the property of the AGENCY and this bid and the acceptance hereof may, at the AGENCY'S option, be considered null and void. SPC03-66 C-1 • • BID SCHEDULE FOR COVEY AVENUE BRIDGE .RUCTION OF GAR CHANNEL RECONS OVER RIO RONDO IN THE CIV OF ROSEMEp,D PROJECT NO. BRLS-5358(006) FEDERAL _ UNIT QUANT" T TEM DiSCR1PT10N 9 _ No. 1 $ N GENERA- L.S. $SAOG _ Mobilization. schedule . (critical path L.S. $ $ ¢,000 1 1 progress 2. method water pollution $ Prep L.S. $ 73 0o0 r I are storm lan SWPPp - 1 L.S. 3. revention pp C)i $ $ ,t8 000 1 4lmPlementatioe gWP pliance and L.S. Regulatory p imp1ement3tion--Corps of Engineers - $S 900 a US Army it_ 1 $ 404 perm- Water Regional - 401 L.S. b Cai"om► Control Board $ 0 5. (Quality 1 $ Permit. Alteration L.S. V! $,x~~.t'!' ~ DFG - Stream Bed it 2 $ C. A reement -1601 Pr? per detail EA imProVements Sig N Proj 6. in A endix. 1 $ $ PROVEMENTS L.S. - STREET IM $ 9~3 rubbing. 1,550 $ D~ Clearing and 9 C.Y. 1,750 Cc $.211 Unclassified fell. C.Y, Pt $ 's D/ 9 9 Unclassified excavation' FA $ 49~3s• tree. &F. 8,970 $ s 10. Remove existing 9l, $ fol D CC sidewalk. 680 $ M 11. Construct 4" P Std- Plan No- ST 'f,• $ Z7' 100 Construct driveway, a-C. 820 $ 3 . 12. 110-1, T e-AorT utter per APWA L.F $ and 9 r per 1,900 $ J9o ~ Construct curb 120-1, T e A2-8- TON 13. Std. Plan No $ $ 52 4wv^ Asphalt concrete. 1,590 .33 14. Asp TON 15. Crushed aggregate base. C_2(3) revised 'C03-66 Addendum 2 ITEM DESCRIPTION UNIT ESTIMATED UNIT EXTENDED NO. QUANTITY PRICES AMOUNT 16. Adjust water meter to grade. EA 2 $ -Teo / 000 17 Adjust water valves, frame and cover EA 3 $.f00 $ S-00 to rade. 1 18 Adjust manhole frame and cover to EA 2 $/1S?O°-° $ JpCO ~ grade. a. Metal fence per detail on Sheet 3. L.F. 195 $ 5-0 $ 9 19. b. Pilaster EA 13 $1 700 - $ tl /&D - c Steel picket railing. L.F. 322 $ : 7S- $ 1!?11 s, BRIDGE 20. Retaining wall No. 1, 2, & 3. L.F. 481 F $ 32,4_ $ 2y 21. Bridge rail pilaster. EA 14 $ ~ 22' oval (includes bridge and rem B d L.S. 1 $ 04 $ ~BrDGID ie rn ores . / 23. Structure excavation (bridge). C.Y. 1,541 F $ A'S°-= $ j8I.W 24. Structure backfill (bridge). C.Y. 558 F $ /s9 $88 ,74Z 25. Furnish piling (Class 70C). L.F. 10,628 P $ $ z4n,& 26. Drive pile (Class 70C). EA 218S $ L 5'6 $ y yG Sc~cS' 27. Furnish piling (Class 45C). L.F. 612 P $ Z2- $ /3 6 y _ 28. Drive pile (Class 45C)_ EA 18S $ 146,1- $ 2% R9,07 29. Prestressing cast-in-place concrete. L.S. 1 P/S $ $ /G v _ 30. Structural concrete bridge footing C.Y. 499 F $ X3000 $P-4 J 70 includes bridge and pier noses). 31. Structural concrete bridge (includes C.Y. 3,175 F $ $4 34L,.US bridge and pier noses). , 32 Structural concrete, approach slab C.Y. 222 F $ 91Q~°= 004L~ $2/B (Type N30). / 33. Structural concrete (lightweight C.Y. 104 F $ /,tLd $ /3/ 3X2 - l concrete . 34. Apply anti-graffiti coating. S. F. 6,600 $ j p p $ •LAD - 35. Fractured rib texture. S. F. 3,080 $ 84- $.IL/JLB8 36 Furnish precast PS, bulb-tee girder EA 52 P $ - $ 1 ' ' . (90'-120'). 6D GQ~ 3 37. Erect precast PS bulb-tee girder. EA 52S $16 $ 38. Joint seal assembly (MR=4"). L.F. 210 $ 216 $ 'illS,.No - 39. Bar reinforcing steel (bridge). LBS. 708'441 F/P/S $ [z $ y 1 /0 67y 40. Miscellaneous metal. LBS. 5,000 F/P/S $ $ /SCIGi0°~ 41. Steel bridge picket railing. L.F. 810 S $ Z-)S - 7 D - $221 42 Channel removal and reconstruction L.S. 1 $ $/B /'~•L (portion). / * Revised as per Addendum 2 SPC03-66 Addendum 2 C-2(b) revised 0 0 ITEM NO. DESCRIPTION UNIT ESTIMATED QUANTITY UNIT PRICES EXTENDED AMOUNT 43. Decorative columns. EA 4 $ 9,/68 $3 1,72 I 44 Construct bathhouse per detail. See Appendix. EA 384 $'2`/ 4'1~ $ /w4A*, CHANNEL 45. T learing and grubbing. C L.S. 1 $ $1 bg I 46. Diversion and control of water. L.S. 1 $ $/.'J't 47. Unclassified (Compacted fill). C.Y. 860 $ s~ $ ~07'F~ 48. Unclassified (Excavation). C.Y. 7,297 $ /A'- $ ,?/1.V t t~ 49 Concrete channel lining (8" thick) and concrete channel invert. C.Y. 1,160 $ 37 $ Ste` Concrete parapet wall, Type a. 2'-4' high L.F. 136 $ 417 $ „S24j 07,2°-° b. 6' high L.F. 106 $ Sjf,2 $5413!2p 50. c. 8' high L.F. 216 e~ $ S'I$ $/~*~.ZoO d. 10' high L.F. 117 $ %Ie N $ 6S e. 12' high L.F. 27 $/~4♦OC $ 4o.t~0 ~ 51. Asphalt concrete - 2". TON 177 $ $ - 52. Aggregate base coarse - 6". TON 529 $ -2_ $ o - 53. Chain link fence - 5'. L.F. 286 $ , Of $ 54. Ornamental fence. L.F. 143 $ 55. Ornamental gates - pedestrian. EA 2 $ z6- $ S' Leo - 56. Safety railing. L.F 590 $ SD - $ Z9 SGO^ 57. Breakaway safety railing. L.F. 141 $ - $ JD 58. Bicycle trail signing and striping. L.S. 1 $ $ JP " 59. Bicycle detour. L.S. 1 $ $A0'ZrJP = 60. Swift water rescue anchoring device. EA 5 $,Z O8 $//540 61. Utility relocation/ reconstruction: a. Drain extension 631+51 Garvey Avenue East Leve L.S. 1 $ $.2B.tCj - b. Drain extension 629+47 Garvey Avenue East Leve L.S. 1 $ $~7y17S~ TRAFFIC AND STREET LIGHTING 62 Install 3" conduit with conductors (push). L.F. 1,000 $ 2s. - $ Z' - 444 63 Install 3.5" conduit with conductors ipush? L.F. 300 $ 34 > 4' $ ` Z1--Q - SPC03-66 Addendum 2 C-2(c) revised • • ITEM NO. DESCRIPTION UNIT ESTIMATED QUANTITY UNIT PRICES EXTENDED AMOUNT 64. Install 2 150 watt electroliers complete per Bridge Street Lighting Plan. EA 18 44flj- $ y ' $ 65. Install pullbox per Bridge Street Lighting Plan. EA 2 $ 3yVW0 $ it 500. 66. Install Type III-BF service complete per Bridge Street Lighting Plan. EA 1 _ $ iU $ 67. Signing and striping per plan. L.S. 1 $ $ 68. Traffic control per plan. L.S. 1 $ N $ 81.200 69. Temporary K railing. L. F. 4,800 $ /,Z $ 40 d7OO 70. Temporary traffic screens. L.F. 3,200 $ o~ M $ /.Z, 940 71. Temporary crash cushion modules. EACH 12 $ .ISO'- $ 3 DOO 72. Inductive loops (Type E) EACH 2 $ I ' $ G 73. 2'/:-inch Type I conduit L.F. 1,000 $ -Mt $ ,~j 90 00 74. 4-inch Type I conduit L.F. 2,800 $ 't9! $ /3 97,Z 75. 5-inch Type I conduit. L. F. 2,800 $ ± $ !8~ / 7.2 - TOTAL BID SCHEDULE IN FIGURES $ TOTAL BID SCHEDULE IN WORDS T' x rv/ " Revised as per Addendum 2 Note: F indicates Final Pay Quantities per Section 9-3.5 S indicates Specialty Item P indicates Partial Payment Item Ss SPC03-66 Addendum 2 C-2(d) revised DESIGNATION OF SUBCONTRACTORS BIDDER proposes to subcontract certain portions of the work which are in excess of one- half of 1 percent of the total amount bid or $10,000, whichever is greater, as follows: NAME, ADDRESS, AND TELEPHONE NUMBER OF SUBCONTRACTORS N,q R ) F17 ` 54 N P 17N:F1 D1 ally PORTION OF WORK 8;R ► 1-1ZE ?-Em 65 VA L CR I F)`1 T)/- 5ANTA Tf 5012J 'ti C'U)?,~, Gy i TFIZ >DI" t,/A41<1 C'q+; r) E ~C - Z/ViI~S1b_F rid-1311 ~'1 SI'h~~LT ✓,'A/G 0'Z,4V L,r C01141 Y S)111P/nlc ` 4A4AAZ ~ T A / P1 IV6 .1 S 14!' -/V 5 1 -14- 6903 /Ni GjZr y Mil jZI TA fit y r~ 1; A / Z- FGUh)DAT)O,N - FvN'TA&)A PiZ-/n/G PDmv)ZUy - PER/?/S g~~-~s r6~9~3 P12_F64 ST Gl iZ,l?F/?S PLcF ))4i4LL - AA)APE110 L/O/ A/ i SE-AL L SIGN/~C- /A)J)US Zy FC%/7/CR4 Prior to award of Contract, Contractor shall submit a list of suppliers and vendors in writing to the City Engineer. SPC03-66 C-3 0 0 I DESIGNATION OF SUBCONTRACTORS BIDDER proposes to subcontract certain portions of the work which are in excess of one- half of 1 percent of the total amount bid or $10,000, whichever is greater, as follows: NAME, ADDRESS, AND TELEPHONE NUMBER OF SUBCONTRACTORS PORTION OF WORK Prior to award of Contract, Contractor shall submit a list of suppliers and vendors in writing to the City Engineer. SPC03-66 C-3 0 0 DESIGNATION OF SUBCONTRACTORS BIDDER proposes to subcontract certain portions of the work which are in excess of one- half of 1 percent of the total amount bid or $10,000, whichever is greater, as follows: NAME, ADDRESS, AND TELEPHONE NUMBER OF SUBCONTRACTORS PORTION OF WORK Prior to award of Contract, Contractor shall submit a list of suppliers and vendors in writing to the City Engineer. SPC03-66 C-3 0 0 REFERENCES Attached STEVE P. RADOS, INC. Construction Experience The following are the names, addresses and telephnne numbers for three public agencies fnr which BIDDER has performed similar work within the past 2 veam- CALTRANS 3347 Michelson Drive, Irvine, CA 92612-1692 1. Name and Address of Owner Project: Rte 405- Sepulveda to Rte 101 Jagdish Patel Vladimir Gurfinkel (Resident Engineer) 818/788-3303;805/ 857-7047 Name and person $23,673,775 Bridge, Highway 4?.005- Active 5/ 7 (estimated completion date) Contract amount Type of work Date completed City of Carson 701 E. Carson St., Carson, CA Namdland Address of Owner Project: Del Amo Blvd. Overcrossing at Rte I-405 Fwy Massoud Ghiam Tel 310/ 830-7600 Name and telephone number of person familiar with project $10,617,000 Bridge, Highway 4/03 Contract amount Type of work Date completed City of Carson 701 E. Carson St., Carson, CA Name and #bdre#s of Owner Project: Sepulveda Blvd. Grade Separation Name and telephone number of person familiar with project $14,836,406 Bridge, Highway 4/02 Contract amount Type of work Date completed The following are the names, addresses, and telephone numbers for all brokers and sureties from whom BIDDER intends to procure insurance and bonds: Broker: AON 1901 Main Street, Irvine, CA 92614 tel (949) 608-6386 Surety: Travelers 9325 Sky Park Ct #220, San Diego, CA 92123 tel (858) 616-6251 EQUAL EMPLOYMENT OPPORTUNITY COMPLIANCE BIDDER certifies that in all previous contracts or subcontracts, all reports which may have been due under the requirements of any AGENCY, State, or Federal equal employment opportunity orders have been satisfactorily filed, and that no such reports are currently outstanding. SPC03-66 C-4 0 0 STEVE P. RADOS, INC. Construction Experience Job # Project Description Owner Total Contract S Code Contract Number Start /Finish Date Contact Person Active (June'06) #273 Motherlode Force Main Sewer Replacement El Dorado $1,919,000 HV-S (Sunset Lane to Shingle Springs Station) Irrigation District Steve Setoodeh Install 4234 LF of 20" PVC sewer force main FM05-11 Tel 530/622-4513 including the tie ins to the existing system. 4272 Finished Water Pump Station Modification Stockton East Active HV-PS Remove existing diesel engines as pumps (2) Water District $1,967,000 Remove existing turbine pumps (4) Spec 07964-29626- Remove existing angle drives & pump control valves 141 3/3/06-1/31/07 Remove existing electrical controls & switch gear. Jeanette Thomas Install 4 new owner furnished pump control valves & Tel 209/ 948-0333 motors. #271 Valmonte Dr./ Stewart Rd. Storm Drain Dept. of Water Active $1,007,000 HV-SD Improvement Resources 5/1/06-9/1/06 Installation of approximately 3999 lineal ft. storm County of William Au drain pipe, 24 drainage inlets, 19 manholes, and other Sacramento Tel 916/ 875-2225 appurtenant structures, removing & replacing curb & Spec 3863 gutter, relocating water lines, relocating sewer services 4270 Tehachapi East Afterbay-Completion -Phase II Dept. of Water $13,920,720.00 1/06/06 - 4 /30/06 HV-CB Replacement contract for completion of portion of Resources James Brantley work. The original contractor has been terminated. Spec 05-16 Tel 661/ 944-8712 Bypass facilities, flow barrier, control building, Contract C51310 furnished rollergates, topsoil, seeding. Remove cofferdam #2. Santa Ana Pipeline-Excavation, Inspection & Dept. of Water $3,260,000.00 10/31/05- 1/30/2006 #269 Repair-Phase III Resources Bill Ashton HV-W-P 4 Locations, excavate, shore, expose existing pre- Spec#05-14 Tel 661/946-1024 stressed concrete pipe, for 18 ft length, concrete Contract C51308 encasement and backfill, support existing utilities. #268 Bushard Trunk Sewer Rehabilitation Orange County 9/16/02 -Active #258 See Job # 258 Sanitation District $30,003,210 HV-S-P Job No. 1-2-4 Paul Vranesic Tel 714/378-0087 SPRConstExperience- 1 spo 1 11/1012006 Job # Project Description Owner Total Contract S Code Contract Number Start- Finish Date Rte 405-Sepulveda to Rte 101 Contact Person #267 The bridge work to be done consists of: Greenleaf St. CALTRANS 4/2005- Active HWY-B On-Ramp Undercrossing & the Ventura Blvd. $ 23,673,775 Undercrossing; both single span bridge, one approx. Contract Vladimir Gurfinkel 32 meters long & 16 meters wide composed of a cast- #07-201204 Resident Engineer in-place post tensioned box girder supported on a cast- Tel (818)788-3303 in-drilled hole and driven steel pile foundation. The other bridge approximately 39 meters wide composed Jagdish Patel of bulb-tee girders supported on cast-in-drilled hole 805/857-7047 foundations. Retaining wall and soundwall work to be done too. Ortega (74) Highway #266 Emergency contract on a 24/7 basis for the repair of CALTRANS $1,500,000.00 HWY- flood damages experienced at 6 locations along SD Highway 74, the Ortega Highway in Orange County, Contract 1/05-2/05 CA. Work included the clean-up of mud and debris, #EA 12-OH0431 Jason Yeung, Manager installation of various pipe culverts, rip rap, tensar Tel 949/ 724-2347 slope, stabilization, asphalt paving, guard rail, seeding Fax 949/ 924-2809 and mulching, and line striping. Lower NW Interceptor-Sacramento Force Main #265 The work consists generally of installing Sacramento HV-S approximately 9,962 LF of dual 66 inch RCCP,CCP or Regional County $43,204,456.00 WSP force main by open trenching method. Installing Sanitation District 1/05-Active approximately 1,480 LF of dual 66inch RCCP force (SRCSD) Robert Cockburn main by microtunneling. Installing approximately Const. Manager Ben Townley 640LF of dual 84 inch steel casing by microtunneling Contract Resident Engineer with 66 inch WSP force main carrier pipe. Installing #3799 Tel 916/665-2220 approximately 1,047 LF of 66 inch RCCP force main Fax 916/665-5235 by open trenching. #264 Garden Grove Freeway (SR-22) HWY- The project will widen the freeway along 12 miles, Orange County $390,000,000.00 DB from its eastern connection at the Costa Mesa Fway to Trans. Authority Valley View St, near the San Diego Fway. The (OCTA) 9/04-Active improvements include building 2 carpool lanes, adding HOV Lane/Design 2 auxiliary lanes between the Santa Ana Freeway & Build Beach Blvd, elevating the fway connector with the Contact:Rick Grebner Orange Fway at the City Dr. to eliminate chronic Granite-Myers-Rados- Program Manager 714/ 560-5729 traffic weaving, & building new on-and-off ramp lanes lointVenture & additional sound walls. Contract 4C-3-0663 SPR Const Experience-1 spo 2 11/10/2006 Job # Project