EXHIBIT HPage 1 of 11
SUMMARY EXCERPT
CITY OF ROSEMEAD CITY COUNCIL
& PLANNING COMMISSION
DRAFT JOINT MEETING MINUTES
JANUARY 9, 2024
The following is a draft summary excerpt from the Joint Special Meeting of the Rosemead City
Council and Planning Commission held on January 9, 2024, at 6:00 p.m., in the Rosemead
City Hall Council Chamber located at 8838 East Valley Boulevard, Rosemead, California.
Present:
Council: Mayor Ly, Mayor Pro Tem Clark, Council Members Dang, and Low
Planning Commission: Vice-Chair Escobar, Commissioners Lopez, Tang, and Ung
Absent:
Council: Council Member Armenta
Planning Commission: Chair Berry
Staff Present: City Manager Kim, City Attorney Richman, Director of Community Development
Valenzuela, Director of Finance Chua, Acting Director of Public Works Leung,
Director of Parks and Recreation Boecking, and City Clerk Hernandez
1.WORKSHOP
A.The Lewis Group of Companies Presentation on Proposed 178-Unit Residential
Planned Development
The Lewis Group of Companies has submitted a Pre-Application
(Pre-Application 23-02), proposing to develop a new 178-unit residential planned
development, which will consist of approximately 105 tandem townhomes units
and 73 row town home units. The size of each dwelling varies from 1,147 square
feet to 2,201 square feet with an attached two-car garage. To develop the site as a
residential planned development, the applicant proposes to change the zone from
Medium Commercial with a Design Overlay (C-3/D-O) to Planned Development
(P-D). The applicant is also proposing to change the General Plan land use
designation from Office/Light Industrial to High Density Residential (0-30
units/acre). The subject site is located at 1515 Walnut Grove Avenue.
MAYOR:
SANDRA ARMENTA
MAYOR PRO TEM:
POLLY LOW
COUNCIL MEMBERS:
MARGARET CLARK
SEAN DANG
STEVEN LY
City of Rosemead
8838 E. VALLEY BOULEVARD
ROSEMEAD, CALIFORNIA 91770
TELEPHONE (626) 569-2100
EXHIBIT H
Page 2 of 11
Recommendation: That the City Council and Planning Commission provide
feedback and input.
Associate Planner Lao stated the Lewis Group of Companies submitted Pre-
Application 23-02, proposing the development of a new 178-unit residential
planned development. The subject site is located at 1515 Walnut Grove Avenue.
Staff then turned the presentation over to Glen Crosby, Vice President of Regional
Communities with the Lewis Group of Companies, to present the proposed project.
Glen Crosby, Vice President of Regional Communities for Lewis Management
Companies, thanked the Council for its guidance and input at this early stage of
the project. He provided an overview of the company, noting that it was established
in the San Gabriel Valley in 1955 and has since built more than 58,000 homes,
developed and sold over 25,000 residential lots, and owns and manages more than
13,000 apartments. The company has also developed more than 24 million square
feet of retail, office, and industrial space.
Mr. Crosby noted that Lewis remains a family-owned company led by its second
and third generations, with an emphasis on community engagement and creating
long-term value. He stated that the company views each project as an opportunity
to build on its legacy and strengthen its commitment to the local community. He
added that the company's experience across multiple development disciplines
positions it to address the challenges associated with the proposed infill project.
Mr. Crosby described the existing site as approximately 9.3 acres located on
Walnut Grove Avenue, approximately one-half mile north of the 60 Freeway. The
site currently contains a four-story, approximately 270,000-square-foot concrete
building constructed in 1983 and renovated in 2010, surrounded by an expansive
parking lot occupying more than half of the property.
Mr. Crosby noted that the California Geological Survey has established earthquake
fault zones encompassing the entire site. Further investigation will be required to
determine the fault alignment and potential development constraints. In the
interim, the project team has projected the fault setback established for the Walmart
property to the north across the site as a preliminary assumption. He explained that
subsurface investigations would be a significant and costly process and
emphasized the importance of receiving the Council's guidance at this stage.
