Loading...
CC - Item 4D - Accept Completed Improvements and Authorize the Filing of a Notice of Completion for the Public Safety Center Upgrades Project No. 31028ROSEMEAD CITY COUNCIL STAFF REPORT TO: THE HONORABLE MAYOR AND CITY COUNCIL FROM: BEN KIM, CITY MANAGER DATE: JANUARY 13, 2026 SUBJECT: ACCEPT COMPLETED IMPROVEMENTS AND AUTHORIZE THE FILING OF A NOTICE OF COMPLETION FOR THE PUBLIC SAFETY CENTER UPGRADES PROJECT NO.31028 SUMMARY On October 22, 2024, the City Council awarded a construction contract to Royal Construction Corp. for the Public Safety Center Upgrades Project. The total construction budget, including a 10% contingency, was $2,626,800.00. On June 10, 2025, the City Council adopted Resolution No. 2025-30 amending the City's Fiscal Year 2024-25 CIP budget to appropriate additional funds in the amount of $255,850.00 to cover the costs of unforeseen conditions. All construction improvements have been completed and have been accepted by City staff. A notice of completion will be filed with the Los Angeles County Recorder upon approval by the City Council. The release of retention funds will occur 35 days after the filing of the notice of completion. BACKGROUND The Public Safety Center previously lacked the necessary amenities and security features to serve as an adequate substation for the Rosemead assigned Los Angeles County Sheriff's deputies. Several upgrades to the Public Safety Center were implemented so the facility can be better equipped with the appropriate amenities that can improve the Sheriff's investigative work and responsiveness within the City of Rosemead. The project scope consisted of upgrades to the facility and included: • Construction of a secured parking lot with gated keypad entry and upgrades to the parking lot lighting. • Construction of a new public parking lot and installation of new public parking lot lighting. • Construction of a locker room for the Los Angeles Sheriff deputies, along with a new gun vault. • Construction of a new lobby, public counter, public restrooms, and staff restrooms, which now includes a shower for deputies. • Overall upgrades to the office space and meeting room. AGENDA ITEM 4.1) City Council Meeting January 13, 2026 Page 2 of 3 Installation of new doors, ceiling tiles, carpeting, flooring, and fresh paint. Replacement of the deteriorated roof, structural building upgrades, removal and replacement of the HVAC system, and installation of a new fire alarm system. The facility was also equipped with new office furniture for staff and a temporary holding area for animals at the enclosed parking lot. DISCUSSION Several challenges were encountered during construction due to unforeseen conditions that were uncovered. Staff worked with the awarded contractor to address issues such as termite damage repairs, upgrading data cabling for the entire building to CAT 6 cabling, upgrading the structural shear wall for the restrooms, adding a wood backing and fascia to provide better waterproofing for the new roof, construction of a new office next to the Director's office, and upgrading vital copper water line piping that services the new restrooms. Additionally, the project included change orders for the construction of new office space to accommodate the relocation of the Code Enforcement staff. This required the installation of new cubicles along with the necessary electrical and data wiring to support the relocated team. During the construction phase, there were a total of eight (8) construction change orders issued to Royal Construction, Corp. The eight change orders amounted to $484,649.90 and were covered using the authorized project contingency that utilized Public Facilities funding. All costs, including the Code Enforcement relocation and associated infrastructure, were included in the final accounting of the overall project cost. STAFF RECOMMENDATION It is recommended that the City Council: 1. Accept the completed improvements for the Public Safety Center Upgrades Project No. 31028 as performed by Royal Construction, Corp. 2. Authorize the recordation of Notice of Completion with the Los Angeles County Recorder and the release of retention funds 35 days thereafter. FISCAL IMPACT The Project was included in the Fiscal Year 2024-2025 Capital Improvement Program (CIP) and consisted of an approved budget of $2,888,707.00. Final expenditures totaled $2,872,649.90. The following is the breakdown of the construction cost: Total Approved Budget $2,888,707.00 Total Construction Contract (including 15% contingency) $2,882,650.00 Construction Expenditures $2,872,649.90 Unexpended Amount $10,000.10 City Council Meeting January 13, 2026 Page 3 of 3 ENVIRONMENTAL REVIEW The project is categorically exempt from the California Environmental Quality Act (CEQA) pursuant to Section 15301 (a) of the CEQA Implementing Guidelines. STRATEGIC PLAN IMPACT The project is consistent with the City of Rosemead's Strategic Plan Goal C - Infrastructure and Facilities, which is to enhance streets, sidewalks, and public infrastructure; coordinate with relevant utility agencies regarding safety and enhancements; and modernize facilities by expanding the use of wireless network technology and renewable energy. PUBLIC NOTICE PROCESS This item has been noticed through the regular agenda notification process. Prepared by: Romany Basi us, City Engineer Submitted by: 4am�ujTiu"tierrez, ly1mifo Q2Ris Works Attachment A: Notice of Completion Attachment A Notice of Completion RECORDING REQUESTED BY CITY OF ROSEMEAD AND WHEN RECORDED MAIL TO: Name City of Rosemead Street Address 8838 E. Valley Blvd. City & State Rosemead, CA 91770 ATTN: CITY CLERK SPACE ABOVE THIS LINE FOR RECORDER'S USE Notice of Completion Notice is hereby given that: 1. The undersigned is owner of the interest or estate stated below in the property hereinafter described. 2. The full name of the undersigned is: City of Rosemead 3. The full address of the undersigned is: 8838 E. Valley Blvd., Rosemead, CA 91770 4. The nature of the title of the undersigned is: In fee (If other than fee, strike "In fee" and insert, for example, "pure aser under contract of purchase", or "lessee") 5. The full names and full addresses of all persons, if any, who hold title with the undersigned are: Names Addresses N/A N/A 6. The names of the predecessors in interest of the undersigned, if the property was transferred subsequent to the commencement of the work of improvement herein referred to: Names Addresses N/A N/A (If no transfer made, insert, "none". 7. A work of improvement on the property hereinafter described was completed on: October 31, 2025 8. The name of the contractor, if any for such work of improvement was: Royal Construction Corp. 9. The property on which said work of improvement was completed is in the City of Rosemead County of Los Angeles State of California, and is described as follows: Public Safety Center Upgrades, Project No. 31028 10. The street address of said property is: 3018 Charlotte Ave, Rosemead, CA 91770 If no street address has been officially assigned, insert "none" Signature of owner named Dated: in paragraph 2: Samuel Gutierrez Director of Public Works By: City of Rosemead I certify (or declare) under penalty of perjury that the foregoing is true and correct. Date Rosemead, CA Place of Execution Samuel Gutierrez Director of Public Works City of Rosemead, California