Description Owner Total Contract S Code Contract Number Start- Finish Date Contact Person 4263 Lower NW Interceptor-Southport Gravity Sewer Sacramento $36,653,752.00 HV-S The work consists of installing approximately 18,200 Regional County lineal feet of 120 inch diameter reinforced concrete Sanitation District 12/04- Active sewer pipe, 17 manholes, and associated (SRCSD) Erick Strickland appurtenances. Pipeline construction will utilize open Contract # 3795 Tel 916/ 928-9600 cut techniques. Fax 916/ 928-9605 #262 Coloma Water Treatment Plant Parallel Line So. California $930,802.00 HV-TP-P Constructed approximately 4,640 feet in 24 inch raw Water Co. 11/04- 2/05 water transmission line along Folsom Blvd. Contract Scott D. Fort # 12240-000 Tel 916/ 853-3628 Fax 916/ 852-0171 #261 Upper NW Interceptor Section 71Elkhorn HV-S-P Sacramento $22,322,757.00 Pipe diameter, length, depth Regional County 7/03- Active 32"48, 24,500 LF, 10'-25' Sanitation District Glen Grant (SRCSD) Tel 916/ 924-8844 Contract #3646 916/ 338-3561 Fax 916/ 338-5129 #260 Folsom East Interceptor/Folsom Blvd Widening Sacramento $14,322,885 HV-S-P Regional County 1/03- 9/04 Pipe diameter, length, depth Sanitation District Thor Lude 54"-72", 11,800 LF, 29'-35' (SRCSD) Tel 916/ 875-2728 Contract 3701 Fax 916/ 338-5129 #259 Rte 73-Modify Exist Storm Drain Systems $2,048,000.00 HWY-SD CALTRANS Construction on State Hway in Orange County at 12/02 -10/03 various locations from 0.2 km. west of wildlife Contract Jose L. Berrios undercrossing no. 1 to 0.7 km of Bison Ave. 4 12-OC9414 Tel 714/ 556-0784 Fax 714/ 556-3869 overcrossing . #258 Bushard Trunk Sewer Rehabilitation Treatment Orange County $30 033210.00 HV-S-P Plant #2 to Ellis Avenue Sanitation District , Construction of a new trunk sewer pipeline in the 11/02 - Active cities of Huntington Beach & Fountain Valley, in OCSD Job. No Orange County, CA. According to the Orange County 1-2-4 C. Mike Bock Sanitation Dist.'s 1999 Strategic Plan, the existing Tel 714/ 593-7340 Bushard Trunk Sewer was identified as being Fax 714/ 964-4775 hydraulically and structurally deficient and in need of SPR Const Experience-1 spo 3 11/10/2006 • r: Job# Project Description Owner Total Contract $ Code Contract Number Start - Finish Date rehabilitation. In addition , future uses for the sewer Contact Person include providing relief for the Knott Interceptor Sewer/Interplant diversion and wet weather flow storage. The pipeline will extend approximately 21,800 linear feet and have an invert depth generally ranging from 15 to 20 feet below ground surface. Construction of Avenida delas Banderas City of Rancho $2,400,000.00 #256 Overcrossing Santa Margarita 2/02- 12/02 HV-SD Mobilization, clearing and grubbing, traffic control, construction of the Avenida delas Banderas Spec #55-698 Tom Wheeler Overcrossing and regarding roadway approaches. City Engineer Tel 949/ 635-1800 Fax 949/635-1840 Contra Costa Multi-Purpose Pipeline 851.00 $50 505 #255 Project & Raw Water System Improvements Contra Costa Water , , HV-W-P This project incorporated the installation of 107,000ft. District 6/01- 2/03 of 42 inch diameter treated water and raw water for the Contra Costa Water District. Work included multiple Project #197071 Annette McClemore tunneling locations of 2000 feet of 42 inch pipe up to Tel 925/ 688-8130 30 feet deep. Other work included cathodic protection Fax 925/ 688-8350 systems, and 1500 double cell box culvert and 70,000 feet trail paving. Geysers Recharge Project-Healdsburg City of Santa Rosa $20,227,000.00 #254 Pipe diameter, length, depth HV-W-P 48", 34,500 LF, 10'-20' Contract #00-845 6/0- 12/5/02 Installation of over 34,000 feet of 48" pipe for the Dan Carlson Santa Rosa Subregional Water Reclamation District. Tel 707/ 543-3357 One microtunneling location crossed under the South Or 543-4200 Fax 707/ 543-3035 Russian River with a 60" diameter carrier casing at a depth of up to 56 feet deep and 426 ft. long. This work also included up to 20 foot diameter at the tunneling locations, an on-site Controlled Low Strength Material (CLSM) plant for backfilling the pipe, relocation of utilities and traffic control for a heavy vineyard harvesting traffic. SPR Const Expenence-1 spo 4 11/10/2006 • • Job # Project Description Owner CODE Contract Number Total Contract $ Start -Finished Date Contact Person #253 Del Arno Blvd. Overcrossing at 1-405 Fwy City Of Carson HWY-R Construction of 1,000 foot post tensioned cast-in-place $10,617,000.00 box girder bridge crossing over 12 lanes of Interstate 405. This 6 lane bridge also spanned a 270 foot wide Project No. 22 3/01-4/03 Dominguez Channel. A double dike water diversion system was implemented to protect the work zone Massoud Ghiam against tidal influences and pumped up to 10 million Tel. 310/ 830-7600 gallons of water a day. This project required Fax: 310/830-7600 coordination with numerous utility companies in order to relocate and protect in place over a dozen utility companies including high pressure gas, oil, hydrogen, sewer and water mains. Over 3.1 million pounds of reinforcing steel was corporated over 13,600 cubic yards of concrete in the major structures. The construction included a double cell reinforced concrete box with 36,000 square feet of wall forms. This box was constructed under a channel diversion. Other items of work included shotcrete slope paving and channel transition walls, asphalt paving, intersection signalizaton and relocation of a fiber optic highway communication lines. #252 California Meadows/ SR 29/ SR 37 Sanitary Sewer HV-SS-P Rerouting Project Vallejo Sanitation . & Flood Control 8,761,000.00 Pipe diameter-200mm, Length-1050mm4 Depth-3500 metersI District 8/00-7/02 Installation of 8" through 42" sanitary sewer including Job #WW 1530 & jacking, boring, microtunneling & appurtenances. Job #WW1531 Rudolf Ohlernutz Tel 707/644-8949 #251 Fax 707/ 644-8975 HV-SD-P Greenflag Storm Drain L.A. County, Dept Installation of storm drain pipe up to 96" diameter pipe of Public Works $8,493,000.00 on different lines for the County of Los Angeles. This project was constructed in a residential neighborhood 10/00- 7/02 with very tight and narrow right-of-way constrains and overhead utility linbe obstructions. This work also Imad Abboud included 730 feet of tunneling in sandy soil up to 100 Tel. 213/0847-5170 feet deep. A 160 foot long by 120 foot wide by 18 feet deep detention chamber was constructed under a park. #250 HV-W-P Allen-McColloch Pipeline Repair (6 sites) MWD of Southern California $1,535,000.00 The work consisted of the removal of existing pipeline Contract No. 1431 4/00-6/00 and installation of new Metropolitan furnished John Wallace, R.E. SPR Const Experience-] spo 5 11/10/2006 Job # Project Description Code pipeline at 6 locations along the McColloch Pipeline. The existing pipeline was prestressed concrete cylinder pipe with nominal diameters of 66 inches, 69 inches, and 78 inches. The Metropolitan-furnished pipe was welded steel pipe of the same nominal diameters. The work also included surface demolition, shoring, earthwork, welding, concrete, lining and coating the new pipeline, and disinfection of the pipeline. Owner Contract Number Tel 213/ 217-6000 Total Contract $ Start/ Finish Date Contact Person Work had to be completed within a 168 hour shutdown for 5 sites and 96 hour shutdown for 2 other sites. STEVE P. RADOS, INC. successfully completed the job ahead of schedule. Pipe diameter, length, depth- 66"-78" 360 LF(total) up to 24; Type of Pipeline -WSP #249 Sepulveda Blvd. Grade Separation HWY-R-B Winner of Carson's 2003 Distinguished Project Award. This project incorporated retaining walls and a bridge span over a major railroad yard to ease congestion in the City of Carson. Retaining walls used over 3,600 cubic yards of concrete. The bridge included almost 10,000 cubic yards concrete. City of Carson Contract #71- DPM-0046 (001) $14,836,406.00 9/16/99-4/02 Patricia Elkins Tel 310/ 830-7600 x1816 Fax 310/ 830-1206 #248 HWY-R-SD Rte 105- Century Fwy Drain Replacement Ph II Upgraded the drainage systems by removal and abandonment of existing systems; constructed new high density polyethylene pipe drainage system. Location: In Los Angeles County-South Gate, Paramount, and Downey from 0.6 km west of Garfield Ave. Overcrossing 0.3 km east of Woodruff Ave. Overcrossing District 07, Rte 105 #246 Washington Blvd./ Santa Fe Improvements HWY-RR-B This included 3 bridges: 1) Santa Fe Ave. Bridge which is a seven span, cast-in-place box girder bridge. It is 712 ft long & 25 ft high 2) BNSF Bridge over Washington Blvd. is a steel truss bridge 206 ft long and 42 ft high that includes 2 railroad lines. 3)ACTA Bridge over Washington Blvd. is a steel girder bridge 151 ft. high that includes 5 railroad lines. Other significant work included retaining walls, storm drain, CALTRANS Contract # 07- 195004 ACTA (Alameda Corridor Transportation Authority) Contract #00097 $3,616,975.00 7/99-3/00 Tom Zawitowski Tel 562/ 401-3339 $36,866,000.00 8/99-6/02 Mark Hackbarth Tel 323/ 826-1930 SPR Const Experience-I spo 6 11/10/2006 0 0 Job # Project Description Owner CODE Contract Number Total Contract S sewer & other utility installation as well as box culvert Start/Finish Date Contact Person construction. #245 Rte 105- Century Fwy Drain Replacement CALTRANS $6,704,655.00 H W Y-R-SD 7/98-10/99 Rehabilitate portions of Interstate 105 (Century Contract #07- Tom Zawitowski Freeway) from west of Garfield Ave. to Woodruff 4C2804 Tel 562/ 401-3339 Ave. San Antonio /Euclid Overcrossing- Rte 30 SANBAG $8,359,007.00 #244 Construction of two (2) span cast-in-place, post 12/97-10/99 "WY-R-13 tensioned box girder bridges each approximately 250 Contract #98-019 Tom Webb feet long-and roadway approach and appurtenances. Tel. 909/ 981-9289 4243 Inland Feeder-Riverside Pipeline South Metropolitan Water 00 District 11/97-8/99 HV-W-P Pipe diameter, length, and depth 11/97- 8199 144", 30,000 LF, 20'-35' Project consisted of furnishing & installing Contract #1300 Norm Barnard approximately 7 miles of 145.5 inches inside diameter Tel. 213/ 217-6000 welded steel pipeline. Construction of a reinforced concrete box siphon approximately 270 lineal feet in lenth. Reinforced transition structures with a concrete- lines canal turnout from and return to the existing San Diego Canal and appurtenant work. Demolition of two existing stilling well associated with the pipeline crossing the Casa Loma Casa land replacement of the concrete lining in the Casa Loma Canal. #242 Arena Drain & Pump Station HV-SD-PS Construction of a storm runoff pumping station with L.A. County, Dept. appurtenant mechanical equipment, electrical Of Public Works $6,814,830.00 instruments and related inlet structure, retention basin. Discharge lines and storm drains; and demolishing and Contract # CB- 6/98-8/99 salvaging two City of El Segundo pump stations 14248 including removal and disposal of waste. The project James Cathey is located within the City of El Segundo. Tel 818/ 458-3149 Sand Canyon Bridges 56 & 57 E.T.C.A./Silverado #241 Bridge 56 is a 13 span, three frame, cast-in-place post Constructors (Prime $11,914,000.00 HWY-R-B tensioned box girder bridge. It is approximately 2087 Contractors) feet long and 37.5 feet wide supported by driven 5/97- 11/98 concrete piles. Bridge 57 is 15 span, cast-in-place post Contract #(SUB) tensioned box girder bridge. It is approximately 2900 40527-0045 William Corn feet long and 37.5 feet wide supported by concrete Tel 714/ 451-0862 SPR Const Experience-1 spo 7 11/10/2006 0 9 Job# Project Description Owner CODE Contract Number Total Contract S piles. This bridge interfaces with mechanically Start- Finish Date stabilized earth (MSE) retaining walls. Contact person #240/239 Sunset Blvd. Pumping Plant HV-S-PS The various construction elements were: City of Los Angeles $8,149,200.00 A new Sunset Pumping Plant and emergency storage 3/97-1999 facilities: a force main sewer located along pacific Contract # Fred Abdoh Coast Hway between Sunset Blvd. & Potrero canyon. EXX31458& Tel 818/ 756-9435 A gravity sewer lateral between the Tahitain Terrace E200245 Mobile Park Home and Temescal Canyon Road; a gravity lateral in Mantua Road; a gravity lateral in Temescal Road Canyon Road; a gravity sewer lateral in Pulga Canyon, with a lateral connecting to the existing lateral in Puerto Del Mar; a diversion sewer in Muskingham Ave., extending from Northfield St. to the new lateral in Pulga Canyon. # 238 Rte 133/5 Separation Bridges E.T.C.A./Silverado HWY-R-B Route 133/5 Separation Bridges is a four span and a 5 Constructors(Prime $3,293,966.00 span, cast-in-place box girder bridge. Approximately Contractor) 9170 cubic yards of structural concrete including 10/96-11/98 abutments. At approximately 65 feet high this bridge Contract No. (SUB) includes 2 cloverleaf connectors. #0527-0042 William Corn El Paseo Storm Drain City of Newport #237 Pipe diameter, length, depth Beach-Dept. of $2,325,242.00 HV-SD-P 102", 1850 LF, 12'-20 Public Works 5/13/96-2/97 Marla Matlove Installation of 1850 LF long storm drain 60" to 102" Tel 714/ 644-3322 diameter with 161 LF jacking under PCH, one junction and one transition structure. #236 Hollyhills Storm Drain- Unit 2 LA County, Dept. HV-SD- This project consisted of installation of over 4800 of Public Works $13,857,216.00 CB linear feet of reinforced concrete box sections up to 25 ft wide and up to 2 feet high and up to 30 ft deep for Contract No. 4/17/95- March 97 the Los Angeles County flood Control district, FX50950 including 33 transition structures and/or junction Gary Johnson structures, flap gates, and 925 heal feet of 48" RCP Tel 818/ 458-3114 plastic lines sewer pipe. This work done with deep shoring under traffic control on cristreets with considerable amount of groundwater. Restoration of 5PR Const Experience-1 spo 8 11/10/2006 • • Job # Project Description Owner CODE Contract Number Total Contract S the existing streets section was also replaced. The Start/ Fnish Date Contact Person total amount of the final contract was $15,622.91. 4235 San Diego Seismic Retrofit- Rte 8,805 CALTRANS $40,495,483.00 HWY-R-B Project consisted of enlarging 30 viaduct footings and Contract 11-050024 2/13/95- 1/99 columns, 95 ramp footing columns. 