The conceptual site plan includes two access points from Walnut Grove Avenue
connected by a loop road, with parking distributed throughout the site. The primary
circulation road and alleyways would be a minimum of 24 feet wide. The project
team has also had preliminary discussions with County Fire regarding circulation
and access.
The conceptual landscape plan incorporates the fault corridor as an opportunity for
non-structural recreational and open-space amenities, including a dog park, two
turf areas, an informal gaming area, a children's tot lot and play structure, a
community grove, and a community garden. Additional amenities would include a
central pool and spa, exercise equipment, and a looped pedestrian walkway. More
Page 3 of 11
than three acres of the existing parking area would be replaced with landscaped
open space.
Mr. Crosby explained that, in response to declining demand for large-scale office
buildings in many markets, the applicant is proposing to replace the existing office
structure and parking lot with approximately 180 attached, three-story townhome
units organized around a central linear park. The applicant is also evaluating an
alternative gated-community configuration with gated entrances on Walnut Grove
Avenue and is currently studying vehicle stacking requirements and related site
modifications.
The proposed homes would feature an architectural style described as an adaptive
interpretation of Prairie Craftsman and Spanish architecture, incorporating hip and
parapet roofs, horizontal and vertical articulation, and varied building massing.
Two product types are proposed. The carriage townhomes would include units with
living areas above ground-level parking, as well as options with a downstairs
bedroom, dual primary bedrooms, and four-bedroom plans of up to approximately
2,200 square feet. The tandem townhomes on the eastern portion of the site would
feature tandem garages and range from approximately 1,147 to more than 1,700
square feet. Homes along Walnut Grove Avenue would include private patio
entries to provide a pedestrian-scale transition and additional buffer from the
roadway. No garage doors, vehicles, or parking would directly face Walnut Grove
Avenue.
Mr. Crosby indicated that the project could serve as a catalyst for the purposeful
redevelopment of opportunity sites identified in the City's Housing Element and
attract new residents, support local businesses, and encourage additional
investment in the community.
For next steps, the applicant is seeking Council feedback on the conceptual
proposal. If the project proceeds, additional work would include a detailed fault
assessment involving multiple levels of testing and potentially significant
excavation, as well as Phase II environmental testing related to the existing
building and prior site uses. The applicant would continue coordinating with the
City and its consultant team throughout the process.
Mayor Ly opened the floor for questions from the Commissioners. There being
none, he invited Council Members to ask questions of the applicant.
Council Member Low asked about the anticipated construction timeline for
the project.
Mr. Crosby explained that the project would require an entitlement process of
approximately 18 months, followed by approximately six to 12 months for
preparation of architectural and technical drawings. He estimated that the project
could reach the builder/market stage in approximately three years. Demolition of
the existing building and parking lot would occur during this period. Following
demolition, the builder would require approximately six to 12 months to complete
Page 4 of 11
construction drawings, followed by approximately 12 months of active site
development. Mr. Crosby anticipated two primary periods of physical activity:
approximately four months for demolition and initial site development, followed
by an additional six to 12 months of construction activity once the builder
begins work.
Council Member Dang asked whether the proposed fault investigation and
geological studies would require the existing building to be demolished at any
point.
Mr. Crosby explained that, based on the current scope of work and consultation
with the project's geotechnical consultants, the fault investigation could be
completed while the building remains in place. Some invasive testing would be
conducted within the building footprint. He noted, however, that the findings could
require additional investigation if unexpected geological conditions, such as a
fissure or fault splinter, were identified.
Council Member Dang commended the applicant's efforts and investment in the
community and emphasized the City's need for additional housing. He expressed
support for increasing the proposed 178-unit development if the site conditions and
project design allow for additional units.
