CDC - Item 3 - Traffic Sig. Del Mar Ave./Highcliff St.Y TO: HONORABLE CHAIRMAN AND MEMBERS ROSEMEAD COMMUNITY DEVELOPMENT OMMISSION FROM: L CROWE, EXECUTIVE DIRECTOR DATE: OCTOBER 4, 2005 RE: APPROVAL OF PROPOSAL TO PROVIDE ENGINEERING SERVICES FOR TRAFFIC SIGNAL IMPROVEMENTS AT DEL MAR AVENUE/HIGHCLIFF STREET AND DEL MAR AVENUE/GRAVES AVENUE At the September 27, 2005 City Council meeting, the City Council concurred with the Traffic Commission's recommendation to install a new traffic signal at the intersection of Del Mar Avenue and Highcliff Street and to install left turn phasing in the northbound and southbound directions at the intersection of Del Mar Avenue and Graves Avenue, and unanimously voted for installation of said traffic signal improvements. Attached for your consideration is an engineering proposal from Willdan for engineering design, utility coordination, contract administration, and construction observation services necessary to complete the project. The total construction cost for this project is estimated to be $230,000, and the estimated contract period is 30 working days. The proposed fees are as follows: • Preliminary and Final Design • Utility Coordination • Contract Administration • Construction Observation $ 18,900 3,950 3,500 19,000 Total Fixed Fee $ 45,350 COMMISSION AGENDA OCT 112005 ITEM No. N-~. IRA. Rosemead Community Development Commission RCDC 8838 East Valley Boulevard, CA 91770 Tel 626.569.2100 Fax 626.307.9218 TO: HONORABLE CHAIRMAN AND MEMBERS f -RO/SEMEAD COMMUNITY DEVELOPMEPMMISSION FROM: ~B(LL CROWE, EXECUTIVE DIRECTOR DATE: OCTOBER 4, 2005 RE: APPROVAL OF PROPOSAL TO PROVIDE ENGINEERING SERVICES FOR TRAFFIC SIGNAL IMPROVEMENTS AT DEL MAR AVENUE/HIGHCLIFF STREET AND DEL MAR AVENUE/GRAVES AVENUE At the September 27, 2005 City Council meeting, the City Council concurred with the Traffic Commission's recommendation to install a new traffic signal at the intersection of Del Mar Avenue and Highcliff Street and to install left turn phasing in the northbound and southbound directions at the intersection of Del Mar Avenue and Graves Avenue, and unanimously voted for installation of said traffic signal improvements. Attached for your consideration is an engineering proposal from Willdan for engineering design, utility coordination, contract administration, and construction observation services necessary to complete the project. The total construction cost for this project is estimated to be $230,000, and the estimated contract period is 30 working days. The proposed fees are as follows: • Preliminary and Final Design $ 18,900 • Utility Coordination 3,950 • Contract Administration 3,500 • Construction Observation 19,000 Total Fixed Fee $ 45,350 e GA41yF~SSIGNI nCrENDA October 4, 2005 Page 2 It is proposed that this project be funded utilizing Community Development Commission funds. Therefore, it will be necessary to appropriate the necessary funds for the project from unappropriated Community Development Commission funds. RECOMMENDATION It is recommended that the Rosemead Community Development Commission approve the attached engineering proposal, direct staff to begin the preparation of the necessary plans and specifications, and appropriate the necessary funds from unappropriated Community Development Commission reserves. Attachment N~~U WILLDAN Serving Public Agencies October 3, 2005 Mr. Bill Crowe Executive Director Rosemead Community Development Commission 8838 East Valley Boulevard Rosemead, CA 91770 13191 Crossroads Parkway North, Suite 405 Industry, California 91746-3497 562/908-6200 fax 562/695-2120 www.willdan.com Subject: Proposal for Professional Engineering Services for Traffic Signal Installation at Del Mar Avenue and Highcliff Street and Traffic Signal Modification at Del Mar Avenue and Graves Avenue Dear Mr. Crowe: As requested, we are pleased to be given the opportunity to submit this proposal to provide traffic engineering design, utility coordination, contract administration, and construction observation services for the subject project. The project includes installation of a new traffic signal at the intersection of Del Mar Avenue and Highcliff Street. In addition, the project includes modifications to the existing traffic signal at the intersection of Del Mar Avenue and Graves Avenue to add left-turn phasing in the northbound and southbound directions. SCOPE OF SERVICES We propose to provide the following basic services for the project: Preliminary Design Confer with Agency staff to review, in full detail, the requirements for the project. Review available information and data assembled by Agency staff. Develop base drawings, including collecting and plotting of field data, and the identification and plotting of substructures and utilities. Prepare traffic signal plans for the intersections of Del Mar Avenue and Highcliff' Street and Del Mar Avenue and Graves Avenue. 4. Prepare signing and striping plans. Develop preliminary project cost estimates. 6. Submit preliminary design plans to all affected agencies and utility companies for review. October 3, 2005 Page 2 Final Design Phase 1. Based on comments received from the Rosemead Community Development Commission and utility companies, revise plans. 2. Prepare detailed final plans and attend coordination meetings, as necessary, with Agency personnel at various times during the design phase to obtain additional input and review work. 3. Prepare specifications and contract documents to conform to applicable requirements of the Rosemead Community Development Commission. 4. Prepare final project cost estimates. Utility Coordination 1. Submit copies of plans to all affected utilities and agencies. 2. Coordinate with affected utility companies to provide for any utility relocation to accommodate new traffic signal pole and foundation installation. 3. Send notification to affected utility companies, other agencies, and contractor, and attend and coordinate the preconstruction conference. Contract Administration 1. Assist the Rosemead Community Development Commission in securing bids and awarding project. 2. Attend preconstruction conference and prepare minutes. 3. Provide contract administration for proper enforcement of the contract plans and specifications. 4. Provide engineering support, as needed, to make as-built revisions to the original plans. 5. Provide the necessary consulting services required to coordinate the efforts between the Agency and contractor. 6. Review and recommend progress payment requests. 7. Answer inquiries and complaints for the Agency relating to the project. Construction Observation 1. Provide the necessary weekly, monthly, and final reports, as needed. October 3, 2005 Page 3 2. Provide daily construction observation during the construction period. 3. Provide copies of daily construction observation reports on a weekly basis, if requested. 4. Provide necessary coordination with otheragencies to provide final inspection of the project. 5. Perform as-built corrections on original drawings. 6. Provide report to the Agency following final inspection stating that the project has been completed, and provide necessary data for the Agency acceptance of the project. Our proposed fees are as follows: • Preliminary and Final Design $18,900 • Utility Coordination $3,950 • Contract Administration $3,500 • Construction Observation $19,000 Total Fixed Fee $45,350 The total estimated construction cost for the project is $230,000. The construction contract period is estimated to be 30 working days. The design fee is based on the fee curve schedule from the American Society of Civil Engineers. The total fee, excluding utility coordination, is in conformance with that portion of the City's agreement with Willdan which pertains to design engineering services. Compensation for weekend inspection and inspection beyond the allocated working days of the construction contract will be on time- and-materials basis. If you have any questions regarding this proposal, please contact me at (562) 908-6200. Respectfully submitted, ~W I LyLD/JA/JN William C. Pagett, P.E. U Senior Vice President AF:mh 95610-05\06-155\P05-189