5.4 million pounds of reinforcing steel was covered with 800 CY Steve Matthew-John of ramp column concrete and 9100 CY of viaduct Tel 619/ 528-0428 column shafts were vibrated into the potentially liquefiable soil. Over 77,000 LF of cast-in-steel pile (CISS) and casi-in-drill hole (CIDH) pile wer installed. All of this work was accomplished under line traffic. Two new 60" via duct columns were installed on four 75' deep 90" diameter piles. #234 HV-W-P LA Reservoir Bypass Line #2 Dept. of Water $4968,559.00 &Power 1/95- 2/29/96 Pipe diameter, length, depth Contract No. 9013 Stephen C. Nielsen 48"-84, 1850 LF, 12'-20' Tel. 213/ 367-0909 Installation of. -1850 LF 84" diameter welded steel pipe (CML&C) A ea 84" butterfly valve A ea 72" butterfly valve -6 ea pre-cast valve vault -mechanical, electrical #233 HWY-R-B Laguna Canyon Bridges California $10,446,277 Laguna Canyon Bridges is a six span, cast-n-place post Corridors 4/6/95-Dec 96 tensioned box girder bridge. Approximately 9170 Constructors cubic yards of structural concrete including abutments. Contract No.- Norm Matson At approximately 65 feet high this bridge includes 2 Subcontruct#021 cloverleaf connectors. #232 Rt 118-Bull Creek Bridge Repair CALTRANS $1,788,594.00 HWY-R-B Contract No. 1/21/94-2/18/94 07H41-EQ Amer Bata Tel 213/260-9459 #231 HWY-R-B Rt 118-Mission Gothic Bridge Repair CALTRANS $645,303.00 Contract No. 1 /21 /94- 2/18/94 07H727-EQ Job # SPR Const Experience-1 spo 9 11/10/2006 • Project Description Code #230 HV-FC- LR #229 HWY-R-B #228 HV-F-LR #227 HWY-R-B #226 H V-S-P #225 H WY- TR-B Nishnabotna River Levee Repair Moulton Section Type/ Length(LF) • Owner Contract Number U.S. Army Corps of Engineer Contract No.DACW45-94- C-008 Total Contract S Start/Finish Date Contact Person $199,885.00 11/21/94- 2/ 1 /94 Bridges California Corridor High Width Constructors (FT) (FT) El Toro Bridge CIP box girder bridge/ 30 74 1350 Aliso Creek CEP box girder bridge/ 25 71 816 Laguna Hills CIP box girder bridge/ 25 71 376 Glennwood Dr CIP box girder bridge/ 30 81 Corning/Mill Creek Levee Repair Rt I IO-Redondo Beach Demolition and reconstruction of 149 Street Overcrossing and the Strawberry Park Railroad Bridge. The construction included 2,675 cubic yards of structural concrete and 493,000 pounds of reinforcing steel. Other work included retaining wall and sound wall construction. Baker-Gisler Interceptor Sewer Pipe diameter, length, deep 24"-66", RCPNCP $11,966,605 Contract No. Subcontract#008 U.S. Army Corps of Engineers Contract No. DACW45-93-B-0169 CALTRANS Contract No. 07- 119084 Orange County Sanitation Baker-Gisler Interceptor, from Reclamation Plant 41 Contract No 14-1- to Gisler Ave. Contract No. 14-1-1 A-a-2 and la-2 & 1-16 modification to Santa Ana Dyer Road Trunk Contract No. 1-16. Metro Rail Greenline-Century/Compton The Metro Green Line is one section of the overall LA County light railway system connecting Los Angeles with the Transportation Commission 4/ 1 /94- Oct. 96 $639,999.00 10/22/93-4/24/94 Larry Gann $6,000,607.00 1/10/93- 3/14/96 Naresh Kumar Tel 310/ 609-1268 $2,945,000.00 4/20/92- II/l/92 John Linder $66,447,526.00 SPR Const Experience-I spo 10 11/10/2006 0 0 Job# CODE Project Description Owner Contract Number Total Contract S Start-Finish Date Contact Person 6/12/91- 4/7/95 adjacent communities to reduce congested freeways. #224 This project consisted of 13,000 feet of post tension HV-FC- box girder bridge, 205 bridge columns. 2,000 feet of cc this line was an "at-grade" segment utilizing mechanically stabilized earth retaining walls. Lower Santa Ana River Channel Construction of approximately 3.2 miles of reinforced concrete channel, approximately 2.6 miles of stone and grouted stone channel, stone jetties and dikes, #223 bicycle bridge, automatic tidal gates, utilities HV-W-P construction (water and sewer line) and removals, site clearing and gubbing, excavation and fill, diversion and control of water and appurtenant work. Santa Margarita South Co Pipeline Pipe diameter, length, depth Job # 48"-66", 33,800 LF, 25' CODE PCH Bridge-Rt/Brookhurst Construction of Talbert Channel Bridge (Flat Slab #222 Bridge) and the demolition of Santa Ana River Bridge HWY-R-B and staged construction of the Santa Ana Bridge with the use of sheet pile walls. The new bridges included 6,850 cubic yards of structural concrete and 1,380,000 pounds of reinforcing steel. Other work included levee improvements, rock slope protection, retaining wall and sound wall construction. Tustin Ranch Road- Bridge Construction of State highway in Orange County in #221 Tustin from El Modena Channel to 0.1 mile south of HWY-R-B Browning Ave. It consisted of widening the freeway and constructing an interchange. Rt 105-Inglewood Box Culvert Frontage road, cul-de-sacs and drainage facilities #220 constructed. HWY-SD- CB Contract No. R23- T01-C0100 Army Corps of Engineer Contract No. DACW09-91-C- 0007 Santa Margarita Water District Contract No. 1485A CALTRANS Tom Waller Tel 310/ 568-0270 $43,110,828.00 4/15/91-8/l/93 Bill Gallegos Tel 714/ 645-6918 $23,253,800.00 11 /l /90- 9/30/92 Dan Roberson Te 1714/ 455-2722 Contract 12-023774 $14,447,469.00 CALTRANS Contract 12-018824 10/30/89-5/21/92 Bill Decker Tel 714/654-1409 $10,041,836.00 6/26/89- 7/31/91 Enrique Alonso Tel 714/ 544-8890 CALTRANS Contract No. 07- 007464 $7,710,661.00 10/30/89- 12/11/90 Sean Rovhani SPR Const Expenence-I spo 11 11/10/2006 0 • Job# Project Desorption Owner Tel 916/ 654-4607 CODE Contract Number Total Contract S #219 HWY-R-B Rt. 5- Jamboree Uncrossing CALTRANS ConStarttFinish Date tact Person Demolition and reconstruction of the Jamboree Road $11,722,039.00 undercrossing and the El Modena Channel Bridge in Contract No.- 07- 10/20/88- 4/9/91 Orange County, including 6 ramps and 1 off-ramp 018814 realignment. Bridge demolition and reconstruction Tim Buchanan was performed over 5 stages. The new bridges Tel 916/ 654-4607 included 7,000 cubic yards of structural concrete and 1,000,000 pounds of reinforcing steel. Other work included construction of a pumping plant and over 47,000 tons of asphalt concrete. #218 HWY -R- Rte 105- Bridges at imperial, Prairie, Hawthorne CALTRANS B Frontage roads constructed and city streets $17,552,000.00 reconstructed by grading and paving with asphalt Contract No. 07- concrete on aggregate subbase and paving with 018814 9/1/88-10/15/91 Portland cement concrete on lean concrete base over aggregate base, and reinforced concrete box culvert Sean Rovhani and 3 multispan prestressed concrete box girder Tel 916/654-4607 bridges constructed. Job # CODE Rte. 405- Culver Drive Overcrossing CALTRANS Bridge widened and ramps modified Contract No. 07- #217 003414 $1,340,109.00 HWY-R-B 5/5/88-5/31/90 Rte. 55-McFadden Bill Decker Widening 3.4 miles of Route 55 through Santa Ana, CALTRANS #216 California. Removed and replaced the McFadden HWY-R-B overcrossing under staged construction. New Contract No. 07- $19,284,728.00 construction of Warner Ave. overcrossing, and the 102754 widening of three other bridges. Other work included 10/20/87- 3/15/90 retaining walls with over 2500 cubic yards of structural concrete, and over 151,000 pounds of steel Brent Felker reinforcement, 60,000 square feet of sound walls, over Tel 916/ 654-4607 103,000 tons of asphalt paving. Rte 105 Airport Viaduct (LAX) CALTRANS Interchange and portion of viaduct constructed and Contract No. 07- airport facilities modified. 060394 $25,305,354.00 #215 9/25/87- 10/9/92 HWY-R-B Nairouz Griess Rte 405/105 Detours & Widening CALTRANS Tel 916/ 445-0437 Widening of 2 miles of Route 405. New construction Contract 07-060194 SPR Const Experience-1 spo 12 11/1012006 0 0 AFFIRMATIVE ACTION CERTIFICATION BIDDER certifies that affirmative action has been taken to seek out and consider minority business enterprises for those portions of the work to be subcontracted, and that such affirmative actions have been fully documented, that said documentation is open to inspection, and that said affirmative action will remain in effect for the life of any contract awarded hereunder. Furthermore, BIDDER certifies that affirmative action will be taken to meet all equal employment opportunity requirements of the contract documents. NONCOLLUSION AFFIDAVIT BIDDER declares that the only persons or parties interested in this proposal as principals are those named herein; that no officer, agent, or employee of the AGENCY is personally interested, directly or indirectly, in this proposal; that this proposal is made without connection to any other individual, firm, or corporation making a bid for the same work, and that this proposal is in all respects fair and without collusion or fraud. SPC03-66 C-5 • • BIDDER'S INFORMATION BIDDER certifies that the following information is true and correct: Bidder's Name STEVE P. RADOS, INC. Business Address 2002 E. McFadden Avenue, S Santa Ana, CA 92705 i Telephone No. 714/ 835-4612 State Contractors License No. and Class 484452 A & B Original Date Issued 12/23/85 Expiration Date 12/31/07 The following are the names, titles, addresses, and telephone numbers of all individuals, firm members, partners, joint venturers, and/or corporate officers having a principal interest in this proposal: Stephen S. Rados President Stephen A. Rados Secretary The date of any voluntary or involuntary bankruptcy judgements against any principal having an interest in this proposal, or any firm, corporation, partnership or joint venturer of which any principal having an interest in this proposal was an owner, corporate officer, partner, or joint venturer are as follows: NONE All current and prior DBA's alias, and/or fictitious business names for any principal having an interest in this proposal are as follows: NONE SPC03-66 C-6 • • IN WITNESS WHEREOF, BIDDER executes and submits this proposal with the names, titles, hands, and seals of all aforenamed principals this 13th day of November , 2006 BIDDER: Steve P. Rados, Inc. Stephen S. Rados, Pres signatdre Stephen A. Rados, Secretary 4 / /D;~- s4hature l The undersigned declares under penalty of perjury under the laws of the State of California that the representatives made hereto are true and c rr ct. Contracto Signature STEPHEN S. RADOS Printed Name Note: All signatures must be acknowledged before a Notary Public, and evidence of the authority of any person signing as attorney-in-fact must be attached. I SPC03-66 C-7 0 0 CALIFORNIA ALL-PURPOSE ACKNOWLEDGMENT State of California County of Orange J } ss. On November 13, 2006 before me, Sandra Lucero Po. Notary Public Date Narne and Tale of officer le. g.. -Jane Doe. Notary Pubic) personally appeared Stephen S Rados & Stephen A. Rados Name(sf of Signer(s) X~ personally known to me - proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the SANDRA LUCERO PO entity upon behalf of which the person(s) acted, Comm. 11540333 executed the instrument. N NOTARY PUBLIC-MlF0RW N Qkl C Ex" Jan. 1,2009 WITNESS my hand and official al. Place Notary Seal Above gnature of No' Publ OPTIONAL Sandra tucero ro, Notary Public Though the information below is not required by law, it may prove valuable to persons relying on the document and could prevent fraudulent removal and reattachment of this form to another document. Description of Attached Document Title or Type of Document: Document Date: Signer(s) Other Than Named Above: Capacity(ies) Claimed by Signer(s) Signer's Name: ❑ Individual ❑ Corporate Officer - Title(s): ❑ Partner - - Limited _ General ❑ Attorney in Fact ❑ Trustee ❑ Guardian or Conservator ❑ Other: - Signer Is Representing: Tao Number of Pages: Signer's Name: i Individual Corporate Officer - Title(s): ❑ Partner - - Limited -General E Attorney in Fact ❑ Trustee ❑ Guardian or Conservator ❑ Other: Signer Is Representing: Top of t, 02004 National Notary Assocratwn ---9350 De Soto Ave.. Po. Box 2402 - Chatsworth. CA 91313-2402 hem No. 5907 Reorder Can Toll-Flee 1-600-876.6827 CITY OF ROSEMEAD PROPOSAL GUARANTEE BID BOND FOR • RECONSTRUCTION OF GARVEY AVENUE BRIDGE OVER RIO HONDO CHANNEL IN THE CITY OF ROSEMEAD FEDERAL PROJECT NO. BRLS-5358(}06) KNOW ALL MEN BY THESE PRESENTS that Stcvc P. Kidos, Inc. as Bt00ER, and Trave ers asu-r tui-an uuetr ompanr o meric i a corporation organized and existing under the laws of the State of onnec ticut , and duly auihorzed to transact business under the':aws of the State of California, as SURETY, are held and firmly bound unto the City of Rosemead, as AGENCY, in the penal sum of [IN WORDS) dollars I o o i which is 10 percent of the total amount bid by BIDDER to A(3ENCY for the above-stated project, for the payment of which sum, BIDDER and SURETY agree to be bound, jointly and severally, firmly by these presents. THE CONDITIONS OF THIS OBLIGATION ARE SUCH that, whereas BIDDER is about to submit a bid to AGENCY for the above- stated project, if said bid is rejected, or if said bid is accepted and a contract is awarded and entered into by BIDDER it the manner and time specified, then this obligation shall be null and void, otherwise it shall remain in full force and effect in favor of AGENCY. IN WITNESS WHEREOF, three (3) identical counterparts of this instrument, each of which shall for all purposes be deemed an original hereof, have been duly executed by Bidder and Surety, on the date set forth below, the name of each corporate party being hereto affixed and these presents duly signed by its undersigned representative(s) pursuant to authority of its governing body. Dated:. Novemker 9 2006 - BIDDER Name: Steve F. ados Inc. - - Address: zoo' W Mc _ F _ J n # zoo SURETY: Name- Travelers (_asualtcl and `?uretcj ConiRa l OFAmenca Address: 9325 Sky Fark Court, '~3uite 220 Note: This bond must be executed and dated, all signatures must be acknowledged before a Notary Public, and evidence of the authority of any person signing as attorney-in-fact must be attached, SPC03-66 C-S Type Name andTille: Stephen S. Rados, President Type Name and Title: Line k gon r AttorninLjjn-Eact • • ACKNOWLEDGEMENT State of California County of Orange On Noy o 9 moo before me, J. Barragan. Notary Public (here insert name and title of the officer) personally appeared Jane personally known to me (or proved to me on the basis of satisfactory evidence) to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledge to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument. J. BARRAGAN