Mr. Crosby responded that the current concept was intentionally conservative and
assumed a worst-case scenario involving a fault zone approximately 100 feet wide
and 800 feet long through the site. He explained that if further investigation
determines that the fault terminates in certain areas or allows for adjustments while
maintaining required setbacks, the applicant would work with City staff to explore
opportunities to increase the number of units.
Council Member Dang also expressed appreciation for the proposed buffer along
Walnut Grove Avenue, the architectural treatment facing the roadway, and the
incorporation of substantial park and recreational areas. He noted that the design
would create a self-contained community while also addressing the City's limited
green space and commended the applicant for incorporating those elements into
the project.
Mayor Pro Tem Clark asked whether additional building measures would be
required to address the earthquake fault if the project is approved.
Mr. Crosby explained that the project's geotechnical consultants would provide
specific recommendations for construction, including potential slab requirements.
He noted that the fault has been extensively studied and that the project team has
consulted with experts familiar with the site and fault conditions, including the
City's consultant. He added that the applicant was awaiting further testing,
including cone penetration testing and potentially additional excavation, before
determining the extent of any required measures.
Page 5 of 11
Mayor Pro Tem Clark also asked whether the project would include affordable
housing units in light of state housing requirements.
Mr. Crosby explained that the applicant has discussed affordable housing with
City staff, although a specific number of units has not yet been determined. The
applicant is evaluating the City's existing program and the funding that may be
available within the anticipated project timeline, with the goal of determining how
those resources could be applied to maximize affordable housing opportunities.
Mayor Ly echoed the Council's comments regarding affordable housing and the
potential to increase the number of units. He noted the City's Regional Housing
Needs Allocation (RHNA) requirements and asked whether the applicant had
conducted a market study to determine the proposed development type and density
rather than pursuing a higher-density or high-rise project.
Mr. Crosby confirmed that the applicant had conducted an extensive market
analysis and determined that the proposed townhome product was the best fit for
the site and market. He explained that higher-density development, such as a wrap-
style project, would involve significant trade-offs on a site of this size. He added
that the applicant has been developing this product for the subject site and another
project in Rancho Cucamonga.
Mayor Ly asked about the availability and cost of insurance for the proposed
condominium-based development and whether the applicant had a contingency
plan if insurance became unavailable or cost prohibitive.
Mr. Crosby acknowledged that insurance has become a challenge for both
apartment and condominium developments but noted that coverage remains
available. He explained that the industry and state are working to address the
broader insurance market, while the applicant is accounting for increased insurance
costs in its project budgets.
Mayor Ly asked whether the applicant had discussed with City staff the
potential use of the City's small-lot subdivision ordinance as an alternative
to a condominium structure, which could potentially address some of the
insurance concerns.
Mr. Crosby confirmed that the applicant was aware of the City's small-lot
subdivision ordinance and would consider that option if insurance became cost
prohibitive, provided the necessary density could be achieved to make the
project financially viable. He noted that the current concept was specifically
designed around the site's characteristics and the unit sizes needed to meet the
anticipated market.
Mayor Ly concluded by expressing his appreciation for the proposed amenities,
particularly the inclusion of a dog park.
Page 6 of 11
Mayor Ly opened the Public Comment period.
Jerry Faustinos, a nearby resident, expressed concerns regarding access and egress
to the proposed development and asked whether all access would be limited to
Walnut Grove Avenue or whether any modifications to the existing block wall
were anticipated. He also raised concerns about potential construction impacts on
the surrounding neighborhood, including traffic, truck routes, smoke, and other
pollution, and asked whether restrictions similar to those imposed during
Walmart's construction would apply.
Mr. Faustinos also asked about the anticipated cost of the proposed units and
whether they would be affordable to younger adults and local residents. He
requested information regarding the target market for the development and
expressed concern about the adequacy of earthquake mitigation and geotechnical
analysis given the area's history of significant earthquakes. He emphasized the
importance of ensuring that the development would be designed to address seismic
risks and protect residents and surrounding infrastructure. He reiterated his concern
about any potential modifications to the existing block wall.