WITNESS my hand and official seal. Commission # 1635125 a rid Notary Public - Callfomla v. Orange County Signature My Comm. Expires ion 5, 2010 (Seal) OPTIONAL Though the data below is not required by law, it may prove valuable to persons relying on the document and could prevent fraudulent reattachment of this form. CAPACITY CLAIMED BY SIGNER ❑ INDIVIDUAL ❑ CORPORATE OFFICER ATTORNEY-IN-FACT TRUSTEE(S) GUARDIAN/CONSERVATOR OTHER: TITLE OR TYPE OF DOCUMENT ❑ PARTNER(S) 8 LIMITED GENERAL DESCRIPTION OF ATTACHED DOCUMENT NUMBER OF PAGES SIGNER IS REPRESENTING: NAME OF PERSON(S) OR ENTITY(IES) DATE OF DOCUMENT SIGNER(S) OTHER THAN NAMED ABOVE STPAUL TRAVELERS POWER OF ATTORNEY Farmington Casualty Company Fidelity and Guaranty Insurance Company Fidelity and Guaranty Insurance Underwriters, Inc. Seaboard Surety Company St. Paul Fire and Marine Insurance Company attorney-In Fact No. 213962 St. Paul Guardian Insurance Company St. Paul Mercury Insurance Company Travelers Casualty and Surety Company Travelers Casually and Surety Company of America United States Fidelity and Guaranty Company Certificate No. 0 0 0 2 5 5 4 6 5 KNOW ALL MEN BY THESE PRESENTS: That Seaboard Surety Company is a corporation duly organized under the laws of the State of New York, that St. Paul Fire and Marine Insurance C ompam. St. Paul Guardian Insurance Company and St. Paul Mercury Insurance Company are corporations duly organized under the laws of the State of Minnesota, that Farmington Casualty Company. Travelers Casualty and Surety Company. and Travelers Casualty and Surety Company of America are corporations duly organized under the laws of the State of Connecticut, that United States Fidelity and Guaranty Company is a corporation duly organized under the laws of the State of Maryland, that Fidelity and Guaranty Insurance Company is a corporation duly organized under the laws of the State of Iowa, and that Fidelity and Guaranty Insurance Underwriters, Inc. is a corporation duly organized under the laws of the State of Wisconsin (herein collectively called the "Companies"), and that the Companies do hereby make. constitute and appoint James A. Schaller, Jeri Apodaca, Linda Enright, Mike Parizino, Nanette Madella-Myers, Rhonda C. Abel, Jane Kepner, Grace Reza, and Rosa E. Rivas of the City of Irvine . State of California , their true and lawful Attomey(s)-in-Fact. each in their separate rapacity if more than one is named above, to sign, execute, seal and acknowledge any and all bonds. recognizances, conditional undertakings and other writings obligatory in the nature thereof on behalf of the Companies in their business of guaranteeing the fidelity of persons, guaranteeing the performance of contracts and executing or guaranteeing bonds and undertakings required or permitted in any, actions or proceedings allowed by law. IN WITNMS HEREOF, the Comp: have caused this instrument to be signed and their corporate seals to be hereto affixed, this arc day of Farmington Casualty Company Fidelity and Guaranty Insurance Company Fidelity and Guaranty Insurance Underwriters, Inc. Seaboard Surety Company St. Paul Fire and Marine Insurance Company 20th St. Paul Guardian Insurance Company St. Paul Mercury Insurance Company Travelers Casualty and Surety Company Travelers Casualty and Surety Company of America United States Fidelity and Guaranty Company SUNEry „FC MSG P~ ~ns"4 J.~ir e~o~ `p syyy ~U1Y'W7 #,df°'46 n g ~OAlit♦D 92~ - i ~rlo~v`•.i~~~ iF~.fy}roa~r~ C r MMtsORD, ~ ~ OpM. e ~ ~ ~cl~t2• s ' `1977 1951 ~ ,t ^'r~ ~~.:5EAL,~o/ ~a~.,S81LL/~ woF (~.~t+0 0 `~SFCA'Ya ~ _.~1 ,Ii •OC~.{W~ \.,.rw ui ~ I~. A11v fy J1 ~Y State of Connecticut City of Hartford ss. By: G ttge W' t umpson. Sen r 1'ir Preddent 20th March 2006 On this the day of . txfore me personally appeared George W. Thompson. who acknowledged himself to be the Senior Vice President of Farmington Casualty Company. Fidelity. and Guaranty Insurance Company. Fidelity and Guaranty Insurance Underwriters. Inc.. Seaboard Surety Company. St. Paul Fire and Marine Insurance Company. St. Paul Guardian Insurance Company. St. Paul Mercury Insurance Company. Travelers Casualty and Surety Company. Travelers Casualty and Surety Company of America. and United States Fidelity and Guaranty Company. and that he. as such, being authorized so to do. executed the foregoing instrument for the purposes therein contained by signing on behalf of the corporations by himself as a duly authorized officer. G•T171 " In Witness Whereof, I hereunto set my hand and official seal. To ,%I~ Commis lion expires the 30th day of June. '_(N16. * j0uel~a # alf 0 58440-9-05 Printed in U.S.A. c~uvu► Marie C. Tetreault, Satan Public OF 0 proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument. CALIFORNIA ALL-PURPOSE ACKNOWLEDGMENT -v` .,;~:c"~'c~. ~'`i~4,~~ ;r.•<^a_ ~•-.ti; • _~,r [:.cv`->4~:~ <~< ~~s~~.'~~: =tip 1r:C'~~5~_S~. _ _ State of California County of Orange On November 13, 2006 Date personally appeared SS. before me, Sandra Lucero Po, Notary Public , Name and Title of Officer (e.g.. "Jane Doe. Notary Public') Stephen S Rados Name,.si r.f S,gner(s) XX personally known to me SANDRA LUCERO PO N Comm.l1540333 eoT~ar PUItUC-cfu~o~nu Ul ~ Corfnlt ~Im, 1, ~OOi WITNESS my hand and official seal. P'!.ace Notary Seal Above V 1 a OPTIONAL gnafu a of Nctary Pu Sandra ~ucero o Though the information below is not required by law, it may prove valuable to persons relying on the document and could prevent fraudulent removal and reattachment of this form to another document. Description of Attached Document Title or Type of Document: Document Date: Signer(s) Other Than Named Above: Capacity(ies) Claimed by Signer(s) Signer's Name: ❑ Individual ❑ Corporate Officer - Title(s): ❑ Partner - Limited - General ❑ Attorney in Fact ❑ Trustee ❑ Guardian or Conservator ❑ Other: Signer Is Representing: Bidder's Bond- Reconstructi 911 Tel Is I'll f!~Ifl:;:i e • Number of Pages: Signer's Name: ❑ Individual ❑ Corporate Officer - Title(s): ❑ Partner - - Limited General G Attorney in Fact - Trustee ❑ Guardian or Conservator ❑ Other: Signer Is Representing: Ave TOP J. 87 ® 2004 National Notary Association • 9350 De Soto Ave.. PO. Box 2402 • ChatswoAft. CA 91313-2402 Item No. 5907 Reorder Cal Toll-Free 1.800 66827 • • ADDENDUM NO. 1 RECONSTRUCTION OF GARVEY AVENUE BRIDGE OVER RIO HONDO CHANNEL IN THE CITY OF ROSEMEAD FEDERAL PROJECT NO. BRLS-5358(006) This attached Addendum No. 1 forms a part of the Contract Documents for the above- identified project and modifies the original Specifications and Contract Documents as noted below. Portions of the Contract Documents not specifically mentioned in this Addendum remain in force. All trades affected shall be fully advised of these changes, deletions, and additions. l - /5- a6 Kenneth J. Rukavina No, 42866 I acknowledge receipt of this Addendum No. 1 and accept the aforementioned. November 13, 2006 Date Attachment uaie Bidder Stephen S. Rados, President SPC03-66 Addendum No. 1 • ADDENDUM NO. 2 • RECONSTRUCTION OF GARVEY AVENUE BRIDGE OVER RIO HONDO CHANNEL IN THE CITY OF ROSEMEAD FEDERAL PROJECT NO. BRLS-5358(006) Addendum No. 2 forms a part of the Contract Documents for the above-identified project and modifies the original Specifications and Contract Document as noted below. Portions of the Contract Documents not specifically mentioned in this Addendum remain in force. All trades affected shall be fully advised of these changes, deletions, and additions. The City of Rosemead has established a hosted by Willdan that allows bidders to documentation. Bidders may access this ftp://ftp.wilidan.com. Username: "garveyavenuebridge" Password: "garveyavenuebridge". "ftp" (file transfer protocol) Internet website review/print Addendum No. 2 and related information by logging onto the website at The following information may be found in the "GarveyAvenueBridge" folder. Each file must be copied into a folder on your local hard drive. 1. Complete Addendum No. 2 (11 pages) 2. Revised Bid Schedule 3. Revised Final Report of Geotechnical Investigation 4. Lead Paint Inspection Report 5. Federal Wage Decision 6. Decorative Column Detail If a bidder does not have Internet capability or is having difficulty accessing the website, these documents are available for review at the City of Rosemead Public Works Department. Please contact the City of Rosemead Public Works Department at (626) 569 ZI50 to make arrangements. Z -41W Alfonso RCE No. 50706 acknowledge receipt of this Addendum No. 2 and accept the aforementioned. November 13, 2006 Date Attachment Spc03-66 Date Bidder Stephen S. Rados, President • 14 7-TA CIVIVE.uT 9 CITY OF ROSEMEAD BID ANALYSIS FOR RECONSTRUCTION OF GARVEY AVENUE BRIDGE OVER RIO HONDO CHANNEL Federal Project No. BRLS-5358(006) BIDDERS BID AMOUNT Reyes Construction $ 10,869,568.20 Sema Construction $ 11,194,740.95 Steve P. Rados, Inc. $ 11,556,234.92 CC Myers, Inc. $ 11,949,130.90 Griffith Co. $ 12,727,017.10 MCM Construction $ 12,970,049.95 Atkinson Contractors $ 13,894,816.00 Bid Amount Average: $ 12,165,936.86 13565 - Spc03-66 11/14/06 mec N cQ CD 0 ~h U1 N o CO au V CA n Q v A W N m 3 z (7 0 0 (7 o ~a m c > o C > n C7 m 'D -0 , D Cn w ~1 co m < C7 N o m m =03 n (o -0 C) N X m o m a co 3 D o a U to ::r o D. N fl o c y c 3 m N (A i n =3 n w ~ ~ Ci 3 ~ a 01 _3 -a o a m 3 m = CU n (3D y a. j D A N (D 3 ? ( D co CD CD O 2 frl m 0 7 : Ei CA O= m . X ( D a a 7 a = 3 a M 'D m - W (D 'D 7 Co CD -0 a o 0 0 o D CD 3 CD X -'w (D 'D CD CL - =3 CD - m n : N 6 m 3 °m ^ App, ~ m=- o vim O [1 m w = ° C1 7 x N O 7 O D ° N > O 3 (n O 3 cn m m 0 a j N 3 Ov m n N A0 C -vo _n Z - cn (7 N N (D o - Cn n Cn ,l m D 0 0 r W m D r cn r co r cn r co r cn r cn r cn C Z co c ° 00 CD 0 ~ v 0 tr 0 N O -1 69 EA m ~ W O M M cn Z G7 cn N 0 N 0 N 0 CJ1 0 0 W 0 0 3 Z m o A A °0 °O 00 °o °o °O °O °o °o D m M rn A o 0 0 0 0 0 0 0 o n O C m O 0 0 0 0 0 0 0 0 0 0 0 0 0 O 0 O 0 0 0 C7 0 0 0 O 0 O 0 ~w CO) fA fn <A <A y0 y9 69 v► <A 4A fA EA D o A v to W O OD co O 0 CT IJ Ct) A ~ 00 p m _ 4 N N A Cn O O O CA D O A O O N O N O O CJ( N O m A W V V O 0 Cn -1 A W Cb O co W A W co m O O O O V s Cp O CT V fA EA fA EA 4A 4A 4A fA fA 69 CA (A EA EA W N Cn 01 D 3 (.)1 w O N O O O O O 0 O (n 0 O CA 0 O 6 0 O O 0 O Cn 0 O Url 0 O o 0 O O c CT W K O O A. 0 0 0 0 0 0 0 0 0 0 0 O O O O O O 0 O 0 O O O O O 0 0 m cn m (n m cn m 0 0 0 0 0 n n n 0 0 ~ c) 0 0 X m r (moo m m m m v v v CD CD CD CD CD CD =01 .Z1 N H N N N N j W v N a a O CL O CL O C7 0 0 o n A c p, N 0 0 ~ o a 3 o o o M TI CD 0. Q I su o, n `D z nz O Ch co ~r to w cMn W O O a) m 0 z Cl) C n O z W v z r TI O n O O N m m D v 0 • v t0 m N O 41 U1 W N W w O N (D N OD N V N O N 0 N A N W N N N N O 0 N OD O) Ut A W m Cr 9- (A ('n m ° (n ° 3 'a o cn m o ° v ° p < - c o T c cn C (n co m cn U ° D ° o . ° D ° n D g • Q D v, a D C7 -ou CT c 2 C C n y CD C a s p~ N N CD C CD C C 0 ~ M m w d m m m m m m » m v v, o a ,c (o w (o d m m d o au a m z o o c o to n 3' O 0 Co N D K -0 o < 'D t, ~ m a~ ° a (D ((M 0 Cl) w :3 O ('1 (Q n CL 3 m n O N y C 7 d N p j y = N ( D (D ( - D _(D < 3 (CD D m~ (D m (A CD (n cn Z ° . M ('D (O SD m Q 0 m ~ cn CA VO N Q N n J (D N w y m 0 a ° m U . Q M. -6 (7 A n V 1 n 0 r u, a tv _ m N ° to v a c O Z v n. U to m a t0 C n (n 0 ° C (D to Qo cn =r w 3 d i N ~ ° ° m G cn w a m 0. 5D v n . lD W D) O m L cn D T D T 0 cn D T T D r- D D D Z Z f z N W (AD j O ccp - A OAD N s w co N W N - O O 0 N Q N -4 to N OD N OD N U1 0 O (A 69 69 EA 4A 69 69 69 69 69 69 69 69 69 69 FA 69 69 69 69 69 69 O 0 0 m z A U7 (n o O in co 0 O W (Jt W 3 D Z m 0 o Ul O O o O 0 O 0 N 0 O 0 N 0 U1 (n V (n O o O 0 0 0 (n 0 O 0 O 0 ()1 0 V (n 0 o A V 0 W (n m 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Co 0 0 0 p 0 0 0 0 0 0 CO 69 69 69 69 *A lfl 69 69 69 69 69 (A EA fA 69 EA EA 6A fA 69 69 69 < ( c A in W w V A N N A cn N (n N IV A Eg_ O M D V (n V (n n N N OD N co D N O - O N D O (D c O N OD OD CO (n O O A OD OD W A A ' OD N OD O (D (n N O N D (n p p p m UI V O O A W 0 V ~ A V m V A W U1 V O O 0 V U1 V 0o O O O 0 V V V " OD O o O N (D 1 V - 1 CO W 69 69 69 4o EA 69 69 69 69 69 69 69 69 69 69 (A 69 69 69 69 69 69 3 w U1 A O W V O O co C n N co U1 N N N O O (D O w V A O N O M O O m O Ul O W m N O C O O O O O O O O Vl Ul O 0 0 0 0 0 0 O O W O UI O O O O O O O O O 0 O 0 O 0 O 0 O 0 O 0 O 0 O 0 O 0 O 0 O 0 O 0 O 0 0 O O O O O O O O O ~ ~ ~ ~ cn ~ cn ~ ~ cn Cn n (n A ~ Cn cn cn cn G7 n D 0 (D < (7 m 3 o m 3 o o m m m m C7 m m 3 m m m < O m m m < m < m < m CD < m m < m < m m N O =r m 0 n D m -0 D -o v 'v rn ° 3 7 _ 70 N .v _ 0 v 1 2 2 0 0 0 o < 0 o < 0 0 0 a 0 N cn w m N y (a cn N C j = _ > n 7 n 7 N 7 n 7 7 n 7 n n 1U CD W `00 V, ° A A A A A A A A - A O W (n W 00 W V W 0) W VI W A W w m o ° (O w V O Ul a w N N n O O 0 O 7 n O 7 Q? C7 - O 7 N C7 O A 7 5- r, ? C) G O 7 (D c 7 n c 7 n o ;E. n D Cn C7 (D O m 7 CD 0 (p C) O 7' O 0) (n m g y a) v - c- O ~ m a@ co -n C -n v D 'O 'D (O' ~ =r A (fl A ~ (p A ? n v . m N 0) CD N 0) O D 0 0 m 0 (D L a m O. N 51 C n C ~m m ~m m m m O m O m om 7 m cn N O (O 2 " m - Q a N ~ m m m (Oc (D j O ro'~ 'D a 0 m m ~ N Q < m c (D m m O o ~ y 0 p v - - m a ~ ~ = o m N m N O) D) o v a a j c d v A 0 3 :5 m y Q O v v v v v 3 m (D ? C G O. cn (p m -u O .y-. m 7 n m :3 (n :3 0 CD '1 : 0 CD N ? G N a O m N c'. 61 `G C , m O o C) m N n . ::r 0 7 (o -p m O a ~ LD = Q 9 p- O' C 0 2 ~ ~ ~ °D a o a m (o a X A CD m Q m 0 ( D ( D FD N N (D _ m ) _ m 0 CD 4 r r r r - r 0 C) n r o r m m r U) r T CC) co r r" T m D m D to m Cn m 0 Z n m T n m < [ t (n D D cn Cn -L V N C7 p O W O m J N OD 0 O Cl) CO A A 00 p n 0 0 O 00 N O N Ln N W O rn O p - O A ID to 0 0 . 69 4A 4A 4.9 4A 4A 4A 4A 4A 69 4A 49 4fl 40 4A 6A m z 0 O C) O O Cn M CT cn G7 Z a) ( n A O 0 0 W O O w N O 0) m 3 D m 0 D 0 V 0 L 0 0 0 o p p o p ~ 0 0 c n 00 m ~ 0 o O 0 00 0 0) 00 o c O O O O O O O O O O O O O O 0 O 0 0 O 0 O O O O O O O O O O N to O 0 O 0 O O 0 O 0 O 0 O N 1 1 69 49 69 6A 61 40 EA 4A 4.9 4A 4A 4A 49 49 6A 40 4A 4A 4A GA {A 4A D J J r O A W O N V N W - OO W o N V O V OO _ O M M ( i V (T A - DO N W co OD O O O (n W -Al CA V D Un 00 W aD Un 00 V (n C7) (n w O O O Cn - U) N V - V W w m O O N w Cn V co co N (O 00 0) IV " N V V - V " Cn V co m O 0 V N (J) ~ O co O co (D A co o 1 O w N (O 1.9 40 4A 4A 4A 4fl 69 6A 0) 4A b9 4A 4A 6A 4A EA 4A 4A 4A 4A 4A 69 O Cn W - 0 A N 3 00 O A 00 A 00 A OD W O N Ul O O O O W A O O O 9 A N A O W 0 cn 0 O O 0 O O O W O CJt CT O O C O O O O O O O Ul O O O O O O O O O O O O O O O O (D O o O O 0. O 0 O O O O O O O O w O ' O c O O O O O O V O O O c~ C') G) fn m fn m C) D it n 0 In m (n m G7 cn m cn m 0) n C) cn m c) (D C-) 0 0 r O S 0) 0) y m D) (D M M y 0) CD C CD U n G) j m (te n O n 0 n m N n x O GG W f 3 7 . n EY Cx n CL =T C) :3 n c =r n O c O c < n O c a CD 0 :3 0 CL O 7 n p > 3 0 O 7 p 7 iU cQ CD O h Cn • • 0 V O) O rn Ch rn A rn W O) N 1~ CD O (h (D cn Oo cn V (t O I cn O Cn A (h co th N C)1 =i m cr a) 3 to r° co ° U Cn C r 0 (o ° rn ° rn c) rn D m m C < n D CD C " n a CO < CO n CO - c) W (o [n a O n 3 O 3 0 D (o D cn =r 3 m _ m m 3 M _ a N C_ a a) C- > m° C ~ m° =1 :3 C N m `z m m 3 w 3 s cfl 3 c0 m -i r a (D N 2, D a W a W N y m O' ~ (D N N m p N ~ m (D m Cu ~ ~ m m - ° ~ tv D m m (p c m ( - N O o 0 o m 3° o w ' m 3~ o ° ° ~ w N 3 - > - , ~ m CT n M D O CD :3 3 C: C N O r- 5* j p r- R 5' cn (a to (D W 0 U) (D CD M -p' - M N a (A CL (n m :3 A . CD :3 to p . 0 C 3 ' c (D n m m I n (D (D n CL a rn W (OD m v V m (mD d. CD 3 (a rn C °j N CD CA Z a to 0 a 0 Z CD ID f0 m (D 2 CD 2 (D o ~ cn m CD CD FD 7' C, r m m m r m r m r (n r Cl) m D r Cn r Cl) r -n r m m D r m r m 00 0 z (n D D D z Z q N O 00 r j Ch A O N W fl) ) Cil CD v A O ( 69 69 69 (A 69 69 69 69 69 69 69 69 Q! 69 69 (A 69 69 m m U z O Ut (h O N O (n V N 3 Z O O O O N W O O O 0 0 CA (D Co Ul O w W A O 0 D m m M 0 0 0 0 o p O o 0 0 0 0 0 0 o cn ch 0 0 0 0 0 0 0 0 0 0 0 o 0 O 0 o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 01 0 0 0 0 cn 69 U% 69 (4 4A 69 (A 69 69 fA y9 69 69 69 (A 69 69 d3 D A 0 fA O CNh 4~ - V W W co V CD ) N Ca M T 1) Cn A V V V O N O N ( D N O CO CO W W A N . A tD W O m V Ch O V N Co O O O tD m A Co m O V A W A N tD N (D V - ~l aD m O o N to Ch V O o) N (D A A V 69 69 EA 69 EA (A 69 69 69 60 69 69 69 69 69 69 69 6) N A N N V Ch N 3 W O O O O O (h O O O W O N Ch O p O O O O O O O O W V Cn O O O O O N O A N O O C O O O O O O O O O O O O O O O O O O O O O O O 0 O Cl O 0 0 O 0 O 0 O 0 O M 0 0 (n Cn Cn 0 C7 C7 Z] 0 Cn (n C7 ~ (n (D (7 0 (D (D (D o n 0 n C7 D m m iD n o m r CD m m m m Cl) m m m CD ( m ((DD m D CD CD CD v v m a 7 N N ? 0) N N N j n 3 a a a O 3 n n CL o OL o CL O :3 C) CL O N CL N N (A N N (A a 7 3 A 7 n 7 A 7 o o A ° v c~ CD Cr O h 01 • 171 cn A W N O COO OOD m m 3 fD fD (D K K . N a n 0 C •O 3 ' 3 ' p CD CD - C' N O O O D O n n _ N o 0 o 0 o ? m Oa a 'D y o n 0 7 v CD 7' 0 n n co o m ? O z o :3 n T r T T r R1 D D T T 0 CZ _ N N ~ W A O O (D (D O CD O O N N N 0 OD 0 O O O O O O 69 69 69 (A 69 69 69 Z CT W I Q Z A A a O 3 D m m w o 0 o Ol o o m X O O o O 0 O 0 O 0 O 0 O 0 O 0 O cn 69 ~ to 69 ~ v9 t~ v+ N -4 W 0 N ~ W 0 M T s N cn ' c0 W N O O (T J O m co W N OD W A A W O O O O A A W 69 69 69 69 69 69 40 69 W 01 O Lr O c O A A O O W N O 7 .A c co co W c0 O O O O b O 0 O 0 O o cn cn (n cn D C) < < < ~ n 'r ~ r CD M CD CD O v a v 0 W d n~i w N _ v CL 0 a 0 O. 0 a o a N y N N Q 7 n 7 n 7 n 7 n lD ~ J W z z Q 2 U 0 z O x 0 9 a o ~ o w O Qoow y LL K m 0>w°z2 f Z w w N o a > ~ a O m m j a w Q,Q 0U' W Ll. 0 W O LL z O F U z z O U W z S 8 88 8 S 88. 88 85 S 88 88 « 8 88 ~n 88 uio 88 ~ 88 85 ' ~ 5 `o g Bi ~ NX "2 ` :ice ~ ~ Vi •9"X .n ; W8 8 88 8 8 8 88 88 88 8 88 88 8 88 88 88 88 88 88 8 8 8 ~ z ~ ~g »St R S 8 88 S 8 8 88 88 85 8 88 88 8 SS S°o 68 88 58 88 8 8 8 a u W8 8 88 8 8 8 88 88 80 8 88 88 8 88 85 88 88 88 88 8 S 8 i SQ `z 2S 8 . 88 S S 8 88 .5,'1 88 8 88 88 S 88 x 88 88 88 88 - R 88 8 8 8 ~a »c G u q " , ~8 8. 88 8 8 8. 88 88 82 R 88 88 8 88 88 88 88 88 88 8 8 8 8 8 88 8 8 8 85 S8 E'4 8 88 88 8 °8 88 88 28 88 88 8 8 8 o E L, ~ wS 8 88 8 8 8 88 88 88 8 88 88 8 85 88 88 88 88 88 8 8 S c$ ~N 39 « 8 8 88 S 8 8 58 88 88 8 88 88 8 88 88 88 88 88 88 8 8. 8 c a w ~f8Q S a 2 QS 858R 1 58p2 88Q2 8 o 858 n~ 288 R a 85 a 1 2 88 B 8 H 48s 8 x 8 888 88' 88 58S22 25 885 » n 88 o. 8 4S. 25 8 R N Zm S 75 s 3 xP 6. a 2 . s 8 8 8 8 8 8 8 8 888 88 8 88 8 8 8 8 88 88 8 8 8$ 888 8 8 8 j ~ W 8 8 8 8 S 8 8 9 88 882 8 8 88 8 8 8 85 88 8 8 88 88 88 8 8 8 8, 8 8 8 8 8 8 E8 85 8 8 8 88 8 8 8 88 88 8 8 x8 88 88 8 8 c p W 8 8 S, S 8 " S 8 8 88 88 8 8 8 88 8 8 8 88 58 8 8 88 58 88 8 8 Z N J"1 2. 9 M MMtl " 8 8 S 8 8 8 8 8 8 8 8 8 5 8 8 85 8 8 8 " 8 8 8 8 8 8 8 8 8 8 ` 8 8 r 8 8 , a W ~ ~ N O N N N ~ rl N « ~ N ~ ~ M M M " ~ ~ O, ~ M 1 ~ ~ " " M ~ W n 8Q 8 . 8 8 8 8 8 5 88 88 8 8 8 88. 8 8 8 85 88 ~R 5 5 $ 85 58 88 8 8 W 't F R 2 R R R o I Nn - v § ~ m 1 1 N 4 _ d8 ~m 8 Z N N N J N W ~ V . U W N N ~ F V W W tt W aa ~ W ~ J ~ N U U < ~ W QQ ~ W U 8 gr n a ~ S au p 8 i + la _ i ki o L8L $p>p b S g w a E~ O 6y q ~ E y W 8 I N ~ ~ r ~~i Ia sN f~3v ° 7 o ~2 3 o v z E I ' I " g ~ ' C EE8 fi III °1 2~ L E eE 6 o o= a3 i o in n E a`6 E2~t KE3n rcE a ~ ~ K U~ c3 t < a N . _ w 31 R N m v ~'m bfR R t w z z a x U zz 0 x o0 ~o 0 > 'n O u^f QO aw J LL m ? J -.3 Z o a Q o v m r a ~ J a U w u. 0 0 W LL z 0 U z Z O U W d' 8 8 88 8 8 8 88 58 88 88 8 8 8 8 8 8 88 88 88 88 88 8 8 0 u n s 8R g8 $ 58 7R» W °n $ $ , 88 5i» 88 Qs QB 25.25 $58s22 25 88 8 s » $8 R g8 8 $8 $ 588 M.~ " 88 ` 88 R8 " 88 » 88 ~ 25 882 ~ 14 f82 25 8 < t . s ~ s~ "su s » ~ 8 8 88 8 8 8 Sm 88 88 ss s8 8 8 8 8 8 8 88 88 88 88 88 8 8 8 < z x c°~ w 8 8 8° 8 8 8, 88 88 88 88 8 8gg 8 8 8 8 85 88 88 88 88 8 8 $ 8 8 88 8 88 8° 88 88 88 88 8 8 8 8 8 $ 88 88 88 88 88 8 8 8 o u fi < y 8 8 8.~ 8 ~ 88 $P 8° Si» «8 ~8 88 ~ 88 88 8 8 8 g 8 8 g 8 88 88 88 ~ 88 ~ 88 ~ 8 8 8 YR . S 3 . z 8 8 88 2 8 2 88 88 58 88 88 88 8 8 8 8 8 8 88 88 88 88 88 $ 8 8 , e g» x »F 89 s V 'w n 8 8 8A ' SS Z JI pS8u2 LE 8S f: " Sg8 ; •^s a 5858 S 252 2 858 5 na " 88 25~ 8 o 8 R a Q8 A 58~ A 8 8 8 88 ~'J.` 88 88 rio 88 tix 8~58~ ~i ~S_ 8 Q8 7f 582 25 s~ ° s 8 " 8 8V88 N y8 ! 88$82 O 2S $8: rt i0 8808 , O r 88 Y b 8888 ry O 888 O O 8 N 88 O 8 n p8. ^ 8 8 88 00 N, ~n ¢8j8 S{ X ~X 8(8 X8[8 ~S ~tl 88 8 x8 F( p8 T : w y S 8 8 p R~ 8S p » eY $ t~ 8888 O D 8 N . 08$ 88 858 ffi ES " 2888 Y" 55 8 8 x 8 Y~ 8. 8 88 O~ 88 g ,N 88g g J p88 , M N 88 N U $S tY1 g8 N $ t J 96 o O r " 8 8 88 8 88 8 ,88 8 8 88 88 8 8 8 8 8 8 8 888 88 88 88 8 8 8 C 8 5i~ o ~3 n w N ~ " ~S :i : i ♦ " A 8 S ~ ttl Y~rv » " w 8 8 8 88 88 8. .-8 8 8 8 88 "a 88 s $ 8 8 8 8 8 8. 888 88 88, 88 8 8 8 Z 8 8 $ 88 88 8 .8 8 8 8 88 8 88 8 8 8 8 $ 8 R 88 R 5 888 M 88 R 88 M 8 8 8 5 , , t w o 8 8 8 88 »a 88 8 88 x 8 8 8 88 ~ 8 88 »N 8 a 8 a 8 8 ig 8 x 8 8E e 8b' 888 88 ~ 8 8 8 8 8 8. 88 88 8 8 E 8 8 88 8 88 8 8 r 8 8 N 8 R 8 88 YS 88 uR 888. 8 8E 8 8 E e s ~ "a » ~ ~ x~ $ "a » - ~x» u n 8, 4 S $ ~v 8 R, 3 88 nm y8~.58 ~S 2 2Q8 5 K. ~8 4$ 8 M 252 8 88.58 5 FfS 2582 2S 85 8n 582 2S 8 7 8. ~ 8Q i~ S8 A. ai 8 88 $v 88. ~J`~ 888 ~•$8i 8582 i5 582 75 582 2f 582 25 w t 7 $ Q = J U U U N Y1 W W p m m t W w" J U U U 4 tJ OF O t w ~ ppk 4s 44 44 G Y $ g B c $ v n a ~ S v $ _ g a ~ fc s - b ~ gi ~ u7 ~ 3 ~ y 3 ¢ f 3 v ~ ~ g ° ° L ~ $ Si ~ q $ € v. mt " <<. LL ow m f -u > > c>:. uu ui o u ~ = ~g' u ,nm mm o° 58< 53i y t l 2 J W Z Z Q U 8 Z O 2 0- 0 00 > N O in w LU C; 0 J j ? `i W N LL Z W 7 O Q Q O o Om 5 m w a ~ J LL W O LL Z O 2 U Z U w z Z s 8 8 8 s ss s~ ~ i s S 0 a 8 S 8 8 8 8 88 $ 88 88 88 8 8 8 8 8 88 8 88 88 88 h8 8 »2 « u s w ~ 8 8 8 8 8 88 8 88 88 88 z 8 8 8 S 8 88 8 85 88 88 3 s < u 8 8 8 8 8 8 88 8 8 .9 E2 a `7 NN 8 8 8 8 8 5 5 8 8 8 8 8 s s R 5~ Q 25 Q Q 3i 5 ~ i5 5 ~ ~ ~ 5 ~ 5 '3 2 ~ 5 ~ y ~ 2 ~ 5 ~ Q 5 LS 2 5 8 ~ S D iY 8 w N2~ 8 wR x» N^ a s u V W ~ U 8 '9i 8 8Q5~ 6 S 9n' 5Q`d~ D y5~ 58 2$2 ~ 8 w 5 S Q8 58~ 8 25N °o S a . i 8 8 8 8 8 88 8 8 88 888 i g ~ a y8y!. ii 8 a 8 § 8 Q8 25. 8~ 25 82 A.« 8 S ~ qR g8W 7a Sa s z 7 8 8 8 8 8 8 88 8 88 88 8 u W 8 8 8 8 8 8 88 8 88 88 5 8 8 8 8 8 b S° 8 88 88 5 n W 8 8 8 8 8 8 88 S8 88 S rc C z o - 8 8 8 8 8 8 88 8 85 58 8 ~ kS 3 g n 8 R 8 p 88 2S 88 S{ Q8 iS Q8 2t l 88 5Q 8 ~ 88 7 8 Qo 8 n W r O N g Q g G ~j j W W W LL W W W LLJ J B b o~ ~ ~ ~ gg y c gg o r r r t W 0 D&B Business Inforniation W rt: RE YES CONSTRUCTION INC is D&B Business Information Report Page I of 8 AI-'TA c/fMEi1T C t / u/ S> Copyright 2006 Dun & Bradstreet - Provided under contract for the exclusive use of subscriber 053012900L ATTN: Mona Christian BUSINESS SUMMARY REYES CONSTRUCTION INC 1383 S Signal Dr Pomona, CA 91766 Rating Change Report Printed: NOV 17 2006 In Date This is a single location. D-U-N-S Number: 15-283-9015 Web site: www.reyesconstruction.com D&B Rating: 1R3 Telephone: 909 622-2259 Formerly 1112 Number of employees: 1R is 10 or more Chief JOSEPH REYES, PRES-SEC-TREAS employees. executive: Composite credit 3 is fair. appraisal: Year started: 1987 D&B PAYDEX®: Employs: 50-100 12-Month D&B PAYDEX: 76 History: CLEAR When weighted by dollar amount, payments to Financing: SECURED suppliers average 6 days beyond terms. SIC: 1611 8711 Based on trade collected over last 12 months. Line of Highway/street construction, business: engineering services SUMMARY ANALYSIS D&B Rating: 1113 Number of employees: 1R indicates 10 or more employees. Composite credit appraisal: 3 is fair. The Rating was changed on May 30, 2006 because of a change in payment information appearing in D&B's file. The 1R and 211 ratings categories reflect company size based on the total number of employees for the business. They are assigned to business files that do not contain a current financial statement. In 1R and 2R Ratings, the 2, 3, or 4 creditworthiness indicator is based on analysis by D&B of public filings, trade payments, business age and other important factors. 2 is the highest Composite Credit Appraisal a company not supplying D&B with current financial Information can receive. For more information, see the D&B Rating Key. Below is an overview of the company's rating history since 06/02/93: D&B Rating Date Applied 1R3 05/30/06 1R2 12/20/04 2R3 10/15/03 3A1 06/07/00 3A2 04/17/99 3A1 04/03/98 2A1 05/20/97 file:HCADocuments and Settingslmchristian\Local Settings\Temporary Internet Files\OL... 11/17/2006 D&B Business Information of rt: REYES CONSTRUCTION INC 0 Page 2 of 8 2A2 04/12/96 2A1 04/11/95 BA2 06/02/93 The Summary Analysis section reflects information in D&B's file as of November 13, 2006. CUSTOMER SERVICE If you have questions about this report, please call our Customer Resource Center at 1.800.234.3867 from anywhere within the U.S. If you are outside the U.S. contact your local D&B office. Additional Decision Support Available Additional D&B products, monitoring services and specialized investigations are available to help you evaluate this company or its industry. Call Dun & Bradstreet's Customer Resource Center at 1.800.234.3867 from anywhere within the U.S. or visit our website at www.dnb.com. HISTORY The following information was reported 05/30/2006: Officer(s): JOSEPH REYES, PRES-SEC-TREAS DIRECTOR(S): THE OFFICER(S) Business started 1987 by Joseph Reyes, Mike Reyes and Pete Garcia. 100% of capital stock is owned by officers. JOSEPH REYES born 1960. 1987-present active here. 1981-1987 employed by Robert Longway Inc, CA, as project manager. BUSINESS REGISTRATION CORPORATE AND BUSINESS REGISTRATIONS REPORTED BY THE SECRETARY OF STATE OR OTHER OFFICIAL SOURCE AS OF NOV 03 2006: This data is for informational purposes only, certification can only be obtained through the Sacramento Office of the California Secretary of State. Registered Name: REYES CONSTRUCTION, INC. Business type: CORPORATION Corporation type: PROFIT Date incorporated: FEB 19 1987 State of incorporation: CALIFORNIA Filing date: FEB 19 1987 Registration ID: C1399781 Status: ACTIVE Where filed: SECRETARY OF STATE/CORPORATIONS DIVISION, SACRAMENTO, CA Registered agent: JOE REYES, 15823 ESGUILIME DR, CHINO HILLS, CA, 917090000 Principals: JOE REYES, PRESIDENT, 15823 ESGUILIME DR, CHINO HILLS, CA, 917090000 OPERATIONS file://CADocuments and Settings\mchristian\Local Settings\Temporary Internet Files\OL... 11/17/2006 D&B Business Information ar rt: REYES CONSTRUCTION INC • Page 3 of 8 05/30/2006 Description: Contractor of highway and street work, specializing in grading. Provides engineering services. Contractor specializing in civil engineer of grading projects for public works. Contracts are obtained through bidding 100%. Contracts call for fixed fee 100%. Retainages, if any, generally 10%. Nonseasonal. Employees: 50-100 which includes officer(s). Employees fluctuate depending on work in progress. Facilities: Owns premises in two story steel building Building is owned by Joseph Reyes and leased to the corpoation. Location: Industrial section on side street. SIC & NAICS SIC: Based on information in our file, D&B has assigned this company an extended 8-digit SIC. D&B's use of 8-digit SICs enables us to be more specific to a company's operations than if we use the standard 4-digit code. NAICS: 237310 Highway,Street and Bridge Construction 541330 Engineering Services The 4-digit SIC numbers link to the description on the Occupational Safety & Health Administration (OSHA) Web site. Links open in a new browser window. 16110203 Grading 87110000 Engineering services D&B PAYDEX The D&B PAYDEX is a unique, dollar weighted indicator of payment performance based on up to 29 payment experiences as reported to D&B by trade references. 3-Month D&B PAYDEX: 77 When weighted by dollar amount, payments to suppliers average 5 days beyond terms. 