Kirk (No last name provided) stated that he lives directly behind the fence and
echoed many of the concerns raised by Mr. Faustino. He explained that his primary
concern is protecting the wall and preventing any damage that could occur as a
result of the project or construction activities. He stated that his main concern is
his mother and the potential effects of construction-related dust, dirt, and other
pollutants on both her health and his own. Kirk emphasized that he will do
whatever he can to ensure these impacts are minimized and expressed hope that
the developer, contractor, and construction crews will take steps to reduce dust,
pollution, and other disturbances affecting nearby residents, particularly his family.
Kirk noted that his family has lived in the area for more than 20 years and is very
comfortable there. He said they do not want their neighborhood or property
disturbed and that the area is especially meaningful to them. He concluded by
stating that he would be disappointed to see changes or impacts that negatively
affect their quality of life.
Norman (No last name provided) stated that he lives on Yarrow Avenue and has
resided there for more than 50 years. He noted that he has witnessed numerous
projects in the area over the years and raised concerns about the roadway shown
on the project plans. He asked whether the proposed circulation route would
function as a public street, an alley, or a driveway, and questioned where it would
terminate.
In response, staff explained that the roadway would function as a driveway and
that amenities such as a park and pool are proposed in that area. Staff further
explained that the project design takes into consideration the presence of the fault
zone and seeks to minimize development and potential impacts in that area in the
event of an earthquake.
Page 7 of 11
Norman stated that the fault area has historically been a concern and recalled
previous development issues associated with the site. He expressed his belief that
the area is not safe for intensive development and referenced a structure that was
previously constructed in the vicinity. He also asked whether the proposed
roadway would connect to Yarrow Avenue and expressed concerns regarding
construction noise, dust, air quality, and the overall impact on residents' quality of
life.
In response to questions regarding traffic, Norman asked how traffic would be
managed during construction and after project completion. He further stated that a
structure previously built on the site had reportedly been constructed without
permits and requested assurance that all permits would be obtained for the
proposed development.
Mayor Ly responded that all necessary permits would be required and obtained
for the project.
An anonymous resident expressed concerns regarding future traffic impacts and
emphasized the need for adequate traffic controls. The resident specifically cited
the intersection of Delta Street and Rush Street, stating that current traffic
conditions are already difficult and that additional vehicle trips generated by the
project could worsen congestion. The resident suggested that a traffic signal may
be needed at the intersection and also raised concerns about traffic operations
near Garvey Avenue, noting issues with signal timing and pedestrian safety.
The resident urged the City Council and commissions to carefully evaluate traffic
circulation and potential signal improvements.
Mayor Ly stated that he would ask the Public Works Director to review the
traffic flow concerns and potentially present the matter to the Traffic Commission
for further consideration.
Andrew (No last name provided) asked about the project's timeline and requested
that nearby residents continue to receive updates throughout the planning and
construction process. He inquired whether future notifications would be mailed,
similar to those recently distributed. Andrew also noted that several of his
neighbors did not receive the previously mailed notices. In addition, he stated that
the notices were provided only in English, despite the community including many
residents whose primary language is not English. He requested that future
correspondence be distributed consistently and in languages that are accessible to
the community.
There being no additional speakers, Mayor Ly closed the Public Comment period.
Mayor Ly asked the applicant and staff to respond to the questions raised by
members of the audience, acknowledging that some questions may not be able to
be answered at this time.
Page 8 of 11
Mr. Crosby responded that, with respect to egress, the site plan shows a loop road
with both connections being made at Walnut Grove. There is no intention to create
a connection through to the adjacent community to the west. Mr. Crosby noted that
this was a concern discussed early in the process with the Fire Department. The
Fire Department confirmed that a connection to the adjacent community would not
be required and that the proposed points of connection would be sufficient.