12-Month D&B PAYDEX: 76 When weighted by dollar amount, payments to suppliers average 6 days beyond terms. Based on trade collected over last 3 months. PAYMENT SUMMARY Based on trade collected over last 12 months. When dollar amounts are not considered, then approximately 84% of the company's payments are within terms. The Payment Summary section reflects payment information in D&B's file as of the date of this report. Below is an overview of the company's dollar-weighted payments, segmented by its suppliers' primary industries: Total Total Dollar Largest High Within Days Slow Rcv'd Amts Credit Terms <31 31-60 61-90 90> M Top industries: Short-trm busn credit 8 156,050 40,000 100 Ret auto supplies 3 1,250 750 100 file://CADocuments and Settings\mchristian\Local Settings\Temporary Internet Files\OL... 11/17/2006 D&B Business Information *rt: REYES CONSTRUCTION INC • Whol chemicals Whol plumb/hydronics General warehousing Misc equipment rental Hvy const eqpt rental Whol Industrial suppl Whol const/mine equip Misc general gov't OTHER INDUSTRIES Other payment categories: Cash experiences Payment record unknown Unfavorable comments Placed for collections: With D&B Other Total in D&B's file 2 1,500 1,000 33 67 - 1 25,000 25,000 50 50 - 1 10,000 10,000 50 50 - 1 5,000 5,000 50 - 50 1 2,500 2,500 50 50 - 1 1,000 1,000 100 - - 1 1,000 1,000 100 - - 1 750 750 100 - - 7 1,650 500 70 - - 1 0 0 1 1,000 1,000 0 0 0 0 0 0 N/A 29 206,700 40,000 The highest Now Owes on file is $20,000 The highest Past Due on file is $2,500 30 Page 4 of S D&B receives over 600 million payment experiences each year. We enter these new andupdated experiences Into D&B Reports as this information isreceived. PAYMENT DETAILS Detailed Payment History Date Reported Paying Record High Credit Now Owes Past Due Selling Terms Last Sale (mm/yy) M M M Within (months) 10/06 Ppt 40,000 20,000 0 1 mo Ppt 35,000 20,000 0 1 mo Ppt 35,000 20,000 0 1 mo Ppt 35,000 1,000 0 1 mo Ppt 7,500 7,500 0 1 mo Ppt 1,000 0 0 N30 4-5 mos Ppt 1,000 1,000 0 1 mo Ppt 750 0 0 6-12 mos Ppt 250 50 0 2-3 mos Ppt 250 100 0 1 mo Ppt 250 0 0 N30 6-12 mos Ppt 250 0 0 6-12 mos Ppt-Slow 30 25,000 1,000 500 1 mo Ppt-Slow 30 10,000 10,000 2,500 1 mo 09/06 Ppt 2,500 2,500 0 1 mo Ppt 1,000 0 0 N30 1 mo Ppt 500 500 0 N30 1 mo Ppt 0 0 0 4-5 mos fileWCADocuments and Settings\mchristian\Local Settings\Temporary Internet Files\OL... 11/17/2006 D&B Business Information *rt: REYES CONSTRUCTION INC • Ppt-Slow 30 1,000 500 0 1 mo (020) 1,000 0 0 4-5 mos 08/06 Ppt-Slow 60 5,000 5,000 1,000 N30 1 mo 07/06 Ppt 100 0 0 6-12 mos (023) 750 1 mo Satisfactory. 06/06 Ppt-Slow 30 2,500 2,500 1,000 1 mo Slow 30 500 0 0 6-12 mos 05/06 Slow 120 500 500 500 09/05 Ppt 50 0 0 6-12 mos (028) 0 0 0 Cash in advance 6-12 mos 07/05 (029) 50 1 mo Satisfactory. Page 5 of 8 Payments Detail Key: red = 30 or more days beyond terms Payment experiences reflect how bills are met in relation to the terms granted. In some instances payment beyond terms can be the result of disputes over merchandise, skipped invoices etc. Each experience shown is from a separate supplier. Updated trade experiences replace those previously reported. FINANCE 05/30/2006 On May 30, 2006, attempts to contact the management of this business have been unsuccessful. Outside sources confirmed operation and location. PUBLIC FILINGS The following Public Filing data is for information purposes only and is not the official record. Certified copies can only be obtained from the official source. SUITS Suit amount: $2,615 Status: Judgment for plaintiff CASE NO.: 02500366 Plaintiff: B.I.G. ENTERPRISES, INC. Defendant: REYES CONSTRUCTION, INC. Cause: NOT AVAILABLE Where filed: LOS ANGELES COUNTY SMALL CLAIMS COURT/EL MONTE, EL MONTE, CA Date status attained: 05/02/2002 Date filed: 02/13/2002 Latest Info Received: 09/11/2004 If it is indicated that there are defendants other than the report subject, the lawsuit may be an action to clear title to property and does not necessarily imply a claim for money against the subject. UCC FILINGS Collateral: All Inventory and proceeds - All Account(s) and proceeds - All General intangibles (s) and proceeds - All Equipment and proceeds - All Chattel paper and proceeds Type: Original file://CADocuments and Settings\mchristian\Local Settings\Temporary Internet Files\OL... 11/17/2006 D&B Business Information iv rt: REYES CONSTRUCTION INC • Page 6 of 8 Sec. party: PFF BANK & TRUST, CHINO, CA Debtor: REYES EQUIPMENT, INC. Filing number: 0236460208 Filed with: SECRETARY OF STATE/UCC DIVISION, SACRAMENTO, CA Date filed: 12/24/2002 Latest Info Received: 01/14/2003 Collateral: All Inventory and proceeds - All Account(s) and proceeds - All General intangibles (s) and proceeds - All Equipment and proceeds - All Chattel paper and proceeds Type: Original Sec. party: PFF BANK & TRUST, CHINO, CA Debtor: REYES CONSTRUCTION, INC. Filing number: 0236460206 Filed with: SECRETARY OF STATE/UCC DIVISION, SACRAMENTO, CA Date filed: 12/24/2002 Latest Info Received: 01/14/2003 Collateral: Account(s) including proceeds and products - Equipment including proceeds and products - General intangibles(s) including proceeds and products - Fixtures including proceeds and products - Building materials including proceeds and products Type: Original Sec. party: U.S. BANK NATIONAL ASSOCIATION, SAN DIEGO, CA Debtor: REYES JOSEPH RAYMOND and OTHERS Filing number: 0114560203 Filed with: SECRETARY OF STATE/UCC DIVISION, SACRAMENTO, CA Date filed: 05/21/2001 Latest Info Received: 06/18/2001 Collateral: Account(s) and proceeds - Contract rights and proceeds - General Intangibles(s) and proceeds - Chattel paper and proceeds - Equipment and proceeds Type: Original Sec. party: CITICAPITAL COMMERCIAL CORPORATION, IRVING, TX Debtor: REYES EQUIPMENT, INC. Filing number: 0229460695 Filed with: SECRETARY OF STATE/UCC DIVISION, SACRAMENTO, CA Date filed: 10/18/2002 Latest Info Received: 11/04/2002 Collateral: Account(s) and proceeds - Contract rights and proceeds - General intangibles(s) and proceeds - Chattel paper and proceeds - Equipment and proceeds Type: Original Sec. party: CITICAPITAL COMMERCIAL CORPORATION, IRVING, TX Debtor: REYES EQUIPMENT, INC. Filing number: 0219660117 Filed with: SECRETARY OF STATE/UCC DIVISION, SACRAMENTO, CA Date filed: 07/12/2002 Latest Info Received: 08/13/2002 Collateral: Account(s) and proceeds - Contract rights and proceeds - General intangibles(s) and proceeds - Chattel paper and proceeds - Equipment and proceeds Type: Original Sec. party: ASSOCIATES COMMERCIAL CORPORATION, NEWPORT BEACH, CA Debtor: REYES CONSTRUCTION CORP. Filing number: 0034460286 Filed with: SECRETARY OF STATE/UCC DIVISION, SACRAMENTO, CA Date filed: 11/28/2000 Latest Info Received: 12/29/2000 Collateral: Vehicles and proceeds file://CADocumentsand Settings\mchristian\Local Settings\Temporary Internet Files\OL... 11/17/2006 D&B Business Information W rt: REYES CONSTRUCTION INC 0 Page 7 of 8 Type: Original Sec. party: CITICAPITAL COMMERCIAL CORPORATION, IRVING, TX Debtor: REYES CONSTRUCTION, INC. Filing number: 0231960047 Filed with: SECRETARY OF STATE/UCC DIVISION, SACRAMENTO, CA Date filed: 11/13/2002 Latest Info Received: 12/09/2002 Collateral: Equipment and proceeds Type: Original Sec. party: CITICAPITAL COMMERCIAL CORPORATION, IRVING, TX Debtor: REYES CONSTRUCTION, INC. Filing number: 0230360104 Filed with: SECRETARY OF STATE/UCC DIVISION, SACRAMENTO, CA Date filed: 10/28/2002 Latest Info Received: 11/12/2002 Collateral: Equipment and proceeds Type: Original Sec. party: CITICAPITAL COMMERCIAL CORPORATION, IRVING, TX Debtor: REYES CONSTRUCTION, INC. Filing number: 0229460701 Filed with: SECRETARY OF STATE/UCC DIVISION, SACRAMENTO, CA Date filed: 10/18/2002 Latest Info Received: 11/04/2002 Collateral: Vehicles and proceeds Type: Original Sec. party: CITICAPITAL COMMERCIAL CORPORATION, IRVING, TX Debtor: REYES CONSTRUCTION, INC. Filing number: 0228460003 Filed with: SECRETARY OF STATE/UCC DIVISION, SACRAMENTO, CA Date filed: 10/09/2002 Latest Info Received: 10/24/2002 Type: Amendment Sec. party: CITICAPITAL COMMERCIAL CORPORATION, IRVING, TX Debtor: REYES CONSTRUCTION, INC. Filing number: 02297CO564 Filed with: SECRETARY OF STATE/UCC DIVISION, SACRAMENTO, CA Date filed: 10/22/2002 Latest Info Received: 11/12/2002 Original UCC filed date: 10/09/2002 Original filing no.: 0228460003 There are additional UCC's in D&B's file on this company available by contacting 1-800-234-3867 The public record items contained in this report may have been paid, terminated, vacated or released prior to the date this report was printed. GOVERNMENT ACTIVITY Activity summary Borrower (Dir/Guar): NO Administrative debt: NO Contractor: YES Grantee: NO fileWCADocuments and Settingslmchristian\Local Settings\Temporary Internet Files\OL... 11/17/2006 D&B Business Information w rt: REYES CONSTRUCTION INC • Page 8 of 8 Party excluded from federal program(s): NO Possible candidate for socio-economic program consideration Labor surplus area: YES (2006) Small Business: N/A 8(A) firm: N/A The details provided in the Government Activity section are as reported to Dun & Bradstreet by the federal government and other sources. Copyright 2006 Dun & Bradstreet - Provided under contract for the exclusive use of subscriber 053012900L file:HCADocuments and Settingslmchristian\Local Settings\Temporary Internet Files\OL... 11/17/2006 D&B Business Information VV rt: SEMA CONSTRUCTION INC • Page 1 of 10 14 77,4 C1.11q&1VT C D&B• Business Information Report (Z g) Copyright 2006 Dun & Bradstreet - Provided under contract for the exclusive use of subscriber 053012900L ATTN: Mona Christian BUSINESS SUMMARY SEMA CONSTRUCTION INC 7353 S Eagle St Centennial, CO 80112 This is a headquarters location Branch(es) or division(s) exist. Web site: www.semaconstruction.com Telephone: 303 627-2600 Fax: 303 627-2626 Chief THOMAS AMES, STOCKHOLDER executive: Year started: 1991 Employs: 450 (25 here) History: CLEAR Financing: SECURED SIC: 1622 1771 Line of Bridge/tunnel construction, concrete business: contractor SUMMARY ANALYSIS Report Printed: NOV 17 2006 In Date D-U-N-S Number: 62-388-2495 D&B Rating: 11114 Number of employees: 1R is 10 or more employees. Composite credit 4 is limited. appraisal: D&B PAYDEX®: 12-Month D&B PAYDEX: 6S When weighted by dollar amount, payments to suppliers average 19 days beyond terms. Based on trade collected over last 12 months. D&B Rating: 1R4 Number of employees: 1R indicates 10 or more employees. Composite credit appraisal: 4 is limited. The 1R and 2R ratings categories reflect company size based on the total number of employees for the business. They are assigned to business files that do not contain a current financial statement. In 111 and 211 Ratings, the 2, 3, or 4 creditworthiness indicator is based on analysis by D&B of public filings, trade payments, business age and other important factors. 2 is the highest Composite Credit Appraisal a company not supplying D&B with current financial information can receive. For more information, see the D&B Rating Key. Below is an overview of the company's rating history since 04/16/91: D&B Rating Date Applied 1R4 07/11/98 1113 05/19/98 1R4 08/20/97 3A3 05/18/96 3A2 02/17/95 3A3 02/17/94 08/10/93 file://CADocuments and Settings\mchristian\Local Settings\Temporary Internet Files\OL... 11/17/2006 D&B Business Information *rt: SEMA CONSTRUCTION INC • Page 2 of 10 IA2 10/17/92 BA2 04/16/91 The Summary Analysis section reflects Information in D&B's file as of November 13, 2006. CUSTOMER SERVICE If you have questions about this report, please call our Customer Resource Center at 1.800.234.3867 from anywhere within the U.S. If you are outside the U.S. contact your local D&B office. Additional Decision Support Available Additional D&B products, monitoring services and specialized investigations are available to help you evaluate this company or its industry. Call Dun & Bradstreet's Customer Resource Center at 1.800.234.3867 from anywhere within the U.S. or visit our website at www.dnb.com. HISTORY The following information was reported 05/25/2006: Officer(s): THOMAS AMES, STOCKHOLDER THEODORE LAUDICK, SEC-TREAS DIRECTOR(S): THE OFFICER(S) This is a corporation formed in the state of Colorado on 4/12/2001. Business started Feb 1991 by officers. 75.76% of capital stock is owned by Thomas and Lois Ames. 24.24% of capital stock is owned by three other individuals. The three other shareholders individually do not own in excess of 10% of the capital stock. THOMAS AMES born 1946. 1965-91 employed by Ames Construction, Burnsville, MN. 1991 to present active here. THEODORE LAUDICK. Here since inception. RELATED CONCERN: Sema Golf LLC, Scottsdale, AZ, started 1998. Operates as golf course construction. Related through the owners. Business address has changed from 6746 S Revere Parkway Ste 140, Englewood, CO, 80112 to 7353 S Eagle, Englewood, CO, 80112. CORPORATE FAMILY Click below to buy a Business Information Report on that family member. For an expanded, more current corporate family view, use D&B's Global Family Linkage product. Subsidiaries (US): Sema Golf, LLC Scottsdale, AZ DUNS # 04-693-2476 Branches (US): Sema Construction Inc Scottsdale, AZ DUNS # 04-687-2623 Sema Construction Inc Lake Forest, CA DUNS # 14-156-7839 OPERATIONS file://CA1Documents and Settingslmchristian\Local Settings\Temporary- Internet F11es\0L... 11/17/2006 D&B Business Information VW rt: SEMA CONSTRUCTION INC • Page 3 of 10 05/25/2006 Description: Operates as a contractor of bridges, tunnels or elevated highways (90%). Contractor of concrete work (10%). Contractor specializing in highway construction including bridges (90%) and structural concrete work (10%). This business contracts 20% of work to others. Contracts are obtained through bidding 95% and negotiation 5%. Contracts call for fixed fee 100%. Terms are progress payments 98% and lump sum payment 2%. Retainages, if any, generally 3%. Terms are progress payments on net 30 days. Has 15-20 account(s). Sells to state highway departments, other contractors, and the U S government. Territory : Western United States. Season peaks summer. Business slow winter. Employees: 450 which includes officer(s). 25 employed here. Employees peak to 450 during peak season and drop to 200 during rest of year. Facilities: Owns 4,200 sq. ft. in a one story concrete block building. Location: Suburban business section on well traveled street. Branches: Branch in Scottsdale, Arizona. SIC & NAICS SIC: Based on information in our file, D&B has assigned this company an extended 8-digit SIC. D&B's use of 8-digit SICs enables us to be more specific to a company's operations than if we use the standard 4-digit code. NAICS: 237310 Highway,Street and Bridge Construction 238110 Poured Concrete Foundation and Structure Contractors The 4-digit SIC numbers link to the description on the Occupational Safety & Health Administration (OSHA) Web site. Links open in a new browser window. 16220000 Bridge, tunnel, and elevated highway construction 17710000 Concrete work D&B PAYDEX The D&B PAYDEX Is a unique, dollar weighted indicator of payment performance based on up to 90 payment experiences as reported to D&B by trade references. 3-Month D&B PAYDEX: 65 When weighted by dollar amount, payments to suppliers average 19 days beyond terms. 12-Month D&B PAYDEX: 65 When weighted by dollar amount, payments to suppliers average 19 days beyond terms. Based on trade collected over last 3 months. Based on trade collected over last 12 months. When dollar amounts are not considered, then approximately 70% of the company's payments are within terms. PAYMENT SUMMARY The Payment Summary section reflects payment information in D&B's file as of the date of this report. Below is an overview of the company's dollar-weighted payments, segmented by its suppliers' primary industries: file:HCADocuments and Settingslmchristian\Local Settings\Temporary Internet FileslOL... 11/17/2006 D&B Business Information va rt: SEMA CONSTRUCTION INC • Total Total Dollar Largest High Within Days Slow Rcv'd Amts Credit Terms <31 31-60 61-90 90> Top industries: Short-trm busn credit 8 191,500 45,000 100 - - - - Nonclassified 7 36,500 20,000 61 2 10 27 - Whol metal 4 146,100 75,000 25 49 - 26 - Whol const/mine equip 3 155,000 95,000 19 62 19 - - Whol plumb/hydronics 3 175,000 90,000 51 30 19 - - Whol electrical equip 3 67,500 50,000 89 11 - - - Crushed stone mining 2 50,250 50,000 - 50 50 - - Whol Industrial equip 1 200,000 200,000 50 50 - - - Ret-direct selling 1 50,000 50,000 100 - - - - Misc business service 1 35,000 35,000 100 - - - - OTHER INDUSTRIES 56 130,550 20,000 62 31 5 2 - Other payment categories: Cash experiences 0 0 0 Payment record unknown 1 50 50 Unfavorable comments 0 0 0 Placed for collections: With D&B 0 0 Other 0 N/A Total In D&B's file 90 1,237,450 200,000 The highest Now Owes on file is $80,000 The highest Past Due on file is $40,000 Page 4 of 10 Dun & Bradstreet has 90 payment experiences in its file for this company. For your convenience, we have displayed 80 representative experiences in the PAYMENTS section. PAYMENT DETAILS Detailed Payment History Date Reported Paying Record High Credit Now Owes Past Due (mm/yy) M M 11/06 Ppt 1,000 50 0 Ppt 500 0 0 Ppt 250 0 0 Slow 30 250 0 10/06 Ppt 45,000 15,000 0 Ppt 35,000 10,000 0 Ppt 35,000 10,000 0 Ppt 35,000 25,000 0 Ppt 35,000 10,000 0 Ppt 10,000 10,000 0 Ppt 5,000 1,000 0 Ppt 5,000 0 0 Selling Terms Last Sale Within (months) 1 mo 2-3 mos 2-3 mos 6-12 mos 1 mo 1 mo 1 mo 1 mo 1 mo N30 1 mo 1 mo N30 6-12 mos file://C:1Documents and Settings\mchristian\Local Settings\Temporary Internet FileslOL... 11/17/2006 D&B Business Information W rt: SEMA CONSTRUCTION INC Q Page 5 of 10 Ppt 2,500 2,500 0 1 mo Ppt 2,500 2,500 0 N30 1 mo Ppt 2,500 2,500 0 N30 1 mo Ppt 1,000 750 0 1 mo Ppt 1,000 0 0 6-12 mos Ppt 500 0 0 2-3 mos Ppt 250 100 0 1 mo Ppt 250 0 0 6-12 mos Ppt 250 100 0 1 mo Ppt 100 100 0 1 mo Ppt-Slow 30 750 0 0 6-12 mos Ppt-Slow 30 500 0 0 6-12 mos Ppt-Slow 30 500 50 0 1 mo Ppt-Slow 30 250 250 0 1 mo Ppt-Slow 45 10,000 2,500 0 N30 1 mo Ppt-Slow 60 7,500 5,000 500 1 mo Ppt-Slow 60 750 0 0 N30 6-12 mos Ppt-Slow 60+ 20,000 7,500 250 1 mo Slow 15 2,500 0 0 N30 4-5 mos Slow 30 95,000 80,000 40,000 N30 1 mo Slow 30 20,000 0 0 4-5 mos Slow 30 750 750 750 1 mo Slow 30-60 50,000 0 0 2-3 mos Slow 60 30,000 0 0 N30 1 mo Slow 30-90 1,000 100 100 1 mo Slow 120 250 0 0 6-12 mos 09/06 Ppt 50,000 0 0 2-3 mos Ppt 10,000 2,500 0 N30 1 mo Ppt 7,500 5,000 0 1 mo Ppt 5,000 2,500 0 1 mo Ppt 100 100 0 1 mo Ppt 0 0 0 N30 1 mo Ppt 0 0 0 N30 1 mo Ppt-Slow 30 70,000 0 0 6-12 mos Ppt-Slow 30 7,500 0 0 N10 1 mo Ppt-Slow 30 2,500 2,500 2,500 1 mo Ppt-Slow 30 250 0 0 2-3 mos Ppt-Slow 60 2,500 2,500 100 1 mo Ppt-Slow 60 1,000 1,000 0 1 mo Slow 30 7,500 1,000 1,000 1 mo Slow 30 2,500 0 0 1 mo Slow 30 500 100 100 1 mo Slow 30-90 75,000 10,000 10,000 4-5 mos Slow 30-90 5,000 0 0 4-5 mos Slow 30-90 500 250 100 1 mo (058) 50 4-5 mos Satisfactory. 08/06 Ppt 50,000 20,000 0 N30 1 mo Ppt-Slow 30 1,000 1,000 1,000 1 mo Slow 5 100 100 1 10 N30 file://C:\Documents and Settings\mchristian\Local Settings\Temporary Internet Files\OL... 11/17/2006 D&B Business Information *rt: SEMA CONSTRUCTION INC 0 Page 6 of 10 07/06 Ppt-Slow 30 5,000 2,500 0 Lease Agreemnt 1 mo Slow 30-60 65,000 0 0 6-12 mos (064) 750 1 mo Satisfactory. (065) 50 4-5 mos Satisfactory. 06/06 Ppt 2,500 2,500 0 1 mo Ppt 1,000 0 0 1/2 10 N30 6-12 mos Ppt 250 250 0 1 mo Slow 30 500 500 500 05/06 Ppt 2,500 0 0 N30 6-12 mos Ppt 250 1 mo 04/06 Ppt 250 0 0 6-12 mos 03/06 Ppt-Slow 30 200,000 45,000 15,000 1 mo 02/06 Ppt 2,500 0 0 4-5 mos Ppt 1,000 0 0 N30 6-12 mos 01/06 Ppt 10,000 1,000 0 N30 Ppt 100 6-12 mos 12/05 Ppt 250 0 0 N30 6-12 mos 09/05 Ppt 30,000 25,000 0 1 mo 08/05 Ppt 90,000 0 0 6-12 mos Payments Detail Key: red = 30 or more days beyond terms Payment experiences reflect how bills are met In relation to the terms granted. In some instances payment beyond terms can be the result of disputes over merchandise, skipped invoices etc. Each experience shown is from a separate supplier. Updated trade experiences replace those previously reported. FINANCE 05/25/2006 On May 26, 2006, inside source confirmed the name, location and the operation of the business. However, deferred all other informations. PUBLIC FILINGS The following Public Filing data is for information purposes only and is not the official record. Certified copies can only be obtained from the official source. JUDGMENTS Status: Unsatisfied DOCKET NO.: 98N43174 Judgment type: Judgment Against: $9,041 - SEMA CONSTRUCTION INC In favor of: J D PEARSON Where filed: DENVER COUNTY COURT, DENVER, CO Date status attained: 05/27/1998 Date entered: 05/27/1998 Latest Info Received: 05/24/2005 file://CADocuments and Settings\mchristian\Local Settings\Temporary Internet Files\OL... 11/17/2006 D&B Business Information W rt: SEMA CONSTRUCTION INC 0 SUITS Suit amount: $162,486 Status: Pending CASE NO.: 060007091 Plaintiff: ANDERSON DRILLING SJA INC Defendant: SEMA CONSTRUCTION INC, LAKE FOREST, CA AND OTHERS Where filed: ORANGE COUNTY SUPERIOR COURT, SANTA ANA, CA Date status attained: 06/14/2006 Date filed: 06/14/2006 Latest Info Received: 07/27/2006 Page 7 of 10 If it is indicated that there are defendants other than the report subject, the lawsuit may be an action to clear title to property and does not necessarily imply a claim for money against the subject. UCC FILINGS Collateral: Inventory Type: Original Sec. party: REDBURN TIRE COMPANY, PHOENIX, AZ Debtor: SEMA CONSTRUCTION Filing number: 20002046646 Filed with: SECRETARY OF STATE/UCC DIVISION, DENVER, CO Date filed: 05/19/2000 Latest Info Received: 06/06/2000 Collateral: Inventory - Products - Proceeds Type: Amendment Sec. party: AG SERVICES OF AMERICA INC, CEDAR FALLS, IA AG ACCEPTANCE CORPORATION, CEDAR FALLS, IA Assignee: AG ACCEPTANCE CORPORATION, CEDAR FALLS, IA Debtor: SEMA CONSTRUCTION and OTHERS Filing number: 20002008622 Filed with: SECRETARY OF STATE/UCC DIVISION, DENVER, CO Date filed: 02/01/2000 Latest Info Received: 03/21/2000 Original UCC filed date: 01/28/1997 Original filing no.: 52705 Collateral: Account(s) and proceeds - Equipment and proceeds Type: Original Sec. party: JOHNSON MACHINERY CO., RIVERSIDE, CA Debtor: SEMA CONSTRUCTION Filing number: 0330860154 Filed with: SECRETARY OF STATE/UCC DIVISION, SACRAMENTO, CA Date filed: 10/29/2003 Latest Info Received: 11/13/2003 Collateral: Proceeds - Equipment Type: Original Sec. party: US BANK NA, DENVER, CO Debtor: SEMA CONSTRUCTION INC Filing number: 20002012770 Filed with: SECRETARY OF STATE/UCC DIVISION, DENVER, CO Date filed: 02/11/2000 Latest Info Received: 03/21/2000 Type: Sec. party: Amendment U.S. BANK NATIONAL ASSOCIATION file://CADocuments and Settings\mchristian\Local Settings\Temporary Internet F11es\OL... 11/17/2006 D&B Business Information W rt: SEMA CONSTRUCTION INC • Debtor; SEMA CONSTRUCTION, INC. Filing number: 2004FO46224 Filed with: SECRETARY OF STATE/UCC DIVISION, DENVER, CO Date filed: 04/27/2004 Latest Info Received: 10/12/2004 Original UCC filed date: 02/11/2000 Original filing no.: 20002012770 Collateral: Proceeds - Equipment Type: Original Sec. party: HOLT COMPANY OF TEXAS, SAN ANTONIO, TX Debtor: SEMA CONSTRUCTION INC and OTHERS Filing number: 20002004838 Filed with: SECRETARY OF STATE/UCC DIVISION, DENVER, CO Date filed: 01/19/2000 Latest Info Received: 02/16/2000 Collateral: Proceeds - Equipment Type: Original Sec. party: CATERPILLAR FINANCIAL SERVICES CORP, PLANO, TX Debtor: SEMA CONSTRUCTION INC Filing number: 19992062243 Filed with: SECRETARY OF STATE/UCC DIVISION, DENVER, CO Date filed: 11/08/1999 Latest Info Received: 11/23/1999 Type: Termination Sec. party: CATERPILLAR FINANCIAL SERVICES CORPORATION, PLANO, TX Debtor: SEMA CONSTRUCTION INC Filing number: 20022121317 Filed with: SECRETARY OF STATE/UCC DIVISION, DENVER, CO Date filed: 11/18/2002 Latest Info Received: 10/28/2003 Original UCC filed date: 11/08/1999 Original filing no.: 19992062243 Page 8 of 10 Collateral: Proceeds - Equipment - PURCHASE MONEY SECURITY INTEREST Type: Original Sec. party: JOHN L RUST CO, ALBUQUERQUE, NM RUST TRACTOR, ALBUQUERQUE, NM Assignee: CATERPILLAR FINANCIAL SERV CORP, PLANO, TX Debtor: SEMA CONSTRUCTION INC Filing number: 19992045585 Filed with: SECRETARY OF STATE/UCC DIVISION, DENVER, CO Date filed: 08/12/1999 Latest Info Received: 08/31/1999 Collateral: Proceeds - Equipment Type: Original Sec. party: JOHN L RUST CO, ALBUQUERQUE, NM RUST TRACTOR CO, ALBUQUERQUE, NM Debtor: SEMA CONSTRUCTION INC Filing number: 19992035449 Filed with: SECRETARY OF STATE/UCC DIVISION, DENVER, CO Date filed: 06/22/1999 Latest Info Received: 07/13/1999 Type: Termination Sec. party: RUST TRACTOR CO, ALBUQUERQUE, NM JOHN L RUST CO, ALBUQUERQUE, NM Debtor: SEMA CONSTRUCTION INC Filing number: 19992043372 Filed with: SECRETARY OF STATE/UCC DIVISION, DENVER, CO file://CADocuments and Settings\mchristian\Local Settings\Temporary Internet Files\OL... 11/17/2006 D&B Business Information *rt: SEMA CONSTRUCTION INC 0 Page 9 of 10 Date filed: Latest Info Received: Original UCC filed date: Original filing no.: 08/02/1999 08/17/1999 06/22/1999 19992035449 Collateral: Proceeds - Equipment Type: Original Sec. party: WAGNER EQUIPMENT CO, AURORA, CO Debtor: SEMA CONSTRUCTION Filing number: 47660 Filed with: OURAY COUNTY CLERK AND RECORDER, OURAY, CO Date filed: 05/28/1998 Latest Info Received: 06/09/1998 Collateral: Proceeds - Equipment - PURCHASE MONEY SECURITY INTEREST Type: Original Sec. party: WAGNER EQUIPMENT CO., AURORA, CO Assignee: CATERPILLAR FINANCIAL SERVICES CORP, PLANO, TX Debtor: SEMA CONSTRUCTION INC Filing number: 43782 Filed with: OURAY COUNTY CLERK AND RECORDER, OURAY, CO Date filed: 03/10/1998 Latest Info Received: 03/17/1998 Type: Termination Sec. party: CATERPILLAR FINANCIAL SERVICES CORPORATION, PLANO, TX Assignee: CATERPILLAR FINANCIAL SERVICES CORP, PLANO, TX Debtor: SEMA CONSTRUCTION INC. Filing number: 54451 Filed with: OURAY COUNTY CLERK AND RECORDER, OURAY, CO Date filed: 10/21/1998 Latest Info Received: 10/27/1998 Original UCC filed date: 03/10/1998 Original filing no.: 43782 There are additional UCC's in D&B's file on this company available by contacting 1-800-234-3867 The public record items contained in this report may have been paid, terminated, vacated or released prior to the date this report was printed. GOVERNMENT ACTIVITY Activity summary Borrower (Dir/Guar): NO Administrative debt: YES Contractor: NO Grantee: NO Party excluded from federal program(s): NO Possible candidate for socio-economic program consideration Labor surplus area: N/A Small Business: N/A 8(A) firm: N/A The details provided in the Government Activity section are as reported to Dun & Bradstreet by the federal government and other sources. file://C:\Documents and Settings\mchristian\Local Settings\Temporary Internet Files\OL... 11/17/2006 D&B Business Information 0rt: SEMA CONSTRUCTION INC • Page 10 of 10 copyright 2006 Dun & Bradstreet - Provided under contract for the exclusive use of subscriber 053012900L file://C:\Documents and Settingslmchristian\Local Se •D&B Business Information sprt: RADOS, STEVE P INC. • Page I of 9 ,Q 7-7-A Cf/i4-Jt14/r C D&B Business Information Report s) Copyright 2006 Dun & Bradstreet - Provided under contract for the exclusive use of subscriber 053012900L ATTN: Mona Christian Report Printed: NOV 17 2006 In Date BUSINESS SUMMARY RADOS, STEVE P INC. (SUBSIDIARY OF RADOS COMPANIES, THE, INC, SANTA ANA, CA) 2002 E Mcfadden Ave 200 Santa Ana, CA 92705 This is a headquarters (subsidiary) location. Branch(es) or division(s) exist. D-U-N-S Number: 00-584-8833 Mailing address: PO Box 15128 Santa Ana, CA 92735 Telephone: 714 835-4612 Chief executive: ALEXANDER S RADOS, PRES-CEO Year started: 1944 Employs: 150-400 History: CLEAR SIC: 1622 1623 Line of business: Highway contractor SUMMARY ANALYSIS D&B Rating: Number of employees: Composite credit appraisal: D&B PAYDEX@: 11113 1R is 10 or more employees. 3 is fair. 12-Month D&B PAYDEX: 551 When weighted by dollar amount, payments to suppliers average 29 days beyond terms. Based on trade collected over last 12 months. D&B Rating: 11113 Number of employees: 1R Indicates 10 or more employees. Composite credit appraisal: 3 is fair. The 1R and 2R ratings categories reflect company size based on the total number of employees for the business. They are assigned to business files that do not contain a current financial statement. In 1R and 2R Ratings, the 2, 3, or 4 creditworthiness indicator is based on analysis by D&B of public filings, trade payments, business age and other important factors. 2 is the highest Composite Credit Appraisal a company not supplying D&B with current financial information can receive. For more information, see the D&B Rating Key. Below is an overview of the company's rating history since 01/01/91: D&B Rating Date Applied 1113 11/25/02 1114 12/31/01 10/04/99 1114 05/11/99 1R3 06/23/98 1114 04/07/98 01/01/91 The Summary Analysis section reflects information in D&B's file as of November 13, 2006. file://CADocuments and Settings\mchristian\Local Settings\Temporary Internet Files\OL... 11/17/2006 D&B Business Information or rt: RADOS, STEVE P INC. Page 2 of 9 CUSTOMER SERVICE If you have questions about this report, please call our Customer Resource Center at 1.800.234.3867 from anywhere within the U.S. If you are outside the U.S. contact your local D&B office. Additional Decision Support Available Additional D&B products, monitoring services and specialized investigations are available to help you evaluate this company or its industry. Call Dun & Bradstreet's Customer Resource Center at 1.800.234.3867 from anywhere within the U.S. or visit our website at www.dnb.com. HISTORY The following information was reported 08/09/2006: Officer(s): ALEXANDER S RADOS, PRES-CEO WALTER S RADOS, SR V PRES STEPHEN S RADOS, SR V PRES MILENKO P DODER, SEC-TREAS DIRECTOR(S): THE OFFICER(S) Incorporated California Dec 17, 1985. Business started 1944 by Steven P Rados. Present control succeeded 1984. 