Mr. Crosby addressed the anticipated cost per unit, noting that it is difficult to
project pricing this far in advance. Based on the range of proposed home sizes, he
estimated that the homes would likely be priced in the $600,000s to over $900,000.
Regarding the affordability component, Mr. Crosby stated that, based on early
projections and as the applicant continues to work with City staff, some of
the affordable units could potentially be priced in the low $500,000s and
accommodated within the site.
Mr. Crosby assured the Council and members of the public that a comprehensive
environmental analysis would be conducted as part of the project. The City and
Lewis Group would work jointly through the environmental review process and
address the issues raised by the public. He stated that traffic would be a primary
consideration and that the project team typically begins its analyses by evaluating
traffic impacts. Noise, dust, pollution, and other potential impacts would also be
evaluated, with appropriate mitigation measures identified and implemented as
necessary.
Mr. Crosby stated that the applicant intended to be a good neighbor throughout the
project and that there would be multiple opportunities for public input and future
public hearings. He added that the applicant would work with City staff to provide
future notices in multiple languages and would accommodate any additional costs
associated with producing those notices.
Mayor Ly asked whether City staff had determined if the project would require
a Mitigated Negative Declaration (MND) or a full Environmental Impact
Report (EIR).
Planning and Economic Development Manager Valenzuela responded that the
project is still in the preliminary stages, and staff has not yet determined whether
the appropriate environmental document will be an MND or an EIR.
Mr. Crosby also addressed concerns regarding construction equipment. He noted
that strict standards have been adopted for construction equipment, including
additional standards adopted this year. He stated that the standards are sufficiently
stringent that they have affected the viability of some equipment operators and
companies. As a result, newer construction equipment used today must meet high
operational standards and comply with stringent requirements related to emissions
and pollution.
Here is the cleaned-up version, maintaining the substance and style of formal
Council meeting minutes:
Page 9 of 11
Council Meeting Minutes – Traffic, Construction, and Fault Concerns
Mayor Ly stated that the next question concerned ensuring that traffic flow into
the community located behind the project would not be adversely affected, both
during construction and after completion. He noted that Mr. Crosby had addressed
construction mitigation but asked him to specifically address potential impacts
from vehicle traffic.
Mr. Crosby responded that he did not anticipate access or significant impacts from
that side of the project. He stated that the project team was working to respect the
existing grades and perimeter conditions, including along the western side of the
site. He acknowledged that there were several homes or improvements installed by
adjacent residents that extended close to the existing wall. However, he noted that,
in most cases, the wall appeared to be of sufficient height to avoid creating issues
for either the neighboring properties or the project site. He added that the project
would have sufficient setbacks to accommodate the proposed improvements
without creating additional traffic or significant construction impacts or damage
along that edge.
Mayor Ly asked Mr. Crosby to again address the earthquake fault in the area,
noting that he and Mayor Pro Tem Clark had previously raised the issue. He asked
Mr. Crosby to explain to the audience what measures would be taken to evaluate
and address the fault and mitigate potential impacts.
Mr. Crosby responded that the project would involve several layers of testing.
The initial testing would involve drilling cores into the ground and analyzing the
various soil samples. Deep cores would be extracted to determine whether there
had been any movement within the soil layers along the cores. Mr. Crosby
explained that if the initial testing was not sufficiently conclusive for the project
consultants and the City's consultants, the project would proceed to more extensive
testing. This could involve excavating relatively deep trenches across the site to
attempt to intercept the fault and determine whether there had been any movement
along the fault line. He stated that the fault would therefore be analyzed extensively
and that the project would involve a much deeper and more conclusive analysis
than what may have been conducted previously. He noted that multiple experts
would be involved in reviewing the findings. Mr. Crosby also noted that the
existing building had already been retrofitted, although he was not certain what
specific assumptions or conditions had been considered as part of that retrofit.
He stated that the proposed project would undergo a significantly more detailed
analysis.
Mayor Ly stated that he wanted to ensure that all necessary permits would be
obtained before construction began and upon completion of each phase, project,
and individual unit.
Mr. Crosby responded, “Absolutely, 100%.”
Mayor Ly asked staff to address questions regarding project timelines, public
notification, and the languages used for notifications. He asked staff to explain
how and when notifications would be provided, including what ongoing
Page 10 of 11
notification would look like throughout the construction timeline and which
languages would be used.
Planning and Economic Development Manager Valenzuela responded that staff
was working with the Lewis Group and that there would be extensive community
outreach. She noted that the Lewis Group was known for conducting outreach as
part of its development projects and stated that staff could work with the applicant
to provide information in multiple languages to ensure that residents could
understand the information.
Mayor Ly asked who had sent out the initial notice, given that the project was
currently in the pre-application stage.
Planning and Economic Development Manager Valenzuela explained that the pre-
application notice was provided as a courtesy and was not required. Staff had sent
that notice in English. However, formal public hearing notices would be translated
into Chinese, Vietnamese, Spanish, and English.
Mayor Ly asked who would receive the public hearing notice.
Planning and Economic Development Manager Valenzuela responded that anyone
living within 300 feet of the project site would receive a public hearing notice.
Mayor Ly reiterated that residents living within 300 feet of the project site would
receive a public hearing notice in four languages: English, Spanish, Chinese, and
Vietnamese. He explained that the notice would provide information about when
the project would come before the Planning Commission, which would be the
first step in the formal approval process and would provide the public with its first
official opportunity to comment on the project. Mayor Ly explained that the
City's pre-application process, which the Lewis Group had participated in,
provided an opportunity to review the project conceptually, identify questions and
concerns, and invite members of the public to provide input. He stated that the goal
was to make the project a collaborative process involving the applicant, the City,
and the community.
Planning and Economic Development Manager Valenzuela affirmed that this was
correct. She added that, depending on the type of environmental document being
prepared, there would be either a 20-day or 30-day public noticing period.
Mr. Crosby added that he had participated in a number of projects of this type and
routinely conducted community engagement meetings. He stated that once the
project team had a better understanding of the project's design and timing, the
applicant would hold meetings independently of the City, while also inviting City
staff to attend. Mr. Crosby also stated that he would personally meet with
individual property owners along the project boundary to provide clear information
regarding anticipated construction activities and timelines. He emphasized that the
goal would be to ensure that there were no surprises throughout the process.
Page 11 of 11
Mayor Pro Tem Clark addressed the issue of public notification and stated that the
City's 300-foot notification requirement had been a concern of his for several years.
He noted that 300 feet could represent only approximately half a block or six lots
and stated that he would like to see the notification area extended, potentially to
600 feet or another greater distance. He explained that, although a larger
notification area was not required, he believed that residents should have greater
awareness of what was happening and an opportunity to provide input.
City Attorney Richman clarified that the applicant could conduct additional
community outreach beyond the City's required notices. However, formal public
hearing notices are governed by the City's Municipal Code, and those notices
would be issued by the City rather than the applicant.
Mayor Pro Tem Clark asked whether the City was legally prohibited from
extending the public hearing notification area beyond 300 feet.
City Attorney Richman responded that the Rosemead Municipal Code does not
require notification beyond the specified area. She clarified that this was separate
from the applicant's ability to conduct additional community outreach. The City
would follow the requirements of the Municipal Code when issuing formal public
hearing notices.
Mayor Ly noted that it appeared the Lewis Group was committed to conducting
additional public workshops and community outreach. He stated that, if the
Council's request was for the applicant to conduct outreach beyond the City's
formal notification requirements, that could be discussed between the City and the
Lewis Group, including determining the scope of outreach and which members of
the community the applicant would be willing to engage.
Mayor Ly thanked the applicant and community for participating in tonight’s
meeting.
End of draft summary Minute Excerpt