100% of capital stock is owned by parent company. Stephen P Rados passed away in 1957 and his interest passed to his widow, Angle Rados. On Jan 1 1984 the corporate stock of this business was transferred to the present parent company. There was no financial consideration involved. ALEXANDER S RADOS born 1928. OCCUPATIONAL BACKGROUND: Son of the late Steven P Rados. Graduated from Stanford University, Palo Alto and served in the U S Army until 1953. 1953-present active here. WALTER S RADOS born 1940. OCCUPATIONAL BACKGROUND: Son of the late Steven P Rados. 1962-present active here. STEPHEN S RADOS born 1945. OCCUPATIONAL BACKGROUND: Son of the late Steven P Rados. 1966-present active here. MILENKO P DODER born 1930. OCCUPATIONAL BACKGROUND: 1961-present active here. RELATED CONCERNS: The following are related through the parent company: Universal Management Corp, Santa Ana, CA. Duns# 78-747-6241. Started 1986. Provides management services to related companies. REC Equipment Corp, Santa Ana, CA. Duns# 15-127-7209. Started 1985. Leases construction equipment. The following is related through stock ownership: Risi Industries Inc, Greenville, TN. Duns# 08-117-2504. Started 1972 and acquired 1976. Manufactures material handling systems. The company is 60% owned by Alexander S Rados. Intercompany relations consist of shared premises and similar officers. There are service transactions which are billed on regular terms. There are no loans, general guarantees or endorsements. No financial information is available. file:/ ADocuments and SettingslmchristianlLocal SettingslTemporary Internet FileslOL... 11/17/2006 D&B Business Information *rt: RADOS, STEVE P INC. • CORPORATE FAMILY Click below to buy a Business Information Report on that family member. For an expanded, more current corporate family view, use D&B's Global Family Linkage product. Parent: Rados Companies Inc Santa Ana, CA Page 3 of 9 DUNS # 03-738-6166 Affiliates (US):(Affiliated companies share the same parent company as this business.) Rec Equipment Corp Santa Ana, CA DUNS # 15_127-7209 Universal Management Corp Santa Ana, CA DUNS # 78-747-6241 BUSINESS REGISTRATION CORPORATE AND BUSINESS REGISTRATIONS REPORTED BY THE SECRETARY OF STATE OR OTHER OFFICIAL SOURCE AS OF NOV 03 2006: This data is for informational purposes only, certification can only be obtained through the Sacramento Office of the California Secretary of State. Registered Name: Business type: STEVE P. RADOS, INC. CORPORATION Corporation type: PROFIT Date incorporated: DEC 17 1985 State of incorporation: CALIFORNIA Filing date: DEC 17 1985 Registration ID: Status: Where filed: Registered agent: Principals: OPERATIONS 08/09/2006 C1360333 ACTIVE SECRETARY OF STATE/CORPORATIONS DIVISION, SACRAMENTO, CA WALTER S RADOS, 2002 E MCFADDEN AVE STE 200, SANTA ANA, CA, 927050000 WALTER S RADOS, PRESIDENT, 2002 E MCFADDEN AVE STE 200, SANTA ANA, CA, 927050000 Description: Subsidiary of RADOS COMPANIES, THE, INC, SANTA ANA, CA started 1957 which operates as a highway, bridge, sewer and water line contractor and leases construction equipment. Parent company owns 100% of capital stock. Parent company has 2 other subsidiary(ies). Intercompany relations: Similar management and shared facilities as well as service transactions which are billed on regular terms. There are no loans, advances, general guarantees or endorsements. As noted, this company is a subsidiary of Rados Companies, The, Inc, Duns #03-738-6166 and reference is made to that report for background information on the parent company and its management. No financial information is released on the parent company. Operates as a highway contractor. Contractor specializing in highways (90%) and water, sewer and pipeline construction (10%). Contracts are obtained through bidding 100%. Contracts call for fixed fee 100%. Retainages, if any, generally 10%. Sells to government fileWC:\Documents and Settings\mchristian\Local Settings\Temporary Internet Files\OL... 11/17/2006 D&B Business Information 0rt: RADOS, STEVE P INC. • Page 4 of 9 Nonseasonal. Employees: 150-400 which includes officer(s). Employees fluctuate according to work In progress. Facilities: Leases 10,000 sq. ft. In a two story concrete block building. The building is owned by the officers and leased back to the corporation. Location: Suburban business section on well traveled street. Branches: Vaelljo, CA (UNKNOWN). SIC & NAICS SIC: Based on information in our file, D&B has assigned this company an extended 8-digit SIC. D&B's use of 8-digit SICs enables us to be more specific to a company's operations than if we use the standard 4-digit code. The 4-digit SIC numbers link to the description on the Occupational Safety & Health Administration (OSHA) Web site. Links open in a new browser window. 16229902 Highway construction, elevated 16230303 Water main construction D&B PAYDEX NAICS: 237310 Highway,Street and Bridge Construction 237110 Water and Sewer Line and Related Structures Construction The D&B PAYDEX is a unique, dollar weighted indicator of payment performance based on up to 52 payment experiences as reported to D&B by trade references. 3-Month D&B PAYDEX: 51 When weighted by dollar amount, payments to suppliers average 29 days beyond terms. Based on trade collected over last 3 months PAYMENT SUMMARY 12-Month D&B PAYDEX: 51 When weighted by dollar amount, payments to suppliers average 29 days beyond terms. Based on trade collected over last 12 months. When dollar amounts are not considered, then approximately 65% of the company's payments are within terms. The Payment Summary section reflects payment information in D&B's file as of the date of this report. 11/17/2006 Below is an overview of the company's dollar-weighted payments, segmented by its suppliers' primary industries: Total Total Dollar Largest High Within Days Slow Rcv'd Amts Credit Terms <31 31-60 61-90 90> Top industries: Public finance 11 88,500 35,000 60 40 - - - Nonclassified 4 137,000 80,000 1 - - 59 40 Whol metal 3 110,000 45,000 53 27 - 20 - Mfg concrete products 1 3,000,000 3,000,000 - 50 50 - - Mfg pumping equipment 1 500,000 500,000 100 - - - - Hvy const eqpt rental 1 65,000 65,000 50 - 50 - - file://C:\Documents and Settings\mchristian\Local Settings\Temporary Internet Files\OL... D'&B Business Information *rt: RADOS, STEVE P INC. • Page 5 of 9 Whol industr4al equip Whol plumb/hydronics Steel works Misc equipment rental OTHER INDUSTRIES Other payment categories: Cash experiences Payment record unknown Unfavorable comments Placed for collections: With D&B Other Total in D&B's file 1 60,000 60,000 50 50 - - - 1 45,000 45,000 - 50 50 - - 1 40,000 40,000 50 - - - 50 1 30,000 30,000 50 50 - - - 24 55,150 15,000 51 30 4 15 - 1 500 500 1 100 100 1 500 500 0 0 0 N/A 52 4,131,750 3,000,000 The highest Now Owes on file is $2,000,000 The highest Past Due on file is $2,000,000 D&B receives over 600 million payment experiences each year. We enter these new andupdated experiences into D&B Reports as this information isreceived. PAYMENT DETAILS Detailed Payment History Date Reported Paying Record High Credit Now Owes Past Due Selling Terms Last Sale (mm/yy) M Within (months) 11/06 Ppt 250 250 4-5 mos Ppt-Slow 30 15,000 0 0 6-12 mos Slow 30 1,000 500 4-5 mos Slow 30 500 500 4-5 mos (005) 500 Sales COD 6-12 mos (006) 100 50 4-5 mos 10/06 Ppt 500 500 0 1 mo Ppt 500 0 0 N30 6-12 mos Ppt 50 0 0 1 mo Ppt-Slow 30 60,000 60,000 2,500 1 mo Ppt-Slow 30 100 0 0 4-5 mos Ppt-Slow 120 40,000 40,000 20,000 N30 1 mo Slow 10 100 0 0 N30 2-3 mos Slow 30 1,000 500 500 N30 09/06 Disc-Ppt 500,000 0 0 6-12 mos Ppt 2,500 0 0 4-5 mos Ppt 2,500 2,500 0 N30 1 mo Ppt 1,000 0 0 6-12 mos Ppt 100 100 0 1 mo Ppt-Slow 30 5,000 5,000 2,500 1 mo Ppt-Slow 30 5,000 5,000 1,000 1 mo Ppt-Slow 90 45,000 0 0 2-3 mos file://C:\Documents and Settings\mchristian\Local Settings\Temporary Internet Files\OL... 11/17/2006 D&B Business Information *rt: RADOS, STEVE P INC. 0 Page 6 of 9 Ppt-Slow 90 15,000 0 0 Ppt-Slow 90 1,000 50 0 Slow 30 30,000 0 0 Slow 30-60 3,000,000 2,000,000 2,000,000 Slow 60 1,000 0 0 Slow 30-60 1,000 0 0 08/06 Ppt-Slow 30 30,000 30,000 5,000 07/06 Ppt 10,000 0 0 Ppt 10,000 0 0 Ppt 7,500 0 0 Ppt 1,000 0 0 Ppt 1,000 0 0 Slow 30-60 45,000 15,000 2,500 Slow 90 80,000 0 0 (037) 750 Satisfactory. (038) 500 500 500 Bad debt. 06/06 Ppt 1,000 1,000 0 Ppt-Slow 60 65,000 65,000 45,000 05/06 Ppt 750 Slow 60 35,000 04/06 Slow 30 1,000 1,000 1,000 03/06 Ppt 50 0 0 02/06 Slow 60 500 0 0 11/05 Ppt 35,000 5,000 1,000 10/05 Ppt 15,000 Ppt 5,000 Ppt 2,500 Ppt 1,000 Ppt 500 09/05 Slow 120 55,000 10,000 10,000 6-12 mos 6-12 mos 1 mo 1 mo 1 mo 1 mo 1 mo 1 mo 6-12 mos Payments Detail Key: red = 30 or more days beyond terms Payment experiences reflect how bills are met in relation to the terms granted. In some instances payment beyond terms can be the result of disputes over merchandise, skipped invoices etc. Each experience shown is from a separate supplier. Updated trade experiences replace those previously reported. FINANCE 08/09/2006 On August 9, 2006, attempts to contact the management of this business have been unsuccessful. Outside sources confirmed operation and location. BANKING BANK: Bank of America, Santa Ana, CA PUBLIC FILINGS N30 N30 1 mo 1 mo 2-3 mos 1 mo 4-5 mos 6-12 mos 1 mo 1 mo 1 mo 1 mo 1 mo 1 mo 1 mo 6-12 mos 1 mo 6-12 mos 1 mo 1 mo 1 mo 1 mo N30 file://CADocuments and Settingslmchristian\Local SettingslTemporary Internet Files\OL... 11/17/2006 D&B Business Information *rt: RADOS, STEVE P INC. • Page 7 of 9 The following Public Filing data is for information purposes only and is not the official record. Certified copies can only be obtained from the official source. SUITS Suit amount: $37,555 Status: Pending CASE NO.: 03CC13014 Plaintiff: AMERICAN UNDERGROUND CONSTRUCTION US TUNNELING LTD Defendant: STEVE P RADOS INC AND OTHERS Where filed: ORANGE COUNTY SUPERIOR COURT, SANTA ANA, CA Date status attained: 10/27/2003 Date filed: 10/27/2003 Latest Info Received: 12/19/2003 Suit amount: $820 Status: Judgment for plaintiff CASE NO.: 02SO2220 Plaintiff: SUPERIOR GUNITE, A CALIFORNIA CORPORATION Defendant: STEVE P. RADOS, INC. Cause: NOT AVAILABLE Where filed: LOS ANGELES COUNTY SMALL CLAIMS/SAN FERNANDO, SAN FERNANDO, CA Date status attained: 08/27/2002 Date filed: 07/02/2002 Latest Info Received: 09/17/2004 Suit amount: $32,119 Status: Pending CASE NO.: 723308 Plaintiff: DECISIVE TESTING, INC. Defendant: STEVE P. RADOS, INC. AND OTHERS Cause: Breach of contract Where filed: SAN DIEGO COUNTY SUPERIOR COURT, SAN DIEGO, CA Date status attained: 08/17/1998 Date filed: 08/17/1998 Latest Info Collected: 08/25/1998 If it is indicated that there are defendants other than the report subject, the lawsuit may be an action to clear title to property and does not necessarily imply a claim for money against the subject. LIENS A lienholder can file the same lien in more than one filing location. The appearance of multiple liens filed by the same lienholder against a debtor may be indicative of such an occurrence. Amount: $4,497 Status: Released CASE NO.: 2003000205689 Type: State Tax Filed by: CA EMPLOYMENT DEVELOPMENT DEPARTMENT Against: STEVE P. RADOS, INC. Where filed: ORANGE COUNTY RECORDER OF DEEDS, SANTA ANA, CA Date status attained: 12/07/2004 Date filed: 02/25/2003 Latest Info Received: 04/26/2005 Status: Released FILING NO.: 0304260085 file://CADocuments and Settings\mchristian\Local Settings\Temporary Internet Files\OL... 11/17/2006 D&B Business Information *rt: RADOS, STEVE P INC. is Type: State Tax Filed by: EMPLOYMENT DEVELOPMENT DEPARTMENT Against: STEVE P. RADOS, INC. Where filed: SECRETARY OF STATE/UCC DIVISION, SACRAMENTO, CA Date status attained: 12/06/2004 Date filed: 02/07/2003 Latest Info Received: 12/19/2004 UCC FILINGS Collateral: Equipment Type: Original Sec. party: NES TRENCH SHORING, HOUSTON, TX Debtor: STEVE P. RADOS Filing number: 0125760091 Filed with: SECRETARY OF STATE/UCC DIVISION, SACRAMENTO, CA Date filed: 09/10/2001 Latest Info Received: 10/03/2001 Page 8 of 9 Collateral: Leased Equipment Type: Original Sec. party: COMPASS EQUIPMENT INC, OROVILLE, CA Debtor: STEVE P. RADOS INC Filing number: 0332360274 Filed with: SECRETARY OF STATE/UCC DIVISION, SACRAMENTO, CA Date filed: 11/13/2003 Latest Info Received: 12/01/2003 Collateral: Leased Equipment Type: Original Sec. party: SHEPHERD MACHINERY CO., LOS ANGELES, CA Debtor: STEVE P. RADOS, INC. Filing number: 0029160013 Filed with: SECRETARY OF STATE/UCC DIVISION, SACRAMENTO, CA Date filed: 10/05/2000 Latest Info Received: 10/27/2000 Collateral: Unspecified Type: Original Sec. party: ROCK SYSTEMS, INC., SACRAMENTO, CA Debtor: STEVE P. RADOS, INC. Filing number: 0322760832 Filed with: SECRETARY OF STATE/UCC DIVISION, SACRAMENTO, CA Date filed: 08/11/2003 Latest Info Received: 09/02/2003 Type: Continuation Sec. party: WOODMEN OF THE WORLD LIFE INSURANCE SOCIETY, A NEBRASKA CORPORATION, OMAHA, NE Debtor: RADOS STEPHEN S Filing number: 04035CO743 Filed with: SECRETARY OF STATE/UCC DIVISION, SACRAMENTO, CA Date filed: 01/30/2004 Latest Info Received: 02/11/2004 Original UCC filed date: 06/21/1999 Original filing no.: 9917960203 file://CADocuments and Settingslmchristian\Local Settings\Temporary Internet Files\OL... 11/17/2006 D&B Business Information 0rt: RADOS, STEVE P INC. • Paoe 9 of 9 The public record items contained in this report may have been paid, terminated, vacated or released prior to the date this report was printed. GOVERNMENT ACTIVITY Activity summary Borrower (Dir/Guar): NO Administrative debt: NO Contractor: NO Grantee: NO Party excluded from federal program(s): NO Possible candidate for socio-economic program consideration Labor surplus area: YES (2006) Small Business: N/A 8(A) firm: N/A The details provided in the Government Activity section are as reported to Dun & Bradstreet by the federal government and other sources. Copyright 2006 Dun & Bradstreet - Provided under contract for the exclusive use of subscriber 053012900L file://C:\Documents and Settings\mchristian\Local Settings\Temporary Internet Files\OL... 11/17/2006